State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Take-away Outlets Projects in NT®ion=⊂=322 in region


NT PARKS & RESERVES
A project in the NT Within Alice Springs Town. Maintenance walking tracks for 12 month period. Click for more details...

KINTORE JOINT VENTURE PROJECT - GOLD RESOURCE
Mining (Open Cut) project In The Alice Springs Town Council Area of Resource - Gold type. Geochemical surveys over the Worman Rocks area in the Kintore Joint Venture detected only scattered low level gold anomalism. The survey has significantly downgraded the project's prospectivity. Click for more details...

VICTORIA HIGHWAY COMPLEX
Ground Maintenance For Victoria Highway Complex project at Victoria Highway Complex, 88 Victoria Hwy, Katherine, NT 0850 In The Council Area Of Katherine Town of State. Ground maintenance services for 12 month period. Click for more details...


Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) New project at Bulman, NT 8999. This type is Houses (2)/Office (1)/Community Hall (1)/Mechanical Workshop (1) with Local Govt ownership. 2 x 3 bedroom, steel framed houses on stumps, 1 x steel framed office on stumps, 1 x community hall & 1 x mechanical workshop. Click for more details...


Umbakumba Community Groote Eylandt, ., NT 8999 currently at Construction stage. Construction of three steel framed dwellings. Click for more details...

MITCHELL STREET/THE ESPLANADE CONVENTION CENTRE
Private ownership Commercial Premises (Offices) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Expansion of existing conference centre & general upgrade & refurbishment to existing buildings. Click for more details...

BRADSHAW FIELD TRAINING AREA
Bradshaw Station Timber Creek via, Katherine, NT 0850 Has Bradshaw Field Training Area currently at Construction stage. Civil component of project comprises of design & construction of 200 km roads & 2 airfields. Click for more details...

BERRIMAH ROAD WEIGHBRIDGE COMPLEX
State ownership Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Darwin City Council Area for New development. Construct weighbridge complex inclusive of civil works, weighbridge building & base. Click for more details...

ROYAL DARWIN HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) project at Rocklands Dve, Darwin, NT 0800 for Renovations, Refurbishments etc.. Repairs & maintenance of refrigeration & airconditioning equipment. Click for more details...

RAAF TINDAL - WASH BAY
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Tindal, Katherine, NT 0852 for New. Design & Construction of Wash Bay at Motor Transport Command, & associated road works. Click for more details...

WALER BARRACKS
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Waler Barracks, Palmerston, NT 0830 for New. Extension of trunk roads & engineering services (water, power, storm water, communications & sewer). Click for more details...

PARKS AUSTRALIA NORTH
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of Infrastructure Works For Campground type. Work will consist of construction of campground roadworks, water supply delivery & reticulation mains, elevated & ground level water storage tanks as well as supply & installation of pumping equipment. Click for more details...

TSOLOS PLACE DWELLINGS
A project in the NT Within Darwin City. Construct 4 x 2 bedroom single storey cluster dwellings. Click for more details...

LITCHFIELD PROJECT - NICKEL RESOURCE
New project of Mining (Exploration - Drilling) project at South west of, Darwin, NT 0800. A 450 metre drilling program targeting the Cobia and barra prospects. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CREEK MANGANESE
Mining - Support Facilities (Industrial buildings) project for New development. Includes co-ordinating a number of design and construction contracts for various components of the bulk loading infrastructure and for the co-ordination and resolution of any associated issues. Includes a rail bottom dump, road bottom dump, bulk materials storage area, shiploader and associated conveyor and internal road systems. Includes review of reports by Bootu Creek Resources and KBR. The facility will initially be used for Bootu Creek Manganese Project. Click for more details...

MARTHAKAL HOMELANDS RESOURCE CENTRE
Residential (Units, apartments, flats, townhouses, villas) project for New development. Construct 1 x 3 bedroom steel framed house at Dolnji Outstation & renovation existing houses at various outstations. Click for more details...

MOUNT HARCUS PROJECT - VARIOUS MINERALS RESOURCE
South east of Pipalyatjara, 200 km from, Yulara, NT 0872 Has Mount Harcus Project - Various Minerals Resource currently at Exploration, Drilling, Survey & Assessment stage. The drilling programmes are designed to investigate three priority targets considered to have potential for nickel/copper sulphide mineralisation similar to that at Voisey's Bay in Canada. Demonstrated potential exists within the Musgrave Province of South Australia for base metals (copper, lead, zinc), ferrous metals (chromium, nickel, vanadium, titanium) and uranium. Potential also exists for precious metals (platinum group metals, gold), precious stones (diamonds, rubies), heavy mineral sands and rare earths. The prospectivity of Proterozoic rocks is well recognised and, with the exception of those contained within the Musgrave Province, have generally been subject to intense exploration for a considerable period of time yielding a number of World Class mineral deposits. Click for more details...

NEBO ROAD WORKSHOP
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project for New development. Construct steel fabrication & welding workshop. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BROWNS OXIDE PROJECT - NEW TAILINGS FACILITY
7 Km North West of, Batchelor, NT 0845 Has Browns Oxide Project - New Tailings Facility currently at Construction stage. The Tailings Storage Facility associated with the approved BOP has been found to overly a zone of potentially economic mineralisation. To avoid sterilisation of this zone of mineralisation th Company intends to construct a new TSF to contain the tailing from ore processed from the Browns oxide deposit in a location immediately adjacent to the approved TSF location. The new TSF has been designed on the basis that it will store both tailing and potentially acid forming (PAF) waste rock from the deposit. Prepatory activities associated with the construction of the new TSF are: vegetation clearing and grubbing, topsoil stripping and stockpiling, levelling of the site and compaction of existing clayey soils. The construction of the TSF will involve: an internal lining of compacted clayey soil, comprising a number of layers of low permeability material. Material for this zone will be preferentially sourced from a borrow pit located within the storage area, a rockfill zone for the external empbankment, constructed using NAF pit waste material, an internal ramp to access the decant system, and a PAF bund. The PAF bund will provide a physical barrier between tailings and the PAF waste, and is required because the tailings level will be higher than PAF waste level in the early stages of construction. A protective rockfill layer place (loose) over the face of the Zone 1 layer to provide protection from erosion and evaporative drying. Click for more details...

MOULDEN PRIMARY SCHOOL DENTAL CLINIC
Education (Schools - primary, secondary (up to Yr 12)) project at 103 Bonson Tce, Palmerston, NT 0831 for Renovations, Refurbishments etc.. Construct upgrade to dental clinic. Click for more details...

KATHERINE AREA PEDESTRIAN GUARDS
A project in the NT Within Katherine Town. Install ground stay pedestrian guards for various sites. Click for more details...

EAST ARNHEM REGION - CAPITOL WORKS PROJECT CONSULTANCY
Residential (Units, apartments, flats, townhouses, villas) project at Various sites within East Arnhem region south of, Nhulunbuy, NT 0880 for New. Project management consultancy for the Indigenous Housing Authority of the Northern Territory(IHANT) Capitol Works Projects. Click for more details...

STUART HIGHWAY ROADWORKS
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Stuart Hwy btwn Ross Smith Av & Parap Rd (inbound only), Darwin, NT 0800. Asphalt resurfacing & skid resistance treatment for Stuart Hwy. Click for more details...

BATCHELOR SUBSTATION - CIVIL/EARTHING WORKS
A project in the NT Within Darwin City. Work comprises civil and drainage works, earth grid and connection tails, fencing, installed certified and fully serviced crib room, new poles, nominated structures, and foundations for HV structures. All structures to include hold down bolts measured to ensure they will accommodate the future installation of electrical equipment that will be relocated from the Edith River substation. Click for more details...

DARWIN REGION BER SCHOOLS
A project in the NT Within Litchfield Shire. Construction of multi purpose facility/cyclone shelter. Concrete slab, concrete block, steel, clerestory aluminium louvre windows, solid core doors, cyclone enclosure for generator, colour-coated metal roof with cyclone fixtures. Click for more details...

KATHERINE REGIONAL CULTURAL PRECINCT STAGE 1B
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at 108 (Lot 3002) Chambers Dr & Lot 3238 Stuart Hwy, Katherine, NT 0850 for Addition. Stage 1B to include: stage, backstage areas, offices, meeting rooms, storage & amenities. Click for more details...

TIO STADIUM MARRARA AMENITIES BLOCK
Social (Amenities, Dressing rooms) New project at ., Darwin, NT 0800. This type is Amenities Block with State ownership. Construction of amenities block. Click for more details...

FORREST PARADE SUBDIVISION/HOUSES
Civil Engineering (Residential Subdivision) project In The Palmerston Town Council Area of Residential Subdivision (11) Lots/Detached Houses/Group Houses (23) type. Land to be subdivided & developed as a residential estate. The development will subdivide into 7 lots ranging in size from 771 sqm to 1078 sqm for single dwellings & 4 lots ranging in size from 949 sqm to 1500 sqm for multiple dwellings. To include construction of an access road which will be configured as a cul-de-sac with a reserve width of 18 m. Two single dwelling lots (Proposed Lots 1 & 2) will be accessed from Amans Place. Proposoed Lot 3 will have a boundary to Amans Place & also the proposed road. Proposed Lots 4, 5, 10 & 11 are in Zone MD. They have been configured to provide small multiple dwelling complexes of 3, 4 & 5 dwellings. Click for more details...

RANGER URANIUM OPERATIONS - BRINE CONCENTRATORS
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at Arnhem Hwy 11km east of, Jabiru, NT 0866. This type is Brine Concentrators with Private ownership. Installation of brine concentrators with a capacity to treat up to 1.8 gigalitres a year to produce clean distillate able to be returned to a wetlands for filtering. Installation of 3 units in a row with the first two processing water from the tailings storage facility & the third one returning brine to that facility. Click for more details...

ICHTHYS GAS PROJECT - MAIN CIVIL WORK (CVL3) - TEMPORARY WORKS DESIGN REV1 CONSULTANCIES
Ichthys Gas Project - Main Civil Work (Cvl3) - Temporary Works Design Rev1 Consultancies is currently at the Construction stage, valued at about $ 250000 it is For the provision of Temporary Works Design along with Construction Methodologies associated with CVL3 Main Civil Works project on the Ichthys Project Onshore LNG facilities. Click for more details...

PALMERSTON CHILD & FAMILY CENTRE EARLY CIVIL WORKS
A project in the NT Within Palmerston Town. Early works to include bulk earthworks, topsoil clearing, subgrade formation & surface preparation. Click for more details...

FARRAR BOULIVARD VILLAS
A project in the NT Within Palmerston Town. Construction of 7 x 3 bedroom villas in 3 single storey buildings. Cement slab, rendered concrete blockwork & metal roof. Parking for 14 cars. Associated landscaping. Click for more details...

MUIRHEAD RESIDENTIAL DEVELOPMENT STAGES 5-7 LANDSCAPE ARCHITECT CONSULTANCY
Consultancy For Residential Subdivision (445) Lots - Stages 5-7 project at Lee Point Rd (Lot 11070), Muirhead, NT 0810 In The Council Area Of Darwin City of Private. Landscape design consultancy for stages 5 - 7 of Muirhead Estate. Reconfiguration into 445 lots. Stage 5 - 189 lots. Stage 6 - 143 lots. Stage 7 - 113 lots. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - LUBE OIL FLUSHING
Lube Oil Flushing project at Blaydin Point, via, Darwin, NT 0800 in the Non-Construction Items (Other mining services). For the provision of pop testing. Click for more details...

DARWIN INTERNATIONAL AIRPORT BOND HELICOPTERS AUSTRALIA HANGAR
Private ownership Public Buildings & Facilities (Passenger terminals (aiport, bus, rail & sea), Air control towers) project In The Darwin City Council Area for New development. Construction of Bond Helicopters Australia Hangar at Darwin International Airport. To include approximately 2200sq m facility. Parking for 20 cars. Associated civil works & landscaping. Click for more details...

NHULUNBUY HIGH SCHOOL INSULATED CHILLED WATER PIPE BRANCHES
Education (Schools - primary, secondary (up to Yr 12)) project at 20 Matthew Flinders Wy, Nhulunbuy, NT 0880 for New. Supply, installation & re-commissioning of replacement insulated chilled water system branch pipework at Nhulunbuy High School. To include decommissioning, disconnection, removal & disposal of all existing & failing insulated chilled water branch pipes & associated components. Click for more details...

UMBAKUMBA ROAD CAUSEWAY UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The East Arnhem Shire Council Area of Roadworks - Causeway Upgrade type. Causeway upgrade works to the Umbakumba Road Ch4.75km & Ch5.42km, Nhulunbuy. Click for more details...

JENKINS ROAD PUMP STATION & CHLORINE BUILDING
Pump Station project at Jenkins Rd, Weddell, NT 0836 In The Council Area Of Litchfield Shire of State. Construction of a 10m x 20m x 7.5m pump station building at Jenkins Road, Weddell. To include elevated walkways, roller doors, air conditioning, roof ventilator, sump pumps & electrical cabling. Supply & installation of pumps, steel pipework, water supply pipework, valves & fittings. Concrete pads & earthing for generator. Electrical conduits, pits, conductors, switchboards & controls. Construction of chlorination building to include monorail crane & all fittings. Sheet metal roofing, acoustic insulation & plasterboard partitions. Click for more details...

MACKILLOP CATHOLIC COLLEGE STAGE 4
Mackillop Catholic College Stage 4 is currently at the Construction stage, valued at about $ 750000 it is Completion of works for Stage 4 of the Mackillop Catholic College at Johnston. To include the conversion of a portion of Block A into a commercial kitchen & dining area. Aluminium roller shutters, aluminium framed windows, vinyl flooring & walls. Conversion of external breezway between Block C & Block D into laboratory. Miscellaneous works through Block B first floor existing laboratories & administration building. Chainmesh fencing with gate surrounding the construction compound. Click for more details...

MILIKAPITI GOVERNMENT EMPLOYEE HOUSING UPGRADES
Residential (Units, apartments, flats, townhouses, villas) project In The Tiwi Islands Shire Council Area of Government Employee Houses (10) - Upgrade type. Refurbishment works to 10 Government Employee Houses located within Milikapiti, Melville Island. To include painting of internal & external surfaces. Removal of vinyl flooring & replacement with ceramic floor tiles. Supply & installation of kitchen fittings & fixtures. Supply & installation of bathroom vanity, cistern, fittings & fixtures. Supply & installation of security screen & air conditioning units. Extension of concrete pathway. Click for more details...

SHADY CAMP BOAT RAMP
Boat Ramp project at Shady Camp Rd, Point Stuart Via, Marrakai, NT 0822 In The Council Area Of Litchfield Shire of State. Design & construction of a boat ramp & upgrade works to the car park at the Shady Camp barrage, located 100km East of Darwin. To include cadastral survey & geotechnical assessment. Click for more details...

LEANYER PRIMARY SCHOOL WATER MAINS UPGRADE
Water Mains - Upgrade - For School project at Leanyer Dr, Leanyer, NT 0812 in the Education (Schools - primary, secondary (up to Yr 12)). Design & construction of water mains for potable water, fire services & irrigation uses at Leanyer Primary School. Design team to include Architect Quantity Surveyor, Structural Engineer, Mechanical Engineer, Electrical Engineer, Hydraulic Engineer, Civil Engineer & Stormwater Engineer. Click for more details...

YUENDUMU COMMUNITY CBD UPGRADE
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at CBD of, Yuendumu, NT 0872. Upgrade of the CBD of Yuendumu. Scope of work includes: establishment of car parks to regulate the car parking & bus bay. Upgrading of Intersections with kerbing & resealing. Construction of Concrete footpaths with pedestrian crossing. Provide earth drains. Construction of steel grated in-situ box culvert. Existing floodway at Coninston Road match smoothly to existing road pavement Click for more details...

TENNANT CREEK REGION GOVERNMENT EMPLOYEE HOUSING
Residential (Units, apartments, flats, townhouses, villas) project at 6 Mulholland Dr (Lot 546), Borroloola, NT 0854 of Housing (2) type of New development. Construction of one 2 x 2 bedroom duplex residence. Fencing and gates. Concrete driveway, patio, paths and mowing strips. Landscaping. Connection of external services including electrical, communications, water and sewerage disposal. Internal services including electrical, air conditioning, mechanical ventilation, water and sewerage disposal. Design & construction of 1 proprietary steel garden shed inclusive of concrete slab & power connection Click for more details...

DALY RIVER POLICE STATION
A project in the NT Within Darwin City. Scope of work includes: earthworks to raise the ground level for preparation of building pad for a concrete slab to house a 10,000L self bunded diesel fuel tank (complete with fuel bowser pump) & a 20ft self bunded dangerous goods store. Supply & installation of new fuel transfer pump & electrical switchboard to replace the existing Power House MSB. Removal of existing elevated fuel storage tank & associated pipework following installation & commissioning of the new tank & transfer pump Click for more details...

GEORGE BROWN BOTANIC GARDENS
Retaining Wall New project In The Darwin City Council Area. Construction of a new retaining wall clad with Porcellanite stone finished in a random rubble pattern Click for more details...

DARWIN REGION BUS STOP SHELTERS
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Darwin City Council Area for New development. Fabricate & install Type 15 Bus Stop Shelters at various locations in Darwin Click for more details...

WEST ARNHEM SHIRE DISASTER RESILIENCE
West Arnhem Shire Disaster Resilience is currently at the Construction stage, valued at about $ 100000 it is Proposed works to include stormwater management & water erosion rectification works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect