ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Primary And Secondary Processing (Piping) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

MCMINN STREET PIPE BARRIERS
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of State ownership. Supply & install pipe barriers. Click for more details...

CENTRAL AUSTRALIAN PROJECT
A project in the NT Within Alice Springs Town. Tanami Gold NL has entered into an agreement to joint venture with BHP Billiton and Teck Cominco. The Alliance (being BHP Billiton and Teck Cominco) has the option to earn a 51% interest in the EL's after expenditure of $2million. The Alliance may then elect to continue sole funding through to completion of a bankable feasibility study or dilute. Tanami Gold has the right to explore the tenements for mineral deposits other than base metals provided such programmes do not interfere with the Alliance programmes. Click for more details...

TASSIE SHOAL METHANOL PROJECT - ACCOMMODATION & CONTROL PLATFORM
Oil & Gas (Topside - modules, platforms) project for New development. Key components of the Tassie Shoal Methanol project include accommodation and control platform for personnel living quarters. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) New project at Bulman, NT 8999. This type is Houses (2)/Office (1)/Community Hall (1)/Mechanical Workshop (1) with Local Govt ownership. 2 x 3 bedroom, steel framed houses on stumps, 1 x steel framed office on stumps, 1 x community hall & 1 x mechanical workshop. Click for more details...


Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) New project at Bulman, NT 8999. This type is Houses (2)/Office (1)/Community Hall (1)/Mechanical Workshop (1) with Local Govt ownership. 2 x 3 bedroom, steel framed houses on stumps, 1 x steel framed office on stumps, 1 x community hall & 1 x mechanical workshop. Click for more details...

KAKADU NATIONAL PARK
Federal ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Pump out/desludging of sewerage & septic tank systems at Park Headquarters, all Ranger Stations & campgrounds throughout Kakadu National Park. Click for more details...


New project of Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at 101 Pruen Rd (Prtn 2029 Hund of Bagot), Berrimah, NT 0828. Industrial workshops & offices. Workshops 390 sq m approx o'all. Offices 90 sq m approx o'all. Workshops - Steel portal frame. Offices -Pre-cast concrete, all with concrete floors, metal deck roof, aluminium framed windows, split airconditioning. Single seal carpark & landscaping. Click for more details...

FAIRWAY WATERS
A project in the NT Within Palmerston Town. To create 71 lots. Roads, water, sewerage, electrical & telephone services. Click for more details...

COMMUNITY HOUSING VIA ALICE SPRING
Residential (Units, apartments, flats, townhouses, villas) New project at Various Communities via, Alice Springs, NT 0872. This type is Houses (5) with Local Govt ownership. Construction of 1 house at each of the following communities: Papunya Ikuntji (Haasts Bluff), Laramba, Ti Tree, & Willowra. Individual floor area: 300 sq m each. Click for more details...

GROOTE EYLANDT-ALYANGULA BUILDING/JOINERY WORKS
Building/Joinery Upgrade For Territory Housing (12) project at Various sites Arnhem Cr, Ayawara Cr & Poinciana St, Groote Eylandt, Alyangula, NT 0885 in the Residential (Units, apartments, flats, townhouses, villas). Various building & joinery works, replace various hinged doors & hardware, replace sliding wardrobe doors with hinged timber doors & new hardware, replace laminate to various bench tops. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) Renovations, Refurbishments etc. project, Ramingining, NT 5999. This type is School Building & Residences - Upgrading with State ownership. Painting & repairs. Click for more details...

WALER BARRACKS
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Waler Barracks, Palmerston, NT 0830 for New. Extension of trunk roads & engineering services (water, power, storm water, communications & sewer). Click for more details...

TANAMI ROAD REHABILITATION
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area for Renovations, Refurbishments etc. development. Gravel resheet Chainage 455.7km - 465.7km & 480km - 490km & gravel resheet & salt stabilise Chainage 450.7km - 455.7km. Click for more details...

MURIN ASSOCIATION WATER SUPPLY REHABILITATION
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of Water Supply - Upgrading type. Upgrade to water supplies on various outstations. Click for more details...

ALICE SPRINGS RESORT-PALM COURT
A project in the NT Within Alice Springs Town. Refurbishing of existing 67 rooms for resort. Click for more details...

JIM JIM CAMPGROUND FACILITIES
New project of Social (Amenities, Dressing rooms) project at Jump Up, Kakadu National Park Region of, Darwin, NT 0800. Work consists of two new ablution blocks each with six showers & six toilets. Steel frame & steel clad, CFC floor sheeting, metal deck roof, tiling. Storage area & shelter for water reticulation equipment. Click for more details...

FLEMING STREET DWELLINGS
New project of Residential (Units, apartments, flats, townhouses, villas) project at 2 (lot 6934) Fleming St (Town of Darwin), The Narrows, NT 0820. Construct 6 x 2 bedroom single storey cluster dwellings. Click for more details...

DIESEL GENERATORS/ANCILLARY MECHANICAL EQUIPMENT - KATHERINE REGION
Various sites Region, Katherine, NT 0850 Has Diesel Generators/Ancillary Mechanical Equipment - Katherine Region currently at Construction stage. Repairs & maintenance of diesel generators & ancillary mechanical equipment throughout Katherine Region for 12 month period. Click for more details...

BULMAN & BLYTH RIVER GRADING GRAVEL ROADS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. Grading of gravel roads between Bulman & Blyth River for 12 month period. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Primary And Secondary Processing (Minerals Processing) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

DARWIN BUS INTERCHANGE - GROUND INDICATORS/PAVING WORKS
Public Buildings & Facilities (Passenger terminals (aiport, bus, rail & sea), Air control towers) Supply & Install project at Intersection Cox Peninsula Rd & Stuart Hwy, Darwin, NT 0801. This type is Tactile Ground Indicators/Associated Paving Works - Supply/Install with State ownership. Supply & installation of tactile ground surface indicators & associated paving works for new Darwin Bus Interchange. Click for more details...

DARWIN/JABIRU - NT GOVERNMENT BUILDINGS - AIRCONDITIONING - GROUP 7
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Darwin City Council Area of Airconditioning Equipment - Repairs/Maintenance type. Repairs & maintenance to airconditioning plant & equipment for 12 month period. Click for more details...

O'FERRALS ROAD DWELLINGS
5 O'Ferrals Rd, Bayview, NT 0820 Has O'Ferrals Road Dwellings currently at Planning stage. Construct 4 x 4 bedroom dwellings within 4 x 2 storey buildings. Click for more details...

KATHERINE REGION URBAN & RURAL ROADWORKS - MAINTENANCE/UPGRADE
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Katherine Town Council Area for New development. Resealing & upgrade of urban & rural roads in & around Katherine region for 'Roads to Recovery Program'. Click for more details...

ICHTHYS LNG PLANT - COMMON FACILITIES - LABORATORY EQUIPMENT REV 2
Oil & Gas (Onshore processing facilities) project for New development. For the provision of Laboratory equipment. Click for more details...

DARWIN AIRPORT CENTRAL
Showrooms/Offices/Recreation Centre project at McMillans Rd (cnr Osgood Dr, Bagot Rd), Marrara, NT 0812 in the Industrial (Warehouses, cargo sheds, distribution centres). Construction of showrooms, offices & recreation facilities. Associated car parking & landscaping. Click for more details...

BULLOCK CREEK UPGRADE
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Katherine Town Council Area for New development. Supply of gravel and all earth works associated with the construction of road pavements including bitumen sealing and line marking. Click for more details...

ALICE SPRINGS CORRECTIONAL CENTRE STAGE 1
Correctional Centre - Altns & Addns - Stage 1 New project In The Alice Springs Town Council Area. Construction of building to accommodate 96 new beds including all associated services. Click for more details...

ALICE SPRINGS COURT HOUSE
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 119000. This project Renovate existing Holding cells. Click for more details...

NORTHERN TERRITORY STRATEGIC INDIGENOUS HOUSING & INFRASTRUCTURE CENTRAL AUSTRALIA & WADEYE
Residential (Units, apartments, flats, townhouses, villas) project at Central Australia & Wadeye areas, ., NT 8999 for New. Part of roposed major Territory housing & refurbishment project, the Strategic Indigenous Housing & Infrastructure Program (SIHIP) in Central Australia & Wadeye District. Click for more details...

LAJAMANU HEALTH CLINIC & HOUSES
Medical (Surgeries, Medical centres) project at ., Lajamanu, NT 0852 of Health Clinic/Houses (2) type of New development. Construction of Health Clinic & 2 x 2 bedroom houses. Associated parking & landscaping. Click for more details...

MIDDLE ARM INDUSTRIAL & WEDDELL TRANSMISSION WATER MAIN CONTRACT 1
New project of Public Utilities (Pumping Stations) project at Jenkins Rd (Stuart Hwy road reserve to 400m west Finn Rd), Weddell, NT 0836. Construction of additional water infrastructure along Jenkins Road. To include: transmission mains, booster pump station, ancillary pipework, off-takes & structures. Associated civil & earthworks. Click for more details...

THE HEIGHTS RESIDENTIAL SUBDIVISION STAGE 2
New project of Civil Engineering (Residential Subdivision) project at 50 (Lot 9765) University Ave & Roystonea Ave, Durack, NT 0830. Stage 2 total of 51 lots - 4 x small lot integrated housing 1 (lot size approx 250 sqm - 299 sqm); 10 x compact lot housing 1 (lot size approx 300 sqm - 399 sqm); 4 x compact lot housing 2 (lot size approx 400 sqm - 499 sqm); 23 x traditional 1 (lot size approx 500 sqm - 699 sqm); 6 x traditional 2 (lot size approx 700 sqm - upward); 3 x multiple dwelling (lot size 1500 sqm - upward); 1 x retirement living (lot size 1.49 ha suitable for future development/subdivision). Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
5,15 & 11 Yarrawonga Rd (Cnr Roystonea Ave & Stuart Hwy ) (Lots 7765, 7766 & 11037), Palmerston, NT 0830 Has Darwin Gateway Shopping Centre Stage 1 currently at Construction stage. Construction of shopping centre. To include Woolworths supermarket, Big W discount store, specialty retail outlets, food court (2150) & cinema complex (4000sq m). Concrete panels, compressed fibre cement sheeting, shopfront glazing, steel framed awnings, metal sheet cladding, vertical blade fins. Parking for 1347 cars. Associated landscaping. Click for more details...

STUART HIGHWAY MOTEL RESTAURANT & OFFICE BUILDING
Hospitality (Restaurants, Canteens) project at 374 Stuart Hwy (Lot 1446), Winnellie, NT 0820 of Restaurant/Office type of New development. Construction of single storey restaurant & office building. To include restaurant & motel reception areas, kitchen, buffet, dining area & amenities. Cement slab, metal cladding walls & metal roof. Parking for 10 cars. 2 loading bays. Associated landscaping. Click for more details...

FLYNN CIRCUIT MIXED USE DEVELOPMENT
Units (30)/Serviced Apartments (36)/Childcare Centre/Commercial - 4 Storey project at 127 Flynn Cct (Lot 10281), Bellamack, NT 0832 In The Council Area Of Palmerston Town of Private. Construction of mixed use commercial & residential development in 1 x 1 & 2 x 4 storey buildings with ground floor & undercroft parking. To include childcare centre (3000sq m), ground floor commercial (1333sq m) & 3 floors of residential above. 6 x 1 bedroom, 18 x 2 bedroom & 6 x 3 bedroom units. 6 x 1 bedroom, 24 x 2 bedroom & 6 x 3 bedroom serviced apartments. Swimming pool. 2 lifts. Concrete blockwork, glass & steel. Parking for 276 cars. Associated landscaping. Click for more details...

NIGHTCLIFF MIDDLE SCHOOL MALE AMENITIES BLOCK UPGRADE
Currently at the Construction stage In Darwin City is a project estimated to be $ 174000. This project Upgrade works to the Male Amenities Block at Nightcliff Middle School, Rapid Creek. To include the removal of existing toilet cubicles, urinals & sinks. Removal of 10sq m of asbestos cement sheeting panel. Construction of 16 male toilet cubicles, CFC cubicle doors, 2 x stainless steel handwashing basins, 2 x stainless steel urinals & 3 x solid blockwork walls between urinals to 1400mm high. Supply & installation of 200mm x 200mm ceramic non-slip floor tiles, 300mm x 200mm ceramic wall tiles & 1200mm x 600mm ceiling tiles. Click for more details...

UMBAKUMBA HOUSES ASBESTOS REMOVAL
Currently at the Construction stage In East Arnhem Shire is a project estimated to be $ 138000. This project Asbestos removal from 3 remote community houses in Groote Eylandt Island, Nhulunbuy, Umbakumba. Click for more details...

LITCHFIELD NATIONAL PARK TOLMER FALLS VISITOR AREA
Entertainment (Parks, Leisure grounds, Playgrounds) project for New development. Upgrade works to the Tolmer Falls Site at Litchfield National Park. To include construction of elevated function shelter, 4 x picnic shelters & ablutions block. Conversion of existing ablutions block to picnic shelter. Refurbishment works to existing boardwalk & lookout shelter with aluminium decking, plastic handrails & kickboards. Installation of solar bollard system. Construction of 3.5m wide gravel track to new campsite area. Replacement of existing concrete pathway to include reinstatement of concrete inverts. Construction of 3m high elevated 10000l water tank with concrete footings, painted steel ladder & platform with railings & kickboards. Associated landscaping Click for more details...

CITY OF PALMERSTON CIVIC PLAZA ROOF REPLACEMENT STAGE 1
Chung Wah Tce & University Ave, Palmerston, NT 0830 Has City Of Palmerston Civic Plaza Roof Replacement Stage 1 currently at Construction stage. Stage 1 of the roof replacement at the City of Palmerston City Council. Click for more details...

PALMERSTON REGIONAL HOSPITAL FENCING
Medical (Hospitals & associated buildings, mortuaries) project In The Litchfield Shire Council Area of Fencing - For Hospital type. Supply & installation of fencing & motorised gates for the Palmerston Regional Hospital. Click for more details...

COOLALINGA SHOPPING VILLAGE
Retail (Shops, shopping centres & arcades, supermarkets) New project at Fairweather Cres, Coolalinga, NT 0835. This type is Shopping Centre with Private ownership. Construction of a 40000sq m shopping centre at Fairweather Crescent, Coolalinga. To include food court & 60 specialty stores. Precast columns, retention & wall panels. Precast & prestressed double tee beams. Associated car parking. Click for more details...

RANKEN ROAD FLOODWAYS
Ranken Rd, Katherine, NT 0850 Has Ranken Road Floodways currently at Construction stage. Construction of 2 x 40m x 8m reinforced concrete floodways at Ch208.62 & Ch208.96 of Ranken Road. To include construction of downstream concrete protection slab with toe walls & slab. Provision of traffic control. Click for more details...

MILIKAPITI SEWER EXTENSION & LOT SERVICES
Public Utilities (Water distribution systems, Drainage) Addition project at Milikapiti, Tiwi Island, NT 0810. This type is Sewer - Extn with Private ownership. Sewer extension (80m) & lot services to 5 lots in Milikapiti, Northern Territory. Click for more details...

TABLELANDS HIGHWAY STRENGTHENING & WIDENING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. Construction of a 3.0km section by strengthening & widening the existing sealed pavement from 4.0m to 7.0m on the Tablelands Highway between CH318.55?CH321.55. Associated civil works. Click for more details...

PARKS & WILDLIFE AIR CONDITIONING REPLACEMENT
Commercial Premises (Offices) New project at 32 Giles St, Katherine, NT 0850. This type is Office - Air Conditioning Replacement with State ownership. Replacement of 2 air conditioning units at Parks & Wildlife office Giles Street, Katherine. Click for more details...

TANAMI ROAD
Tanami Road is currently at the Construction stage, valued at about $ 454000 it is Scope of work includes: various lifting, pavement repair & resheeting works between chainages 510.00 & 527.00km Click for more details...

TITJIKALA REMOTE COMMUNITY HOUSING
State ownership Residential (Units, apartments, flats, townhouses, villas) project In The Macdonnell Shire Council Area for New development. Demolition of one dwelling. Construction of 2 x 2 bedroom dwellings on Lot 8 in the community of Titjikala Click for more details...

ANZAC PARADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Litchfield Shire Council Area of Local Govt ownership. Pavement strengthening and widening between chainage 1.35km & chainage 2.175km on Anzac Parade. Click for more details...