List of ⊂category=Tunnels, Subways Projects in NT®ion=⊂=1731 in region


ST JOHN GROUNDS
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project for Renovations, Refurbishments etc. development. Grounds maintenance for various St John properties in Darwin area for a period 2 years commencing 1 February 2002. Click for more details...

AYERS ROCK RESORT - SAILS IN THE DESERT HOTEL
Tourism (Tourist villages, Resort complexes) project, Yulara, NT 0872 for Renovations, Refurbishments etc.. Refurbishing of existing 14 premium rooms incorporating spas into each room. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project In The Palmerston Town Council Area of Local Govt ownership. Vacate maintenance & unforseen maintenance to Housing Commission dwellings. Click for more details...

CASUARINA SHOPPING SQUARE
Cinema Complex - 2 Level New project In The Darwin City Council Area. Seven screen cinema with seating for approx 1800 patrons. Restaurant & retail development. Pre-cast concrete construction, concrete floor, metal deck roof, aluminium framed windows, airconditioning, fire services. Additional carparking & landscaping. Click for more details...

ALICE SPRINGS COURT HOUSE
Renovations, Refurbishments etc. project of Public Buildings & Facilities (Law Courts) project at Parsons St, Alice Springs, NT 0870. Various painting & replacement damaged ceiling. Click for more details...

ROADSIDE MAINTENANCE
Renovations, Refurbishments etc. project of Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Northern & Southern Zone Rural Regions of, Darwin, NT 0800. Roadside verge maintenance slashing, litter collection & guide post installation for 12 month period. Click for more details...

DEPARTMENT INFRASTRUCTURE/PLANNING & ENVIRONMENT
State ownership Commercial Premises (Offices) project In The Various Council Area for New development. Period panel contract for 12 months to allow establishment of panel of consultants to undertake Cadastral Surveying work for the NT Government. Click for more details...

TIMBER CREEK SLASHING MAINTENANCE
Currently at the Tenders & Building stage In Unincorporated North is a project estimated to be $ 30000. This project Slashing contract for 12 month period. Click for more details...

GARRAK-JURRU/JABIRU/MITATJA REGIONS
Public Utilities (Water distribution systems, Drainage) project In The Unincorporated North Council Area of Local Govt ownership. Installation & repairs of solar powered bore pumps, construction of pipelines & erection of tanks & stands. Click for more details...

GROOTE EYLANDT MANGANESE
New project of Mining - Civil Services (Power stations, Power generation) project at North west of Groote Eylandt Gulf of Carpentaria, Darwin, NT 0800. Three new generators. Click for more details...

TENNANT CREEK JOINT VENTURE - QUEEN OF SHEBA
Mining (Underground - including longwall) project In The Barkly Shire Council Area of Private ownership. Interpretation & modelling of recently acquired detailed helicopter magnetic data has identified a high priority target at the Queen of Sheba Prospect. Previous work at this location although returning encouraging results failed to intersect economic mineralisation. With the aid of the new data & downhole magnetic probe surveys, a large magnetic body has been modelled at depth with two near surface extensions neither of which have been intersected by previous drilling. Click for more details...

BROWNS POLYMETALLIC PROJECT
Mining (Open Cut) New project at Approx 60 km south east of, Darwin, NT 0800. This type is Bulk Sample Extraction with Private ownership. A contract has been prepared to re-enter the bulk sample pit at Browns. The pit will be dewatered and a clear floor prepared ahead of mining a 400 tonne sample. The sample will be typical of the sulphide to be treated during the first five years of mining. This will be freighted to Adelaide for processing through the flotation prototype plant to be constructed at Amdel. This plant will operate during the June quarter to produce 50 tonnes of concentrate for prototyping through the Ausmelt process and subsequent matte segregation and hydrometallurgical studies. Click for more details...

X
Medical (Hospitals & associated buildings, mortuaries) project at Gap Rd, Alice Springs, NT 0870 of Trade Package For Painting - Hospital - Redevelopment type of Subcontract development. Painting for hospital redevelopment. Click for more details...

GATEWAY RESORT
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 1200000. This project Headworks for Tourist Development including roads, sewer, water, fire main & electrical services. Click for more details...

BATHURST ISLAND DEFENCE RADAR SITE
Bathurst Island Defence Radar Site is currently at the Construction stage, valued at about $ 2500000 it is Building works & services includes workshop & accommodation. Click for more details...

JABIRU TOWN COUNCIL GROUND MAINTENANCE/TRADE MAINTENANCE/CLEANING CONTRACT
Ground Maintenance/Trade Maintenance/Cleaning Contract project at Region of, Jabiru, NT 0886 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). Ground maintenance contract (mowing), trade maintenance contract & municipal cleaning contract. Click for more details...

PETER MCAULAY CENTRE HOUSING
Residential (Units, apartments, flats, townhouses, villas) project In The Darwin City Council Area of Executive Housing - Refurbishment type. External cleaning & painting, internal painting, relacement 2 ceilings, replace carpets, replace window furnishings, repairs & replace sun shades, relaminating joinery, replace oven, cook top & removal RAC air conditioner & patching wall penetration. Click for more details...

ROYAL DARWIN HOSPITAL INDEX WASHER
Index Washer - Supply/Install/Maintain project at Rocklands Dr, Casuarina, NT 0810 in the Medical (Hospitals & associated buildings, mortuaries). Supply, install & maintain new index washer for hospital. Click for more details...

BATCHELOR SUBSTATION - CIVIL/EARTHING WORKS
A project in the NT Within Darwin City. Work comprises civil and drainage works, earth grid and connection tails, fencing, installed certified and fully serviced crib room, new poles, nominated structures, and foundations for HV structures. All structures to include hold down bolts measured to ensure they will accommodate the future installation of electrical equipment that will be relocated from the Edith River substation. Click for more details...

DARWIN BOTANICAL GARDENS RAIN FOREST WALK BOARDWALKS
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area for Supply & Install development. Supply, deliver & intall replacement raised boardwalks. Click for more details...

MELVILLE BAY ROAD ROAD/DRAINAGE WORKS
Public Utilities (Water distribution systems, Drainage) New project at Melville Bay Rd btwn CH: 13.91 km & CH: 15.85 km within region of, Nhulunbuy, NT 0880. This type is Road/Drainage Works with State ownership. Widening of shoulders & various drainage works on Melville Bay Rd. Click for more details...

PETER MCAULAY CENTRE AIR CONDITIONERS (CONTRACT T07-1366)
Peter Mcaulay Centre Air Conditioners (Contract T07-1366) is currently at the Construction stage, valued at about $ 150000 it is Works to include the installation of high efficiency inverter type split system airconditioners to all living & bedroom areas of 45 single officers units. Install new circuits & electrical isolators adjacent to each condenser & wiring off. Click for more details...

CHINESE SOUTH EXTENDED & MOTTRAMS GOLD MINE PROJECT
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project at Doulgas Station, Stuart Hwy, 12km North of Hayes Creek Wayside Inn, via, Pine Creek, NT 0847 for New. The company proposes to recommence gold mining operations. Mining is proposed to commence on two deposits within this area. The proposed mining development consists of two open cut pits and will employ conventional open cut excavation methods. No mineral processing will occur on these sites. The ore will be transported by road, approximately 62km south-east, for processing. The major components of the proposed Chinese South Extended and Mottrams development include: construction of two open cut mines, pit dewatering, water storage and management, stockpiling of ore, construction of access and haul roads; and construction of two waste rock storage facilites. Click for more details...

EAST ARM WHARF PORT FACILITIES CONSULTANCY
Civil Engineering (Docks & piers, wharves, boat ramps) project at ., Darwin, NT 0800 for New. Works comprise: Filling of a bulk minerals stockpile area to the North East of the existing East Arm Wharf quay line. Filling & Armouring of an offshore supply base area. Filling a hardstand area for use by Defence. New rail spur providing access to the new stockpile area. New blocks (to be filled by the developer)for LDC extension of Muramats Road. Extension of the East Arm Wharf Northwest (two new berths). Dredging associated with all the above = dredged spoil to be piped or barged to onshore disposal ponds or disposed offshore at a nominated spoil site. Construction of an area to the North East of the existing wharf quay line for temporary stockpiling of fill material (behind a sand bund). Click for more details...

BOOTU CREEK NORTH MANGANESE PROJECT
Mining (Exploration - Drilling) project at Approximately 110km North of, Tennant Creek, NT 0860 for New. The project tenement covers prospective ground along strike from the Bootu Creek mine within the same geological-structural corridor. Click for more details...

EAST ARNHEM REGION MILINGIMBI COMMUNITY EDUCATION CENTRE EARLY LEARNING CENTRE & CLASSROOM BER PROJECT
Milingimbi, Milingimbi, NT 0822 Has East Arnhem Region Milingimbi Community Education Centre Early Learning Centre & Classroom Ber Project currently at Construction stage. Construction of Classrooms Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - P&C MODULE OFFLOADING FACILITIES
Module Offloading Facilities New project In The Darwin City Council Area. The scope of work for this package includes the supply of materials and the installation of the jetty platform and trestle portion of the Module Offloading Facility including fenders, catwalks, mooring and breasting dolphins and navigational aids. Work not included is the engineering and the causeway from the site to the jetty trestle platform. Click for more details...

WALLACE ROCKHOLE ACCESS ROAD UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Macdonnell Shire Council Area of Local Govt ownership. Repair & upgrade of the access road to Wallace Rockhole Community. Work to include resheet 2.8 km of flood damages road; reinstate drainage throughout; rehabilitate floodways; full maintenance grade. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining - Primary And Secondary Processing (Minerals Processing). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

GIRRAWEEN RESIDENTIAL SUBDIVISION
Residential Subdivision (93) Lots project at 303 307 365 435 Girraween Rd & 269 Hicks Rd, Girraween, NT 0835 in the Civil Engineering (Residential Subdivision). Subdivision for 93 lots. To be developed in 5 stages of 20 lots each. Click for more details...

JOHNSTON RIDGE SUBDIVISON STAGE 2 (STAGE 1A)
Civil Engineering (Residential Subdivision) project for New development. Part of 6 stage residential development. Click for more details...

VEREKER STREET SHOWROOM & WAREHOUSE
New project of Industrial (Warehouses, cargo sheds, distribution centres) project at 6 (Lot 2561) Vereker St, Humpty Doo, NT 0836. Construction of showroom & warehouse. Steel framed & metal cladding. Parking for 16 cars & additional handicap carpark. Associated landscaping. Click for more details...

MIDDLE ARM INDUSTRIAL & WEDDELL TRANSMISSION WATER MAIN CONTRACT 2
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 6390000. This project Construction of new transmission water main along Jenkins Road & Channel Island Road. To include: ancillary pipework, off-takes & structures. Associated connection works to future elevated tank site & contract 1 works. Click for more details...

HARVEY STREET MIXED USE DEVELOPMENT
Units (76)/Shop/Office - 13 Storey project at 20 Harvey St (Lot 02279), Darwin, NT 0800 In The Council Area Of Darwin City of Private. Construction of 13 storey mixed use building with 76sq m office/retail tenancy on ground floor & 76 units above. 16 x 1 bedroom & 60 x 2 bedroom units. 2 lifts. Gymnasium. Swimming pool. 2 levels of basement carparking. Associated landscaping. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - TANK CALIBRATION
Tank Calibration Services New project In The Darwin City Council Area. Comprehensive post-build survey of the interior of tanks followed by preparation of detailed calibration charts. To include a propane refrigerant storage sphere & miscellaneous non-cryogenic storage tanks (eg condensate, hydrocarbon drain, solvent, water, diesel). Click for more details...

CASUARINA DRIVE UNITS - ALLURE RESIDENCES
Units (24) - 5 Storey project at 286 Casuarina Dr (Lot 33), Rapid Creek, NT 0810 In The Council Area Of Darwin City of Private. Construction of 24 x 2 bedroom units in a 5 storey building. Concrete blockwork, glass & steel. 1 lift. Gymnasium. Swimming pool. Parking for 48 vehicles. Associated landscaping. Click for more details...

KRAIT STREET ELECTRICAL & COMMUNICATION WORKS
Civil Engineering (Industrial Subdivision) project In The Unincorporated North Council Area of Electrical/Communication- For Industrial Subdivision type. Construction of power supply infrastructure for a subdivision of section 7104 Krait Street, East Arm. To include overhead HV/LV aerial power supply, substations, street lighting & communications. Click for more details...

FLYNN DRIVE HEALTH CENTRE WORKSHOP
Medical (Surgeries, Medical centres) project for New development. Design, construction & certification of a new dental engineering workshop building at the Flynn Drive Health Clinic in Alice Springs. Cladding, lining, membranes, concrete, steel, aluminium framed windows, irrigation pipework & metal roof sheeting. Associated landscaping. Click for more details...

TARAKAN COURT APARTMENTS
Apartments (31) - 4 Storey New project In The Palmerston Town Council Area. Construction of 30 x 3 bedroom & 1 x 4 bedroom units in 4 x 1 & 4 x 2 storey buildings. Communal area, storage, swimming pool & lift. Associated car parking & landscaping. Click for more details...

BATHURST ISLAND COMMUNITY CENTRE
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) New project at Tipungwati Cres (Lot 827), Bathurst Island, NT 0822. This type is Community Centre with Private ownership. Construction of a community centre at Tipungwati Crescent, Bathurst Island. To include 11.2sq m kitchen, 3.9sq m store room, laundry & amenities. 45.6sq m open plan office, 13.1sq m conference room, 8.9sq m training room & 10.59sq m meeting room. Tile flooring. 27.6sq m timber decking & 47.4sq m back timer deck. Car parking for 5 cars. Associated landscaping. Click for more details...

LITCHFIELD NATIONAL PARK TERMITE MOUNDS SITE UPGRADE
Entertainment (Parks, Leisure grounds, Playgrounds) project at Litchfield Park Rd, Litchfield Park, NT 0832 for New. Upgrade works to the Magnetic Termite Mounds site at Litchfield National Park. Works to include the refurbishment of the existing boardwalk & construction of a new boardwalk with aluminium decking, plastic handrails & kickboards. Upgrades to pedestrian services & footpath drains. Construction of new ablution building. Click for more details...

ALBATROSS STREET WAREHOUSE MEZZANINE EXTENSION
8 Albatross St (Lot 1743), Winnellie, NT 0820 Has Albatross Street Warehouse Mezzanine Extension currently at Construction stage. Proposed addition of a 200sq m mezzanine floor addition to an existing warehouse. To include block steel framed walls, handrails & stairs. Click for more details...

BATCHELOR INSTITUTE ELECTRICAL SERVICES MAINTENANCE & REPIARS
Education (Tertiary - colleges, institutes, universities) Renovations, Refurbishments etc. project at Nurndina St, Batchelor, NT 0845. This type is Electrical Services - Maintenance & Repairs with Private ownership. Maintenance & repair works to electrical services at the Batchelor Institute of Indigenous Tertiary Education. Click for more details...

ANULA PRIMARY SCHOOL CAR PARKS & WALKWAYS
Renovations, Refurbishments etc. project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at 73 Yanyula Dr, Anula, NT 0812. Upgrade of 2 car parks, construction of a drop-off area & construction of covered footpaths at Anula Primary School. Associated civil & construction works. Click for more details...

CHARLES DARWIN CENTRE LEVEL 7 & 9 ALTERATIONS
Renovations, Refurbishments etc. project of Commercial Premises (Offices) project at Smith St, Darwin, NT 0800. Alterations for the Department of Business Level 7 & 9 offices within the Charles Darwin Building. To include demolition of 4 work stations (work stations to be dismantled & stored in the basement of CDC), relocation of 2 work stations, alteration of fire sprinkler heads, relocation of light fittings, supply & installation of 2 new work stations, supply of new chairs & mobile pedestals, office meeting desk & chairs to executive offices, installation of new steel stud partition walls & new aluminium glazing partition system walls. Click for more details...

TENNANT CREEK REGION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Barkly Shire Council Area of Seal/Culverts type. Widening of seal & culverts CH850.33-CH854.71 Click for more details...

BARUNGA & PIGEON HOLE SCHOOLS
Education (Schools - primary, secondary (up to Yr 12)) New project at Central Arnhem Rd & 45kms off the Brutine Hwy, Katherine, NT 0850. This type is Basketball Court/Shade Structures with State ownership. Barunga School - construction of a new basketball court, line marking & blackboard, ring & support structure & solid shade structure over the entire court. Pigeon Hole School - solid structure over entire court, removal of existing free standing light; supply & installation of new lighting including protective shields Click for more details...

ALYANGULA POLICE STATION
Public Buildings & Facilities (Police Stations) project for Renovations, Refurbishments etc. development. Life cycle replacement of 5 of the existing 6 package air conditioning units servicing nominated buildings located within the grounds of the NT Police facilities, Alyangula Click for more details...

GALIWINKU POLICE STATION
Public Buildings & Facilities (Police Stations) New project at Elcho Island, Galiwinku, NT 0822. This type is Ablution Block with State ownership. Construction of a transportable ablutions block including connection to sewer at Galiwinku Police Station. Demolition 15lm of existing fencing and install 116m x 2100 high chain wire fencing including gates Click for more details...

NGUKURR OFFICE
Renovations, Refurbishments etc. project of Commercial Premises (Offices) project at Lot 293, Ngukurr, NT 0852. Upgrade of the Ngukurr Community offices located within Lot 293 consisting of four buildings. The improvements will provide disabled access, and an upgraded entrance to bank offices at the northern end of the lot. The entrance will have a painted covered area, footpath, drainage and seating. Internally the electrical works will enable separate billing for each business unit within the offices as well as for the adjacent rental offices. Decorative gates will be installed to some entrance areas to improve aesthetics as well as providing increased security Click for more details...