ROYAL DARWIN HOSPITAL
Royal Darwin Hospital is currently at the Tenders & Building stage, valued at about $ 30000 it is Provision chilled water by-pass pump. Click for more details...

TERRITORY HOUSING-KATHERINE
Renovations, Refurbishments etc. project of Residential (Units, apartments, flats, townhouses, villas) project at 20 Condon St, 11 & 13 Callistemon Dr, Katherine, NT 0850. Complete internal paint to all previously painted surfaces to three (3) dwellings. Click for more details...

DIRECTOR OF PUBLIC PROSECUTIONS
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Alice Springs Town Council Area of State ownership. Alterations & additions but not limited to: demolition existing partitions & services, making good all affected surfaces, supply & install new partitions, glazed units & joinery, alterations & additions to mechanical, hydraulic, electrical services (power outlets, communications & data cabling, general lighting, exit & emergency lighting) including rebalancing & commissioning of systems, installation of BMS onto two doors & provision of 50 reader keys, relocation of office server & associated split system, complete repainting of tenancy. Click for more details...

CENTRELINK CUSTOMER SERVICE CENTRE - TENNANT CREEK
Commercial Premises (Offices) New project at 77 Patterson St, Tennant Creek, NT 0862. This type is Customer Service Centre - 2 Level with Private ownership. Construction of 2 level customer service centre. Click for more details...

RAAF BASE DARWIN
A project in the NT Within Darwin City. Department of Defence is planning to replace Airmen's Recreation Centre at RAAF Base Darwin. New facility will provide a suitable venue for recreational activities for RAAF Base Darwin's 505 non-commissioned personnel, with capacity to cater for up to 950 personnel. New facility will be required to accommodate following activities: indoor bar & lounge areas, outdoor bar & entertainment areas, TV, ante & games facilities, private functions & general entertainment, food storage, preparation & service, minor retail activities, facility administration & management, car parking. Click for more details...

URBAN REGION - ROAD REHABILITATION
Currently at the Construction stage In Darwin City is a project estimated to be $ 280000. This project Period contract for pavement markings to 31 December 2002. Click for more details...


Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) Renovations, Refurbishments etc. project at Region of, Katherine, NT 0850. This type is Electronic Equipment - Upgrading - Pawa Installations with State ownership. General repairs & maintenance to Electronic equipment, instrumentation & PLC's on PAWA installations in Katherine region. Click for more details...

AREYONGA COMMUNITY
A project in the NT Within Macdonnell Shire. Proposed construction new bore. Click for more details...

STUART HIGHWAY
Stuart Highway is currently at the Construction stage, valued at about $ 31000 it is Asphalt overlay to various location of highway. Click for more details...

ROBERTSON BARRACKS
Optic Fibre Cable - Upgrading New project In The Litchfield Shire Council Area. Retrofit of optic fibre cable infrastructure to 2nd Cavalry & 1st Armoured Regiment. Click for more details...

ALICE SPRINGS CONVENTION CENTRE
Hospitality (Conference & reception centres & facilities) New project at Barrett Dr, Alice Springs, NT 0870. This type is Convention Centre with State ownership. Convention centre with theatre seating for 1200 people & banqueting facility for 780 people. Aluminium, brick & glass construction, concrete floor, metal deck roof, airconditioning, fire services. Carparking & landscaping. Click for more details...

UBIRR ROCK - KAKADU NATIONAL PARK
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Roadworks For Park type. Work comprises construction of 3 No concrete floodways on Ubirr Rock access road, reconstruction of Ubirr Rock carpark utilizing brick pavers laid on constructed FCR base & compacted subgrade. Construction of following items of work are also required: Site drainage, fencing, drainage culverts & sign posting. Click for more details...

ROBERTSON BARRACKS
Closed Training Areas/Area Magazine/Landscaping - Apin - Stage 2 project at Robertson Barracks (formerly Waler Barracks), Palmerston, NT 0830 In The Council Area Of Litchfield Shire of Federal. Close training areas, area magazine & continuation of forward tree planting program established under APIN stage 1. Click for more details...

TANAMI ROAD REHABILITATION
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area for Renovations, Refurbishments etc. development. Gravel resheet Chainage 455.7km - 465.7km & 480km - 490km & gravel resheet & salt stabilise Chainage 450.7km - 455.7km. Click for more details...

TANGENTYERE COUNCIL WATER SUPPLY RETICULATION
Public Utilities (Water distribution systems, Drainage) project at Charles Creek Camp Region of, Alice Springs, NT 0870 of Water Supply Reticulation type of New development. Construction of water supply reticulation at Charles Creek Camp. Click for more details...

MINJILANG COMMUNITY
Currently at the Construction stage In West Arnhem Shire is a project estimated to be $ 450000. This project Construction of 2 x 3 bedroom steel framed houses & renovation/extension to an existing house. Click for more details...

WINNELLIE WAREHOUSE DEVELOPMENT
Industrial (Warehouses, cargo sheds, distribution centres) project In The Darwin City Council Area of Warehouses (18) type. Construct 18 small warehouses on 4,400 sq m allotment in heart of Winnellie. Click for more details...

FRANCES BAY DRIVE CLUSTER DWELLINGS
New project of Residential (Units, apartments, flats, townhouses, villas) project at 76 (pt lot 5725 & proposed lot 5) Frances Bay Dr (Town of Darwin), Darwin, NT 0800. 3 bedroom. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

WINNELLIE POST OFFICE
Addition project of Commercial Premises (Post Offices) project at Winnellie Post Office, 354 Stuart Hwy, Winnellie, NT 0820. Enclose part of rear section of Post Office. Comprising concrete work, steel frame & roller doors. Click for more details...

KATHERINE TERRITORY HOUSING DWELLINGS UPGRADE
Renovations, Refurbishments etc. project of Residential (Units, apartments, flats, townhouses, villas) project at Various sites Region of, Katherine, NT 0850. Upgrade & replace cupboards to various Territory Housing Dwellings. Click for more details...

ROAD PROJECTS THROUGHOUT NT
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of State ownership. Project & site management services as & when required from suitably qualified & experienced Project, Site & Engineering Managers. Click for more details...

DEPARTMENT OF BUSINESS INDUSTRY AND RESOURCE CONSULTANCY
Mining (Offshore - oil & gas) project In The Barkly Shire Council Area of Petrological/Mineralogical/Analytical Services - Contract type. Panel contract for the provision of Petrological, Mineralogical and Analytical services for a period of 3 years. Click for more details...

DRIPSTONE CHILDCARE CENTRE KITCHEN
State ownership Education (Kindergartens, day nurseries, child care centres) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Replace existing kitchen joinery with new joinery, general repairs, re-tiling splashbacks & painting, minor electrical & plumbing work. Click for more details...

TI TREE RESEARCH STATION
Renovations, Refurbishments etc. project of Industrial (Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)) project at Ti Tree Research Station, 180 km approx north of, Alice Springs, NT 0870. Renovate bathroom & laundry. Click for more details...

BURNSIDE GOLD OPERATIONS - UNIONS REEF GOLD PLANT UPGRADE
Currently at the Early Planning stage In Katherine Town is a project estimated to be $ 15000000. This project The Union Reef gold plant is 2.5 Mt dual mill CIL plant. It has recently been recommissioned and did its first gold pour in late September 2006. The developer has signed a licence agreement with GeoBiotics to use the GEOCOAT refractory ore treatment process. Using this process the developer is proposing to construct a new flotation plant and a bio-oxidation heap leach facility. Ore production is targeted at 250,000 ounces per annum. Click for more details...

ALICE SPRINGS REGION MEDIANS/VERGES/ROADSIDE LANDSCAPING
Various locations within region of, Alice Springs, NT 0872 Has Alice Springs Region Medians/Verges/Roadside Landscaping currently at Tenders & Building stage. Maintenance of medians, verges & roadside landscaping at various locations within region of Alice Springs for 12 month period contract. Click for more details...

MOTOR VEHICLE REGISTRY GOYDER ROAD SERVICE AREA UPGRADE
State ownership Commercial Premises (Motor Registries) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Modifications & repairs to Motor Vehicle Registry service area. Click for more details...

WANGURI PRIMARY SCHOOL MULTI PURPOSE LEARNING AREAS BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) New project at 46 Gsell St, Wanguri, NT 0810. This type is Multi Purpose Learning Areas with State ownership. Construction of Multipurpose Learning Area Click for more details...

DARWIN GOVERNMENT HOUSE PERIMETER FENCING
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) New project at Jervois Rd, Darwin, NT 0800. This type is Perimeter Fencing with State ownership. Remove existing perimeter fence & replace with new fence on boundary along Jervois Rd. Click for more details...

ALICE SPRINGS YOUTH & COMMUNITY CENTRE STAGES 5-8
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 5000000. This project Redevelopment of Alice Springs Youth and Community Centre. To include old class rooms converted to office space for NGO & government youth services, installation of a commercial quality kitchen, installation of a skate ramp, upgrading of access to the Youth Hub to comply with Australian mobility standards including the installation of a ramp to the first floor, installation of a lift & internal renovations such as painting & flooring & electrical. Stage 5 - new skate way upgrade & roof enclosure structure (783sq m). Stage 6 - new boxing centre & minor conversion of existing boxing shed to museum (423sq m). Stage 7 - demolition of existing shed & new martial art & gymnasium building (208sq m). Stage 8 - Arrernte cultural court. Click for more details...

DEFENCE HOUSING TINDAL
Federal ownership Military (Military housing & accommodation, Military colleges) project In The Katherine Town Council Area for Renovations, Refurbishments etc. development. To include some house extensions, complete renovations & minor alterations for 62 DHA Houses. Click for more details...

ROBERTSON BARRACKS REDEVELOPMENT WORKS PART 2 HIGH VOLTAGE ELECTRICAL RETICULATION SYSTEM UPGRADE & BUILDING WORKS
Military (Military installations & facilities) project In The Darwin City Council Area of High Voltage Electrical Reticulation System/Building Works type. Work to include construction of new emergency power station, upgrade to substations & modification to two other buildings. Click for more details...

ICHTHYS MAIN CIVIL WORKS (CVL3) - GRE/GRVE PIPING INSTALLATION
Oil & Gas (Onshore processing facilities) project for New development. Contract for installation & spooling of 16km of DN 150mm-900mm glass reinforced vinyl ester (GRVE) & DN 1050mm-1800mm glass-fibre reinforced epoxy (GRE) pipes. Contract to also include lamination of rubber ring jointing at the Ichthys Onshore LNG facilities project. Click for more details...

FOWLESTONE ROAD INDUSTRIAL DEVELOPMENT
Warehouses (2)/Workshop/Showroom/Offices (5) project at 35 Fowlestone Rd (& 36 Coffee St) (Lot's 11011, 11012, 10993 & 10994), Tivendale, NT 0822 in the Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods). Construction of industrial building with mezzanine level. To include 2 x warehouse (4616sq m), workshop (560sq m) showroom (131sq m), mezzanine level (200sq m), 5 x offices (291sq m) & staff amenities (88sq m). Concrete slab, rendered concrete blockwork & metal roof. Parking for 69 cars. 7 loading bays. Associated landscaping. Click for more details...

ICHTHYS GAS PROJECT - MAIN CIVIL WORK (CVL3) - TEMPORARY WORKS DESIGN REV1 CONSULTANCIES
Ichthys Gas Project - Main Civil Work (Cvl3) - Temporary Works Design Rev1 Consultancies is currently at the Construction stage, valued at about $ 250000 it is For the provision of Temporary Works Design along with Construction Methodologies associated with CVL3 Main Civil Works project on the Ichthys Project Onshore LNG facilities. Click for more details...

DUNDEE BEACH BOAT RAMP RECONSTRUCTION
Boat Ramp - Reconstruction project at Located within, Dundee Beach, NT 0822 In The Council Area Of Unincorporated North of State. Reconstruction of the Dundee Beach boat ramp at Fog Bay. To include supply & installation of concrete foundations, geotextile fabric, precast concrete planks & crushed rock. Extension & augmentation of existing rock groyne to include foundation preparation, quarry run core material & 2 layers of graded armour rock. Dredging of access channel. Reprofiling & nourishment of beaches. Supply & installation of solar navigation aids. Click for more details...

GUNN POINT ROAD RESHEETING
Roadworks - Resheeting project at Gunn Point Rd, Gunn Point, NT 0822 In The Council Area Of Palmerston Town of State. Resheeting work to various locations on Gunn Point Road. Locations to include Ch10.5 - Ch11.6, Ch18 - 18.5, Ch29.4 - Ch30.5 & Ch31.3 - Ch31.6. Supply & lay 150mm thick subgrade compacted to 95% MMDD. Supply & lay 1500mm thick type 2 gravel base course compacted to 95% MMDD. Construction of trapezoidal flat bottom drains 400mm below surface. Compaction of table drain block & offlets to 95% MMDD. Provision of traffic control. Click for more details...

LITCHFIELD NATIONAL PARK TERMITE MOUNDS SITE UPGRADE
Entertainment (Parks, Leisure grounds, Playgrounds) project at Litchfield Park Rd, Litchfield Park, NT 0832 for New. Upgrade works to the Magnetic Termite Mounds site at Litchfield National Park. Works to include the refurbishment of the existing boardwalk & construction of a new boardwalk with aluminium decking, plastic handrails & kickboards. Upgrades to pedestrian services & footpath drains. Construction of new ablution building. Click for more details...

DRIPSTONE MIDDLE SCHOOL CANTEEN UPGRADE
Currently at the Construction stage In Darwin City is a project estimated to be $ 150000. This project Refurbishment works to the existing canteen at Dripstone Middle School at Delamere Street, Tiwi. To include demolition of internal canteen fit out. Supply & installation of new internal benches, tiled flooring & roller door. Provision of painting internal areas, mechanical upgrades, electrical works & ceiling works. Click for more details...

SADADEEN PRIMARY SCHOOL ROOFING REPAIRS
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 108000. This project Design & construction for repair works to roofing of school building & walkways at the Sadadeen Primary School. To include the removal of existing roof sheeting. Supply & installation of metal roof sheeting, ridge caps, sundry trims, cleats & purlins. Guttering & insulation. Click for more details...

CLYDE FENTON PRIMARY SCHOOL WATER MAINS UPGRADE
New project of Education (Schools - primary, secondary (up to Yr 12)) project at 10 Tilston Ave, Katherine, NT 0850. Design & construction of upgrates to water mains for potable water, fire services & irrigation uses at the Clyde Fenton Primary School. Design team to include Architect, Quantity Surveyor, Structural Engineer, Mechanical Engineer, Electrical Engineer, Hydraulic Engineer, Civil Engineer & Stormwater Engineer. Click for more details...

CALVERT ROAD WIDENING
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Calvert Rd, Tennant Creek, NT 0860. Widening of Calvert Road from 4.5m to 6m between Ch113.48 & Ch122.48. Supply & lay gravel to 150mm depth compacted to 95% MMDD. Reconstruction of gravel block drains & table offlet drains. Click for more details...

JABIRU FIRE STATION
Public Buildings & Facilities (Fire Stations, SES) project at 1 Gregory Pl, Jabiru, NT 0886 of Bitumen Works type of New development. Scope of work includes: repair bitumen driveways. Prepare and paint all external previously painted surfaces. Replace all internal recessed mounted lights with new batten lights with diffuser. Make good and repair damaged ceilings Click for more details...

NORTHERN GAS PIPELINE - VENT SILENCER
Non-Construction Items (Supply/fabrication) project at Tennant Creek to Mount Isa, ., NT 8999 of Vent Silencer type of New development. Works to include the design and supply a vent silencer for the Mount Isa compressor station. The vent silencer shall be mounted atop a vertical pipe stack, & be required to provide noise attenuation in accordance with the site requirements. Click for more details...

ALICE SPRINGS HOSPITAL - STAFF ACCOMMODATION
Medical (Hospitals & associated buildings, mortuaries) project at Gap Rd, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Remove & dispose off site decommissioned air handling plant. Remove decommissioned hot water plant & associated redundant components & dispose offsite. Reconnect existing infrastructure into newly installed hot water plant, commission & test Click for more details...

TAMINMIN COLLEGE - BLOCKS 3 & 7
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 185000. This project Refurbishment of the girls, boys & male staff toilets in ablution blocks 3 & 7. Scope of work includes: repairs & painting. New toilet suites. New drinking fountain. New hand wash troughs. New urinals & new toilet cubicle doors Click for more details...

YIRRKALA SCHOOL
Court - Refurbishment project at ., Yirrkala, NT 0880 in the Sports (Sports ground hard surface (tennis courts,netball courts, basketball & skateparks)). Court resurfacing: pepare existing asphalt outdoor basketball & tennis courts & associated bitumen surfaces & apply a new acrylic sports surface and line marking. Fencing upgrade: remove & dispose of existing perimeter fencing (not including existing posts/footings). Install new hot dip galvanised Straining wire, chain mesh fencing, PA gates & locking furniture. Click for more details...

ROOM TO BREATHE
Residential (Units, apartments, flats, townhouses, villas) project for Addition development. Room to Breathe early works program in Numbulwar. Creation of new living spaces in existing homes Click for more details...