State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Roads, Airstrips, Culverts, Retaining walls Projects in NT®ion=⊂=2710 in region


ALICE SPRINGS TOWN COUNCIL
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area for Renovations, Refurbishments etc. development. Various period contracts: General building maintenance, construction of concrete footpaths, construction of paving in CBD, & sprayed bituminous surfacing. Click for more details...

ARNHEM HIGHWAY
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. Construct sealed left turn lane into Produce Rd from Arnhem Hwy. Click for more details...

MCMINNS ZONE SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) Supply & Install project at McMinns Zone Substation (Sec 1685) 1030 Stuart Hwy, Bee's Creek Region of, Darwin, NT 0800. This type is Substation - Supply & Install with State ownership. Comprising supply & installation new 10/13.5 MVA 66/22kV Transformer & associated tap changer cubicle. Click for more details...

NT GOVERNMENT ASSETS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Various Council Area of State ownership. Panel contract for provision of engineering surveying, survey drafting & specialist surveying services for 3 year period. Click for more details...


A project in the NT Within Alice Springs Town. 3 bedroom. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

NORTHERN TERRITORY UNIVERSITY
Multi Skilling Workshop - Package 1 - Stage 2 - Casuarina Campus Development project at Ellengowan Dve, Casuarina, NT 0810 in the Education (Tertiary - colleges, institutes, universities). Scope of works involved: a) Hairdressing (building 4)/ Existing fittings to be reconditioned/repositioned and/or replaced. Minor alteration works internally. New floor finishes with new paint finish to walls. b) Building Trades Workshop (building 6). Existing building to be internally gutted. Construct extension of 180 sq m. Fitout entire building to new requirements. Fit new industrial louvres to external walls, along with a facelift to external elevations. All services to be gutted & replaced to requirements. c) Applied Electrical Workshop (building 7). Existing building to be internally gutted. End two bays to be demolished. Construct extension of 180 sq m. Fitout entire building to new requirements. Fit new industrial louvres to external walls, along with a facelift to external elevations. All services to be gutted & replace to requirements. d) Combined Projects Area (between 6 & 7). Construct new covered area 600 sq m between two existing buildings, of sheeting on steel framed roof on columns. New reinforced concrete floor beneath, with required drainage. e) Vehicle Body Trades & Auto Electrical (building 37). New external covered stairs to existing mezzanine floor. Two existing classrooms to be be converted to computer laboratory. Possible extension of 300 sq m. Relocate existing spray booth from building 8. Click for more details...


Tivendale Rd (Pt Secn 2426 Hund of Bagot) Hudson Creek, NT 0800 currently at Construction stage. Earthworks & stormwater drainage. Click for more details...

MCARTHUR RIVER BASE METALS MINE - UNDERGROUND OPERATIONS
Near, Borroloola, NT 0854 Has Mcarthur River Base Metals Mine - Underground Operations currently at Construction stage. Up to 1.5 mil. tonnes of ore will be extracted annually from an underground mine to produce 350,000 tonnes of mixed concentrate containing 160,000 tonnes of zinc, 45,000 tonnes of lead and 1.6 million ounces of silver. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) Addition project at Lots 332 & 334 Angurugu Community Groote Eylandt, ., NT 8999. This type is Dwellings (2) - Addns with Local Govt ownership. Supply & erect verandah & bedroom additions to each dwelling. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Katherine Town Council Area of Mine Access Road - Batten Creek Overflow Channel Floodway Repairs type. Install new culvert supplied by the Principal, reinstate embankment, reconstruct pavement, install new erosion protection works and undertake limited stream training works. Click for more details...

SUNSET COVE
Sunset Cove is currently at the Construction stage, valued at about $ 5000000 it is Roads & all services including power, water, sewerage, telephone services for 65 lots. Click for more details...

STANTON PROJECT
A project in the NT Within Roper Gulf Shire. Proposed as a small open cut to supply feedstock to the company's cobalt chemicals business in Newcastle, New South Wales. Following a scoping study carried out by an independent engineer, the board is considering Infill drilling to confirm the preliminary reports. timing of infill drilling is dependent on weather conditions and availability of contractors for this exercise. Click for more details...

BOOTU CREEK MANGANESE PROJECT - INFRASTRUCTURE
Infrastructure project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). 75 person accommodation village, office, stores, laboratory, heavy vehicle workshop, diesel fuelled power generating plant. Click for more details...

DARWIN INTERNATIONAL AIRPORT APRON BAYS 11 & 12
A project in the NT Within Darwin City. Construct new Apron Bay 11 & 12. Works includes earthworks including disposal of soil on or off site, heavy grandular pavements with concrete in-fills & AC surfacing plus match to existing airfield pavements, relocated airside roadworks including service re-location, underground services covering drainage lines & interceptor structures, civil works for construction of high pressure fuel lines & communication infrastructure (latter two possibly by nominated subcontract), ordinary related works - linemarking, water supply, fencing, onduits, landscape etc & hardstand lighting. Click for more details...

HIDDEN VALLEY MOTOR SPORTS COMPLEX - VARIOUS WORKS
Compliance Works/Replacement Facilities - Stage 7a Renovations, Refurbishments etc. project In The Darwin City Council Area. Construct compliance works & replacement facilities (stage 7a) at Hidden Valley Motor Sports Complex. Click for more details...

DARWIN REGION GOVERNMENT BUILDINGS PERIOD CONTRACT FIRE DETECTION SYSTEMS
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Darwin City Council Area of State ownership. Maintenance of fixed fire detection systems of Northern Territory Government occupied buildings for 12 month period. Click for more details...

DARWIN REGION NT GOVERNMENT BUILDINGS - AIRCONDITIONING - GROUP 6
State ownership Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. NT Government building repairs & maintenance to airconditioning plant & equipment for 12 month period. Click for more details...

NT GOVERNMENT ASSETS EAST ARNHEM REGION - MAINTENANCE SERVICES
East Arnhem Region within region of, Nhulunbuy, NT 0881 Has Nt Government Assets East Arnhem Region - Maintenance Services currently at Tenders & Building stage. Provision of maintenance services to government assets including building, plumbing & electrical works for 12 month period. Click for more details...

KATHERINE RESEARCH STATION PATTERSON BUILDING EXTENSIONS (CONTRACT T07-1269)
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) Addition project at Katherine Research Station, 4391 Stuart Hwy, Katherine, NT 0851. This type is Research Building - Extn- Supply/Construct with State ownership. Supply materials & labour for extensions to existing building. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - CLEARING CONTRACT
Bonaparte Gas Pipeline Project - Clearing Contract is currently at the Construction stage, valued at about $ 10000000 it is For the provision of clearing services for 275 km pipeline. Click for more details...

BERRIMAH ROAD WAREHOUSE
Industrial (Warehouses, cargo sheds, distribution centres) project In The Darwin City Council Area of Private ownership. Construction of a warehouse to include railway track running into warehouse. Parking for 6 cars. Associated landscaping. Click for more details...

MANINGRIDA COMMUNITY EDUCATION CENTRE RESOURCE CENTRE BER PROJECT (INCORPORATED INTO ID 1155087)
., Maningrida, NT 0822 Has Maningrida Community Education Centre Resource Centre Ber Project (Incorporated Into Id 1155087) currently at Planning stage. Construction of multi purpose facility/cyclone shelter. Concrete slab, concrete block, steel, clerestory aluminium louvre windows, solid core doors, cyclone enclosure for generator, colour-coated metal roof with cyclone fixtures. Click for more details...

SHELL PRELUDE SUPPLY BASE
Administration Bulding/Warehouse/Storage Yards/Hardstand/Roads/Car Parking project at East Arm Wharf, Darwin, NT 0800 In The Council Area Of Darwin City of Private. Construction of a base to support the offshore Prelude gas project. To include an administration building, warehouse, storage yards, hardstands, wash down pad, roads & car park. Click for more details...

ICHTHYS MAIN CIVIL WORKS (CVL3) - GRE/GRVE PIPING INSTALLATION
Mining - Primary And Secondary Processing (Piping) project for New development. Contract for installation & spooling of 16km of DN 150mm-900mm glass reinforced vinyl ester (GRVE) & DN 1050mm-1800mm glass-fibre reinforced epoxy (GRE) pipes. Contract to also include lamination of rubber ring jointing at the Ichthys Onshore LNG facilities project. Click for more details...

KILGARIFF SUBDIVISION STAGE 1B
Kilgariff Subdivision Stage 1b is currently at the Construction stage, valued at about $ 3000000 it is Reconfiguration into 50 lots (688sqm - 966sq m) to include 2 multiple dwelling lots. Construction of residential roads, kerb, drainage, water supply, gravity sewerage & recycled water supply. Installation of power distribution, street lighting & lot service connections. Click for more details...

ROPER BAR IRON ORE PROJECT - MINING CONTRACT
Mining Contract project at Via St Vidgeon pastoral lease, 80km Southeast of Roper Bar via, Ngukurr, NT 0852 in the Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines). For the provision of mining services. Click for more details...

ROPER BAR IRON ORE PROJECT - MINING CONTRACT
Mining Contract project at Via St Vidgeon pastoral lease, 80km Southeast of Roper Bar via, Ngukurr, NT 0852 in the Mining (Open Cut). For the provision of mining services. Click for more details...

MANINGRIDA SCHOOL TRADE TRAINING CENTRE
State ownership Education (Schools - primary, secondary (up to Yr 12)) project In The West Arnhem Shire Council Area for New development. Design & construction of industrial trade training centre. To include workshop (160sq m), classroom (60sq m), visitor officer quarters (40sq m) & amenities. Open bay (80sq m), driveway & car parking (110sq m). Associated landscaping. Click for more details...

HIDDEN VALLEY TOURIST PARK EXTENSION
Tourism (Caravan parks with assoc facilities, Camping grounds) Addition project at 25 Hidden Valley Rd (Lot 5198), Berrimah, NT 0828. This type is New Sites (74)/Amenity Block with Private ownership. Extension to existing caravan park. To include 74 sites with 46 powered sites & amenity block (220sq m). Cement slab, rendered concrete blockwork & metal roof. Associated car parking & landscaping. Click for more details...

HIDDEN VALLEY TOURIST PARK CABINS
A project in the NT Within Darwin City. Construction of 3 x 2 bedroom standalone cabins. Elevated steel flooring system approx 600mm off ground, lightweight wall cladding & metal roof. Parking for 4 cars. Associated landscaping. Click for more details...

ROYSTONEA AVENUE & CALLANAN ROAD WATER MAIN CROSS CONNECTIONS
Public Utilities (Water distribution systems, Drainage) project In The Palmerston Town Council Area of Water Main type. Construction of approximately 165m of water main along Callanan Road to Temple Terrace & approximately 265m along Roystonea Avenue to Temple Terrace. Replacement of 165m of existing asbestos cement pipe along Callanan Road. Associated civil works. Click for more details...

ICHTHYS LNG PROJECT - INTEGRITY & MAINTENANCE PROGRAM DEVELOPMENT CONTRACT
Currently at the Construction stage In Darwin City is a project estimated to be $ 100000000. This project For the provision of Integrity & Maintenance Program Development services. Click for more details...

DRIPSTONE MIDDLE SCHOOL REPLACEMENT ROOF & VAPOUR BARRIER
Currently at the Construction stage In Darwin City is a project estimated to be $ 1606000. This project Removal/demolition of existing Dripstone Middle School roofs. To include the supply & installation of new vapour barrier, mesh linings, colour coated metal roof, eave sheeting, new lighting for courtyard. Removal of asbestos & installation of new soffits. Associated services. Click for more details...

SANDOVER HIGHWAY RESHEETING
Currently at the Construction stage In Barkly Shire is a project estimated to be $ 468000. This project Resheeting of gravel pavement on Sandover Highway between Ch227.63km to Ch236.63km. To include preparation of existing pavement using the grade water roll method & resheet by importing & compacting a 150mm layer of sand-clay base material. Click for more details...

RAMINGINING SCHOOL DEMOLITION & ASSOCIATED WORKS
Ramingining School Demolition & Associated Works is currently at the Construction stage, valued at about $ 876000 it is Demolition & associated works at Ramingining School in the East Arnhem Region. Works to include demolition of exiting Pre-School & Classroom/Canteen/Ablution Block. Provision of 2 new 20ft lockable shipping containers on site for storage with cyclone footings & tie downs. Supply & install 1800mm high chainmesh fencing (approx. 470lm) & 2 x 6000mm wide double access vehicular gates. Removal of existing concrete footings & reinstate ground surface. Relocation of existing Transportable to rear of site on new concrete footings & stumps. Concrete footings & stumps to be designed by contractor. Provision of section 40 structural certificate for new footings/stumps. Installation of new power, water, sewer & communications services to Transportable. Click for more details...

NIGHTCLIFF MIDDLE SCHOOL MALE AMENITIES BLOCK UPGRADE
Currently at the Construction stage In Darwin City is a project estimated to be $ 174000. This project Upgrade works to the Male Amenities Block at Nightcliff Middle School, Rapid Creek. To include the removal of existing toilet cubicles, urinals & sinks. Removal of 10sq m of asbestos cement sheeting panel. Construction of 16 male toilet cubicles, CFC cubicle doors, 2 x stainless steel handwashing basins, 2 x stainless steel urinals & 3 x solid blockwork walls between urinals to 1400mm high. Supply & installation of 200mm x 200mm ceramic non-slip floor tiles, 300mm x 200mm ceramic wall tiles & 1200mm x 600mm ceiling tiles. Click for more details...

DE HAVILLAND DRIVE WATER MAIN REPLACEMENT
De Havilland Dr, Alice Springs, NT 0870 Has De Havilland Drive Water Main Replacement currently at Construction stage. Replacement of a water main at De Havilland Drive in Alice Springs. Click for more details...

MIDDLE POINT BUS TURNAROUNDS
Middle Point Bus Turnarounds is currently at the Construction stage, valued at about $ 214000 it is Construction of bus turnaround areas at Anzac Parade for the Middle Point School & at the intersection of Miniata Drive & Billabong Road, Lambells Lagoon. To include earthworks, clearing & grubbing. Construction of 40mm thick asphalt surface with 200mm gravel base pavement compact to 100% MMDD. Supply & installation of 1.2 high pedestrian gates at Middle Point School. Provision of line marking & road signage. Provision of traffic control. Click for more details...

FREDS PASS ROAD UPGRADE STAGES 1 & 2
Roadworks - Upgrades - Stages 1 & 2 project at Freds Pass Rd, Humpty Doo, NT 0836 In The Council Area Of Litchfield Shire of Local Govt. Upgrade works to the Fred's Pass Road to be completed over 2 stages. Stage 1 to include upgrade works to the intersection of Fred's Pass Road, Krichauff Road & Redcliffe Road using an improved curve. Stage 2 to include widening, realignment & drainage works of Fred's Pass Road. Construction of shared path, pedestrian crossing & refuge islands opposite Humpty Doo Primary School. Reposition bus depot entry & exit points. Upgrade works to the Fred's Pass Road & Challoner Circuit intersection & Fred's Pass Road & Beumont Road intersection. Click for more details...

ALICE SPRINGS CORRECTIONAL CENTRE EMERGENCY LIGHT DEFECT RECTIFICATION
Public Buildings & Facilities (Prisons) project at Stuart Hwy, Alice Springs, NT 0870 of Emergency Lighting - Rectification type of New development. Rectification of exit & emergency lighting at the Alice Springs Correctional Centre. Click for more details...

NITMILUK GORGE WATER TREATMENT PLANT MAINTENANCE
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Katherine Town Council Area for Renovations, Refurbishments etc. development. Monitoring, servicing & maintenance works to the Nitmiluk Gorge Water Treatment Plant, located in the Nitmiluk National Park. To include supply & installation of chemicals as required. Click for more details...

ARUNGA PARK SPEEDWAY SAFETY FENCE UPGRADE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Alice Springs Town Council Area of State ownership. Upgrade works to the Arunga Park Speedway safety fencing. To include demolition of existing fencing. Construction of concrete perimeter walls to include earthworks, reinforcement, formwork & jointing. Supply & installation of steel cables, safety mesh & timber boards. Click for more details...

LINDSAY STREET COMPLEX CAR PARK RESEAL
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Resealing of the Lindsay Street Complex Car Park. Click for more details...

PALMERSTON REGIONAL HOSPITAL SEWER MAIN HEADWORKS
Public Utilities (Treatment plants, Sewerage reticulation) New project at Roystonea Ave, Palmerston, NT 0830. This type is Headworks - Sewer Main - For Hospital with State ownership. Provision of sewerage main headworks for the Palmerston Regional Hospital. To include construction of 1068m DN225 gravity sewer from Palmerston Hospital to Farrar. Supply & installation of DN225 GRP jacking pipe & DN225 PVC-U sewer pipe. Click for more details...

CORROBOREE ACCESS ROAD
Currently at the Construction stage In Darwin City is a project estimated to be $ 1300000. This project Upgrade & seal 4.0km of Corroboree Access Road from the Marrakai Station Access Road intersection. Scope of work includes: traffic management. Earthworks, clearing, grubbing & rehabilitation. Pavement & shoulder reconstruction. Drainage works (culverts at 4 locations). Protection works. Sealing with double seal 14/7 mm aggregate & S10E bitumen. Road furniture (road signs, guide posts and linemarking). Click for more details...

YIRRKALA SCHOOL
Court - Refurbishment project at ., Yirrkala, NT 0880 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). Court resurfacing: pepare existing asphalt outdoor basketball & tennis courts & associated bitumen surfaces & apply a new acrylic sports surface and line marking. Fencing upgrade: remove & dispose of existing perimeter fencing (not including existing posts/footings). Install new hot dip galvanised Straining wire, chain mesh fencing, PA gates & locking furniture. Click for more details...

HIDDEN VALLEY MOTOR SPORTS COMPLEX
State ownership Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area for New development. Construction of package 2 for a new water main for Hidden Valley Motor Sports Complex consists: new water main, 250 diameter (ND) HDPE. Ten new irrigation points & 5 house connections, the location of these connection points will be directed on site. Approval of the new water main construction by PWC Click for more details...

OWEN SPRINGS POWER STATION
Public Utilities (Water distribution systems, Drainage) project at 205 Brewer Rd, Alice Springs, NT 0870 of Water Line - Upgrade type of New development. Supply, installation, testing & commissioning of reticulated domestic water system within the Owen Springs Power Station. Installation will require appropriate trenching, pipe encasement within clean sand fill & final compaction Click for more details...

ANGURUGU SEWER RETICULATION
New project of Public Utilities (Water distribution systems, Drainage) project at ., Angurugu, NT 0822. Upgrade stage 1 - house connections & septic tank decommissioning (Package 2) of he Angurugu Sewer reticulation project Click for more details...

STUART HIGHWAY
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Alice Springs Town Council Area of State ownership. Upgrading of the street lighting on the south of Stuart Highway at the intersections for Commonage Road, Ross Highway & Ilparpa Road in Alice Springs. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect