State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Topside - modules, platforms Projects in TAS®ion=⊂=2510 in region


BASS HIGHWAY DUPLICATION
A project in the TAS Within Latrobe. The Bass Highway between Winspears Road at Latrobe and East Devonport is to be upgraded to a dual carriageway and the existing at Grade Junction at Port Sorell Main Road converted to A Grade Separated Interchange. Click for more details...

MELROSE ROAD JUNCTION ROADWORKS
Roadworks project at Sheffield Main Road, Near, Spreyton, TAS 7310 In The Council Area Of Devonport of State. Construction of left side passing lane. Click for more details...

OCEANA DRIVE CONSTRUCTION
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Clarence Council Area for New development. Work includes road pavement, kerb & channel, drainage works, concrete footpaths. Click for more details...

STRAHAN SEWERAGE SCHEME
Regatta Point, Strahan, TAS 7468 Has Strahan Sewerage Scheme currently at Construction stage. Supply of materials & construction of approximately 6,000 metres of DN100 to DN300 gravity sewers, rising mains & 5 pumpstations. Click for more details...

PUMP STATION NO 9 BYPASS PIPELINE
New project of Public Utilities (Water distribution systems, Drainage) project at Leven River, Ulverstone, TAS 7315. Construction of approximately one (1) klm of HDPE pipeline under the Leven River from Simplot (Mason Street, Ulverstone) via the Coastal Reserve to the Bass Highway Bridge. Click for more details...

TAFE TASMANIA CLARENCE CAMPUS - STAGE 3
Education (Tertiary - colleges, institutes, universities) project for Renovations, Refurbishments etc. development. Extensive internal refurbishment over two floors of block B including new insulation and the replacement of existing roof decking and rain water goods over the building. Click for more details...

CRADLE COAST WATER RESERVOIR ROOFS
Public Utilities (Reservoirs) project for New development. Construction of reservoir roofs for eight (8) water supply reservoirs as follows: Big & little Cardigan Reservoirs (concrete, 41.8m & 23m dia respectively), Somerset. Dooleys Reservoir (concrete 43.1 dia), Latrobe. Grants Reservoir (concrete 44.8 dia), Wynyard. Murfets Reservoir (steel 41.7m dia), Heybridge. Port Sorell Reservoir (concrete 35.1m dia), Port Sorell. Stubbs Reservoir (concrete 35.1m dia), Forth. White Hills treatment plant treated water storage (concret 29.2m dia), Penguin. Click for more details...


A project in the TAS Within Various. Dismantle and remove steel structures, remove heavy electrical equipment (heaviest single lift 54 tonnes) and demolish cellular building structures. Click for more details...

HUON HIGHWAY TRUCK & FUEL DEPOTS & LANDSCAPE SUPPLIES
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) New project at 2896 Huon Hwy, Huonville, TAS 7109. This type is Truck Depot/Fuel Depot & Landscape Supplies with Private ownership. Construction of truck depot, fuel depot and landscape supplies business. Click for more details...

LATROBE COUNCIL WORKS DEPOT/OFFICE EXTENSION
Addition project of Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at 8709 Bass Hwy, Latrobe, TAS 7307. Extension to works depot/office. Click for more details...

BURNIE HIGH SCHOOL
State ownership Education (Tertiary - colleges, institutes, universities) project In The Burnie Council Area for Addition development. Alterations and additions to existing classrooms. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - BUILDING CONTRACTORS COMPOUND
Private ownership Mining - Support Facilities (Administration facilities) project In The King Island Council Area for New development. For the provision of accommodation buildings, bath houses & crib rooms etc for Building Contractors Compound. Click for more details...

ANZ BUILDING HOBART LEVEL 1
Currently at the Construction stage In Hobart is a project estimated to be $ 100000. This project Internal demolition and fitout of offices. Works include new offices and work stations, partitions, painting, carpet and associated services. Click for more details...

BAROSSA PARK
Aged Care Facility - Stage 2 project at 59c Tolosa Street and Clydesdale Avenue, Glenorchy, TAS 7010 in the Aged Care & Retired Developments (Nursing homes). Construction of a 96 bed aged care facility, 32 bed step down unit and dementia care hostel, commercial kitchen and laundry. Precast concrete walls, metal roof, aluminium windows and concrete floors. Click for more details...

KARLA COURT TOWNHOUSES
Townhouses (5) New project In The Launceston Council Area. Construction of five, three bedroom, 2 storey townhouses. Rendered brick construction, metal roof and concrete floors. Click for more details...

ROYAL HOBART HOSPITAL WARD 1B NORTH
Mechanical Services New project In The Hobart Council Area. To provide modifications to mechanical services on ward 1B North to create a quarantine/ isolation unit that meets current standards. Click for more details...

GRAVELLY BEACH ROAD RECONSTRUCTION
A project in the TAS Within West Tamar. Construction of new road pavement includes sealing, kerb, channel, footpaths and drainage. Click for more details...

TASMANIAN HOCKEY CENTRE REDEVELOPMENT
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project In The Hobart Council Area of Clubrooms - Stage 2 type. Construction of clubrooms, concrete construction, steel frame, metal roof. Click for more details...

QUEEN STREET APARTMENTS
Currently at the Tenders & Building stage In Burnie is a project estimated to be $ 650000. This project Construction of 1 X 2 bedroom and 2 x 3 bedroom apartments and demolition of existing dwelling. Brick veneer, metal roof, concrete and timber floors. Click for more details...

CAMBRIDGE STREET UNITS
Cambridge Street Units is currently at the Construction stage, valued at about $ 400000 it is Construction of three units, brick veneer, metal roof and concrete floors. Click for more details...

COSGROVE PARK REDEVELOPMENT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Launceston Council Area of Private ownership. Demolition of existing building and construction of a 136 bed residential care unit. Brick and block construction, precast concrete, metal roof and concrete suspended slab. Click for more details...

THE ICON COMPLEX (FORMER MYER SITE) - STAGE 2
Hospitality (Restaurants, Canteens) project In The Hobart Council Area of Private ownership. Stage 2. To comprise a 3-level building fronting on Murray Street. Basement level and ground and level 1 specialty retail. Levels 2 and 3 will also be part of the Myer Store. Concrete construction. Click for more details...

VICTORIA SQUARE RESIDENTIAL SUBDIVISION
Victoria Square Residential Subdivision is currently at the Construction stage, valued at about $ 315000 it is Construction of a 9 lot fully serviced subdivision Click for more details...

ALBERT HALL
Lift - Installation project at 45 Tamar St (Corner Cimitiere St), Launceston, TAS 7250 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Replacement of existing goods lift with a passenger lift, works involve excavation, underpinning, demolition, steel fabrication and all that is required in the construction of a three level passenger lift within an existing building. Click for more details...

NORTH EAST DAMS
North East Dams is currently at the Planning stage, valued at about $ 75000000 it is The new dam will have a volume of 70,000 ML and will benefit the communities of Scottsdale, Bridport and Ringarooma with an irrigable area of 40,000 ha. Click for more details...

ROYAL HOBART HOSPITAL - FIRE SAFETY UPGRADE PROGRAM
Medical (Hospitals & associated buildings, mortuaries) project In The Hobart Council Area of Fire Suppression Systems type. Fire safety upgrade program - fire suppression systems. Click for more details...

HOUSING TASMANIA CLAREMONT UNIT
Residential (Units, apartments, flats, townhouses, villas) project at Site Undisclosed, Claremont, TAS 7011 of Unit type of New development. Construction of a four bedroom unit. Click for more details...

CHANNEL COURT RETAIL DEVELOPMENT - STAGE 3
Retail Tenancies And Associated Works New project In The Kingborough Council Area. Channel Court stage 3 development incorporating demolition works, supermarket, approximately 20 retail tenancies and additional car parking. Concrete construction and glazing. Click for more details...

CLARENCE COUNCIL FOOTPATH RECONSTRUCTION
A project in the TAS Within Clarence. Repairs to existing footpath, kerb and gutter at various locations within the municipality of Clarence. Click for more details...

SCOTTSDALE LEVEE
Civil Engineering (Dams) project at ., Launceston, TAS 7250 of Consultants type of New development. Consultants for the Scottsdale Levee geotechnical investigation, t-bar testing and associated works. Geotechnical studies carried out to date have identified the need for additional, sensitive testing to be undertaken in order to assess the stability of the soils in the Inveresk Precinct for levee remedial works assessment. Click for more details...

COAL MINE ROAD RETAINING WALL STRUCTURE
Civil Engineering (Retaining walls, Seawalls) project In The Kingborough Council Area of Retaining Wall type. Construction of a retaining wall structure. Click for more details...

TELSTRA BUILDING
State ownership Commercial Premises (Offices) project In The Hobart Council Area for Renovations, Refurbishments etc. development. Refit levels 4 and 5 of the Telstra Building. Click for more details...

NORTHERN TASMANIAN CRICKET ASSOCIATION (NTCA) SPORTS COMPLEX
A project in the TAS Within Launceston. The re-roofing of the grandstand and some internal refurbishment of the change rooms at the NCTA Sports Complex. Removal and replacement of the Boon Stand roof sheeting, some minor structural internal work, including concrete and electrical trades. Click for more details...

PARKLANDS PARADE DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) project at 93 Parklands Parade, Newnham, TAS 7248 of Dwellings (3) type of New development. Construction of 3 dwellings. Click for more details...

WHITEMARK WATER TREATMENT PLANT
A project in the TAS Within Flinders. Design and construction of a new water treatment plant at Whitemark on Flinders Island. Click for more details...

QUADRANT MALL REDEVELOPMENT
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Launceston Council Area of Mall Expansion/Play Areas type. Quadrant Mall Redevelopment Project through modern landscape, street furniture, lighting, drainage & associated works. The works include installation of underground services, lighting & electrical, new planters including performance stages, street furniture, landscaping & earthworks associated with the base preparation. Click for more details...

KINGS MEADOWS HIGH SCHOOL
Currently at the Construction stage In Launceston is a project estimated to be $ 5100000. This project Refurbishment of B block, part of C block and the library at Kings Meadows high school. Click for more details...

BITUMEN SURFACING SERVICES 2015/16
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Circular Head Council Area of Private ownership. Circular Head Council invite suitably qualified contractors to tender for the provision of Bitumen Surfacing Services for 2015/16. Click for more details...

ROSE LANE SUBSOIL INSTALLATION
Subsoil - Installation project at Rose Ln, Launceston, TAS 7250 In The Council Area Of Launceston of Local Govt. Installation of approximately 380 meters of subsoil drainage & approximately 60 meters of stormwater piping at Rose Lane, South Launceston. Project also involves the installation of deep relief wells. Click for more details...

LAUNCESTON WASTE CENTRE
Launceston Waste Centre is currently at the Construction stage, valued at about $ 500000 it is Preparative works for the landfill extension Launceston Waste Centre. Works Include: - Removal of Vegetation - Undertake earthworks to achieve specified sub-grade & sub-soil drain - Supply & install drainage layer - Supply & Construct composite leachate barrier - Supply & install leachate subsoil drains including manholes and inspection shafts and tubes - Supply & installation of a steel shed - Compliance testing & reporting Click for more details...

IIP WESTERN LINE RAIL CROSSING UPGRADE
Iip Western Line Rail Crossing Upgrade is currently at the Construction stage, valued at about $ 1500000 it is IIP Western Line Rail Crossing Upgrade in Devonport (3 crossings) and Leith (2 crossings) area. Click for more details...

CASCADE ROAD MEDICAL CENTRE
Private ownership Medical (Veterinary Clinics) project In The Hobart Council Area for Renovations, Refurbishments etc. development. Refurbishment and fitout of an existing medical centre. Click for more details...

DEPARTMENT OF PREMIER & CABINET
Commercial Premises (Offices) project for Renovations, Refurbishments etc. development. Fitout of level 4 at 15 Murray St Hobart for the Department of Premier & Cabinet. Works include partitions, glazing, joinery, painting, carpet and services. Click for more details...

UNION BRIDGE ROAD BRIDGE REPLACEMENT
A project in the TAS Within Meander Valley. Design & construct of Bridge No 3137 on Union Bridge Road, Mersey River. Click for more details...

REDWOOD ROAD UNITS
Units (3) project at 346 Redwood Rd (Lot 29, SP171047), Kingston, TAS 7050 In The Council Area Of Kingborough of Private. Construction of a single storey unit to include 3 x 2 bedroom units. Treated pine timber screen fence, face brickwork, roof cladding & aluminium framed windows. Car parking for 7 vehicles to include 3 residential & 4 visitor bays. Associated landscaping. Click for more details...

GRASSTREE HILL SECONDARY ROAD ROADWORKS
Roadworks - Reinstatement project at Grasstree Hill Secondary Rd East Derwent Hwy Sugarloaf Rd, Geilston Bay, TAS 7015 In The Council Area Of Clarence of State. Construction of road reinstatement of approximately 1.4km of Grasstree Hill Secondary Road. Works to include overlays & full depth reconstruction of the failing pavement asset & additional sealed shoulder & sealing of bus bays. Click for more details...

LEVEN RIVER BRIDGE REPLACEMENT
Bridge Works - Replacement New project In The Central Coast Council Area. Replacement of Leven River Bridge, Marshalls Bridge Road, Gunns Plains. Click for more details...

CONNECTOR PARK DRIVE OFFICES, WORKSHOP & SHOWROOM
Offices/Workshop/Showroom New project In The Launceston Council Area. Construction of a workshop with ancillary offices, showroom & signage. Associated car parking & landscaping. Click for more details...

BENNETTS SERVICE STATION
4 Burnett St, New Norfolk, TAS 7140 Has Bennetts Service Station currently at Construction stage. Partial demolition to the existing structure. Extension of Mood Food store & new forecourt to the existing service station. Signage. Rendered blockwork, automatic sliding glass entry doors within powdercoated aluminium frame, new parapet & roof. Click for more details...

RONALD STREET PAVEMENT WORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Ronald St, Devonport, TAS 7310 for New. Works to include the reconstruction of the Ronald Street Pavement from Madden Street to Parker Street. Associated civil works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect