State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Transmission lines/towers, switching yards, transformers, substations, cabling Projects in NSW®ion=⊂=2650 in region


REVESBY WORKERS CLUB
A project in the NSW Within Bankstown. Redevelopment of the Revesby Workers Club, comprising alterations to existing club facilities; new fitness centre and 'learn-to-swim' & health facilities; associated access signage & landscaping works, 7/8 storeys excluding plant. The redevelopment will comprise alterations & additions to the existing club totalling 12,970sq m, predominantly in the same position on site with an addition to the east of the existing building. Level 1 will comprise club administration & offices; learn to swim facility (16m x 9m pool & 25m x 13m pool) of 1,495sq m in size with associated amenities & cafe; club services such as occasional child minding facility, travel agent, hairdresser, first aid & storage; back of house stores. Level 1A will comprise the addition of a 3,975sq m fitness centre to the east of the existing club comprising 17m x 9m pool, cardio, weights, boxing, group exercise spaces & change rooms; mind & body health facility; hotel reception area. Level 2 will comprise reception & club sign in area; designated smoking terraces to the east & west of the gaming rooms; internalised outdoor gaming courtyard; lounge areas, restaurants & bar/cafe; existing terraces to the west of the sorts lounge; creation of a partly enclosed piazza space. Level 2A will comprise function spaces including smaller & larger meeting rooms; large show room including terrace from the pre-function area to the south east; back of house areas & amenities. The total GFA will be 26,620sq m, which comprises club 12,970sq m, fitness 4,731sq m, learn to swim 1,495sq m, retail 7,323sq m. External finishes & materials will generally comprise aluminium framed glazed elements, rendered & painted masonry walls, wall cladding & steel awnings along the lower levels of the building & the new eastern addition, aluminium framed glazed elements, aluminium steel sunshade louvres & painted metal roof fascia on the hotel component. Landscaping. Click for more details...

ANDERSON ST UNITS
Residential (Units, apartments, flats, townhouses, villas) project In The Shoalhaven Council Area of Units (8) type. Construction of 8 x 2 bedroom units, associated carparking & landscaping. Click for more details...

DAVIES RD ROWHOUSES
Residential (Units, apartments, flats, townhouses, villas) project In The Bankstown Council Area of Private ownership. Construction of 3 x 2 storey rowhouses. Associated carparking & landscaping. Click for more details...

HILTON TROTTER PL HOUSES
Houses (3) project at 14 (Lot 21) Hilton Trotter Pl (DP1052637), West Kempsey, NSW 2440 In The Council Area Of Kempsey of Private. Construction of 2 x 3 & 1 x 2 bedroom cluster houses. Click for more details...

BASS HILL DRIVE-IN SITE SUBDIVISION
Civil Engineering (Residential Subdivision) project for New development. Proposed residential subdivision of 69 small lots. Click for more details...

WOODBURY PARK ESTATE - STAGE 4
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Wyong Council Area of Private ownership. Proposed 200 lot residential subdivision. Click for more details...

GREAT WESTERN HWY SERVICE STATION
Private ownership Industrial (Factories & Factory Units) project In The Penrith Council Area for New development. Proposal includes a service station, convenience store, drive-in takeaway restaurant, 3 stand alone restaurants and 7 industrial units, some of which will be new, others refurbished, associated carparking and landscaping. Click for more details...

MCKIERHANS BRIDGE
Fossickers Way, Dungowan, NSW 2340 Has Mckierhans Bridge currently at Early Planning stage. Replacement of existing timber bridge with a box culvert structure. Click for more details...

LANCASTER HOLDEN-MITSUBISHI MOTOR SHOWROOM
Motor Showrooms (3)/Office/Workshop New project In The Singleton Council Area. Construction of 3 motor dealership showrooms, an administration centre, service centre & outdoor display area for new & used vehicles, 16 customer carparking spaces are proposed along with 54 spaces for staff & service parking. Most of the development is single story. However, Building 1, Holden Dealership & service centre, contains an upper storey administration area comprising 180 sq m of floor area. Building 1 has an area of 2,211 sq m. Building 2, which comprises dealership 2 & 3, has an area of 280 sq m & building 3 has an area of 56 sq m. Building 3 is to be utilised for used car sales. The service centre is to comprise 12 vehicle service bays, 2 truck bays, 2 washdown bays, 2 detailing bays, a truck detail bay & a tyre fitting & wheel alignment bay. Click for more details...

SOUTH STEYNE UNITS - DUNGOWAN
New project of Residential (Units, apartments, flats, townhouses, villas) project at 7 South Steyne, Manly, NSW 2095. Additions to increase height of building from 4 to 8 storeys & to increase number of units to a total of 31. Associated carparking & landscaping. Click for more details...

NARRABRI AGED CARE HOSTEL
Narrabri Aged Care Hostel is currently at the Construction stage, valued at about $ 1550000 it is Extensions to existing building comprising of 10 new purpose built units, each with en-suite and private recreation area. Click for more details...

RED CROSS HOUSE
Office/Laboratory - Fitout Renovations, Refurbishments etc. project In The Sydney Council Area. Construction of labs & office on 8th Floor. Hebel block walls, timber framed false floor, aluminium window wall, stud & plaster partitions, fire rated ceiling, metal deck roof on structural steel framing. Associated mechanical, electrical & hydraulic services. Supply & installation of laboratory benches. Click for more details...


149 Mitchell Rd, Erskineville, NSW 2043 currently at Construction stage. Warehouse extension of 335 sq m to Unit 5. Click for more details...


Addition project of Industrial (Service stations) project at 238 Cumberland Rd (Lot D DP39440 & Lot 2 DP501969), Auburn, NSW 2144. Alterations & additions to existing service station involving a ground & first floor addition of additional shop area & residence. 4 carparking spaces, 2 of which are to be in a tandem stacked arrangement. Landscaping. Click for more details...

LAKE HAVEN AGED CARE FACILITY
New project of Aged Care & Retired Developments (Aged care facilities) project at Lot 2 Stratford Ave (DP1033952), Charmhaven, NSW 2263. Construction of a 40 bed aged care development which contains a 10 bed dementia care unit & 30 bed low care unit with administration, kitchen, parking, substantial landscaping as site is vacant at present & ancillary services. It is a single building with 1 & 2 levels. Click for more details...

TURA BEACH AGED CARE
New project of Aged Care & Retired Developments (Aged care facilities) project at Lot 944 Tura Beach Dr (DP 78525), Tura Beach, NSW 2548. Proposal includes the construction of 52 aged care units with associated facilities, carparking and landscaping. Click for more details...

O'RIORDAN STREET WAREHOUSE
Industrial (Warehouses, cargo sheds, distribution centres) project at 68 O'Riordan St, Alexandria, NSW 2015 for New. Erect a part single, part 3 storey building for warehousing of marble, trade showroom, ancillary office & workshop. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project at 251 Abercrombie St, Chippendale, NSW 2008 of Units (18)/Shop type of New development. Demolish the existing buildings & erect a new 3 storey building, basement car parking for 15 vehicles, 1 shop & landscaping. Click for more details...

FEMALE ORPHAN SCHOOL
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Parramatta Council Area of Historic Building - Restoration - 2 Storey (Stage 1) type. Partial demolition & conservation adaptation & refurbishment works to the Female Orphan School for use as meeting rooms & seminar, conference & research facilities. Building consists of ground, 1st & 2nd floors. Work includes mechanical, electrical, fire, hydraulic & lift services. Associated landscaping including tree removal. Click for more details...

CLARKE & WALKER
Addition project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 476 Miller St, Cammeray, NSW 2062. Removal of parking bays from the area located to the south west of the rear portion of the existing building. Construction of an underground parking facility beneath the existing parking area located at ground level. Access & egress to the underground parking level will be via the driveway located approximately 39 m from the existing Amherst Street vehicular access. A separate pedestrian egress & access is proposed to the underground parking level, landscaping. Click for more details...

PEAK HILL GOLD MINE
, Peak Hill, NSW 2869 Has Peak Hill Gold Mine currently at Construction stage. Open cut mine. Also includes pre-stripping, preparation of heap leach pad, preparatory site works and mining contract. Click for more details...


Units (78) - 12 Storey - Refurbish project at 71-75 Regent St, Chippendale, NSW 2008 In The Council Area Of Sydney of Private. Refurbish an existing 12 storey commercial building consisting of 11 studio apartments & 67 x 1 bedroom apartments, parking for 10 cars & rooftop recreation space. Click for more details...

CARLOTTA RD RESIDENTIAL APARTMENTS
Apartments (6) - 5 Storey project at 51-53 Carlotta Rd, Double Bay, NSW 2028 in the Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria). The proposal involves the demolition of the 2 existing dwelling-houses, consolidation of 2 allotments, excavation of the site for the provision of carparking & part of the residential accommodation & then construction of a 5 storey, stepped, residential flat building containing 6 apartments. Four swimming pools in total would be provided comprising, 2 new small pools to the front yard & 1 new swimming pool as well as the existing swimming pool to the rear yard. Click for more details...

RED SPOT SERVICE STATION
Service Station/Convenience Store/Restaurant - Altns & Addns project at 1465-1467 Elizabeth Dr, Kemps Creek, NSW 2171 in the Retail (Shops, shopping centres & arcades, supermarkets). Redevelopment of the site with a service station, convenience store & fast food restaurant with drive through facility. The proposal contains a service station with 5 double-sided fuel bays, a canopy of 499sq m, a 300sq m convenience store & a fast food restaurant of 293sq m with seating for 100 patrons including a drive through facility & 76 car parking spaces. Click for more details...

HUNTER VALLEY GRAMMAR SCHOOL
School - Addns project at Norfolk St, East Maitland, NSW 2323 in the Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums). Construction of a multi-purpose hall, to include 2 full sized basketball courts, fully equipped gymnasium, large foyer, extra classrooms & performance facilities. Click for more details...

LOFTUS ST MIXED DEVELOPMENT
Units (10)/Medical Centre project at 9 Loftus St(DP 379137), Wollongong, NSW 2500 In The Council Area Of Wollongong of Private. Construction of a multi-storey development containing 10 (8 x 2 & 2 x 1 bedroom ) units and a medical centre of 566 sq m with basement carparking and associated landscaping. Click for more details...

FORMER COAL LOADER/CALTEX SITE - WAVERTON SUSTAINABILITY CENTRE
Commercial Premises (Offices) project at Balls Head Dr (former Coal Loader/Caltex site), Waverton, NSW 2060 for New. Redevelopment of the former coal loader site for public use. The development will comprise new parkland and an associated Sustainability Centre. Demolition of former Caltex site office, drainage & resurfacing of the coal loader platform, handrails & balustrades, new landscape design & associated works. Various component spaces of the development have been identified. The Street consists of a series of existing industrial buildings including the mess, former powerhouse & caretaker's cottage, refurbished to provide new community and commercial uses. The Street will contain a vehicle drop of zone, visitor orientation kiosk (former paymaster's office) and vehicular entry. It is proposed that the Caltex site office be reconstructed , its function will depend on future use, options proposed are a community nursery, interpretation centre or a facility for the SES. A new cafe will be located to the south of the office under an existing shed roof. The masterplan provides for 14 carparking spaces. An existing toilet structure opposite the former powerhouse will be refurbished to create separate men's & women's toilets. The former Powerhouse will be refurbished to provide leased commercial space of 176sq m. The former face brick and tiled caretaker's cottage will be refurbished as a Sustainability Centre. The existing entrance will be retained and enhanced. the former bedrooms will be remodelled to provide new reception & informal display. It is proposed to locate the cafe opposite the Sustainability Centre within an existing structure previously used for vehicle storage. The Lookout is the end point of the Street sequence and is thee key point for site observation. Options are to re-grade the entire surface of the Platform and replace structural slab. The tunnels are powerful spaces that can support a number of uses from access to interpretation. Tunnel 1 will be used to interpret the coal loading process. Tunnel 2 will be used as an access way connecting the site to the Ball's Head bushland reserve. Tunnels 3 & 4 will be gated. The Square is at the heart of the site, and will remain mainly the same with tree planting. The slopes were created to facilitate access to the water's edge. A set of stairs will be constructed along the length of the existing stone wall. The thresholds will be treated as garden space. The gardens will consist of the nursery & community gardens, the indigenous heath garden and the wilderness garden. Associated carparking for 6 vehicles. Click for more details...

BARWAN ST RESTAURANT
Currently at the Planning stage In Narrabri is a project estimated to be $ 281000. This project Construction of a new 205 sq m restaurant. Click for more details...

GREAT WESTERN HIGHWAY TOWNHOUSES & VILLAS
Residential (Units, apartments, flats, townhouses, villas) project In The Holroyd Council Area of Private ownership. Demolition of existing & construction of 6 x 2 storey x 3 bedroom townhouses & 8 x 2 bedroom single storey villas. Associated carparking 23 vehicles & landscaping. Click for more details...

NORTHPARKES MINES - TAILINGS DAM EARTHWORKS
New project of Mining - Earthworks/Civil Engineering (Dredging, Pile driving, Sand mining, Section dredging) project at Bogin Road Via, Parkes, NSW 2870. Project will involve the excavation, movement and placing of an estimated 600,000 cubic metres of clay and rock. Earthworks involving the raising the height of an existing tailings storage facility. Click for more details...

162 MARSDEN ROAD TOWNHOUSES
Residential (Units, apartments, flats, townhouses, villas) project for New development. Construction of 6 x 2 storey townhouses over basement carparking and associated landscaping. Click for more details...

BERRY ST CHILD CARE CENTRE - ACRE WOODS CHILDCARE
A project in the NSW Within North Sydney. Fitout for the purposes of a 69 place child care centre at ground level & part 1st floor level. Click for more details...

MONOMEETH ST UNITS
Currently at the Construction stage In Rockdale is a project estimated to be $ 4500000. This project Demolition of existing dwellings. Construction of 2 x 4 storey residential flat buildings containing 28 units. Basement carparking for 40 vehicles. Associated landscaping. Sect 96 modifications include minor external changes, addition of substation and brick walll within the front setback, changes to external balconies and stormwater design. Click for more details...

ST VINCENTS CLINIC
Clinic - Refurbishment project at 438 Victoria St, Darlinghurst, NSW 2010 in the Medical (Surgeries, Medical centres). Internal refurbishment of levels 4 to 10 and creation of new stairs linking levels 4 & 5 of St Vincents Clinic. Works will include carpet replacement on floors 4-10, new tiles to be laid on level 4. New stud & plasterboard partitions & a new stair will link levels 4 & 5 with existing 3 storey atrium. Existing joinery to be replaced. Click for more details...

MCDONALDS RESTAURANT
New project of Civil Engineering (Retaining walls, Seawalls) project at 12-18 Central Ave, Thornleigh, NSW 2120. Construction of an additional lane on existing driveway entrance to drive through restaurant, retaining wall. Click for more details...

REGATTA TAVERN
Tavern/Function Centre/Motel Units - 3 Storey project at 198-204 (Lot 1) Andrews Rd (DP1087962), Penrith, NSW 2750 In The Council Area Of Penrith of Private. Proposed tavern development. The proposal includes entertainment venues such as function centres, bars, cafes, restaurants, motel units & a bottle shop. The main entry features a drop off zone that leads to a large open atrium foyer space, the atrium is proposed to run through the building to give an internal courtyard feel. The bottle shop will be located off the main entry. The bars & gaming areas will be located towards the western/front boundary for access outside of the main entry. The function room/reception will be accessible by a large stair located from the entry foyer. The motel units will be on the upper levels. Total internal GFA will be 5,047.38sq m which includes ground level 2,154.58sq m, level 1 1,614.01sq m, & level 2 1,278.79sq m The function centre on level 1 will have a GFA of 540sq m, & the ground floor will include a dining area of 600sq m. Associated carparking & landscaping. Click for more details...

SOUTH SYDNEY LEAGUES CLUB
Bar/Restaurant/Conference Facility - Fitout project at 261-265 Chalmers St (ground & first floors), Redfern, NSW 2016 In The Council Area Of Sydney of Private. Hospitality fit-out of the first floor of South Sydney Leagues Club building, including bar, restaurant and kitchen areas, conference facility with bar; bowling alley; separate external smoking and dining areas; with ground floor entry lobby and merchandise store to Chalmers Street. Click for more details...

AUSTRALIAN ISLAMIC MISSION SCHOOL AND MOSQUE
Currently at the Construction stage In Canterbury is a project estimated to be $ 5650000. This project Demolition of existing structures. Stage 1 will involve demolition and construction of the basement car park and school buildings and associated landscaping. Stage 2 the construction of the mosque and completion of landscaping. Construction of a Part 1 and Part 3 storey Primary School and a Mosque. There are 5 components of the development being: The single storey school administrative building addressing Matthews Street.. The 3 storey school building along the southern side of the site accommodating class rooms and library. The mosque building in the north west corner of the site. Car park within 2 basement levels. The central landscaped courtyard and playground. Basement level 2 will accommodate 55 car spaces, 2 plant rooms, a lift and 2 fire staircases. Basement level 1 will accommodate 52 car spaces, 1 plant room and 1 store room, a lift and 2 fire staircases. Ground floor is a single storey primary school administrative building, school canteen, store room, lift and 2 stair cases, school library, building containing second block of toilets, ground floor of mosque and associated toilets and wash area. Central landscaped playground and landscaping including 2 water features. Level 1 has 4 school class rooms all linked by covered walkway, a lift and 2 external stair cases, terrace areas connected to external walkways. Level 2 has 3 school class rooms, a lift and 2 external stair cases, external terrace area connected to walkways and mezzanine level of the mosque including toilet ablution block area, stair case. A minaret at main entry to mosque. Building materials comprise of insitu concrete, precast concrete panels, rendered brick, timber screening and doors, hardwood timber, terracotta, sandstone and zincalume roofing. Click for more details...

PENRITH PUBLIC SCHOOL BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Construction of a new library and new classroom facilities Click for more details...

SUTHERLAND ST TOWNHOUSES
Sutherland St Townhouses is currently at the Construction stage, valued at about $ 850000 it is Demolition of the existing car workshop, garage & single storey house. Construction of 4 x 2 storey terrace houses. Metal roof sheeting, cement render texture finish to external walls, selected timber slat system balustrade, selected timber framed windows, privacy timber louvre screen, colorbond fencing, colorbond gutters. Associated carparking. Associated landscaping Click for more details...

NORTH PARRAMATTA BUS LANE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Construction of a 24 hours southbound bus lane extension in Church St, North Parramatta. Project involves - widening Church St from Barney St to Pennant Hills Rd to create space for a bus lane & the shared pedestrian-cyclist path being built on the eastern side of the existing general traffic lane. Enhancing the Church St frontage & heritage value of St Patrick's Cemetery by constructing heritage-style fencing behind the first row of trees. Construction of a bus bay in Church St near Factory St. Construction of right turn bays into Factory St for northbound & southbound traffic. Click for more details...

GLENMORE PARK STAGE 2 - PRECINCTS A & B
Dwellings (4) - 2 Storey project at 38 Glenmore Ridge Dr, Mulgoa, NSW 2745 In The Council Area Of Penrith of Private. Stage 1 comprises construction of 4 attached dwellings. Dwelling 1 & 2 x ground floor living room, dining room, kitchen, laundry, toilet double garage & outdoor terrace. First floor contains more passive areas including 3 bedroom & 2 bathrooms & a small north facing balcony. Studio/dwellings 3 & 4 are located above the garages of dwelling 1 & 2. The studio is self contained with open plan design. Masonry walls, exposed or rendered brick, steel roof, & colours that reflect the existing character of the older suburb & embraces modern building materials. Associated carparking. Landscaping Click for more details...

NARRABRI COUNCIL BITUMEN SEALING
Narrabri Council Bitumen Sealing is currently at the Tenders & Building stage, valued at about $ 850000 it is Bitumen Sealing for the period from 1 December 2011 to 31 October 2012 Click for more details...

UNITING CARE BEECROFT
A project in the NSW Within Hornsby. Demolition of 4 dwellings. Construction of 46 units within 3 buildings in the form of: 2 storey unit for initial use as a Minister's residence; 32 x 2 bedroom affordable rental units for seniors, people with a disability or care workers; 13 x 2 bedroom units for a variety of residents including seniors. Single storey community building for use of residents & residents of Copeland Gardens Retirement Village. Building 1 is 2 storey & contains 8 x 2 bedroom units & a 3 bedroom maisonette style dwelling for a ministers residence 12 basement carparking paces & caretakers workshop. Building 2 is 2-5 storey & contains 17 x 2 bedroom units, with shared basement carpark with Building B containing 15 carparking spaces. Building 3 is 2-5 storey & contains 20 x 2 bedroom units, shared basement carpark with 15 carparking spaces. Face brick walls, FC sheet cladding, rendered brick, timber screen/fence, metal/glazed balustrade, privacy screens with restricted operable louvres, aluminium framed windows, steel & terracotta tiled roof, concrete floor. Basement carparking for 32 vehicles. Landscaping. Click for more details...

SYDNEY ST TOWNHOUSES
Currently at the Construction stage In Penrith is a project estimated to be $ 1950000. This project Demolition of the existing fibro garage, carport & trees. Construction of 10 X 2 storey townhouses. Roof tiles, colorbond fascia, gutters, garage & downpipes, facebrick, feature blade walls, timber window gable, timber awning, timber fence. Carparking. Associated landscaping Click for more details...

NORTH PENRITH DEFENCE SITE
Commercial/Retail/Aged Care - 2/6 Storey New project In The Penrith Council Area. Landcom is seeking interest and feedback from institutions, retailers, commercial users, developers & aged care providers to participate in the creation of a new commercial centre at North Penrith. Site 1 comprises 3,600sq m retail space including supermarket & 2,950sq m commercial space with a height limit of 2 storeys. Site 2 comprises 6,400sq m commercial space & 325sq m retail space with a height limit of 6 storeys. Site 3 comprises 575sq m retail space & 1,300sq m commercial space with a height limit of 4 storeys. Site 4 comprises senior living aged care of approximately 100 dwellings with a height limit of 6 storeys Click for more details...

ST PAULS CATHOLIC COLLEGE - ST PATRICKS ESTATE PRECINCT 4 & 11
Private ownership Education (Schools - primary, secondary (up to Yr 12)) project In The Manly Council Area for Addition development. Removal of existing demountable class rooms. Construction of a multi purpose school hall with undercroft space accommodating an arts precinct, space for indoor basketball, entry foyer, stage area, hospitality kitchen, change rooms and amenities, staff offices, first aid room and storage area. The undercroft level accommodates music rooms, visual arts teaching space and storage and a 120 seat auditorium and small gymnasium area. Construction of a new 3 storey central wing accommodating teaching and staff facilities, an open colonnade opening onto a central courtyard and extending from the hall to existing northern wing, staff facilities, office area, lunch room, meeting rooms, reception area and a library resource centre. Refurbishment of the existing north wing building, ground floor; an open colonnade onto courtyard, staff facilities, office area, lunch room, meeting rooms. First floor; design and technology spaces and storage areas, computer labs and general purpose teaching spaces, science labs. High pressure laminate cladding, colorbond roof sheeting, gutters, downpipes metal roof decking, aluminium windows and doors. Additional car parking areas. New courtyard and associated landscaping. Click for more details...

BRANXTON PRESCHOOL
35 Cliff St & 35 John St, Branxton, NSW 2335 Has Branxton Preschool currently at Construction stage. Alterations & additions to the existing pre-school. Click for more details...

SPRINGWOOD HOSPITAL
Fire Hydrant - Upgrade project at 7 Huntley Grange Rd, Springwood, NSW 2777 in the Medical (Hospitals & associated buildings, mortuaries). Upgrade of the fire hydrant booster system Click for more details...

BANKSTOWN FOOTPATH RECONSTRUCTION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Bankstown Council Area of Footpath - Reconstruction type. Scope of works generally includes demolition and reconstruction of kerb and gutter sections, concrete and asphalt footpath, vehicular crossings, kerb ramps, bus stop, and minor stormwater drainage, Works also include reconstruction of traffic islands, installation of tree beds, garden beds, garden wall and minor landscaping as well as removal of trees and relocate signage between Macauley Avenue and Cambridge Avenue - Bankstown. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect