State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Ski Lifts Projects in NT®ion=⊂=1460 in region


TIMBER CREEK PROJECT
Timber Creek Project is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 10000000 it is In 2004 kimberlite had been put through an on-site rented Dense Media Separation plant and the heavy mineral concentrate produced shipped to the Company's diamond recovery facility in South Africa for final diamond recovery. Rehabilitation of the areas where previous bulk sampling had been undertaken is planned. Click for more details...

AYERS ROCK RESORT - SAILS IN THE DESERT HOTEL
Ayers Rock Resort - Sails In The Desert Hotel is currently at the Construction stage, valued at about $ 1000000 it is Specialised work including joinery finishes. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project at Garden Point Melville Island, NT 8999 of House (1) type. 3 bedroom. Block-work construction. Click for more details...


Residence - Extns project at Willowra via, Alice Springs, NT 0870 in the Residential (Units, apartments, flats, townhouses, villas). Change from 3 bedroom residence to 6 bedroom residence. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...


A project in the NT Within Palmerston Town. Layout of shops/offices subject to requirements of lessee. Concrete frame, pre-cast concrete & block-work infills, concrete floor, metal deck roof, aluminium framed windows, airconditioning, fire services, lifts, stairs. Basement carparking. Click for more details...


New project of Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at 101 Pruen Rd (Prtn 2029 Hund of Bagot), Berrimah, NT 0828. Industrial workshops & offices. Workshops 390 sq m approx o'all. Offices 90 sq m approx o'all. Workshops - Steel portal frame. Offices -Pre-cast concrete, all with concrete floors, metal deck roof, aluminium framed windows, split airconditioning. Single seal carpark & landscaping. Click for more details...

BERRIMAH AGRICULTURE RESEARCH FARM
Stuart Hwy, Berrimah, NT 0828 Has Berrimah Agriculture Research Farm currently at Construction stage. Construct additional office including associated services. Click for more details...

MCARTHUR RIVER BASE METALS MINE
Mine - Site Buildings/Earthworks project at 50 km southwest of Booraloola, NT 0854 in the Commercial Premises (Offices). Contract was to involve earthworks (approximately $500,000) including general civils, site preparation & pouring of concrete footings. Several buildings required (at least one transportable) for administration, changehouse, laboratory & associated infrastructures. Work incorporates provision of underground & piped services. Scope of works has been reduced from the original plans. Click for more details...

WOODCUTTERS BASE METALS MINE
Addition project of Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800. Supply & installation of steelwork for shaft extension. Works to be carried out over 325m from the RL730 to the RL405 level. Click for more details...

DARWIN TRANSMISSION LINES
66 Kv Transmission Lines New project In The Darwin City Council Area. Consultants to investigate maximum operating temperature of 66 Kv transmission lines. Click for more details...

STUART/VICTORIA HIGHWAY REHABILITATION
Stuart & Victoria Hwys Region of, Katherine, NT 0850 Has Stuart/Victoria Highway Rehabilitation currently at Tenders & Building stage. Slurry correction & overlay. Click for more details...


is currently at the Construction stage, valued at about $ 190000 it is Construction of 1 x 3 bedroom dwelling. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Upgrades to 4 existing houses. Click for more details...


State ownership Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Palmerston Town Council Area for Renovations, Refurbishments etc. development. Tree removal & pruning maintenance of trees in Northern Territory HOusing Commission allotments - Darwin, Casuarina & Palmerston Region. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Screening For Dam Walls For Tailings Dam project at Approx 200 km east of, Daly Waters, NT 0852 In The Council Area Of Darwin City of Private. Providing plant, equipment and services for screening materials for the dam walls. Click for more details...

AYERS ROCK RESORT - DESERT GARDENS HOTEL
Tourism (Tourist villages, Resort complexes) project, Yulara, NT 0872 of Resort - Altns & Addns - Central Facilities type of Addition development. Construction of new kitchen, extensions to existing restaurants, extensions & upgrading of existing reception & foyer areas. Click for more details...

BROWNS POLYMETALLIC PROJECT
Mining (Open Cut) New project at Approx 60 km south east of, Darwin, NT 0800. This type is Bulk Sample Extraction with Private ownership. A contract has been prepared to re-enter the bulk sample pit at Browns. The pit will be dewatered and a clear floor prepared ahead of mining a 400 tonne sample. The sample will be typical of the sulphide to be treated during the first five years of mining. This will be freighted to Adelaide for processing through the flotation prototype plant to be constructed at Amdel. This plant will operate during the June quarter to produce 50 tonnes of concentrate for prototyping through the Ausmelt process and subsequent matte segregation and hydrometallurgical studies. Click for more details...

GURUNGU COUNCIL ABORIGINAL CORPORATION HOUSING PROGRAM
Residential (Units, apartments, flats, townhouses, villas) project In The Barkly Shire Council Area of Local Govt ownership. Construction of 2 x 3, 1 x 4 & 1 x 5 bedroom elevated houses. Steel frame & steel clad, timber floor, metal deck roof, aluminium framed windows., Click for more details...

CLUB ALICE
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Alice Springs Town Council Area of Sporting Complex/Residential Subdivision For Golf Club - Redevelopment type. Plans are to expand with an extra 18 holes, plus new 18 hole short course under lights. Likely to include bowling greens, squash & tennis courts. Urban development would include: child care centre, swimming pool, barbecue areas, convenience store, function & gaming rooms, bars, gyms & offices as well as houses. Golf club rooms would be relocated & extra 18 holes & housing development would be built on north side of Stephens Road between Lasseters Hotel Casino & existing housing in new suburb in Mt John Valley. Click for more details...

MURIN ASSOCIATION WATER SUPPLY REHABILITATION
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of Water Supply - Upgrading type. Upgrade to water supplies on various outstations. Click for more details...

ALICE SPRINGS HOSPITAL
Trade Package For Ceilings - Hospital - Redevelopment project at Gap Rd, Alice Springs, NT 0870 In The Council Area Of Alice Springs Town of State. Ceilings for hospital redevelopment. Click for more details...

LUDMILLA WASTEWATER TREATMENT PLANT
Public Utilities (Water distribution systems, Drainage) project for New development. Excavation & construction of large underground chambers & elevated concrete structure. 140 m reinforced concrete pipeline. Extension to existing building. Block-work & masonry construction, concrete floor, metal deck roof, electrical & associated works. Click for more details...

LYONS SUBDIVISION DEVELOPMENT
Commercial Premises (Offices) project at Located west of Lee Point Rd (next to Royal Darwin Hospital & bordered to north by RAAF radar site) Lyons, Region of, Darwin, NT 0800 for New. New suburb will be built in Darwin's Northern area on 68 ha Defence Department land. To include 700 lots, 400 approx houses, parks, & associated community facilities. Click for more details...

BROWNS OXIDE PROJECT - NEW TAILINGS FACILITY
7 Km North West of, Batchelor, NT 0845 Has Browns Oxide Project - New Tailings Facility currently at Construction stage. The Tailings Storage Facility associated with the approved BOP has been found to overly a zone of potentially economic mineralisation. To avoid sterilisation of this zone of mineralisation th Company intends to construct a new TSF to contain the tailing from ore processed from the Browns oxide deposit in a location immediately adjacent to the approved TSF location. The new TSF has been designed on the basis that it will store both tailing and potentially acid forming (PAF) waste rock from the deposit. Prepatory activities associated with the construction of the new TSF are: vegetation clearing and grubbing, topsoil stripping and stockpiling, levelling of the site and compaction of existing clayey soils. The construction of the TSF will involve: an internal lining of compacted clayey soil, comprising a number of layers of low permeability material. Material for this zone will be preferentially sourced from a borrow pit located within the storage area, a rockfill zone for the external empbankment, constructed using NAF pit waste material, an internal ramp to access the decant system, and a PAF bund. The PAF bund will provide a physical barrier between tailings and the PAF waste, and is required because the tailings level will be higher than PAF waste level in the early stages of construction. A protective rockfill layer place (loose) over the face of the Zone 1 layer to provide protection from erosion and evaporative drying. Click for more details...

SOUTH STUART HIGHWAY SHOULDERS
Shoulder - Reinstatement Renovations, Refurbishments etc. project In The Alice Springs Town Council Area. Reinstatement of shoulders along various secns of highway (between Ch: 1,700 km & Ch: 1,742 km). Click for more details...

EAST ARM WHARF FENDER REPAIRS
Civil Engineering (Docks & piers, wharves, boat ramps) project for Renovations, Refurbishments etc. development. Fender repairs to East Arm Wharf. Click for more details...

TABLELANDS HIGHWAY ROADWORKS
Tablelands Hwy btwn CH: 101.93 km & CH: 104.03 km, Tennant Creek, NT 0861 Has Tablelands Highway Roadworks currently at Construction stage. Construct overtaking opportunity on Tablelands Hwy between CH: 101.93 km & CH: 104.03 km. Click for more details...

LYONS CIVIL WORKS PHASE 1 - STAGE2 (STAGES 6-2) - DOUBLE ENTRY
A project in the NT Within Darwin City. Civil works including roads, drains & other service infrastructure including civil work Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TEMPORARY LAYDOWN AREAS
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Temporary Laydown Areas currently at Construction stage. For the provision of temporary laydown areas for the 275 km pipeline. Click for more details...

MOUNT JOHNS VALLEY ESTATE SUBDIVISION STAGE 1
Civil Engineering (Residential Subdivision) New project at Mt Johns Valley, Alice Springs, NT 0870. This type is Residential Subdivision (29) Lots - Stage 1 with Private ownership. Development of 29 lot subdivision. Click for more details...

LEONINO ROAD 13 LOT SUBDIVISION
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 390000. This project Subdivision for 13 lots. Click for more details...

NORTHERN TERRITORY INDUSTRY CAPABILITY NETWORK INDIGENOUS HOUSING
Residential (Units, apartments, flats, townhouses, villas) project In The Central Desert Shire Council Area of State ownership. New Housing Packages 10 & 11. Construction details not disclosed. Click for more details...

AUSTRALIAN COMMUNICATIONS & MEDIA AUTHORITY HOWARD SPRINGS NORTHERN TERRITORY
A project in the NT Within Litchfield Shire. Site preparation/remediation works for replacement of ageing High Frequency Direction Finding (HFDF) system at existing sites in Bullsbrook, Western Australia, Capalaba, Queensland, Shoal Bay, Northern Territory & Richmond, Tasmania. Works include the demolition & removal of existing equipment hut, towers & antennas & site preparation works including civil works, mechanical & electrical services. Click for more details...

MAGNUM APARTMENTS
Residential (Units, apartments, flats, townhouses, villas) project at 44 Woods St (Lot 1423), Darwin, NT 0800 for New. Construction of 9 storey mixed use building with 194sq m commercial tenancy on ground floor & 40 units above. 24 x 1 bedroom & 16 x 2 bedroom units. Concrete blockwork, glass & steel. 1 lifts. Swimming pool. 3 levels of basement carparking. Associated landscaping. Click for more details...

BULLOCKY POINT NORTHERN TERRITORY OPEN EDUCATION CENTRE
Education (Schools - primary, secondary (up to Yr 12)) project In The Darwin City Council Area of Open Education Centre - 3 Storey type. Construction of 3 storey purpose built facility to cater for delivery of modern distance education across Northern Territory. Ground level to include 8 offices, open office area, reception area, foyer/arrival hall, meeting & staff room, finance workstation area, student services & entry, amenities, sick bay, copy room, storage & cleaners room. Level 1 to include 5 offices, open office area, meeting room, 2 general learning areas, reception & foyer, amenities, tea room, despatch area & storage. Level 2 to include 2 open teaching areas, student digital lounge, music studio, multipurpose wet area, staff room, amenities & storage. Concrete slab, colour-coated steel cladding, cement cladding panels, rendered blockwork, concrete wall, colour-coated metal roof. Outdoor staff area. Associated car parking & landscaping. Click for more details...

STUART HIGHWAY STUARTS WELL & HUGH RIVER STOCK ROUTE
Stuart Highway Stuarts Well & Hugh River Stock Route is currently at the Construction stage, valued at about $ 968000 it is Upgrade of intersection at Stuart Highway corner of Stuart's Well & Hugh River Stock Route. Works to include turning lanes, earthworks, drainage & pavement works. Click for more details...

WADEYE POLICE STATION
Public Buildings & Facilities (Police Stations) project at Perdjert St (Lots 447 - 450, 527, 575), Wadeye, NT 0822 for New. Proposed construction of the Wadeye Police Complex to include police station, visiting officers quarters & housing. To include demolition & decommissioning of existing Power Water Corporation facility & existing dwellings. Construction of Police Station in a single storey building with reception, office areas, interview rooms, cells, communications, interview facilities, sally port & ancillary administration areas. 10 x 4 bedroom detached 2 storey dwellings with double car ports & balconies. Construction of 2 x 3 bedroom duplexes with carports & balconies. 8 x single bedroom units for visiting officers in a 2 storey building. Boat shed & dog storage area with 3 roller doors & internal workshop. Painted steel balustrades, concrete blockwork walls, ceramic floor tiles, vinyl flooring, sheet metal roofing & cladding. 2.1m high chainmesh fence around site boundary & 1.8m high chainmesh fence around dwellings. Asphalt driveways & total car parking for 18 cars. Associated landscaping. Click for more details...

MCCOURT ROAD WAREHOUSE & OFFICE
27 McCourt Rd (Lot 8543), Yarrawonga, NT 0830 Has Mccourt Road Warehouse & Office currently at Construction stage. Construction of a 927.45sq m warehouse & 147.8sq m office space. To include 139.89sq m mezzanine area & 167.2 sqm external storage area. Reception, display area, 3 x offices, meeting room, photocopy room, kitchen & amenities. Sealed gravel hardstand, reinforced concrete, concrete kerb & gutter, concrete retaining wall, metal battens, steel framed awnings & wall cladding. Car parking for 19 cars. Associated landscaping. Click for more details...

RAMINGINING SCHOOL DEMOLITION & ASSOCIATED WORKS
Ramingining School Demolition & Associated Works is currently at the Construction stage, valued at about $ 876000 it is Demolition & associated works at Ramingining School in the East Arnhem Region. Works to include demolition of exiting Pre-School & Classroom/Canteen/Ablution Block. Provision of 2 new 20ft lockable shipping containers on site for storage with cyclone footings & tie downs. Supply & install 1800mm high chainmesh fencing (approx. 470lm) & 2 x 6000mm wide double access vehicular gates. Removal of existing concrete footings & reinstate ground surface. Relocation of existing Transportable to rear of site on new concrete footings & stumps. Concrete footings & stumps to be designed by contractor. Provision of section 40 structural certificate for new footings/stumps. Installation of new power, water, sewer & communications services to Transportable. Click for more details...

MIDDLE POINT BUS TURNAROUNDS
Middle Point Bus Turnarounds is currently at the Construction stage, valued at about $ 214000 it is Construction of bus turnaround areas at Anzac Parade for the Middle Point School & at the intersection of Miniata Drive & Billabong Road, Lambells Lagoon. To include earthworks, clearing & grubbing. Construction of 40mm thick asphalt surface with 200mm gravel base pavement compact to 100% MMDD. Supply & installation of 1.2 high pedestrian gates at Middle Point School. Provision of line marking & road signage. Provision of traffic control. Click for more details...

CENTRALIAN MIDDLE SCHOOL LABORATORY UPGRADE
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at Milner Rd, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Upgrade works top the Block C Laboratory at the Centralian Middle School in Alice Springs. To include the demolition of existing laboratory, fittings & fixtures. Removal & capping of redundant services, Supply & installation of fixed furniture, lining & services. Patch & paint new & existing walls, doors & door frames. CFC sheeting, 50mm stud lined vinyl walls, blinds, splash back & aluminium framed windows. Vinyl flooring & carpet floor tiles. Click for more details...

MANINGRIDA GOVERNMENT EMPLOYEE HOUSES UPGRADES
Government Employee Houses (25) - Upgrades project at Located Within, Maningrida, NT 0822 In The Council Area Of West Arnhem Shire of State. Refurbishment works to 25 Government Employee Houses located 500km East of Darwin. To include painting of internal & external surfaces. Removal of vinyl flooring & replacement with ceramic floor tiles. Replacement of kitchen & bathroom fittings & fixtures. Supply & installation of stainless steel security mesh. Supply & installation of 2.3m x 1.6m x 2.1m cyclone rated garden shed with connection to electrical services. Click for more details...

CASUARINA COASTAL RESERVE DRIPSTONE CLIFFS & RAPID CREEK SITE UPGRADES
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Darwin City Council Area of Parks - Upgrades type. Upgrade works to the Dripstone Cliffs Site & Rapid Creek Site at the Casuarina Coastal Reserve. Dripstone Cliffs works to include demolition of existing car parking facilities & landscaping of existing car parking loop. Construction of new carp parking area, shelters, picnic tables & barbecues. Rapid Creek works to include construction of sealed access road & car park, landscaping & construction of new picnic area with shelters & toilet block. Construction of concrete beach ramp. Click for more details...

ROYAL DARWIN HOSPITAL BUILDING 4 FIRST FLOOR REFURBISHMENT
Medical (Hospitals & associated buildings, mortuaries) project for New development. Refurbishment works at the Royal Darwin Hospital Building 4, first floor red wing. To include removal of asbestos vinyl floor tiles & overlaying carpet. Supply & installation of sheet vinyl flooring, vinyl skirting & carpet tiles. Fit out of tea room to include demolition & removal of existing fixtures & installation of sliding door, fixtures & joinery. Painting of all modified surfaces. Click for more details...

TERRITORY GYMNASTICS ACADEMY
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 426 Stuart Hwy, Winnellie, NT 0820 for New. Proposed construction of a gymnastics training facility. Car parking for 39 vehicles. Associated landscaping. Click for more details...

ICHTHYS LNG PROJECT - ACCOMMODATION VILLAGE OPERATION & MAINTENANCE (OPS2) - REPAIRS, MAINTENANCE & SERVICING
Repairs/Maintenance/Servicing Of Kitchen Exhaust System New project In The Darwin City Council Area. For the provision of cleaning & services on all exhaust extraction fans, ducting & double sided range hoods. Click for more details...

PORT KEATS BARGE RAMP
Civil Engineering (Docks & piers, wharves, boat ramps) project at ., Port Keats, NT 0822 of Barge Ramp - Repairs type of New development. Repairs to the Port Keats barge ramp, including the reconstruction of the barge ramp concrete slab. Click for more details...

WEST ARNHEM SHIRE
Private ownership Commercial Premises (Offices) project In The Darwin City Council Area for Addition development. Alterations & additions to an existing warehouse to comprise addition of office & caretaker's residence, relocation of entrance & installation of new stairs. Click for more details...

KATHERINE REGION URBAN PUBLIC HOUSING
State ownership Residential (Units, apartments, flats, townhouses, villas) project In The Victoria Daly Shire Council Area for New development. Construction of 2 x 3 bedroom block single storey dwellings at lots 138 & 140 Click for more details...

NGUKURR REMOTE COMMUNITY HOUSING
State ownership Residential (Units, apartments, flats, townhouses, villas) project In The Roper Gulf Shire Council Area for Renovations, Refurbishments etc. development. Upgrade to 14 Remote Community Housing (RCH) assets in the Community of Ngukurr. The lot numbers are 286, 287, 304, 306, 309, 311, 312, 320, 325, 326, 328, 364, 366 and 389 Click for more details...

PORT KEATS ROAD
Public Utilities (Water distribution systems, Drainage) project for New development. Reform & resheeting of various sections between chainage 24km & chainage 180km at Port Keats Road. Works also include reinstatement of table drains, offlet drains & table drain blocks. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect