List of ⊂category=Tunnels, Subways Projects in NT®ion=⊂=1731 in region


NT GOVERNMENT OCCUPIED BUILDINGS
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at Jabiru township, urban & rural areas of, Darwin, NT 0800 for Renovations, Refurbishments etc.. Routine servicing & emergency repair to fixed fire detection & gasseous fire suppression systems - Package C. Click for more details...

CENTRAL AUSTRALIAN PROJECT
A project in the NT Within Alice Springs Town. Tanami Gold NL has entered into an agreement to joint venture with BHP Billiton and Teck Cominco. The Alliance (being BHP Billiton and Teck Cominco) has the option to earn a 51% interest in the EL's after expenditure of $2million. The Alliance may then elect to continue sole funding through to completion of a bankable feasibility study or dilute. Tanami Gold has the right to explore the tenements for mineral deposits other than base metals provided such programmes do not interfere with the Alliance programmes. Click for more details...

KATHERINE HOSPITAL & MACFARLANE PRIMARY SCHOOL AIRCONDITIONING CONDENSERS
Katherine Hospital Gorge Rd & MacFarlane Primary School Grevillea Dr, Katherine, NT 0850 Has Katherine Hospital & Macfarlane Primary School Airconditioning Condensers currently at Construction stage. Replace airconditioning condensers for hospital & primary school. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project at North & West of railway line, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Maintenance of evaporative air coolers for Housing Commission dwellings. Click for more details...

BERRIMAH AGRICULTURAL RESEARCH FARM
New project of Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at Stuart Hwy, Berrimah, NT 0828. Block-work construction, concrete floor, metal deck roof, extensive joinery, airconditioning, fire services. Minimal carparking & landscaping. Click for more details...


Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Region of Coomalie, NT 0845 for Renovations, Refurbishments etc.. Work involved includes repairs to sealed & unsealed roads, tree lopping, clean-up after storm damage & such like. Click for more details...


Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) Renovations, Refurbishments etc. project at Region of, Katherine, NT 0850. This type is Electronic Equipment - Upgrading - Pawa Installations with State ownership. General repairs & maintenance to Electronic equipment, instrumentation & PLC's on PAWA installations in Katherine region. Click for more details...

DOCKER RIVER/MULGA PARK ROAD REHABILITATION%
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 316000. This project Maintenance grading of Mulga Park, Docker River & other roads in the area including NT Parks & Wildlife access roads & pastoral access roads. Also include minor pavement & drainage repairs such as silt removal, floodway repairs & patching failed pavement holes & "blow outs" for 12 month period. Click for more details...

COASTAL PLAINS RESEARCH STATION
Renovations, Refurbishments etc. project of Civil Engineering (Retaining walls, Seawalls) project at Coastal Plains Research Station lot 1585 Middle Point Anzac Pde, Darwin, NT 0800. Replace existing perimeter fencing & associated works. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project. Upgrade & additions to existing residence. Click for more details...

WURANKUWU BATHURST ISLAND AIRSTRIP
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Offshore Council Area of Airstrip - Stage 2 type. Clearing of ground & construction of unsealed gravel airstrip. Click for more details...

AYERS ROCK RESORT - SAILS IN THE DESERT
Resort - Addns project, Yulara, NT 0872 In The Council Area Of Macdonnell Shire of Private. Cocktail bar including joinery work, complete new wet bar, refurbishing of existing space. Click for more details...

ROBERTSON BARRACKS
Closed Training Areas/Area Magazine/Landscaping - Apin - Stage 2 project at Robertson Barracks (formerly Waler Barracks), Palmerston, NT 0830 In The Council Area Of Litchfield Shire of Federal. Close training areas, area magazine & continuation of forward tree planting program established under APIN stage 1. Click for more details...

TOMS GULLY GOLD OPERATIONS - QUEST 29
Toms Gully Gold Operations - Quest 29 is currently at the Construction stage, valued at about $ 3000000 it is Over the first 2-3 years of the project ore will be mined from a number of small open pits at Quest 29, approx 17 km from Tom's Gully. Approx 250,000 tpa of higher grade ore will be hauled to Tom's Gully for processing through the existing CIL processing plant. Lower grade ore will be dump leached on site. The final length of the contract will be dependent on further exploration success within the company's prospective tenement holdings. The open pit mining contract will include mainly drill & blast mining, ore & waste haulage & maintenance of haul roads. Mining will be a rate of about 2000 bcm per day. Other services will include pit de-watering & the construction of siltation ponds & a diversionary berm. Click for more details...

ROBERTSON BARRACKS
Military (Military installations & facilities) project at Robertson Barracks (Formerly Waler Barracks), Palmerston, NT 0830 of 8/12 Battery Regiment - Apin - Stage 2 type of Addition development. Administrative & industrial accommodation for elements of 8/12 Regiment Battery. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS - MRM EXPANSION PROJECT
Mining (Underground - including longwall) project for New development. Looking at options from a feasability study. Click for more details...

ALICE SPRINGS HOSPITAL
Subcontract project of Medical (Hospitals & associated buildings, mortuaries) project at Gap Rd, Alice Springs, NT 0870. Mechanical services for hospital redevelopment. Click for more details...

ENVIRONMENT AUSTRALIA
Federal ownership Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Darwin City Council Area for New development. Facility will house Office of Supervising Scientist (OSS), Parks Australia North (PAN) & Environmental Research Institute of Supervising Scientist (ERISS). Facility of approximately 2,000 sq m including 600 sq m laboratory space is to provide accommodation for about 50 personnel. It is to include research laboratories, administration facilities, office accommodation & storage space for samples & equipment. Laboratories are to facilitate special & varied activities & must be planned to meet specific functional interrelationships. They are mixture of wet & dry, indoor & outdoor facilities. Click for more details...

NT OPEN LEARNING CENTRE
Security System For Centre project at Open Learning Centre, Chrisp St, Rapid Creek, NT 0810 In The Council Area Of Darwin City of State. Supply, install, test & commission security system. Click for more details...

1ST AVIATION REGIMENT ROBERTSON BARRACKS
A project in the NT Within Darwin City. Construct aircraft shelter & workshop. Click for more details...

PAPUNYA & NYIRRIPI BORES
Aboriginal Communities of Nyirripi &, Papunya, NT 0872 Has Papunya & Nyirripi Bores currently at Construction stage. Drilling bores at Aboriginal communities Papunya & Nyirripi. Click for more details...

CASUARINA STREET PRIMARY SCHOOL - BLOCK C AIRCONDITIONING
A project in the NT Within Katherine Town. Airconditioning upgrade to Block C at school. Click for more details...

GOVE DISTRICT HOSPITAL - MECHANICAL/ELECTRICAL
Medical (Hospitals & associated buildings, mortuaries) project at Matthew Flinders Wy, Nhulunbuy, NT 0880 of Mechanical/Electrical Works type of Renovations, Refurbishments etc. development. Various electrical/mechnanical works for Hospital. Click for more details...

EAST ARM WHARF FIRE FIGHTING SYSTEMS
Currently at the Planning stage In Darwin City is a project estimated to be $ 100000. This project Three year period contract for maintenance of fire fighting systems. Click for more details...

TENNANT CREEK/BARKLY REGION AIRCONDITIONING SYSTEMS REPAIRS/MAINTENANCE
Airconditioning Systems - Repairs/Maintenance project at Various areas within regions of Barkly &, Tennant Creek, NT 0860 In The Council Area Of Barkly Shire of State. Repairs & maintenance to airconditioning systems for 12 month period. Click for more details...

BATCHELOR SUBSTATION PROJECT - INDOOR SWITCHING ROOM
Currently at the Construction stage In Darwin City is a project estimated to be $ 719000. This project Design, construction, testing and commissioning of a 22 KV Transportable Indoor Switching Room. Click for more details...

NHULUNBUY REPAIRS/MAINTENANCE TO TERRITORY HOUSING- 12 MONTH PERIOD (CONTRACT T07-1153)
Housing - Repairs/Maintenace project at ., Nhulunbuy, NT 0880 In The Council Area Of East Arnhem Shire of State. Repairs and Maintenance to Territory Housing. Click for more details...

WATERFRONT MAVIE STREET UPGRADE (CONTRACT T07-1161)
Mavie Street (Ch.435.68 to ch.601.80), Darwin, NT 0800 Has Waterfront Mavie Street Upgrade (Contract T07-1161) currently at Construction stage. The work comprise of the upgrade of an existing section of Mavie Street to Primary Collector (Minor Industrial) standard, including the provision of new pavements, seal concrete kerbs & footpaths and stormwater drainage. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - CLEARING CONTRACT
Bonaparte Gas Pipeline Project - Clearing Contract is currently at the Construction stage, valued at about $ 10000000 it is For the provision of clearing services for 275 km pipeline. Click for more details...

LITCHFIELD NATIONAL PARK WANGI FALLS CAMPGROUND STAGE 1
Campground/Day Use Area - Upgrade Stage 1 project at Litchfield National Park Via, Yarrawonga, NT 0830 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). The works comprise of campground rationalisation and upgrade works to day use area including' but not limited to; extension to car park, landscaping and irrigation works, and construction of a new ablution block in camp ground. Click for more details...

PORT KEATS ROAD ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Port Keats Rd (Ch 107 to 108 & Ch 111 to 115km), Darwin, NT 0800. This type is Roadworks - Pavement Formation/Gravelling/Culvert with State ownership. Clearing and grubbing to obtain formation width of the cross section required generally 20m. Cleared width to be approximately 10m each side of existing road centre. Reformation of existing Roadway. Reformation in fill of existing Roadway. Regravelling pavements and shoulders. Construct Cement Stabilised and two coat Sealed Floodway's including concrete margins. Construct Reinforced Concrete Box Culverts with concrete decking and approach slabs. Construct works in accordance with drawings and specifications. Existing Surface Levels - Obtain inspections of any disputed existing surface levels with the Superintendent prior to any earthworks operations. Quantities are based on the existing surface levels prior to earthworks. Click for more details...

MANINGRIDA ROAD & CENTRAL ARNHEM ROAD ROADWORKS
Currently at the Tenders & Building stage In East Arnhem Shire is a project estimated to be $ 500000. This project Regravel Click for more details...

NGANMARRIYANGA (PALUMPA) HEALTH CENTRE
Medical (Surgeries, Medical centres) project at (Lot 00077), Nganmarriyanga, NT 0822 for Addition. Construction of additional consulting rooms and provision of all associated services. Click for more details...

ICHTHYS GAS PROJECT - OFFSHORE - GAS EXPORT PIPELINE
Oil & Gas (Pipelines & associated contracts) project at off Maret Islands & Blaydin Point via, Darwin, NT 0800 for New. For the construction of the Gas Export Pipeline. Scope of work to include installation of 889km of subsea pipeline, in water depths of up to 275m connecting the offshore central processing facility to the onshore processing facility in Darwin. Click for more details...

GROOTE EYELANDT MANGANESE OPERATIONS EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at At, Groote Eylandt, NT 0822 for New. Part of a project to expand production from 4.2 million tonnes per annum (Mtpa) to 4.8Mtpa along with road & port capacity to 5.9Mtpa. Processing plant upgrade to include replacement of desliming screens with banana screens & a new lump bypass facility in the heavy media circuit. Replacement of stacker & hopper cars at the port stockpile. Increase of the ship loading conveyor & road train receival capacities. Upgrade of 2 intersections on the Rowell Highway. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
5,15 & 11 Yarrawonga Rd (Cnr Roystonea Ave & Stuart Hwy ) (Lots 7765, 7766 & 11037), Palmerston, NT 0830 Has Darwin Gateway Shopping Centre Stage 1 currently at Construction stage. Construction of shopping centre. To include Woolworths supermarket, Big W discount store, specialty retail outlets, food court (2150) & cinema complex (4000sq m). Concrete panels, compressed fibre cement sheeting, shopfront glazing, steel framed awnings, metal sheet cladding, vertical blade fins. Parking for 1347 cars. Associated landscaping. Click for more details...

FINNISS STREET MIXED USE DEVELOPMENT
Residential (Units, apartments, flats, townhouses, villas) project at 6 Finniss St (Lot 1740), Darwin, NT 0800 of Units (76)/Offices (3)- 12 Storey type of New development. Construction of a 12 storey mixed use building with 3 office tenancies (324sq m) on ground floor & 76 units above. 12 x 1 bedroom, 52 x 2 bedroom & 12 x 3 bedroom units. 1 lift. Swimming pool & gymnasium. 3 levels of basement car parking. Associated landscaping. Click for more details...

KATHERINE - CENTRAL REGION BITUMEN RESURFACING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Katherine Town Council Area of Roadworks - Resurfacing type. Resealing of varous roads & highways throughout Katherine - Central Region. Stuart Highway (Katherine) - 534.88 km ? 549.93 km - Various Sections. Stuart Highway (Tennant Creek) - 928.27 km ? 937.00 km Various Sections. Barkly Highway - 28.15 km ? 30.25 & 260.81 - 265.74 km - Various Sections. Tablelands Highway - 237.45 km ? 244.23 km - Various Sections. Carpenteria Highway (Tennant Creek) - 270.30 km ? 358.35 km - Various Sections. Bing Bong Road - 38.68 km ? 43.11 km. Carpenteria Highway (Katherine) ? 192.86 km ? 207.26 km - Various Sections. Roper Highway ? 34.31 km ? 66.80 km - Various Sections. Buntine Highway ? 166.47 km ? 225.10 km - Various Sections. To include conventional bitumen, cutback bitumen or bitumen emulsion binder, geotextile fabric reinforcement & using various aggregate sizes. Click for more details...

SMITH STREET APARTMENTS
New project of Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project at 166 Smith St (Lot 2450), Larrakeyah, NT 0820. Construction of 18 x 2 bedroom apartments in 8 storey building. Covered roof garden with raised deck, barbecue area & bench seating. Communal open space. Lift. Swimming pool. Car parking for 36 vehicles. Associated landscaping. Click for more details...

BYERS ROAD & MANTON VALLEY ROAD RECONSTRUCTION & SEALING
Byers Road & Manton Valley Road Reconstruction & Sealing is currently at the Construction stage, valued at about $ 500000 it is Reconstruction of pavement & sealing works to Byers Road & Manton Valley Road, Acacia Hills. Works to include reconstruction of pavement to create specific grade line. Supply & laying of 100% MMDDD base course to 200mm. Prime & seal with 20/14 aggregate. Upgrade existing access to adjoining properties. Installation of road furniture. Provision of line marking & traffic control. Click for more details...

ALICE SPRINGS DESERT PARK SHADE STRUCTURES
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Alice Springs Town Council Area of Shade Structures type. Construction of 2 shade structures at the Alice Springs Desert Park. To include the cut back & removal of existing awnings. Metal roof sheeting, steel columns in concrete footings, fans & LED lighting. Click for more details...

MELACCA SWAMP BARRAGE UPDGRADE
New project of Civil Engineering (Retaining walls, Seawalls) project at Located within, Adelaide River, NT 0846. Upgrade works to an existing barrage at Melacca Swamp, Adelaide River. Click for more details...

ADELAIDE RIVER CEMENT WATER MAIN REPLACEMENT
Public Utilities (Water distribution systems, Drainage) project at Stuart Hwy, Adelaide River, NT 0846 for New. Replacement of an asbestos cement water main on the Stuart Highway Service Road, Adelaide River. Click for more details...

GOYDER BUILDING LEVEL 4 REFURBISHMENT
Commercial Premises (Offices) project at Chung Wah Tce (Lot 4312), Palmerston, NT 0830 for Renovations, Refurbishments etc.. Refurbishment works to Level 4 of the Goyder Building, Palmerston. To include removal of existing partitions, walls & doors. Supply & installation of joinery, fixtures, 2 x new conference rooms, sprinkler system & disability access. Click for more details...

TRAINER STREET DUPLEX
Duplex project at 37 Trainer St (Lot 11858), Muirhead, NT 0810 in the Residential (Units, apartments, flats, townhouses, villas). Construction of a 2 x 3 bedroom duplex in single storey building. To include verandas, front porches, double garages & solar hot water units. Sheet metal roofing, cladding & roller doors. Aluminium framed sliding glass doors, sliding glass windows & louvres. Rendered blockwork wall & stone feature wall. Plasterboard ceiling & 190mm core filled block fire wall. 1.8m high plastic coasted chainmesh fencing. Total car parking for 4 vehicles. Associated landscaping. Click for more details...

COMMUNITY 360 STAGE 1
Medical (Rehabilitation Centres, Youth Care Accommodation) project In The Darwin City Council Area of Community Hub - 2 Storey - Stage 1 type. Construction of Stage 1 of the Community 360 hub to provide community services. To include 2 storey administration office hub with conference rooms, interview rooms, offices, store rooms, library, seminar rooms, amenities & kitchen. Early intervention centre to include therapy rooms, storage rooms, offices & amenities. Recreation building to include 2 x studio rooms, 2 x multiurpose rooms, gymnasium, cafe, kitchen, creche & amenities. Day respite building to include dining areas, kitchen, lounge, offices, therapy rooms & conference rooms. 2030sq m car parking for 160 vehicles. Associated landscaping. Click for more details...

YUENDUMU COMMUNITY CBD UPGRADE
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at CBD of, Yuendumu, NT 0872. Upgrade of the CBD of Yuendumu. Scope of work includes: establishment of car parks to regulate the car parking & bus bay. Upgrading of Intersections with kerbing & resealing. Construction of Concrete footpaths with pedestrian crossing. Provide earth drains. Construction of steel grated in-situ box culvert. Existing floodway at Coninston Road match smoothly to existing road pavement Click for more details...

WULAGI PRIMARY SCHOOL
24 Brolga St, Wulagi, NT 0812 Has Wulagi Primary School currently at Construction stage. New extension to the existing assembly hall, stage and immediate surrounds. Scope of work includes: a new multi-purpose room. Independent office & accessibility ramp. Refurbishment works to existing structures. Replacement of roof and vapour barrier system. Asbestos removal. Groundwork & landscaping. Associated works Click for more details...

WOOLWORTHS SERVICE STATION BAGOT
Retail (Shops, shopping centres & arcades, supermarkets) project In The Darwin City Council Area of Service Station type. Construction of service station to comprise canopy (415sq m), 8 pumps, underground fuel storage tanks, hardstand pavement for forecourt & building surrounds & Cellarbrations Superstore (300sq m) with trading area, storage, toilet & ancillary facilities. Rendered & paint finish to blockwork walls, feature timber panels, powder coated aluminium window & door frames & powder coated aluminium awning. Car parking for 22 vehicles to include 20 car parks, 2 accessible car parks & 6 caravan parks. Associated landscaping. Click for more details...

BEES CREEK SCHOOL
Bees Creek School is currently at the Construction stage, valued at about $ 236000 it is Construction of a new 27 bay carpark and service access road in Lot 3022, including upgrades to an existing crossover onto Bees Creek Road. Construction of a new concrete footpath around the perimeter of the new carpark, as well as between the carpark and the existing Preschool building sited on the adjacent Lot 3023 Click for more details...