State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Theatres, Cinemas Projects in NT®ion=⊂=1211 in region


NT GOVERNMENT ASSETS-EAST ARNHEM REGION
Fixed Fire Detection Services - Package B - Maintenance project at Groote Eylandt &, Nhulunbuy, NT 0880 in the Education (Schools - primary, secondary (up to Yr 12)). Replacement existing fire indicator panels, specified thermal/smoke detectors & other specified works - Package B. Click for more details...

JULALIKARI BURAMANA HOUSING
Residential (Units, apartments, flats, townhouses, villas) Renovations, Refurbishments etc. project at Julalikari - Buramana Community, Tennant Creek, NT 0862. This type is Houses (8) - Renovations with Local Govt ownership. Renovations to 8 houses on 3 outstations in Tennant Creek Region. Click for more details...

PARKS AUSTRALIA NORTH - ULURU-KATA TJUTA NATIONAL PARK
Currently at the Tenders & Building stage In Alice Springs Town is a project estimated to be $ 30000. This project Programmed maintenance & repairs to electrical systems. Click for more details...

PARKS AUSTRALIA NORTH - ULURU-KATA TJUTA NATIONAL PARK
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Uluru-Kata Tjuta National Park Region of, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Programmed maintenance & repairs to power generation systems. Click for more details...

PALMERSTON SHOPPING CENTRE
Private ownership Retail (Shops, shopping centres & arcades, supermarkets) project In The Palmerston Town Council Area for New development. Discount store, supermarket, 40-50 specialty shops, steel & brick construction, concrete floor, metal deck roof, aluminium shop front windows, airconditioning, fire services. Carparking for approx 700 cars. Landscaping. Click for more details...

ST PAUL'S ANGLICAN CHURCH
A project in the NT Within Katherine Town. Construction of new building to seat between 200 - 250 people. Click for more details...

MARRARA SPORTS COMPLEX
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for New development. Construction of carpark & headworks for second hockey field. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project In The Darwin City Council Area of Private ownership. Overall proposal to include installation of underground loading station & shaft fitout. All electrical services to be carried out by contractor main work to involve 2 x plate feeders, conveyor & grisleys & general power distribution. Click for more details...

DEPARTMENT INFRASTRUCTURE/PLANNING & ENVIRONMENT
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Various Council Area for New development. Period panel contract for 12 months to allow establishment of panel of consultants to undertake Cadastral Surveying work for the NT Government. Click for more details...

AREYONGA COMMUNITY
A project in the NT Within Macdonnell Shire. Proposed construction new bore. Click for more details...

NIGHTCLIFF SHOPPING CENTRE
Woolworths Supermarket - Addns Addition project In The Darwin City Council Area. 350 sq m addition to existing store. Click for more details...

GROOTE EYLANDT-ALYANGULA BUILDING/JOINERY WORKS
Building/Joinery Upgrade For Territory Housing (12) project at Various sites Arnhem Cr, Ayawara Cr & Poinciana St, Groote Eylandt, Alyangula, NT 0885 in the Residential (Units, apartments, flats, townhouses, villas). Various building & joinery works, replace various hinged doors & hardware, replace sliding wardrobe doors with hinged timber doors & new hardware, replace laminate to various bench tops. Click for more details...

PAPUNYA AERODROME
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Papunya Aerodrome, Papunya, NT 0872 of Airstrip - Upgrade type of Renovations, Refurbishments etc. development. Upgrade airstrip to CASA standards. Click for more details...

GENERAL DRAFTING SERVICES-POWER & WATER
General Drafting Services - Consultants New project In The Various Council Area. General drafting services for Northern Region for 3 year period. Click for more details...

GATEWAY RESORT
Tourist Development project at Lot 4177 bnd by Stuart Hwy & Yarrawonga Rds, Palmerston, NT 0830 in the Hospitality (Conference & reception centres & facilities). 77,000 sq m or 7.7 ha resort development features likely to include 60 motel rooms, function & conference room to cater for up to 250 people, 50 cabins & camping facilities. Click for more details...

MCARTHUR RIVER BASE METALS MINE - UNDERGROUND OPERATIONS
Near, Borroloola, NT 0854 Has Mcarthur River Base Metals Mine - Underground Operations currently at Construction stage. Up to 1.5 mil. tonnes of ore will be extracted annually from an underground mine to produce 350,000 tonnes of mixed concentrate containing 160,000 tonnes of zinc, 45,000 tonnes of lead and 1.6 million ounces of silver. Click for more details...

BRADSHAW FIELD TRAINING AREA
Bradshaw Field Training Area is currently at the Construction stage, valued at about $ 20000000 it is Scope of works to comprise, but not limited to: Range Control facilities including workshop & sleeping quarters, 2 Caretaker's residences, Training Force maintenance area, 3 x 250 person scale A camps, 3 x 250 person Satellite camps. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

NIGHTCLIFF AQUATIC CENTRE
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at Casuarina Dve, Nightcliff, NT 0810 of Leisure Centre - Remaining Stages type of New development. Including gym, restaurant & learner's pool. Development would take place throughout 1.67 ha pool site, including two adjacent carparks. Click for more details...

ADELAIDE RIVER/BATCHELOR RISING MAINS/RESERVOIRS REHABILITATION
Public Utilities (Water distribution systems, Drainage) project at Adelaide River, Batchelor Region of, Darwin, NT 0800 for Renovations, Refurbishments etc.. Various welding fabrications associated with rising mains & collection reservoirs. Click for more details...

ALICE SPRINGS HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) Subcontract project at Gap Rd, Alice Springs, NT 0870. This type is Trade Package For Partitions - Hospital - Redevelopment with State ownership. Partitioning for hospital redevelopment. Click for more details...

FLOOD REPAIR WORKS WALLACE ROCKHOLE - HERMANNSBURG AREA
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 159000. This project Department of Local Government Alice Springs Region - Flood repair works, various Communities in Wallace Rockhole - Hermannsburg area. Click for more details...

LITCHFIELD PROJECT - NICKEL RESOURCE
New project of Mining (Underground - including longwall) project at South west of, Darwin, NT 0800. A 450 metre drilling program targeting the Cobia and barra prospects. Click for more details...

TIWI ISLANDS MINERAL SAND PROJECT - OPERATING MINE
Tiwi Islands Mineral Sand Project - Operating Mine is currently at the Construction stage, valued at about $ 4500000 it is Resource estimate is 6,980,000 tonnes @ 4.4% HM. Reserves are 6,530,000 tonnes @ 4.5% HM and 87% VHM. Mine life is expected to be six years. Targeted annual production of 35,000 tonnes per annum. Dry mining is the method of mining adopted by the feasibility study. The development will use a front end loader operating in a dry environment loading a feeder to a conventional wet spiral concentrator. The concentrate will then be trucked to the Port Melville deep water port for shipment direct to China. An off take agreement has signed with Astron Limited to take all production from the mine. A 76 Km four wheel track has been upgraded. Click for more details...

HOSPITAL DEVELOPMENT NT WIDE
Master Plan Consultants For Hospitals Renovations, Refurbishments etc. project In The Darwin City Council Area. Northern Territory (NT) Department of Health & Community Services is seeking tenders from suitably experienced consultants to produce revised master plans for Hospitals comprising non-Darwin NT Hospital network at Gove, Katherine, Tennant Creek & Alice Springs & Royal Darwin Hospital. Click for more details...

DARWIN EAST ARM WHARF - OPERATORS/TESTING BUILDING
Darwin East Arm Wharf - Operators/Testing Building is currently at the Construction stage, valued at about $ 289000 it is The contract comprises the design, construction and installation of two buildings. The buildings are to comprise split system air conditioning, all fixed furniture, the installation of a safety shower and additional security fencing with gates. Connections to existing power, water and sewerage services is to be carried out. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

MIDDLE SCHOOLS ACCESS ROADWORKS (T07-1328)
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Gilruth Av, Goyder Rd, Atkins Dr & Conacher St, Bullocky Point within region of, Darwin, NT 0800. This type is Roadworks with State ownership. Access roadworks on various roads at Bullocky Point. Click for more details...

CHARLES DARWIN UNIVERSITY SPORT & RECREATION
Sports Facility/Medical Clinic project at Casuarina Campus Lakeside Drive, Darwin, NT 0800 in the Sports (Sports grounds soft surface (bowling greens, cricket pitches, rugby & soccer fields)). Construction of gymnasium, medical centre & amenities. Click for more details...

CAVENAGH STREET UNITS
A project in the NT Within Darwin City. Construction of 28 x 2 bedroom & 42 x 3 bedroom multiple dwellings with ground level commercial space (588 sqm). 3 levels of basement carparking for 132 cars & 3 motorbike spaces. 295 sqm of communal space including swimming pool. Associated landscaping. Click for more details...

WALLACE ROCKHOLE ACCESS ROAD UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Macdonnell Shire Council Area of Local Govt ownership. Repair & upgrade of the access road to Wallace Rockhole Community. Work to include resheet 2.8 km of flood damages road; reinstate drainage throughout; rehabilitate floodways; full maintenance grade. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS CRUSHER CIRCUIT CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Roper Gulf Shire Council Area for New development. One year extension of the contract to operate the crusher circuit including feeding from the run-of-mine (ROM) stockpile. Covers the primary, secondary & tertiary crushing plants & mobile equipment. Click for more details...

STUART HIGHWAY COMMERCIAL DEVELOPMENT
New project of Commercial Premises (Offices) project at 455 Stuart Hwy (Lot 13), Coolalinga, NT 0835. Construction of 7 storey office building. Click for more details...

GROOTE EYLANDT MANGANESE MINE EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) New project at Groote Eylandt, Groote Eylandt, NT 0822. This type is Sands Benefication Plant with Private ownership. Extension to facility to increase the capacity by 0.5Mt/a by re-processing manganese ore stored in tailings stockpiles. Works to include detailed design, supply, fabrication, construction & commissioning of a sands beneficiation plant, port stockpile expansion & associated infrastructure. Click for more details...

COOLALINGA CARWASH & TYRE CENTRE
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project for New development. Construction of carwash & 4 bay tyre fitting centre (146.2sq m). To include ancillary office (22.4sq m), storage area (18.3sq m), staff amenities (9.1sq m), waiting area (23.2sq m), lunchroom (15.3sq m) & mezzanine over lunchroom/amenities/part of office (38.6sq m). 3 carwash bays, 2 auto wash bays, 1 super wash bay, 4 vacuum bays & 2 dog wash bays. 5 waiting bays & 2 loading bays. Powdercoated light pole, roller doors, guardrails, suspended concrete slab, steel, capping, wall sheeting & louvres. Car parking for 12 cars. Associated landscaping. Click for more details...

INVERWAY CIRCUIT DUPLEXES
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 920000. This project Construction of 2 x 3 & 2 x 2 bedroom duplex villas in 2 single storey buildings. Concrete slab, rendered blockwork, powdercoated aluminium frames, colour-coated metal cladding & roof sheeting. Parking for 8 cars. Associated landscaping. Click for more details...

FOELSCHE STREET CARPARK
Currently at the Construction stage In Darwin City is a project estimated to be $ 150000. This project Construction of 22 bay ground level open car park. To include bitumen spray seal with 7mm aggregate on compacted base to 95% MMDD. Associated concrete infrastructure & drainage. Click for more details...

PORT KEATS ROAD REINSTATEMENT & RESHEETING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Port Keats Rd, Wadeye, NT 0822. This type is Roadworks - Reinstatement/Resheeting with State ownership. Port Keats Road - Reformation & Resheeting of Pavement at Various Chainages including Ch25.00-km To Ch27.00-km. Ch40.00-km To Ch41.00-km. Ch88.00-km To Ch90.00-km. Works to include raising the existing formation by not less than 200-mm by widening & deepening table drains to form a sub-grade & importation of base gravel materials for Resheeting of not less then 200-mm of compacted base. Reformation to allow for a 9.00-m formation ? 6.00-m pavement & 1.5-m shoulder both sides. Convert table drains to allow sheet-flow. Reform Existing Pavement by winning material from outer batters & table drains. Using won materials to form up pavement to sub-grade standard ? To achieve depth of not less than 200mm compacted depth. Win, Load, Haul & place Base Course material on the prepared Subgrade to not less than 200mm compacted depth. Water bind, compact & trim. Click for more details...

CENTRALIAN MIDDLE SCHOOL LABORATORY UPGRADE
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at Milner Rd, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Upgrade works top the Block C Laboratory at the Centralian Middle School in Alice Springs. To include the demolition of existing laboratory, fittings & fixtures. Removal & capping of redundant services, Supply & installation of fixed furniture, lining & services. Patch & paint new & existing walls, doors & door frames. CFC sheeting, 50mm stud lined vinyl walls, blinds, splash back & aluminium framed windows. Vinyl flooring & carpet floor tiles. Click for more details...

NITMILUK GORGE WATER TREATMENT PLANT MAINTENANCE
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Katherine Town Council Area for Renovations, Refurbishments etc. development. Monitoring, servicing & maintenance works to the Nitmiluk Gorge Water Treatment Plant, located in the Nitmiluk National Park. To include supply & installation of chemicals as required. Click for more details...

NGWUNGA STREET DUPLEX
Residential (Units, apartments, flats, townhouses, villas) project at Ngwunga St (Lot 3045), Alyangula, NT 0885 of Duplex type of New development. Construction of a 2 x 2 bedroom duplex on Ngwunga Street, Alyangula. To include 2 x sheet metal garden sheds, patios, carports & solar hot water systems. Ceramic floor tiles, fire wall, steel stud walls with plasterboard sheeting & sheet metal roofing. 1.2m high chainmesh fencing around lot perimeter & sheet metal fencing between residences. 100mm thick concrete driveway. Associated car parking & landscaping. Click for more details...

TENNANT CREEK WATER SUPPLY & SEWERAGE INFRASTRUCTURE INFRASTRUCTURE MAINTENANCE & REPAIRS
Public Utilities (Water distribution systems, Drainage) project In The Barkly Shire Council Area of State ownership. Provision of repairs & maintenance works to water supply infrastructure & sewerage infrastructure at services locations within the Tennant Creek region. Water supply works to include repairs & maintenance to transmission & reticulated water mains, valves hydrants, water storage tanks & stands. Sewerage infrastructure works to include repairs & maintenance to rising mains, gravity sewers, pump station, access chambers & Septic Tank Effluent Pumping System. Associated repair works to tracks, hardstand, driveways, roadways & fencing. Click for more details...

BULLITA ROAD CONCRETE INVERTS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Bullita Rd, Katherine, NT 0850. This type is Roadworks - Concrete Inverts with State ownership. Construction of concrete inverts on Bullita Road between Ch7.17 & Ch10.38. To include provision of traffic control. Click for more details...

BATH STREET & STOTT TERRACE FOOTPATH UPPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area of Footpath - Upgrade type. Bath Street & Stott Terrace footpath upgrade. To include demolishing existing footpath & construction of new footpath & kerbing. Associated civil works. Click for more details...

TIWI ISLAND OFFICE & AMENITIES
Social (Amenities, Dressing rooms) project In The Offshore Council Area of Private ownership. Construction of an office & amenities building approximately 50sq m. Click for more details...

TIMPSON COURT WATER & SEWER
Water/Sewer project at Timpson Court, Darwin, NT 0800 In The Council Area Of Darwin City of State. Construct water & sewer services for Timpson Court (Lot 1097) subdivision Click for more details...

NUMBULWAR HEALTH CENTRE
Social (Crematoria, funeral parlours) project for New development. Construction of new morgue facility Click for more details...

BULLA REMOTE COMMUNITY HOUSING
A project in the NT Within Katherine Town. Construction of 3 x 3 bedroom remote community housing dwellings Click for more details...

WURRUMIYANGA MORGUE
Social (Religious Buildings, civil chapels) New project at Lot 737, Wurrumiyanga, Darwin, NT 0800. This type is Morgue with State ownership. Construction of a new morgue Click for more details...

KALKARINDJI MORGUE
Morgue project at Lot 659, Kalkarindji, Katherine, NT 0850 In The Council Area Of Katherine Town of State. Construction of a new morgue building Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect