State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Surgeries, Medical centres Projects in NT®ion=⊂=1111 in region


NT GOVERNMENT OCCUPIED BUILDINGS
Commercial Premises (Offices) Renovations, Refurbishments etc. project at Urban Regions of, Darwin, NT 0800. This type is Fire Detection Equipment - Package A - Maintenance with State ownership. Routine servicing & emergency repairs to fixed fire detection equipment - Package A Click for more details...

NT GOVERNMENT OCCUPIED BUILDINGS
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at Jabiru township, urban & rural areas of, Darwin, NT 0800 for Renovations, Refurbishments etc.. Routine servicing & emergency repair to fixed fire detection & gasseous fire suppression systems - Package C. Click for more details...

BICKERTON ISLAND (MILYAKBURRA) AIRSTRIP
Public Utilities (Water distribution systems, Drainage) project at Situated btwn East Arnhemland coast & Groote Eylandt, ., NT 8999 for Renovations, Refurbishments etc.. Drainage & gravel works on Milyakburra Airstrip. Click for more details...

DARWIN BOTANIC GARDENS
Currently at the Construction stage In Darwin City is a project estimated to be $ 224000. This project Construct upper & lower creek channel, 2 bridges & concrete works for water feature. Click for more details...

VANDERLIN DRIVE ROADWORKS REHABILITATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. Construct left turn lane into Meuller Road. Associated works include relocation of bicycle & footpaths. Click for more details...

DARWIN RIVER DAM PUMPING STATION
Currently at the Tenders & Building stage In Darwin City is a project estimated to be $ 170000. This project Comprising supply & installation Fluorosilicic Acid Dosing Facility. Click for more details...

BRADSHAW FIELD TRAINING AREA
Bradshaw Station Timber Creek via, Katherine, NT 0850 Has Bradshaw Field Training Area currently at Construction stage. Civil component of project comprises of design & construction of 200 km roads & 2 airfields. Click for more details...

KAKADU NATIONAL PARK
Currently at the Construction stage In Darwin City is a project estimated to be $ 100000. This project Upgrading of campground ablution block at Gunlom. Proposed works include upgrade shower & toilet cubicles, replace existing internal walls, provide new internal wall linings to shower & toilet cubicles, plumbing works, electrical works including solar electrics, various carpentry work, painting, tiling. Click for more details...

MELALEUCA ON MITCHELL
Backpackers Hostel/Shops (6) - 4 Storey New project In The Darwin City Council Area. Construction of 4 storey Back Packers Hostel comprising 98 strata titled units with 6 shops at street level 2 leisure decks, bar, kitchen & dining room. Click for more details...

ALICE SPRINGS HOSPITAL
Alice Springs Hospital is currently at the Construction stage, valued at about $ 200000 it is Ceramic tiling for hospital redevelopment. Click for more details...

KAKADU NATIONAL PARK
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Maguk Barramundi Creek Kakadu National Park Area of, Darwin, NT 0800. This type is Walkway For Maguk Barramundi Creek - Stage 1 with State ownership. Construction of new galvanised steel sub framed, aluminium decked walkway across & up short distance of Barramundi Creek. Click for more details...

CHARIOT GOLD PROJECT
Mining Contract - Open Cut New project In The Barkly Shire Council Area. For the greater part, Chariot will be an underground mine. An open pit will be excavated to a depth of 45 m from which a portal for a decline will be established to access the orebody. Click for more details...

1ST AVIATION REGIMENT ROBERTSON BARRACKS
Military (Military installations & facilities) New project at Robertson Barracks, Darwin, NT 0800. This type is Administration Building For Command Precinct - Major Works - Package 3 with State ownership. Construct Administration building for Command Precinct. Click for more details...

BROOKER STREET SHOWROOM/OFFICE/WAREHOUSES
7 Brooker St (Secn 5188 Hund Bagot), Winnellie, NT 0820 Has Brooker Street Showroom/Office/Warehouses currently at Construction stage. Construct showroom, office & 3 warehouses in 2 storey building. Click for more details...

OPEN EDUCATION CENTRE
State ownership Education (Schools - primary, secondary (up to Yr 12)) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Replace supply air ductwork in top floor ceiling space of building as well as supply & install new cushion heads, remove solar hot water panels & support stand from roof. Remove old hot water storage vessel & both circulating pumps. Install new 200 litre electrically heated storage vessel & one magnetic drive circulating pump. Replace rusted roof sheeting under solar panels that are being removed. Click for more details...

ANMATJERE HOUSING
Residential (Units, apartments, flats, townhouses, villas) project at Ti-Tree & surrounding communities Region of, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Review existing housing stock manged by Anmatjere Council to determine housing needs at Pmara Jutunta, Nturiya, Alyuen & Yanginj Communities. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Subcontracts (Mechanical installation) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

STUART HIGHWAY - VARIOUS STUCTURAL & CIVIL WORKS
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Alice Springs Town Council Area of Visitor Facilities/Sealed Accesses/Shelter/Various Items type. Upgrade visitor facilities, construct sealed accesses, shelter & various items from Teamster Memorial to Mount Polhill on Stuart Hwy within Alice Springs Region. Click for more details...

WEST MACDONNELL NATIONAL PARK FACILITIES EXPANSION PART 1
Facilities Expansion - Part 1 Renovations, Refurbishments etc. project In The Alice Springs Town Council Area. Upgrade & expand park facilities including walking tracks & car parks within park. Click for more details...

DARWIN URBAN ROAD NETWORK - BITUMEN SURFACES
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. Maintenance of bituminous surfaces for period of 12 months to urban road network. Click for more details...

POWER & WATER CORPORATION OLD CHLORINE DOSING ROOM
Old Chlorine Dosing Room - Renovation Renovations, Refurbishments etc. project In The Katherine Town Council Area. Renovations to old Chlorine Dosing Room within water treatment plant. Click for more details...

CHANNEL ISLAND POWER STATION CONTROL ROOM AIRCONDITIONING
A project in the NT Within Darwin City. Provision of stand by air conditioning to control rooms. Click for more details...

RAPHAEL ROAD SHOWROOM SALES BUILDING
Currently at the Planning stage In Darwin City is a project estimated to be $ 200000. This project Construct showroom sales for equipment hire. Click for more details...

POWER & WATER CORPORATION - DARWIN REGION REMOTE ABORIGINAL COMMUNITIES - CIVIL/HYDRAULIC WORKS/SERVICES
Power & Water Corporation - Darwin Region Remote Aboriginal Communities - Civil/Hydraulic Works/Services is currently at the Tenders & Building stage, valued at about $ 270000 it is Panel contract for provision of civil & hydraulic works & services to water & sewerage infrastructure for period of 36 months for remote Aboriginal communities within Darwin region. Click for more details...

LAJAMANU POLICE STATION FENCE
Fence project at ., Lajamanu, NT 0852 in the Public Buildings & Facilities (Police Stations). Supply, Delivery and Installation of Fencing. 284 Lineal Metres. Click for more details...

NORTHERN TERRITORY POWER TRANSFORMERS
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Various Council Area of Power Transformers type. Various maintenance, installation, commissioning and refurbishment on Power Transformers in the electricity distribution network within, and connecting, regional centres throughout the Northern Territory. Typical works will include but not be limited to: Replacement of gaskets. Bushing Replacements. Refurbishment and or repairs of Online Tap Changers. Dry Outs. Installation of Conservator oil preservation systems. Installation and maintenance of Moisture management systems. Installation of monitoring devices. Commissioning of transformers. Click for more details...

CENTRELINK OFFICES
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project for New development. Request for application for inclusion to be included in a multi-use list of entities who can provide Architectural, Design and Projects Management Services in relation to the Fitout of Centrelink Offices, with aspects of Supervision of Construction of new and in existing buildings to be occupied by Centrelink. Click for more details...

KATHERINE CENTRAL CHILDRENS SPORTSGROUND/PLAYGROUND
Sports (Sports grounds soft surface (bowling greens, cricket pitches, rugby & soccer fields)) New project at Adjacent skatepark, Katherine, NT 0850. This type is Sportsground/Playground with Local Govt ownership. Supply & construction of coloured concrete footpath (180 m x 1.4 m). Supply & installation of 210 m x 1.8 m high chain mesh security fencing including minimum 300 mm extension for the placement of two barbed wire strands over the top of the chain mesh. Click for more details...

ANGURUGU, GAPUWIYAK, GUNBALANYA, LAJAMANU & NUMBULWAR COMMUNITY EDUCATION CENTRES
Angurugu, Gapuwiyak, Gunbalanya, Lajamanu & Numbulwar Community Education Centres is currently at the Planning stage, valued at about $ 2000000 it is Design of Community Education Centre Upgrades. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - RETRACTABLE ROOF
Retractable Roof New project In The Darwin City Council Area. Design, fabrication & delivery of a motorised retractable roof (28m long x 16m wide x 1.5m high) to prevent rainwater entering an evaporation pond. Click for more details...

SMITH STREET MOTEL CONVERSION
Smith Street Motel Conversion is currently at the Construction stage, valued at about $ 3000000 it is Conversion of 4 storey commercial building & construction of additional floor to provide 83 motel suites & an additional 2 x 2 bedroom units. To include 169sq m retail tenancies on ground floor. Swimming pool, amenities, bar & laundry facilities on ground floor. Concrete blockwork, glass & steel. Reconfiguration of car parking for 58 vehicles. Associated landscaping. Click for more details...

KALKARINDJI CHILD CARE CENTRE
A project in the NT Within Katherine Town. Construction of child care centre for up to 25 children at Kalkarindji. To include activity room, sleep room, veranda, office, children & staff amenities, store room, change room/laundry & kitchen. Concrete slab, vinyl flooring, concrete pavers & ceramic floor tiles. Sheet metal cladding & roofing, aluminium framed windows & doors, metal clad external doors with glazed vision panels & galvanised steel sunshade. Supply & installation of 11000l water tank & pump. Construction of concrete carpark (679sq m), drop off zone, pathway & 1.5m high chain mesh fencing with 2 vehicle gates. Associated landscaping. Click for more details...

ARAFURA COURT TOWNHOUSES
Residential (Units, apartments, flats, townhouses, villas) project at 5 Arafura Ct (Lot 1334), Rapid Creek, NT 0810 for New. Construction of 3 x 4 bedroom townhouses in 3 x 2 storey buildings. Concrete slab, rendered concrete block wall, aluminium louvre privacy screens & metal roof. Parking for 8 cars. Associated landscaping. Click for more details...

COFFEY STREET WAREHOUSE
Warehouse New project In The Unincorporated North Council Area. Construction of warehouse (1008sq m) with ancillary office & showroom (200sq m). To include mezzanine open storage area (190sq m). Concrete slab, colour-coated ribbed cladding, sealed precast concrete, powdercoated vent louvres, aluminium clad awning, commercial glazed windows, colour-coated roof sheeting. Parking for 24 cars. Associated landscaping. Click for more details...

AMADEUS GAS PIPELINE UPGRADE
Darwin to, Alice Springs, NT 0870 Has Amadeus Gas Pipeline Upgrade currently at Construction stage. For the provision of below ground pipework coating at 25 stations. To include assessment of the coating condition as well asrestoring the stations to their original condition. Click for more details...

CENTRAL ARNHEM ROAD REFORMATION & REGRAVEL CH255KM TO CH319KM
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Reformation & regravel of unsealed pavements on Central Arnhem Road between Ch255.75Km to Ch259.35Km, Ch260.8Km to Ch263.8Km & Ch310.7Km to Ch319Km. To include widening of table drains. Click for more details...

ILPEYE ILPEYE SUBDIVISION PLAYGROUND EQUIPMENT & ESTATE SIGNAGE
Ilpeye Ilpeye Subdivision Playground Equipment & Estate Signage is currently at the Construction stage, valued at about $ 281000 it is Supply & installation of playground equipment, entry signage & associated works at White Gum Park for the recently upgraded Ilpeye Ilpeye town camp. To include demolition/removal of existing playground equipment, supply & installation of a rockasaurus, rockeby, monkey bars, balance beams, echidna springer 2 x fitness stations & associated signage, flying disk, sand spinner & double swings. Water bubbler, seating, shade structures, rubbish bins, site fencing & additional signage. Subgrade, cracker dust layer, underlay & wearing layer. Click for more details...

PALMERSTON REGIONAL HOSPITAL - CONCRETE PUMPS
Concrete Pumps - For Hospital project at Stuart Hwy (Section 4231 Hundred of Bagot S901068), Palmerston, NT 0830 in the Public Utilities (Water distribution systems, Drainage). Provision of concrete pumps in various sizes at the Palmerston Regional Hospital. Click for more details...

TIMBER CREEK TOWNSHIP & AIRSTRIP MAINTENANCE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Victoria Daly Shire Council Area of State ownership. Maintenance of the Timber Creek Township & Timber Creek Airstrip for a period of 28 months. Click for more details...

PALMERSTON REGIONAL HOSPITAL CIVIL WORKS
213 Taylor Rd (Section 4231 Hundred of Bagot S901068), Holtze, NT 0829 Has Palmerston Regional Hospital Civil Works currently at Construction stage. Civil Works for the Palmerston Regional Hospital. To include cut & fill, carparks & in ground drainage. Compaction testing, subgrade/subbase, asphalt linemarking & kerb. Maintenance of fire breaks, ESC & access road. Contractors carpark. Click for more details...

LITCHFIELD NATIONAL PARK FLORENCE FALLS CAR PARK UPGRADES
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 538000. This project Construction of a new coach parking facility & alterations to the existing car park at Florence Falls in Litchfield National Park. To include the construction of a 6 bay asphalted coach parking area separate to the current car park. Modifications to existing coach parking area to include resealing & line marking to increase the number of car parks. Construction of 2 new car parks for rangers & emergency vehicles. Extension of drop off bay for coaches. Click for more details...

FAIRWAY WATERS & BAKEWELL SEWER PUMP STATION CONTROL CENTRE UPGRADES
Public Utilities (Treatment plants, Sewerage reticulation) project at Located Within, Bakewell, NT 0832 for New. Upgrade works to the motor control centre at the Fairway Waters & Bakewell Sewer Pump Station. Click for more details...

CENTRALIAN MIDDLE SCHOOL LABORATORY UPGRADE
Education (Schools - primary, secondary (up to Yr 12)) project at Milner Rd, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Upgrade works top the Block C Laboratory at the Centralian Middle School in Alice Springs. To include the demolition of existing laboratory, fittings & fixtures. Removal & capping of redundant services, Supply & installation of fixed furniture, lining & services. Patch & paint new & existing walls, doors & door frames. CFC sheeting, 50mm stud lined vinyl walls, blinds, splash back & aluminium framed windows. Vinyl flooring & carpet floor tiles. Click for more details...

BAKEWELL WOOLWORTHS MEDICAL CLINIC & RESTAUARANT
Medical (Surgeries, Medical centres) project In The Palmerston Town Council Area of Private ownership. Construction of extension to existing retail centre to provide medical clinic (205sq m) & restaurant (280sq m). Car parking for 32 cars. Associated landscaping. Click for more details...

COMMUNITY 360 STAGE 1
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Darwin City Council Area of Community Hub - 2 Storey - Stage 1 type. Construction of Stage 1 of the Community 360 hub to provide community services. To include 2 storey administration office hub with conference rooms, interview rooms, offices, store rooms, library, seminar rooms, amenities & kitchen. Early intervention centre to include therapy rooms, storage rooms, offices & amenities. Recreation building to include 2 x studio rooms, 2 x multiurpose rooms, gymnasium, cafe, kitchen, creche & amenities. Day respite building to include dining areas, kitchen, lounge, offices, therapy rooms & conference rooms. 2030sq m car parking for 160 vehicles. Associated landscaping. Click for more details...

NORTHERN GAS PIPELINE GEOTECHNICAL TEST PITS
Oil & Gas (Pipelines & associated contracts) project In The Various Council Area of Geotechnical Test Pits - For Gas Pipeline type. Construction of geotechnical test pits for the Northern Gas Pipeline. To include backfilling test pits with excavated material. Click for more details...

TENNANT CREEK REGION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Barkly Shire Council Area of Seal/Culverts type. Widening of seal & culverts CH850.33-CH854.71 Click for more details...

TAMINMIN COLLEGE
70 Challoner Cct (Lot 1849), Humpty Doo, NT 0836 Has Taminmin College currently at Construction stage. STEM Centre - early works. Construction of a new engineering fill platform to include: demolition of concrete pavements, footing & related services. Preparation of ground. New redirected fire main. Engineered fill platform Click for more details...

MILYAKBURRA REMOTE COMMUNITY HOUSING
Residential (Units, apartments, flats, townhouses, villas) project In The East Arnhem Shire Council Area of State ownership. Upgrade of 2 remote community houses Click for more details...

ALAWA PRIMARY SCHOOL
Staffroom/Amenities - Refurbishment New project In The Darwin City Council Area. Staff room & amenities refurbishment at Alawa Primary School. Scope of works includes: Alterations to the existing kitchen including the removal of floor tiles, some walls, upgrade to the electrical fittings, fire detection & alterations to the toilets & store room layout. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect