State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Supply/fabrication Projects in NT®ion=⊂=2220 in region


TERRITORY HOUSING-KATHERINE
Renovations, Refurbishments etc. project of Residential (Units, apartments, flats, townhouses, villas) project at 20 Condon St, 11 & 13 Callistemon Dr, Katherine, NT 0850. Complete internal paint to all previously painted surfaces to three (3) dwellings. Click for more details...

LYONS SUBDIVISION DETACHED HOUSES
Residential (Units, apartments, flats, townhouses, villas) project at Lee Point Rd Lyons Suburb of, Darwin, NT 0909 of Detached Houses (20) - Stage 1 type of New development. Construction of 20 detached houses. Painted concrete block, metal roof. Click for more details...

PARKS AUSTRALIA NORTH - KAKADU NATIONAL PARK
Electrical Systems - Upgrade Renovations, Refurbishments etc. project In The Darwin City Council Area. Programmed maintenance & repairs to electrical systems. Click for more details...

NORTHERN TERRITORY UNIVERSITY - CASUARINA CAMPUS
Education (Tertiary - colleges, institutes, universities) New project at Ellengowan Dve, Casuarina, NT 0810. This type is Commercial Building For University with State ownership. Building likely to contain: retail outlets, food & beverage outlets, function & conference facilities. Click for more details...


Industrial (Warehouses, cargo sheds, distribution centres) project for New development. 5 warehouses. 1 x 70 sq m, 1 x 79 sq m, 1 x 103 sq m, 1 x 108 sq m, & 1 x 166 sq m. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Paving, carparking for 13 cars. Landscaping. Click for more details...


Workshop/Offices New project In The Darwin City Council Area. Workshop & 4 offices. Steel frame & steel construction, concrete floor, metal deck roof, aluminium framed windows, airconditioning to offices. Click for more details...

MARRARA SPORTS COMPLEX
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Construction of carpark & headworks for second hockey field. Click for more details...

1ST AVIATION REGIMENT ROBERTSON BARRACKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Robertson Barracks, Darwin, NT 0909 of 1st Aviation Regiment - Early Works type of New development. Major Civil construction & inground services. Click for more details...

GROOTE EYLANDT-ALYANGULA HOUSING REHABILITATION
Residential (Units, apartments, flats, townhouses, villas) project In The Darwin City Council Area of State ownership. Internal & external repaint to various duplex units. Click for more details...

DEPARTMENT OF THE ENVIRONMENT & HERITAGE - PARKS AUSTRALIA NORTH
Parks Australia North, ., NT 8999 Has Department Of The Environment & Heritage - Parks Australia North currently at Tenders & Building stage. Programmed maintenance to general services. Click for more details...

GREENLEAVES SUBDIVISION
Residential (Units, apartments, flats, townhouses, villas) New project at Pt lot 8537 Burke St, Alice Springs, NT 0870. This type is Cluster Dwellings (12) with Federal ownership. 8 x 2 bedroom each 100 sq m approx. 4 x 3 bedroom each 140 sq m approx. Brick veneer construction, concrete floor, metal deck roof, aluminium framed windows. Carports, carparking & landscaping. Click for more details...


Dwellings (3 - 7) project, Numbulwar, NT 0852 in the Residential (Units, apartments, flats, townhouses, villas). 2 bedroom. Steel framed & steel construction on stumps, timber floor, metal deck roof, aluminium framed windows. Click for more details...

BROWNS POLYMETALLIC PROJECT
Mining (Open Cut) New project at Approx 60 km south east of, Darwin, NT 0800. This type is Bulk Sample Extraction with Private ownership. A contract has been prepared to re-enter the bulk sample pit at Browns. The pit will be dewatered and a clear floor prepared ahead of mining a 400 tonne sample. The sample will be typical of the sulphide to be treated during the first five years of mining. This will be freighted to Adelaide for processing through the flotation prototype plant to be constructed at Amdel. This plant will operate during the June quarter to produce 50 tonnes of concentrate for prototyping through the Ausmelt process and subsequent matte segregation and hydrometallurgical studies. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

DEPARTMENT OF BUSINESS INDUSTRY AND RESOURCE CONSULTANCY
Mining (Exploration - Drilling) project In The Barkly Shire Council Area of Petrological/Mineralogical/Analytical Services - Contract type. Panel contract for the provision of Petrological, Mineralogical and Analytical services for a period of 3 years. Click for more details...

PEKO TAILINGS DAM PROJECT - EARTHMOVING CONTRACT
Peko Tailings Dam Project - Earthmoving Contract is currently at the Construction stage, valued at about $ 1000000 it is Earthmoving contract is for moving 4 million tonnes of magnetite stockpile to plant. Click for more details...

DARWIN REGION NT GOVERNMENT BUILDINGS - AIRCONDITIONING - GROUP 6
State ownership Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. NT Government building repairs & maintenance to airconditioning plant & equipment for 12 month period. Click for more details...

BONAPARTE GAS PIPELINE
J/V - Private & Govt ownership Mining (Onshore - oil & gas) project In The Coomalie Community Council Area for New development. To construct a gas pipeline from the Blacktip Gas Plant near Wadeye (Port Keats) to meet the existing Amadeus to Darwin Gas Pipeline on Ban Ban Springs Station in the Northern Territory. The pipeline will follow a route of approximately 275km and will initially be capable of delivering 30 petajoules per year. Click for more details...

PETER MCAULAY CENTRE - GROUNDS MAINTENANCE
A project in the NT Within Darwin City. Provision of ground maintenance services for period of 36 months for Peter McAulay Centre. Click for more details...

LYONS CIVIL WORKS PHASE 1 STAGE 1 (STAGES 1 - 5)
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of Local Govt ownership. Civil works including roads, drains & other service infrastructure. Click for more details...

KATHERINE REGION ROADWORKS/REPAIRS/MAINTENANCE
Civil Engineering (Bridges, Aqueducts, Viaducts) New project at Roads within region of, Katherine, NT 0852. This type is Drainage/Structures/Bridges/Grids - Repairs/Maintenance with State ownership. Repairs & maintenance of drainage, structures, bridges & grids for 12 month period. Click for more details...

NATIONAL ABORIGINAL HEALTH SCHEME HOUSING PROGRAM WADEYE TOWNSHIP
Federal ownership Residential (Units, apartments, flats, townhouses, villas) project In The Unincorporated North Council Area for New development. Construct 6 houses for NAHS, concrete tilt-slab construction. Click for more details...

LITCHFIELD PARK ROAD - UPGRADE AND SEAL (CONTRACT T07-1397)
Roadworks - Upgrade And Seal New project In The Darwin City Council Area. Reconstruction of 9.3 kilometre of Litchfiel Park Rd to a seal stantard including intersection works, commencing at chainage 0 km located at the intersection of Litchfield Park Road with Cox Peninsula Road. Click for more details...

ARNHEM HIGHWAY CARAVAN PARK/MOTEL/VILLAS/RESTARAUNT
(Lot 4) 350 Arnhem Hwy, Humpty Doo, NT 0836 Has Arnhem Highway Caravan Park/Motel/Villas/Restaraunt currently at Construction stage. Construction of caravan park of 60 sites (includes 40 sites with own amenities), 12 room Motel, 16 x 3 bedroom villas, restaurant/shop. Click for more details...

MANINGRIDA ROAD & CENTRAL ARNHEM ROAD ROADWORKS
Currently at the Tenders & Building stage In East Arnhem Shire is a project estimated to be $ 500000. This project Regravel Click for more details...

ARNHEM HIGHWAY 16 LOT SUBDIVISION
New project of Civil Engineering (Residential Subdivision) project at 1125 (Section 3465) Arnhem Hwy, Humpty Doo, NT 0836. Stage 2 - 11 lots. Lots 2 Ha. Roadworks 800m. Click for more details...

MILLNER VILLAGE PLAZA STAGES 1 & 2
New project of Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at 348 Bagot Rd (Lot 9240), Millner, NT 0810. Construction of a village plaza providing mixed use commercial tenancies (1600sq m) in 1, 2 & 3 storeys with 54 apartments located behind the commercial areas. 48 x 2 bedroom & 6 x 3 bedroom apartments in 1 x 2 , 1 x 1 & 3 x 3 storey buildings. 2 x 2 storey showrooms & warehouses, shops, gymnasium & offices in 2 stages. Cement slab, rendered concrete blockwork & metal roof. Parking for 208 cars. Associated landscaping. Click for more details...

MILLNER VILLAGE PLAZA STAGES 1 & 2
New project of Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 348 Bagot Rd (Lot 9240), Millner, NT 0810. Construction of a village plaza providing mixed use commercial tenancies (1600sq m) in 1, 2 & 3 storeys with 54 apartments located behind the commercial areas. 48 x 2 bedroom & 6 x 3 bedroom apartments in 1 x 2 , 1 x 1 & 3 x 3 storey buildings. 2 x 2 storey showrooms & warehouses, shops, gymnasium & offices in 2 stages. Cement slab, rendered concrete blockwork & metal roof. Parking for 208 cars. Associated landscaping. Click for more details...

LEONINO ROAD 13 LOT SUBDIVISION
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 390000. This project Subdivision for 13 lots. Click for more details...

MITCHELL STREET SEWER RETICULATION
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of Truck Sewer Main/Stormwater Drainage type. Construction of approximately 87m of trunk sewer main with associated stormwater drain reconstruction along Mitchell Street. To include construction of approximately 35m of sewer reticulation & reconnection to all property sanitary drains to new sewer system. Click for more details...

GOTHENBURG CRESCENT UNITS
Units (12) - 4 Storey New project In The Darwin City Council Area. Construction of 12 x 2 bedroom units in 4 storey building. Concrete blockwork, glass & steel. Parking for 24 cars. 1 lift. Associated landscaping. Click for more details...

ICHTHYS LNG PROJECT - OPERATIONS - MAINTENANCE SERVICES
Private ownership Maintenance Contracts (Oil & gas facilities maintenance) project In The Darwin City Council Area for New development. For the provision of maintenance services for the Ichthys offshore & onshore assets. Click for more details...

SMITH STREET MOTEL CONVERSION
Smith Street Motel Conversion is currently at the Construction stage, valued at about $ 3000000 it is Conversion of 4 storey commercial building & construction of additional floor to provide 83 motel suites & an additional 2 x 2 bedroom units. To include 169sq m retail tenancies on ground floor. Swimming pool, amenities, bar & laundry facilities on ground floor. Concrete blockwork, glass & steel. Reconfiguration of car parking for 58 vehicles. Associated landscaping. Click for more details...

DUKE STREET UNITS
Residential (Units, apartments, flats, townhouses, villas) project at 29 Duke St (Lot 2999), Stuart Park, NT 0820 of Units (16) - 4 Storey type of New development. Construction of 9 x 2 bedroom & 7 x 3 bedroom units in four storey building with basement carparking. Cement slab, rendered concrete blockwork, metal roof. 1 lift. Parking for 32 cars. Associated landscaping. Click for more details...

NHULUNBUY HIGH SCHOOL STUDENT BOARDING FACILITY STAGES 1 & 2
Residential (Student & group accommodation) project In The East Arnhem Shire Council Area of State ownership. Construction of 80 bed residential student boarding facility aligned to Nhulunbuy High School in 2 stages to be completed concurrently or separately. Tenderers are to price their works for two options: the completion of both stage 1 & 2 concurrently & the completion stage 1 & 2 separately. Stage 1 to include the construction of administration building, staff housing, community buildings & 2 x 20 bed residential buildings. Associated civil works, landscaping & fencing. Demolition of existing sports courts. Stage 2 to include construction of final 2 x 20 bed residential buildings, fencing & covered paths. Click for more details...

DARWIN MIDDLE SCHOOL BASKETBALL COURT & BIKE SHED
State ownership Education (Schools - primary, secondary (up to Yr 12)) project In The Darwin City Council Area for New development. Construction of basketball/multi use courts & bike storage shed at Darwin Middle School. Concrete, steel, roof battens, metal purlins, security screens & doors & galvanized pipes. Associated landscaping. Click for more details...

GEORGE STREET TRIPLEX
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 900000. This project Construction of 3 x 3 bedroom dwellings in a single storey triplex. To include private open space & double car garages for 6 cars. Powder coated aluminium framed doors & windows, rendered & painted reinforced concrete blockwalls, metal fencing & metal roof sheeting. Associated landscaping. Click for more details...

RAMINGINING SOLAR FACILITY
22730 Central Arnhem Rd (Lot 1646), Ramingining, NT 0822 Has Ramingining Solar Facility currently at Construction stage. Construction of a solar facility capable of generating 500kw as part of the Solar Energy Transformation Program (SETuP). To include solar arrays & mounting frames. Security fencing & gates. Installation of underground power cabling & telecommunication services. 6m wide access roads. Associated carparking & landscaping. Click for more details...

MIDDLE POINT BUS TURNAROUNDS
Middle Point Bus Turnarounds is currently at the Construction stage, valued at about $ 214000 it is Construction of bus turnaround areas at Anzac Parade for the Middle Point School & at the intersection of Miniata Drive & Billabong Road, Lambells Lagoon. To include earthworks, clearing & grubbing. Construction of 40mm thick asphalt surface with 200mm gravel base pavement compact to 100% MMDD. Supply & installation of 1.2 high pedestrian gates at Middle Point School. Provision of line marking & road signage. Provision of traffic control. Click for more details...

DARWIN DECKCHAIR CINEMA UPGRADE
A project in the NT Within Darwin City. Upgrade works to the Darwin Deckchair Cinema to include construction of a new dining deck & extension to existing roofing. Click for more details...

SHADY CAMP BOAT RAMP
Boat Ramp project at Shady Camp Rd, Point Stuart Via, Marrakai, NT 0822 In The Council Area Of Litchfield Shire of State. Design & construction of a boat ramp & upgrade works to the car park at the Shady Camp barrage, located 100km East of Darwin. To include cadastral survey & geotechnical assessment. Click for more details...

NUMBULWAR HEALTH CLINIC STAGE 2
Health Clinic - Stage 2 project at Lot 141 Township of Numbulwar, Numbulwar, NT 0852 In The Council Area Of Roper Gulf Shire of State. Construction of Stage 2 of the Numbulwar Health Clinic to include a 2 x 2 bedroom duplex to provide ancillary accommodation. To include verandas, carport, garden sheds & solar hot water systems. Concrete blockwork walls, ceramic floor tiles, plasterboard ceiling, sheet metal roofing & sheet metal fencing between residences. Associated landscaping. Click for more details...

CASUARINA AUSTRALIA POST REFURBISHMENT
Commercial Premises (Post Offices) Renovations, Refurbishments etc. project at 4 Rawling St, Casuarina, NT 0810. This type is Post Office - Refurbishment with Private ownership. Refurbishment of the Casuarina Australia Post Office. Click for more details...

PALMERSTON SENIOR COLLEGE AIR CONDITIONING UPGRADES
Education (Schools - primary, secondary (up to Yr 12)) project at Tilston Ave, Palmerston, NT 0830 for New. Upgrade works to air conditioning in the Trades Block at Palmerston Senior College. To include demolition of existing thermal plant room. Supply & installation of thermal plant & ancillaries. Replacement of main air conditioning chiller. Upgrade works to electrical systems. Click for more details...

KATHERINE REGION URBAN PUBLIC HOUSING
State ownership Residential (Units, apartments, flats, townhouses, villas) project In The Victoria Daly Shire Council Area for New development. Construction of 2 x 3 bedroom block single storey dwellings at lots 138 & 140 Click for more details...

FREDS PASS RESERVE
Social (Amenities, Dressing rooms) project for New development. Construct a new ablution block at Freds Pass Reserve Click for more details...

TIO STADIUM MARRARA
Currently at the Construction stage In Darwin City is a project estimated to be $ 1036000. This project Staged renovation of the Level 1 - change room ablutions north & south. Staged renovation of the Level 2 male & female toilets Click for more details...

TANAMI ROAD
Tanami Road is currently at the Construction stage, valued at about $ 2849000 it is Scope of work comprises: upgrade of the Tanami Road, from the end of the existing seal at chainage 252.00km through to chainage 257.00km. The upgrade is to construct a 7m sealed, dual lane, rural arterial road on a 9m formation within the extents of the current road alignment. Click for more details...

OWEN SPRINGS POWER STATION
Public Utilities (Water distribution systems, Drainage) project at 205 Brewer Rd, Alice Springs, NT 0870 of Water Line - Upgrade type of New development. Supply, installation, testing & commissioning of reticulated domestic water system within the Owen Springs Power Station. Installation will require appropriate trenching, pipe encasement within clean sand fill & final compaction Click for more details...

ROOM TO BREATHE
Addition project of Residential (Units, apartments, flats, townhouses, villas) project at ., Areyonga, NT 0872. Room to Breathe early works program for Areyonga. Creation of new living spaces in existing homes Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect