ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

ARNHEM HIGHWAY
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. Construct sealed left turn lane into Produce Rd from Arnhem Hwy. Click for more details...

BINJARI COMMUNITY
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at Binjari Community, Katherine, NT 0852 of Ablutions/Storage Building type of New development. Design, construct & deliver one ablution & storage building. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at on McArthur River (approx 50kms sth west of Borroloola), Katherine, NT 0850 for New. Work to include roads & earthworks. Click for more details...

CENTRAL AUSTRALIAN FOOTBALL LEAGUE
Central Australian Football League is currently at the Construction stage, valued at about $ 88000 it is Custom orb cladding, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

NGUKURR POLICE STATION
Boundary Fencing For Police Station project at Ngukurr Police Station, Ngukurr, NT 0852 In The Council Area Of Roper Gulf Shire of State. Replace boundary fence for Ngukurr Police Station. Click for more details...

ELANG
Oil & Gas (Pipelines & associated contracts) project In The Darwin City Council Area of Resource - Oil/Gas - Field Development - Offshore & Floating Production Facility type. Field development plan involves subsea completions of the existing vertical Elang 1 & 2 wellbores; connection of wells via subsea flowlines to leased FPSO moored over the field using a disconnectable single point riser turret moring; production & export of crude oil using shuttle tankers. Click for more details...

NT GOVERNMENT OCCUPIED BUILDINGS
Public Buildings & Facilities (Police Stations) Renovations, Refurbishments etc. project at Palmerston, Darwin rual area incl Batchelor, Nhulunbuy, Groote Eylandt &, Darwin, NT 0800. This type is Fire Detection Equipment - Package B - Maintenance with State ownership. Routine servicing & emergency repair to fixed fire detection - Package B. Click for more details...

CHARIOT GOLD PROJECT - WARREGO TREATMENT PLANT
Private ownership Mining - Subcontracts (Mechanical installation) project In The Barkly Shire Council Area for New development. Mechanical works packages. Package one tankage work and structural repairs. Click for more details...

LOCKHEAD ROAD OUD
Lockhead Rd OUD, Katherine, NT 0850 Has Lockhead Road Oud currently at Tenders & Building stage. Survey & earthworks to establish drain floor to facilitate improved flow of drain. Click for more details...

SERVICED LAND AVAILABILITY PLANS DRAFTING SERVICES-POWER & WATER
., ., NT 8999 Has Serviced Land Availability Plans Drafting Services-Power & Water currently at Planning stage. Serviced Land Availability Plans (SLAP) Drafting Services for 3 year period. Click for more details...

ROBERTSON BARRACKS
Federal ownership Military (Military installations & facilities) project In The Palmerston Town Council Area for New development. 72 beds of Other Rank accommodation. Click for more details...

WALER BARRACKS
Military (Military housing & accommodation, Military colleges) project In The Litchfield Shire Council Area of Federal ownership. Accommodate building facilities for 1st Armoured Regiment. Click for more details...

WOODS STREET FLATS
New project of Residential (Units, apartments, flats, townhouses, villas) project at 28 Woods St (pt lot 6828 Town of Darwin), Darwin, NT 0800. 1 bedroom. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. 2 levels of carparking. Click for more details...

FLYNN DRIVE RENAL UNIT
Medical (Surgeries, Medical centres) project for Renovations, Refurbishments etc. development. Minor building work including painting & replacement floor coverings. Click for more details...

LEANYER PRIMARY SCHOOL
School - Upgrade - Stage 1 project at Leanyer Dr, Leanyer, NT 0812 in the Education (Schools - primary, secondary (up to Yr 12)). Upgrade to administration & library & selected refurbishment of classrooms. Click for more details...

HOWARD SPRINGS CARAVAN PARK
A project in the NT Within Litchfield Shire. Cabins to be constructed & delivered to site then connected to services. Click for more details...

PINE CREEK FOOTPATHS
Footpaths New project In The Katherine Town Council Area. Construction of footpaths to Moule Street, Main Terrace & Heritage Park. Click for more details...

OLD ADMIRALTY HOUSE SITE OFFICE & APARTMENT DEVELOPMENT
Residential (Units, apartments, flats, townhouses, villas) project at 70 (lot 229) The Esplanade (Town of Darwin), Darwin, NT 0800 of Offices/Flats (10) - 14 Storeys type of New development. Construction of offices & 10 x 3 bedroom apartments in 14 storeys. Associated basement car parking & landscaping. Click for more details...

MUTITJULU COMMUNITY INCORPORATED
Currently at the Tenders & Building stage In Alice Springs Town is a project estimated to be $ 1500000. This project Civil Works: Upgrade of existing CED sewerage system, upgrade of an existing sewerage pond, new effluent disposal system, approx 1.4 km of new roads, lot servicing to 14 house lots. Click for more details...

DORAT ROAD REHABILITATION
Currently at the Planning stage In Darwin City is a project estimated to be $ 300000. This project Proposed Dorat Road bitumen reseal Ch: 0km - 11km. Click for more details...

TIWI ISLANDS MINERAL SAND PROJECT - OPERATING MINE
Tiwi Islands Mineral Sand Project - Operating Mine is currently at the Construction stage, valued at about $ 4500000 it is Resource estimate is 6,980,000 tonnes @ 4.4% HM. Reserves are 6,530,000 tonnes @ 4.5% HM and 87% VHM. Mine life is expected to be six years. Targeted annual production of 35,000 tonnes per annum. Dry mining is the method of mining adopted by the feasibility study. The development will use a front end loader operating in a dry environment loading a feeder to a conventional wet spiral concentrator. The concentrate will then be trucked to the Port Melville deep water port for shipment direct to China. An off take agreement has signed with Astron Limited to take all production from the mine. A 76 Km four wheel track has been upgraded. Click for more details...

STUART PLATEAU & ROPER VALLEY RADIO REPEATER
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Katherine Town Council Area of State ownership. Supply, install, commission & maintain radio repeater equipment. Click for more details...

GROOTE EYLANDT MANGANESE OPERATIONS - GEMCO - BARRACK RENOVATIONS
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Darwin City Council Area of Private ownership. Renovation of 4 low set timber framed barrack buildings, each comprising 12 bedrooms and communal toilets and showers. To be completed by mid-November 2004. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CK MANGANESE - DUMP STNS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Darwin City Council Area of Private ownership. Two dump stations. Road and rail dump facilities. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Earthworks/Civil Engineering (Stockpile Management) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

FAMILY & CHILDRENS SERVICES GROUND & FIRST FLOOR REFURBISHMENTS
A project in the NT Within Darwin City. Proposed refurbishment Family & Childrens Services offices on ground floor & including new ablutions on first floor. Click for more details...

STUART HIGHWAY - VARIOUS STUCTURAL & CIVIL WORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area of Visitor Facilities/Sealed Accesses/Shelter/Various Items type. Upgrade visitor facilities, construct sealed accesses, shelter & various items from Teamster Memorial to Mount Polhill on Stuart Hwy within Alice Springs Region. Click for more details...

BONAPARTE GAS PIPELINE
J/V - Private & Govt ownership Oil & Gas (Pipelines & associated contracts) project In The Coomalie Community Council Area for New development. To construct a gas pipeline from the Blacktip Gas Plant near Wadeye (Port Keats) to meet the existing Amadeus to Darwin Gas Pipeline on Ban Ban Springs Station in the Northern Territory. The pipeline will follow a route of approximately 275km and will initially be capable of delivering 30 petajoules per year. Click for more details...

CENTRAL ARNHEM ROAD ROADWORKS
A project in the NT Within East Arnhem Shire. Upgrade & seal intersection of Central Arnhem Rd with Dhupuma Rd, Nhulunbuy. Click for more details...

POWER & WATER CORPORATION - ALL CENTRES ELECTRICAL DISTRIBUTION SYSTEMS
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Darwin City Council Area of State ownership. Panel contract for electrical works on electricity distribution systems for 36 months. Click for more details...

JABIRU GEH TENANTED DWELLINGS AIR CONDITIONING UPGRADE
Residential (Units, apartments, flats, townhouses, villas) project at Various sites within, Jabiru, NT 0886 for Renovations, Refurbishments etc.. Air conditioning upgrade to 43 GEH tenanted dwellings including comprehensive maintenance & warranty services for 12 month period (5-10 years). Click for more details...

LAJAMANU POLICE STATION FENCE
Fence project at ., Lajamanu, NT 0852 in the Public Buildings & Facilities (Police Stations). Supply, Delivery and Installation of Fencing. 284 Lineal Metres. Click for more details...

ALICE SPRINGS AIRPORT SOLAR FARM
Federal ownership Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Alice Springs Town Council Area for New development. Proposed development of solar farm to service Alice Springs Airport. Click for more details...

BULLOCK CREEK UPGRADE
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Katherine Town Council Area for New development. Supply of gravel and all earth works associated with the construction of road pavements including bitumen sealing and line marking. Click for more details...

ALICE SPRINGS MIDDLE SCHOOL UPGRADE (CENTRALIAN MIDDLE SCHOOL)
Gillen Campus (2) - Stage 1 - Upgrade Renovations, Refurbishments etc. project In The Alice Springs Town Council Area. Refurbishment & new work to Blocks C & F at Gillen Campus (Alice Springs High School). Click for more details...

AHL BOARDING FACILITY
Private ownership Residential (Student & group accommodation) project In The Victoria Daly Shire Council Area for New development. Construction of girls & boys boarding facility, 4 youth centre buildings, main administration area, tutorial area to seat 50 students, cool room, amenities, manager's residence. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining - Earthworks/Civil Engineering (Stockpile Management). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

VIRGINIA 92 LOT SUBDIVISION
Virginia 92 Lot Subdivision is currently at the Construction stage, valued at about $ 2760000 it is Residential subdivision to create 92 lots. In three stages, to be developed concurrently to include roads & water supply. Click for more details...

DEPARTMENT OF DEFENCE - REMEDIAL WORKS
Military (Military installations & facilities) project for New development. Undertake remedial works to bring a range of facilities to top secret level at DW45 Click for more details...

GROOTE EYELANDT MANGANESE OPERATIONS EXPANSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at At, Groote Eylandt, NT 0822 for New. Part of a project to expand production from 4.2 million tonnes per annum (Mtpa) to 4.8Mtpa along with road & port capacity to 5.9Mtpa. Processing plant upgrade to include replacement of desliming screens with banana screens & a new lump bypass facility in the heavy media circuit. Replacement of stacker & hopper cars at the port stockpile. Increase of the ship loading conveyor & road train receival capacities. Upgrade of 2 intersections on the Rowell Highway. Click for more details...

ARRAY APARTMENTS ON DALY
Units (68)/Commercial Premises - 11 Storey project at 29 Daly St (Lots 2811 & 1786), Darwin, NT 0800 in the Residential (Units, apartments, flats, townhouses, villas). Construction of 11 storey mixed use building with 230sq m office/retail tenancy on ground floor & 68 units above. 5 x 1 bedroom, 54 x 2 bedroom & 9 x 3 bedroom units. Concrete blockwork, glass & steel. 2 lifts. Gymnasium. Swimming pool. 3 levels of basement carparking for 103 cars . Associated landscaping. Click for more details...

FOG BAY ROAD LEVIATHAN CREEK CROSSING UPGRADE & SEAL
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Fog Bay Rd south west of, Dundee Beach, NT 0822 of High Level Crossing/Roadworks/Drainage - Upgrade type of New development. Construction of a 2 lane bridge & 1.1km of 2 lane sealed road at the Leviathan River crossing on the Fog Bay Road between Ch14.130km & Ch15.220km from the Cox Peninsula Road intersection. Drainage. Bitumen, base gravel, w-beam guardrail, concrete batter protection & asphalt. Wingwall, headstock, ballast, piles & socket. Click for more details...

POLGLASE CIRCUIT VILLAS
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 2700000. This project Construction of 11 x 3 bedroom villas in 6 single storey buildings. Concrete slab, rendered blockwork, powdercoated aluminium frames, colour-coated metal roof. Parking for 22 cars. Associated landscaping. Click for more details...

PARAP POOL REDEVELOPMENT
Pool - Redevelopment project at 77 Ross Smith Ave, Parap, NT 0804 in the Social (Amenities, Dressing rooms). Redevelopment of the Parap Pool. To include construction of 50m FIDA competition & training pool, 25m multi-purpose indoor pool with access ramps for universal access & seating for 600 spectators & the ability to accommodate 1600 temporary seats. Construction of 11.5m high 33,0000sq m shade structure to cover pool areas. Pump room building with chemical store (270sq m), control room building (42sq m), pool store room building (42sq m), swim club building (42sq m). Reconfiguration of existing car park to accommodate parking 64 vehicles. Construction of administration building (450sq m) with kiosk/cafe, office, communications room, amenities, family room & first aid room. Associated landscaping. Click for more details...

LORELLA SPRINGS WILDERNESS PARK WATER PIPELINE
Public Utilities (Water distribution systems, Drainage) project for New development. Proposed construction of a 5km water pipeline to connect Lorella Springs Wilderness Park's 100,000l water tank to an existing bore. To include a solar powered water pump. Click for more details...

ALICE SPRINGS GOLF CLUB BOWLING GREENS
Bowling Greens project at 110 Barrett Dr (Lot 5782), Alice Springs, NT 0870 In The Council Area Of Alice Springs Town of State. Relocation of existing practice putting & driving range to allow for the construction of 2 lawn bowling greens at the Alice Springs Golf Club. To include the demolition & removal of paths, decking & landscaping. Construction of sealed surface access road with associated kerbing. 18m high driving range nets, concrete slab & footings & shade structures. 1.2m high pool fence, retaining walls & flood lighting. 2500mm wide paved pedestrian access pathway. Click for more details...

ROYSTONEA AVENUE OUTBOUND THIRD LANE
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 14144000. This project Construction of a third outbound lane on Roystonea Avenue, Palmerston. To include construction of new road pavement, drainage & lighting. Construction of new left slip lane from Roystonea Avenue to the Gateway Development Service Lane. Construction of new bus way & bus shelter. Upgrades to the Yarrawonga Road intersection & University Avenue intersection. Upgrades to the Boulevard intersection to include fourth leg & signalisation. Upgrades to shared path & footpaths. Provision of traffic control. Click for more details...

DARWIN REGION - REMOTE HEALTH CENTRES
Medical (Surgeries, Medical centres) project for Renovations, Refurbishments etc. development. Minor building, plumbing & electrical works required at the Community Health Centres of Pirlangimpi, Julanimawu (Nguiu) and Milikapiti Click for more details...

KINTORE STREET SCHOOL
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at 11 Kintore St, Katherine, NT 0850 of Fencing type of New development. Remove & dispose of the existing fences & gates. Design, construct & certify the replacement of the perimeter fence & gates Click for more details...