State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Retail facilities Projects in NT®ion=⊂=2120 in region


YIMUYN MANJEER GOLD MINE - MOUNT TODD TENEMENTS
Currently at the Early Planning stage In Katherine Town is a project estimated to be $ 1000000. This project The first mortgagee is offering for sale by tender a number of exploration titles. These are highly prospective tenements near Mount Todd, located in the historic Pine Creek geosyncline. Potential also exists for base metal mineralisation. Click for more details...

WATARRKA NATIONAL PARK-KINGS CANYON
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Alice Springs Town Council Area of Descent To Rim Walk Upgrade For Kings Canyon type. Rock paving to create steps & walkways to make easier descent & reduce soil erosion. Click for more details...

DUNDEE BEACH SCHOOL
Airconditioning Unit Replacement For School project at Main Classroom, Namarada Dr (lot 3084), Dundee Beach, Darwin, NT 0800 In The Council Area Of Darwin City of State. Replace airconditioning unit for main classroom. Click for more details...


Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at Fitzgerald St (Lots 8634 4546 & 8636 Town of Nightcliff) & 365 Bagot Rd, Millner, NT 0810 for New. Block-work construction, concrete floor, metal deck roof, aluminium framed shop front windows, airconditioning. Carparking. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) New project at Bulman, NT 8999. This type is Houses (2)/Office (1)/Community Hall (1)/Mechanical Workshop (1) with Local Govt ownership. 2 x 3 bedroom, steel framed houses on stumps, 1 x steel framed office on stumps, 1 x community hall & 1 x mechanical workshop. Click for more details...

BATCHELOR & LITCHFIELD PARK REHABILITATION
Currently at the Construction stage In Darwin City is a project estimated to be $ 50000. This project Repairs & painting to various assets throughout Batchelor & Litchfield Park. Click for more details...

YUENDUMU HOUSING PROJECT
Public Utilities (Water distribution systems, Drainage) New project at Yuendumu Community (280 km North West of Alice Springs) via, Alice Springs, NT 0872. This type is Services For Housing Project with Local Govt ownership. Drainage & roadworks for housing community. Click for more details...

ROBERTSON BARRACKS
Federal ownership Military (Military installations & facilities) project In The Litchfield Shire Council Area for New development. An Australian rules oval & rugby pitch either side of Barracks entrance accompanied by change rooms & carparks. Religious centre, Military Museum. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at Approx 200 km east of, Daly Waters, NT 0852 for Subcontract. Work on tailings dam expected to be completed within 10 - 11 weeks of commencement. Click for more details...

MITCHELL CENTRE
Currently at the Construction stage In Darwin City is a project estimated to be $ 60000000. This project Construction of multi storey development to include retail on ground floor, carparking structure, 10 floors of office space & police station comprising of watch-house, cells & 24 hour shop-front. Tenancies to include Coles supermarket, 40 specialty shops, restaurant precinct & parking for 650 vehicles. Click for more details...

WADEYE (PORT KEATS) DWELLINGS
Dwellings (2) project at New lots 563 & 564 at rear of Lot 371 Port Keats, Wadeye, NT 0822 in the Residential (Units, apartments, flats, townhouses, villas). Construct 2 x 2 bedroom transportables. Click for more details...

CORPORATE COMMUNICATIONS OFFICE
A project in the NT Within Darwin City. Supply & install new proprietary modular partitioning system to office area of Corporate Communications office. Click for more details...

DARWIN EAST ARM WHARF - BULK MATERIALS HANDLING INFRASTRUCTURE PROJECT
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The Darwin City Council Area of Private ownership. Expressions of interest are sought to design, procure and construct common user bulk materials handling facilities for the export of bulk ore. The package includes rail and road bottom dump facilities, including an associated conveyor system to a stockpile area and headworks and a ship loader and associated headworks. Click for more details...

DARWIN EAST ARM WHARF - OPERATORS/TESTING BUILDING
Darwin East Arm Wharf - Operators/Testing Building is currently at the Construction stage, valued at about $ 289000 it is The contract comprises the design, construction and installation of two buildings. The buildings are to comprise split system air conditioning, all fixed furniture, the installation of a safety shower and additional security fencing with gates. Connections to existing power, water and sewerage services is to be carried out. Click for more details...

DIESEL GENERATORS/ANCILLARY MECHANICAL EQUIPMENT - KATHERINE REGION
Various sites Region, Katherine, NT 0850 Has Diesel Generators/Ancillary Mechanical Equipment - Katherine Region currently at Construction stage. Repairs & maintenance of diesel generators & ancillary mechanical equipment throughout Katherine Region for 12 month period. Click for more details...

BULLOCKY POINT MUSEUM/ART GALLERY CORNUCOPIA CAFE
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) Renovations, Refurbishments etc. project at 19 (lot 05714) Conacher St Bullocky Point, Darwin, NT 0800. This type is Loading/Storage Area Modifications For Walk-In Freezer with State ownership. Modifications to existing loading & storage areas for provision new walk-in freezer. Click for more details...

CHAN BUILDING OPERATIONS ROOM UPGRADE
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project at Chan Bldg, cnr Smith & Mitchell Sts, Darwin, NT 0800 of Operations Room Upgrade - Supply & Install type of Supply & Install development. Supply & install workstations, overhead shelves, benches & mobile pedestals. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

ALICE SPRINGS HOSPITAL PROFESSIONAL OFFICERS QUARTERS BATHROOM
Renovations, Refurbishments etc. project of Medical (Hospitals & associated buildings, mortuaries) project at Gap Rd, Alice Springs, NT 0870. Refurbishment of Professional Officers Quarters Block 1 bathroom. Click for more details...

STUART HIGHWAY - VARIOUS STUCTURAL & CIVIL WORKS
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Alice Springs Town Council Area of Visitor Facilities/Sealed Accesses/Shelter/Various Items type. Upgrade visitor facilities, construct sealed accesses, shelter & various items from Teamster Memorial to Mount Polhill on Stuart Hwy within Alice Springs Region. Click for more details...

NAPIER ROAD VARIOUS WORKS
Napier Rd btwn Ch: 0.00 km & CH: 2.70 km, Katherine, NT 0850 Has Napier Road Various Works currently at Construction stage. Upgrade pavement & floodways between CH: 0.00 km & CH: 2.70 km. Click for more details...

TAMINMIN HIGH SCHOOL ALTERATION & ADDITION
Education (Schools - primary, secondary (up to Yr 12)) project In The Darwin City Council Area of School - Altn & Addn type. Construct new middle school facility including covered shelter & associated works within Taminmin High School grounds. Alterations & additions to existing buildings for high school. Click for more details...

RAAF BASE TINDAL STAGE 5
New project of Military (Military installations & facilities) project at Raaf Base, Tindal Raaf, NT 0853. Redevelopment will comprise 12 project elements including extension of the existing security fence, Central Emergency Power Station generator works, water supply to Ordnance Loading Aprons, new vehicle maintenance facilities, refurbishment & extensions to working accommodation including office style buildings, new catering & refurbishment of existing messing facilities, security works & new oxygen storage facility. Click for more details...

DEPARTMENT OF DEFENCE - NORTHERN TERRITORY & KIMBERLEY DEFENCE REGION
Military (Military housing & accommodation, Military colleges) project at Various, ., NT 8999 of Consultants/Contractors - For Various Defence Projects type of New development. Professional Engineering, Technical Advice and Design Services - Air Conditioning & Refrigeration, Architectural Design, Asbestos Management, Bulk Fuel Management/Distribution, Civil Engineering, Construction Practitioner & Accredited Building Certifier, Energy Management, Environmental & Hazardous Material Management, ESD - Ecologically Sustainable Development, Electrical Engineering, Fire Safety Auditing, Fire Systems Engineering, Heritage, Hydrologist & Environmental Sciences, Hydraulic Engineering, Quantity Surveying, Marine Engineering, Mechanical Engineering, OH&S Audits, Occupational Hygienist, Project Management, Structural Engineering, Surveying Consultants. General Construction & Civil Works - Air Conditioning, Heating & Controls, Asbestos Testing & Monitoring, Contamination Works, Earthmoving/Civil Works, Electrical Works, Environmental Works, Fire Protection, Fuel Infrastructure Works, General Building Works, Heritage Works, Painting, Plumbing, Specialist Corrosion/Blasting Works, Structural Marine Works, Termite and Pest Control. Click for more details...

PALUMPA AIRSTRIP
via Port Keats, ., NT 8999 Has Palumpa Airstrip currently at Construction stage. Reconstruction and Sealing of the Palumpa Airstrip. Click for more details...

TIGER BRENNAN DRIVE EXTENSION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of State ownership. Consultancy for Independent Estimator. Click for more details...

JOHNSTON ESTATE TOWNHOUSES
Residential (Units, apartments, flats, townhouses, villas) project In The Palmerston Town Council Area of Townhouses (3) type. Construction of 1 x 2 bedroom & 2 x 3 bedroom multiple dwellings in 2 single storey buildings. Concrete slab, rendered & painted concrete block walls & metal deck roofing. Click for more details...

ALICE SPRINGS SUPREME COURT & OFFICE BUILDING
Commercial Premises (Offices) project In The Alice Springs Town Council Area of Private ownership. Construction of supreme court & offices in 5 storey building. To include 2 oval shaped court rooms, legal office space, prisoner holding cells, interview, jury & meeting rooms & cafe (37sq m) on 2 levels. With 2 levels commercial office space (1728sq m) above. 2 levels of basement car parking. Open rooftop public use area. Associated landscaping. Click for more details...

CHARLES DARWIN CENTRE (PASPALEY BUILDING)
Commercial Premises (Offices) project In The Darwin City Council Area of State ownership. Redevelopment of former Paspaley Building to house major government tenant (9970 sqm Level 6 to Level 15) in 5 green star rating building. To include other office, commercial & retail space, including Paspaley Pearl Properties (1984 sqm Levels 16 & 17). The building will present as two distinct parts - a tower with a lens-shaped floor plate, & a 5 level podium wrapping around & behind the base of the tower. The podium is configured to retain the heritage colonnade. Podium to includedate parking at levels 1,2 & 3 & some office space. The building will contain 16,170 sqm of office space above ground & 900 sqm of retail space at ground level. 1 level of basement parking. Click for more details...

THE HEIGHTS RESIDENTIAL SUBDIVISION STAGE 1
Civil Engineering (Residential Subdivision) project at 50 (Lot 9765) University Ave & Roystonea Ave, Durack, NT 0830 for New. Residential subdivision comprising: Stage 1 total of 52 lots - 4 x small lot integrated housing 1 (lot size approx 250 sqm - 299 sqm); 13 x compact lot housing 1 (lot size approx 300 sqm - 399 sqm); 3 x compact lot housing 2 (lot size approx 400 sqm - 499 sqm); 21 x traditional 1 (lot size approx 500 sqm - 699 sqm); 7 x traditional 2 (lot size approx 700 sqm - upward); 1 x multiple dwelling (lot size 1500 sqm - upward); 2 x parkland/reserve Lot 101 (1610 sqm) & Lot 103 (3290 sqm); 1 x community purposes (lot size 6000 sqm). Click for more details...

MCCOURT ROAD WORKSHOPS SHOWROOMS & OFFICES
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project for New development. Construction of mixed use commercial development in single & 2 storey buildings. Consisting of 19 workshops (2116 sqm), 10 showrooms (1572 sqm) & 13 offices (1704 sqm). Associated verandahs, covered ways, loading bays, refuse collection points & landscaping. Total parking for 138 cars. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - PRESSURE TESTING & FLUSHING SERVICES
A project in the NT Within Darwin City. For the provision of pressure testing & flushing services. Click for more details...

FLYNN CIRCUIT MIXED USE DEVELOPMENT
Units (30)/Serviced Apartments (36)/Childcare Centre/Commercial - 4 Storey project at 127 Flynn Cct (Lot 10281), Bellamack, NT 0832 In The Council Area Of Palmerston Town of Private. Construction of mixed use commercial & residential development in 1 x 1 & 2 x 4 storey buildings with ground floor & undercroft parking. To include childcare centre (3000sq m), ground floor commercial (1333sq m) & 3 floors of residential above. 6 x 1 bedroom, 18 x 2 bedroom & 6 x 3 bedroom units. 6 x 1 bedroom, 24 x 2 bedroom & 6 x 3 bedroom serviced apartments. Swimming pool. 2 lifts. Concrete blockwork, glass & steel. Parking for 276 cars. Associated landscaping. Click for more details...

VANDERLIN DRIVE DUPLICATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Vanderlin Dr (Mueller Rd to McMillans Rd), Darwin, NT 0800 of Roadworks - Widening type of New development. Duplication of Vanderlin Drive & additional 3km of 4 lane access along Vanderlin Drive from Mueller Road to the Vanderlin Drive/McMillans Road roundabout. To include relocation of bus stop, upgrade works to Shoal Bay Recycling Centre road intersection & construction of a median strip. Footpath & cycle path connections. Supply & lay S10E spray seal & 14mm thick aggregate. Supply & lay dense gravel asphalt to 40mm thickness. Construction of table drain offlets & blocks. Supply & installation of street lighting. Associated landscaping. Provision of traffic control. Click for more details...

GRAY PRIMARY SCHOOL BLOCK E AIR CONDITIONING
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 468000. This project Removal of existing Block E air conditioning systems & provision of new air conditioning systems. Provision of 1 aircooled chiller & 2 chilled water airhandling units. Associated pipework, wiring & plant areas. New Mechanical Services Switchboard & electrical upgrades. Automatic control systems. Ducted air distribution systems including sheetmetal internally insulated supply & return ductwork & proprietary fabric ductwork systems. Modifications to existing classroom lights, projectors & other exposed services to suit new ductwork. New electrical submain & distribution board to serve Block E. Click for more details...

DINAH BEACH CRUISING YACHT ASSOCIATION CAR PARK
Car Park - Altns/Addns Addition project In The Darwin City Council Area. Construction of 62 additional sealed, drained & line marked car parks in a new car parking area at Dinah Beach Cruising Yacht Association. To include low retaining wall, access stairs, footpath & concrete wall. Associated landscaping. Click for more details...

DARWIN REGIONAL COUNCIL PLAYGROUND SHADE SHELTERS STAGE 1
Shade Shelters - For Playgrounds project at Various loactions within, Darwin, NT 0800 In The Council Area Of Darwin City of Local Govt. Design & construction of shade structures for approximately 10 playgrounds within Darwin City Council. Locations to include Allen Park, Bill Sullivan Park, Brazil Park, Cameron Park, Garanmanuk Park, Greenwood Park, Haritos Park, Johnson Park & Linde Park. Click for more details...

PALMERSTON REGIONAL HOSPITAL - PAD FOOTINGS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Palmerston Town Council Area of Pad Footings - For Hospital type. Pad footings for the Palmerston Regional Hospital. To include excavation for pad footings, supply & pour binding layer. Set out pad footings & column starters. Supply & installation of reinforcing & concrete. Provision of safety barricade for excavations. Click for more details...

PERENTIE COURT UNIT UPGRADES
Units (6) - Upgrades project at 23 Perentie Court (Lot 213), Yulara, NT 0872 In The Council Area Of Macdonnell Shire of State. Upgrades to Government Employee Housing dwellings at 23 Perentie Court, Yulara. To include works at units 5, 9, 10, 11, 16 & 17. To include the replacement of wall sheeting, external doors, floor tiling & kitchen cupboards. Remove existing carpet from bed rooms. Supply & installation vinyl flooring to kitchen areas & 200mm x 200mm no slip tiles. Vanity unit, cabinets, shower, bath & cistern. Remove existing steel shade structure & replace with patio 5m x 3m at units 5, 9, 10 & 11. Supply & installation of 1.75m x 1.9m x 2.6m metal sheeting shed at units 16 & 17. To include 200mm concrete slab flooring with F52 mesh. Click for more details...

NATHAN RIVER ROAD RESHEETING
Nathan River Road Resheeting is currently at the Construction stage, valued at about $ 223000 it is Resheeting works to Nathan River Road from Ch3.7 to Ch10.7. To include removal of existing pavement. Construction 95% MMDD sub grade layer by creating wet mix to 150mm, layout, shape & trim. Supply & lay gravel to 8m width x 150mm depth to create base course layer. Compact to 95% MMDD. Construction of new table off let drains & blocks. Click for more details...

WOODROFFE AVENUE SALVATION ARMY OFFICE EXTENSION
Woodroffe Avenue Salvation Army Office Extension is currently at the Construction stage, valued at about $ 200000 it is Construction of an office extension to the existing Salvation Army Community Centre at Woodroffe. To include the removal of the existing 50sq m office & replacement with 108sq m office. Office to include open plan office area, storage room, conference room & 3 x closed offices. Metal cladded windows & doors, sliding glass window & aluminium framed windows. Existing car parking for 19 cars. Associated landscaping. Click for more details...

TENNANT CREEK PRODUCTION BORE REPLACEMENT PROGRAM STAGE 1A
Various Locations, Tennant Creek, NT 0860 Has Tennant Creek Production Bore Replacement Program Stage 1a currently at Construction stage. Replacement of production bores at Tennant Creek for the Production Bore Replacement Program Stage 1A. Click for more details...

MILES ROAD OFFICE
Office project at Miles Rd (Lot 7290), Berrimah, NT 0828 in the Commercial Premises (Offices). Construction of an single storey office building. Rendered concrete blockwork walls, metal cladding, metal sheet roofing, aluminium framed windows & doors. 1.8m high screen fence & precast concrete boundary walls. Sealed concrete driveway & car parking for 25 vehicles. Associated landscaping. Click for more details...

COMMUNITY 360 STAGE 1
Hospitality (Restaurants, Canteens) project In The Darwin City Council Area of Community Hub - 2 Storey - Stage 1 type. Construction of Stage 1 of the Community 360 hub to provide community services. To include 2 storey administration office hub with conference rooms, interview rooms, offices, store rooms, library, seminar rooms, amenities & kitchen. Early intervention centre to include therapy rooms, storage rooms, offices & amenities. Recreation building to include 2 x studio rooms, 2 x multiurpose rooms, gymnasium, cafe, kitchen, creche & amenities. Day respite building to include dining areas, kitchen, lounge, offices, therapy rooms & conference rooms. 2030sq m car parking for 160 vehicles. Associated landscaping. Click for more details...

KURRINGAL SENIORS VILLAGE WATER SERVICES UPGRADE
Aged Care & Retired Developments (Aged care facilities) project for New development. Upgrade works to water supply services to the Kurringal Seniors Village. To include the disconnection of 100mm water supply service from Lot 9930. Supply & installation of a new 100mm water supply service & upgrade to existing 100mm water service. Provision of traffic control. Click for more details...

CASUARINA STREET PRIMARY SCHOOL CAR PARK
Education (Schools - primary, secondary (up to Yr 12)) project at Casuarina St, Katherine, NT 0850 of Car Park & Drop Off Zone - For School type of New development. Casuarina Street Primary School car park & drop off zone. To include removal of landscaped vegetation, construction of asphalt car park, pavement marking, signage, installation of bus shelter, construction of new bus pick up/drop off zone, construction of new though road & installation of concrete footpath. Associated civil & construction works. Click for more details...

SANDERSON MIDDLE SCHOOL AIR CONDITIONING UPGRADES
New project of Education (Schools - primary, secondary (up to Yr 12)) project at 60 Matthews Rd, Malak, NT 0812. Upgrades to the air conditioning system at Sanderson Middle School in Trades Block E. To include demolition of existing thermal plant. Supply & installation of thermal plant with ancillaries & temporary equipment. Supply & installation of water cooled chiller, chiller water pumps & condenser water pumps. Click for more details...

MILIKAPITI SEWER EXTENSION & LOT SERVICES
Public Utilities (Water distribution systems, Drainage) Addition project at Milikapiti, Tiwi Island, NT 0810. This type is Sewer - Extn with Private ownership. Sewer extension (80m) & lot services to 5 lots in Milikapiti, Northern Territory. Click for more details...

SANDOVER HIGHWAY
A project in the NT Within Alice Springs Town. Gravel resheeting from chainage 295.93 to 303.17 & chainage 333.49 to 336.25 a total of 10km Click for more details...

MOIL PRIMARY SCHOOL
New project of Public Utilities (Water distribution systems, Drainage) project at 37 Lanyon Tce, Moil, NT 0810. Replace, fire, potable & irrigation mains. Associated works Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect