State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Sample analysis, Laboratory testing Projects in NT®ion=⊂=2040 in region


KINTORE JOINT VENTURE PROJECT - GOLD RESOURCE
Mining (Underground - including longwall) project In The Alice Springs Town Council Area of Resource - Gold type. Geochemical surveys over the Worman Rocks area in the Kintore Joint Venture detected only scattered low level gold anomalism. The survey has significantly downgraded the project's prospectivity. Click for more details...

YUENDUMU HOUSING PROJECT
Houses (6) project at Yuenumu Community (280 km North West of Alice Springs) via, Alice Springs, NT 0872 In The Council Area Of Alice Springs Town of Local Govt. Construction of 6 new single storey houses. Click for more details...

ANMATJERE COMMUNITY GOVERNMENT COUNCIL
Houses (7) New project In The Alice Springs Town Council Area. 3 bedroom each 100 sq m approx. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

CAVANAGH 21
In Darwin City is a project estimated to be $ 20000000. This project Office retail. 83 bedsitters each 35 sq m approx, 32 x 1 bedroom flats each 45 sq m approx, 5 x 3 bedroom flats each 100 sq m approx. Masonry block walls, concrete floor, metal deck roof, aluminium framed windows, airconditioning, fire services, 2 lifts, stairs. Click for more details...

DARWIN BOTANIC GARDENS
Currently at the Construction stage In Darwin City is a project estimated to be $ 224000. This project Construct upper & lower creek channel, 2 bridges & concrete works for water feature. Click for more details...


Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. Supply of all plant & labour for maintenance grading of roads, road shoulder & stormwater drainages. Click for more details...

NORTHERN TERRITORY UNIVERSITY
New project of Public Utilities (Water distribution systems, Drainage) project at Ellengowan Ave, Casuarina, NT 0810. Hotmix 60 bays, linemarking, lighting, concrete kerbing & stormwater. Click for more details...

ALI CURUNG HOUSING
Currently at the Planning stage In Alice Springs Town is a project estimated to be $ 100000. This project Installation of stoves & air conditioners in 80 houses. Click for more details...

NGUKURR POLICE STATION
Boundary Fencing For Police Station project at Ngukurr Police Station, Ngukurr, NT 0852 In The Council Area Of Roper Gulf Shire of State. Replace boundary fence for Ngukurr Police Station. Click for more details...

MOUNT TODD GOLD MINE
Mining - Subcontracts (Electrical installation) project In The Katherine Town Council Area of Private ownership. Contract to provide a 32 megawatt gas turbine power facility for mine expansion. Click for more details...

ROBERTSON BARRACKS
Federal ownership Military (Military housing & accommodation, Military colleges) project In The Palmerston Town Council Area for New development. 72 beds of Other Rank accommodation. Click for more details...

BRADSHAW FIELD TRAINING AREA
Bradshaw Station Timber Creek via, Katherine, NT 0850 Has Bradshaw Field Training Area currently at Construction stage. Civil component of project comprises of design & construction of 200 km roads & 2 airfields. Click for more details...

ALICE SPRINGS CULTURAL PRECINCT - THE RESIDENCY
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Addition project at Alice Springs Cultural Precinct - The Residency, Alice Springs, NT 0870. This type is Paving Levels - Altns/Stormwater - Install with State ownership. Alterations paving levels & installation storm water. Click for more details...

MITCHELL CENTRE
Currently at the Construction stage In Darwin City is a project estimated to be $ 60000000. This project Construction of multi storey development to include retail on ground floor, carparking structure, 10 floors of office space & police station comprising of watch-house, cells & 24 hour shop-front. Tenancies to include Coles supermarket, 40 specialty shops, restaurant precinct & parking for 650 vehicles. Click for more details...

BOOTU CREEK MANGANESE PROJECT - PROCESS PLANT
Process Plant project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying). The process plant will have a dense media plant, which is a necessary to gain a consistent grade of ore. The ore to be processed near the extractive area by crushing, screening, washing and separation into lump manganese and fine manganese. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARY WORKS
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The East Arnhem Shire Council Area of Civil Works type. Preliminary works to include roads, laydown areas. Click for more details...

DEPARTMENT OF BUSINESS INDUSTRY AND RESOURCE CONSULTANCY
Mining (Exploration - Drilling) project In The Barkly Shire Council Area of Petrological/Mineralogical/Analytical Services - Contract type. Panel contract for the provision of Petrological, Mineralogical and Analytical services for a period of 3 years. Click for more details...

OLD FORT HILL WHARF
Civil Engineering (Docks & piers, wharves, boat ramps) project at Old Fort Hill Wharf, Kitchener Bay, Darwin, NT 0800 for Renovations, Refurbishments etc.. Remove entire structure including complete pile extraction of Old Fort Hill Wharf & disposal of materials to nominated location on sea bed, remove large spill of concrete in west of wharf & temporary land based safety fencing to site during period of contract. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Subcontracts (Electrical installation) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

DARWIN REGION - RURAL AREA SEALED PAVEMENT REPAIRS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Sealed Pavement - Repairs type. 12 month period contract for sealed pavement repairs. Click for more details...

RAAF BASE DARWIN C17 HEAVY AIRLIFT FACILITIES AIRFIELD WORKS/ASSOCIATED FACILITIES
Federal ownership Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Works for infrastructure support for C17 Globemaster III aircraft based at Amberley: aircraft aprons & taxiways & potentially runway works, explosive ordinance loading bays & associated taxiways, other associated airfield works (including but not limited to airfield lighting & air cargo/movement facilities), extension of existing Air Movements building to provide substantial cargo handling capacity, introduction of hjydrant refuelling into new apron, new vehicle washbay. Click for more details...

POWER & WATER CORPORATION ELECTRICAL DISTRIBUTION SYSTEMS MAINTENANCE CIVIL WORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Various locations within region of, Darwin Dc, NT 0820 of Maintenance Civil Works type of New development. Provision of civil works associated with maintenance of electrical distribution systemsfor period of 36 months within Darwin region. Click for more details...

KORMILDA COLLEGE VE&T UPGRADE STAGES 1 & 2
Education (Schools - primary, secondary (up to Yr 12)) project In The Darwin City Council Area of Vocational Education & Training Facility - Stages 1 & 2 type. Construction of ground floor 730sq m building to provide a specialist office learning environment and other classrooms & second storey 1100 sqm. Work also includes refurbishment of 12 middle school classrooms in an existing building. Click for more details...

NORTHERN TERRITORY INDUSTRY CAPABILITY NETWORK INDIGENOUS HOUSING
Residential (Units, apartments, flats, townhouses, villas) project In The Central Desert Shire Council Area of State ownership. New Housing Packages 10 & 11. Construction details not disclosed. Click for more details...

STUART HIGHWAY 83 LOT SUBDIVISION
Private ownership Civil Engineering (Residential Subdivision) project In The Darwin City Council Area for New development. Residentail subdivision to create 83 lots. Click for more details...

STUART HIGHWAY RAIL OVERPASS
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Stuart Hwy & Santa Teresa Rd (Roger Vale Dr) approx 10.5km from, Alice Springs, NT 0870. Construction of rail overpass with double stack container clearances & allowing for 2 rail lines & road underneath. Associated civil & earthworks, electrical relocation, floodways, stormwater drainage including concrete lined channel & guard rail. Click for more details...

CASUARINA SQUARE STUDENT ACCOMMODATION
Student Accommodation - 8 Storey New project In The Darwin City Council Area. Construction of 8 storey student accommodation building for 303 students in flexible suites over 6 levels with common rooms & group study areas. 1 level to include internet kiosk, games room, dining & common areas. 2 lifts. Undercroft parking for 31 cars, 40 motorcycles & 80 bicycles. Click for more details...

FOWLESTONE ROAD INDUSTRIAL DEVELOPMENT
Warehouses (2)/Workshop/Showroom/Offices (5) project at 35 Fowlestone Rd (& 36 Coffee St) (Lot's 11011, 11012, 10993 & 10994), Tivendale, NT 0822 in the Commercial Premises (Offices). Construction of industrial building with mezzanine level. To include 2 x warehouse (4616sq m), workshop (560sq m) showroom (131sq m), mezzanine level (200sq m), 5 x offices (291sq m) & staff amenities (88sq m). Concrete slab, rendered concrete blockwork & metal roof. Parking for 69 cars. 7 loading bays. Associated landscaping. Click for more details...

AACAP WUTUNUGURRA COMMUNITY CENTRE & CANTEEN CREEK ROAD UPGRADE
Community Centre/Road Duplication project at Wutunugurra &, Canteen Creek, NT 0862 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Construction of community centre facility at Wutunugurra. Upgrade 1.05km of unimproved road at Canteen Creek into dual lane, sealed ring road. Click for more details...

GOTHENBURG CRESCENT UNITS
Units (12) - 4 Storey New project In The Darwin City Council Area. Construction of 12 x 2 bedroom units in 4 storey building. Concrete blockwork, glass & steel. Parking for 24 cars. 1 lift. Associated landscaping. Click for more details...

STUART HIGHWAY MOTEL RESTAURANT & OFFICE BUILDING
Hospitality (Restaurants, Canteens) project at 374 Stuart Hwy (Lot 1446), Winnellie, NT 0820 of Restaurant/Office type of New development. Construction of single storey restaurant & office building. To include restaurant & motel reception areas, kitchen, buffet, dining area & amenities. Cement slab, metal cladding walls & metal roof. Parking for 10 cars. 2 loading bays. Associated landscaping. Click for more details...

HPA DISABILITY SERVICES WORKSHOP ADDITION
Commercial Premises (Offices) project for Addition development. Workshop addition (466sq m) & alterations to ancillary offices & amenities (162sq m) of existing industrial workshop development. Parking for 22 cars. Associated landscaping. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - PRESSURE TESTING & FLUSHING SERVICES
A project in the NT Within Darwin City. For the provision of pressure testing & flushing services. Click for more details...

MILINGIMBI GOVERNMENT EMPLOYEE HOUSING
A project in the NT Within East Arnhem Shire. Construction of 2 x 2 bedroom duplex villas in single storey building. Concrete slab, aluminium powdercoated balustrade, galvanised mesh, colour-coated metal wall & roof cladding. Parking for 4 cars. Associated landscaping. Click for more details...

VICTORIA HIGHWAY SADDLE CREEK CROSSING
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Construction of 2 x 13m span concrete plank bridge on existing eastern depression at chainage 399.35km & 3 x 13m span bridge that will replace current bridge at main channel at chainage 399.5km. To include raising the road level from 51.965m above sea level to 54.03m. Removal/demolition of existing culvert & bridge crossing. Associated civil works. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 500000. This project Supply & installation of a 1,100sq m pond water feature at the Gateway Shopping Centre. Click for more details...

PALMERSTON REGIONAL HOSPITAL LIFTS
Medical (Hospitals & associated buildings, mortuaries) New project at 213 Taylor Rd (Section 4231 Hundred of Bagot S901068), Holtze, NT 0829. This type is Lifts - For Hospital with State ownership. Installation of lifts at Palmerston Regional Hospital. To include the supply & installation of lifts. Allowance for builders lift fitout during construction. Final & trade cleans. Click for more details...

TENNANT CREEK HOUSES (NPARIH)
Residential (Units, apartments, flats, townhouses, villas) New project at Various Locations within, Tennant Creek, NT 0860. This type is Houses (23) with State ownership. Construction of 23 houses in Tennant Creek under the National Partnership Agreement on Remote Indigenous Housing (NPARIH) Click for more details...

WEST MACDONNELL NATIONAL PARK LARAPINTA TRAIL CAMP FACILITY UPGRADE
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 348000. This project Campground upgrades at 2 locations on the Larapinta Trail at Hugh Gorge & Birthday Water Hole in the West MacDonnell Ranges National Park. To include the construction of 1 steel shelter at each location with steel columns, framing & earth floor. Sheet metal roofing, guttering & cladding. Winged awning windows with poly-carbonate. Steel framed cement sheet lined bed platform & cupboard. Supply & installation of 2 x 4500l water tanks at each site on concrete slab. Supply & installation of 1 free standing toilet structure & hybrid septic system at each site. Supply & lay river sand bedding to create 3m x 3m x 100mm tent pads with 6 at each site. Click for more details...

TENNANT CREEK SPEEDWAY INFRASTRUCTURE UPGRADES
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Barkly Shire Council Area for New development. Design & construction of upgrade works at the Tennant Creek Speedway. To include control tower/canteen building, pathways & safety fencing. Retaining walls & concrete ramp. 50m of rising main to connect to existing septic system. Click for more details...

VICTORIA HIGHWAY HOUSING UPGRADES
Victoria Highway Housing Upgrades is currently at the Construction stage, valued at about $ 814000 it is Upgrade works to 14 dwellings at Katherine. To include removal of vinyl tiles & replacement with ceramic tiles. Replacement of roofing, kitchens & cisterns. Painting of all internal & external surfaces. Click for more details...

JABIRU SEWER PUMP STATION UPGRADE
Located Within, Jabiru, NT 0866 Has Jabiru Sewer Pump Station Upgrade currently at Construction stage. Upgrade works to the sewer pump station located in Jabiru, located 250km East of Darwin. Click for more details...

NGUKURR SOLAR FACILITY
Currently at the Construction stage In Roper Gulf Shire is a project estimated to be $ 1000000. This project Construction of a solar facility capable of generating 400kw as part of the Solar Energy Transformation Program (SETuP). To include solar arrays & mounting frames. Security fencing & gates. Installation of underground power cabling & telecommunication services. 6m wide access roads. Associated carparking & landscaping. Click for more details...

BORROLOOLA CHILD CARE CENTRE
Located Within, Borroloola, NT 0854 Has Borroloola Child Care Centre currently at Construction stage. Construction of a child care centre located within Borroloola to accommodate 30 children. To include concrete slab, steel framed walls & steel framed roof. Click for more details...

DARWIN MIDDLE SCHOOL COVERED BASKETBALL COURT
State ownership Sports (Sports ground hard surface (tennis courts,netball courts, basketball & skateparks)) project In The Darwin City Council Area for New development. Design & construction of a roof over an existing basketball court at Darwin Middle School. Design & construction of a covered walkway link between existing covered walkways & basketball court. Provision of gutter, downpipes & concrete splash pads. Click for more details...

MITCHELL STREET MIXED USE DEVELOPMENT
A project in the NT Within Darwin City. Construction of a 20 storey mixed use development with 19 x 1 bedroom apartments, 20 x 2 bedroom apartments, 31 x 3 bedroom apartments, 2 x 4 bedroom apartments & 55 x 2 bedroom dual key serviced apartments. Ground floor to include bottle shop, cold room, foyer, sub station & cafe. Mezzanine level to include storage area, office, laundry, fire tanks & pumps. Podium levels 1 - 3 to include car parking for 202 cars & 11 motor bikes. Podium level 4 to include swimming pool (239.86sq m), pool deck, barbecue deck, gymnasium (100.37sq m), 5 x 1 bedroom apartments & 5 x 2 bedroom apartments. Levels 5 & 6 to include 5 x 2 bedroom apartments & 7 x 1 bedroom apartments. Levels 7 - 16 to include 6 x 2 bedroom apartments & 3 x 3 bedroom apartments. Level 17 & 18 to include 3 x 2 storey penthouse apartments with 3 x swimming pools. Click for more details...

CHANNEL ISLAND POWER STATION EVAPORATION POND LINERS
New project of Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Channel Island Rd, Darwin, NT 0800. Relining 2 evaporation ponds with High Density Polyethylene at Channel Island Power Station. Click for more details...

TENNANT CREEK REGION PUBLIC HOUSING DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) project at 12 Bornite St, 19 Scheelite Cr & 18 Standley St, Tennant Creek, NT 0860 for New. Demolition of existing. Construction of 2 x 3 bedroom dwellings on Lot 1177, 18 Standley St & Lot 471, 19 Scheelite Cr & 1 x 3 bedroom dwelling on Lot 506, 12 Bornite St. Construction of car port & adjoining structures. Storage room/shed. Site works. Driveways & external paving. Landscaping Click for more details...

SANDOVER HIGHWAY
A project in the NT Within Alice Springs Town. Gravel resheeting from chainage 295.93 to 303.17 & chainage 333.49 to 336.25 a total of 10km Click for more details...

ANGURUGU REMOTE COMMUNITY HOUSING
Residential (Units, apartments, flats, townhouses, villas) project at Lots 425, 451, 628, 632 & 633, Angurugu, NT 0822 of Dwellings (5) type of New development. Demolition of 4 lots at 425, 451, 628 & 632. Construction of 5 x 3 bedroom dwellings at lots 425, 451, 628, 632 & 633 Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect