State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Units, apartments, flats, townhouses, villas Projects in NT®ion=⊂=1520 in region


WOODCUTTERS BASE METALS MINE
Mine - Underground - Pumping Station Addition project In The Darwin City Council Area. One 22 kva substation required for dewatering of the underground mine. Contract to include installation of pipework, pumps & associated services. Project also involves 3 x 300 horsepower pumps. Click for more details...

ST PHILIP'S COLLEGE
Private ownership Education (Tertiary - colleges, institutes, universities) project In The Alice Springs Town Council Area for New development. To be constructed above music, drama, general learning facilities. Block-work & steel construction, metal deck roof, aluminium framed windows, airconditioning. Click for more details...

GREENLEAVES SUBDIVISION
Residential (Units, apartments, flats, townhouses, villas) New project at Pt lot 8537 Burke St, Alice Springs, NT 0870. This type is Cluster Dwellings (12) with Federal ownership. 8 x 2 bedroom each 100 sq m approx. 4 x 3 bedroom each 140 sq m approx. Brick veneer construction, concrete floor, metal deck roof, aluminium framed windows. Carports, carparking & landscaping. Click for more details...

JULALIKARI BURAMANA ABORIGINAL CORPORATION
Residential (Units, apartments, flats, townhouses, villas) project In The Barkly Shire Council Area of Local Govt ownership. Construction of 4 x 3 bedroom houses. Steel frame & steel clad construction, elevated timber floors, metal deck roof, aluminium framed windows. Repairs & maintenance to 2 existing houses in Barkly Region under IHANT Program. Click for more details...

ROBERTSON BARRACKS
Petrol/Oil & Lubrication Point - Apin - Stage 1 project at Robertson Barracks (formerly Waler Barracks), Palmerston, NT 0830 in the Military (Military installations & facilities). Wash down bays, industrial refuelling points. Block paving. Click for more details...

ROBERTSON BARRACKS
Military (Military installations & facilities) New project at Robertson Barracks (formerly Waler Barracks), Palmerston, NT 0830. This type is Squadron & Regimental Headquarters Building - A Basb - Stage 2 with Federal ownership. Squadron & Regimental Headquarters building 1 BASB - Transport & Maintenance Companies. Click for more details...

ROBERTSON BARRACKS
Military (Military installations & facilities) project at Robertson Barracks (Formerly Waler Barracks), Palmerston, NT 0830 of Logistic Facilities - Stage 2 - Apin - Stage 2 type of New development. DLB Q store, supply company main Q store & headquarters. Click for more details...

LOVEGROVE SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Civil works for Alice Springs distribution RGPS/Lovegrove substation 22KV express feeder 2. Click for more details...

DEPARTMENT OF ENVIRONMENT & HERITAGE - PARKS AUSTRALIA NORTH
Public Utilities (Treatment plants, Sewerage reticulation) project at Parks Australia North, ., NT 8999 for Renovations, Refurbishments etc.. Pump out/desludging sewerage & septic tank systems. Click for more details...

BAGOT COMMUNITY
Residential (Units, apartments, flats, townhouses, villas) project In The Darwin City Council Area of Duplex (1) type. Construction of 1 x 2 bedroom duplex. Block-work construction. Click for more details...

FRANCES BAY DRIVE CLUSTER DWELLINGS
New project of Residential (Units, apartments, flats, townhouses, villas) project at 76 (pt lot 5725 & proposed lot 5) Frances Bay Dr (Town of Darwin), Darwin, NT 0800. 3 bedroom. Click for more details...

CHARIOT GOLD PROJECT
Mining (Underground - including longwall) project at 9 km west of, Tennant Creek, NT 0860 for New. Underground mine plan includes establishment of a decline portal towards the base of the Chariot open pit. decline to be developed to a depth of 300 metres below the surface with the first ore development level at 120 metres below the surface. Flat back cut and fill stoping. production rates 10,000 to 12,000 tonnes per month. Click for more details...

BOOTU CREEK MANGANESE PROJECT - PROCESS PLANT
Process Plant project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying). The process plant will have a dense media plant, which is a necessary to gain a consistent grade of ore. The ore to be processed near the extractive area by crushing, screening, washing and separation into lump manganese and fine manganese. Click for more details...

GROOTE EYLANDT MANGANESE OPERATIONS - GEMCO - BARRACK RENOVATIONS
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Darwin City Council Area of Private ownership. Renovation of 4 low set timber framed barrack buildings, each comprising 12 bedrooms and communal toilets and showers. To be completed by mid-November 2004. Click for more details...

POWER & WATER DISSOLVED AIR FLOTATION PLANT
Dissolved Air Flotation Plant - Supply/Install project at Within region of, Alice Springs, NT 0870 in the Public Utilities (Water distribution systems, Drainage). Supply & install dissolved air flotation plant & associated electriacl & mechanical services for water facility. Click for more details...

PEPPIMENARTI WATER STORAGE TANK
Water Storage Tank - Supply & Install project at Peppimenarti Community 280 km approx south west of, Darwin, NT 0800 in the Public Utilities (Water distribution systems, Drainage). Supply & install one 1,000 kl (1.0 ml) nett working capacity water storage tank. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Earthworks/Civil Engineering (Stockpile Management) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

NAMARADA DRIVE - SEALING
Namarada Drive - Sealing is currently at the Construction stage, valued at about $ 159000 it is Sealing works to Namrada Dr btwn CH: 3.902 km & CH: 4.650 km. Click for more details...

ALPURRURULAM AERODROME
New project of Public Buildings & Facilities (Passenger terminals (aiport, bus, rail & sea), Air control towers) project at Within region of, Tennant Creek, NT 0860. Construct all weather aerodrome. Click for more details...

DARWIN REGION PANEL CONTRACT ENGINEERING SERVICES
General Engineering Services Consultants Panel Contract project at Within region of, Darwin, NT 0800 in the Public Utilities (Treatment plants, Sewerage reticulation). Panel contract for provision of general enginering services for three year period. Click for more details...

ALICE SPRINGS REGION URBAN ARTERIAL ROADS MAINTENANCE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Various areas within region of, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Urban arterial roads contract mainenance of medians, verges & roadside for 12 month period. Click for more details...

ROYAL DARWIN HOSPITAL RAPID ASSESSMENT & PLANNING UNIT
Medical (Hospitals & associated buildings, mortuaries) project at Rocklands Dr, Casuarina, NT 0810 for New. Construct Royal Darwin Hospital's Rapid Assessment & Planning Unit. Click for more details...

RAAF BASE TINDAL STAGE 5
New project of Military (Military installations & facilities) project at Raaf Base, Tindal Raaf, NT 0853. Redevelopment will comprise 12 project elements including extension of the existing security fence, Central Emergency Power Station generator works, water supply to Ordnance Loading Aprons, new vehicle maintenance facilities, refurbishment & extensions to working accommodation including office style buildings, new catering & refurbishment of existing messing facilities, security works & new oxygen storage facility. Click for more details...

LIQUORLAND BOTTLESHOP REFURBISHMENT
Retail (Shops, shopping centres & arcades, supermarkets) project In The Darwin City Council Area of Bottleshop - Refurbishment type. Refurbishment to 3 retail outlets at Palmerston, North lakes & CBD Darwin. Click for more details...

DARWIN REGION BER SCHOOLS
A project in the NT Within Litchfield Shire. Construction of multi purpose facility/cyclone shelter. Concrete slab, concrete block, steel, clerestory aluminium louvre windows, solid core doors, cyclone enclosure for generator, colour-coated metal roof with cyclone fixtures. Click for more details...

PALMERSTON CHRISTIAN SCHOOL BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project at 50 Waler Rd, Marlow Lagoon, NT 0830 for New. Construction of Language Hub & NTCSA Network. Click for more details...

BAYVIEW BOULEVADE UNITS
New project of Residential (Units, apartments, flats, townhouses, villas) project at 56 Bayview Bvd, Bayview, NT 0820. Construction of 4 x 3 bedroom multiple dwellings in 2 x 2 storey buildings. Click for more details...

MITCHELL STREET SEWER RETICULATION
Public Utilities (Treatment plants, Sewerage reticulation) project In The Darwin City Council Area of Truck Sewer Main/Stormwater Drainage type. Construction of approximately 87m of trunk sewer main with associated stormwater drain reconstruction along Mitchell Street. To include construction of approximately 35m of sewer reticulation & reconnection to all property sanitary drains to new sewer system. Click for more details...

FOWLESTONE ROAD INDUSTRIAL DEVELOPMENT
Warehouses (2)/Workshop/Showroom/Offices (5) project at 35 Fowlestone Rd (& 36 Coffee St) (Lot's 11011, 11012, 10993 & 10994), Tivendale, NT 0822 in the Industrial (Warehouses, cargo sheds, distribution centres). Construction of industrial building with mezzanine level. To include 2 x warehouse (4616sq m), workshop (560sq m) showroom (131sq m), mezzanine level (200sq m), 5 x offices (291sq m) & staff amenities (88sq m). Concrete slab, rendered concrete blockwork & metal roof. Parking for 69 cars. 7 loading bays. Associated landscaping. Click for more details...

AACAP WUTUNUGURRA COMMUNITY CENTRE & CANTEEN CREEK ROAD UPGRADE
Community Centre/Road Duplication project at Wutunugurra &, Canteen Creek, NT 0862 in the Social (Community centres, Clubs (unlicensed), Youth centres, Day respite). Construction of community centre facility at Wutunugurra. Upgrade 1.05km of unimproved road at Canteen Creek into dual lane, sealed ring road. Click for more details...

COSMO GOLD OPERATIONS - MINING SERVICES CONTRACT
New project of Mining - Earthworks/Civil Engineering (Underground mining & crushing) project at 130km southeast of, Darwin, NT 0800. A 2 year contract for the provision of mill feed ore from the underground mine. To include development, mining & associated works. Click for more details...

PALMERSTON HOTEL
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 50000000. This project Construction of 200 unit hotel in a 8 storey building. To include ancillary shops & offices. Concrete blockwork, glass & steel. 4 lifts. 2 loading bays. Parking for 240 cars. Associated landscaping. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS (MEC-2) CONTRACT
Mechanical Works (Mec-2) Contract project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the provision of Onshore Mechanical Works (MEC-2) services. Click for more details...

YARRAWONGA ROAD WOOLWORTHS SERVICE STATION
Industrial (Service stations) project In The Palmerston Town Council Area of Private ownership. Construction of a Woolworths Service Station. To include 120sq m of floor space & refueling forecourt, 409sq m canopy, 3 x 55kL underground fuel storage tanks & 25.2kL underground SPEL full separator. Steel framed canopy, flat metal deck roof, signage panels, fascias, profiled metal soffit lining & hardstand pavement for forecourt. Car parking for 5 cars. Associated landscaping. Click for more details...

VANDERLIN DRIVE DUPLICATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Vanderlin Dr (Mueller Rd to McMillans Rd), Darwin, NT 0800 of Roadworks - Widening type of New development. Duplication of Vanderlin Drive & additional 3km of 4 lane access along Vanderlin Drive from Mueller Road to the Vanderlin Drive/McMillans Road roundabout. To include relocation of bus stop, upgrade works to Shoal Bay Recycling Centre road intersection & construction of a median strip. Footpath & cycle path connections. Supply & lay S10E spray seal & 14mm thick aggregate. Supply & lay dense gravel asphalt to 40mm thickness. Construction of table drain offlets & blocks. Supply & installation of street lighting. Associated landscaping. Provision of traffic control. Click for more details...

ALICE SPRINGS YOUTH & COMMUNITY CENTRE STAGES 3 & 4
A project in the NT Within Alice Springs Town. Construction of the Youth Wellbeing Centre as part of the Alice Springs Youth & Community Centre (ASYCC) stage 3 & 4 redevelopment. To include demolition of concrete slab, vinyl flooring, partition wall & veranda structure with asbestos lining. Construction of new office building to include 4 x counselling rooms, 2 x consult rooms, group counselling room, main meeting place, reception, managers office & welcome court. Refurbishment works to existing to include amenities, kitchen, servery & multipurpose room. Construction of plant room with aluminium louvers on existing roof. Glazed pergola over courtyard area & new veranda sheet metal roof. Vinyl flooring, ceramic floor & wall tiles. Concrete blockwork retaining walls & 2m high steel picket fence. Associated landscaping. Click for more details...

SUNSET PARK SEAWALL
Sunset Park Seawall is currently at the Construction stage, valued at about $ 514000 it is Construction of 155m solid concrete sea wall around the perimeter of Sunset Park. Associated landscaping. Click for more details...

CASUARINA STREET FOOTPATH
Footpath New project In The Katherine Town Council Area. Supply & construction of a 430m concrete footpath between 2909 Casuarina Street & Martin Terrace, East Katherine. Footpath to be 1.5m wide & 100mm depth. Works to include excavation of concrete, grass & soil to 75mm. Supply & lay 20/20mpa concrete with F72 reinforcing mesh & broom finish. Construction of disable access & pedestrian crossovers in 5 locations. Click for more details...

MILES ROAD OFFICE
Office project at Miles Rd (Lot 7290), Berrimah, NT 0828 in the Commercial Premises (Offices). Construction of an single storey office building. Rendered concrete blockwork walls, metal cladding, metal sheet roofing, aluminium framed windows & doors. 1.8m high screen fence & precast concrete boundary walls. Sealed concrete driveway & car parking for 25 vehicles. Associated landscaping. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - ROAD CONSTRUCTION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Katherine Town Council Area of Road Construction - Earthworks/Pavement - Roper River type. Earthworks & pavement stabilisation of 5.5kms of the Roper Highway at the approaches the the Roper River High Level Crossing. Click for more details...

GEORGE BROWN BOTANICAL GARDENS TOILET BLOCK
Social (Amenities, Dressing rooms) project at Geranium St, The Gardens, NT 0820 of Amenities Block type of New development. Construction of a amenities block at the George Brown Botanical Gardens. To include 2 x male, 2 x female, 1 x disabled toilet & 3 x hand basins. Construction of concrete slab, strip footings, steel roof beams & sheet metal roofing. Ripple iron perforated panels, internal blockwork & aluminium louvers. Concrete pathway & stairs. Click for more details...

BERRIMAH FARM JOHN ENGLAND BUILDING REFURBISHMENT
Commercial Premises (Offices) project for Renovations, Refurbishments etc. development. Refurbishment works to the ground floor of the John England Building, Berrimah Farm. To include demolition & removal of existing doors, windows, ceiling, walls, flooring, plumbing fixtures & planter areas. Supply & installation of carpet tiles, 200mm x 200mm bathroom floor tiles, plasterboard ceiling & 7mm stud framed plasterboard wall. Aluminium framed windows & doors. Click for more details...

BATCHELOR INSTITUTE ELECTRICAL SERVICES MAINTENANCE & REPIARS
Education (Tertiary - colleges, institutes, universities) Renovations, Refurbishments etc. project at Nurndina St, Batchelor, NT 0845. This type is Electrical Services - Maintenance & Repairs with Private ownership. Maintenance & repair works to electrical services at the Batchelor Institute of Indigenous Tertiary Education. Click for more details...

GOODALL LEGACY MINE SITE FENCING
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) New project at Stuart Hwy, Adelaide River, NT 0846. This type is Fencing - For Mine with State ownership. Supply & installation of 10km of ringlock fencing for the Goodall Legacy Mine site, located 31km East of Adelaide River. To include supply & installation of double swinging gates Click for more details...

JESSOP CRESCENT SHOWROOM & WAREHOUSE
Jessop Crescent Showroom & Warehouse is currently at the Construction stage, valued at about $ 1800000 it is Construction of showroom & warehouse to comprise 4 loading bays, office & meeting rooms. Powder coated aluminium awning, higth level louvres & cement render to paint finish blockwork. Car parking for 20 vehicles. Associated landscaping. Click for more details...

MCCARTHY CLOSE WAREHOUSE
Industrial (Warehouses, cargo sheds, distribution centres) project In The Unincorporated North Council Area of Warehouse - Altns & Addns type. Proposed alterations & additions to an existing warehouse to include increase of the existing cool room areas. Click for more details...

TAMINMIN COLLEGE - BLOCKS 3 & 7
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 185000. This project Refurbishment of the girls, boys & male staff toilets in ablution blocks 3 & 7. Scope of work includes: repairs & painting. New toilet suites. New drinking fountain. New hand wash troughs. New urinals & new toilet cubicle doors Click for more details...

BARKLY HIGHWAY
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Barkly Shire Council Area for New development. Shoulder repairs at various locations from chainage 148.66 to chainage 179.54 Click for more details...

EARLY INTERVENTION LEARNING HUB
Renovations, Refurbishments etc. project of Education (Schools - primary, secondary (up to Yr 12)) project at 312 Trower Rd, Wanguri, NT 0810. Installation of new chiller & 2 new AHU's. Scope of work includes: decommission & remove from site the redundant existing built up Air handling units (AHUs), Air cooled chiller, Liquid receivers, remote refrigeration compressors, chilled water (CHW) pumps, associated refrigerant pipework, CHW pipework, electrical and associated, wiring, boards & controls. Supply, install, test, commission & maintain new chilled water AHUs.Supply, install, test, commission & maintain air-cooled chiller. Supply, install, test, commission & maintain primary chilled water pumps. Supply, install, test, commission & maintain chilled water pipework. Replace existing ductwork. New access platforms to plantrooms. New structure to chiller enclosure. Associated building, electrical & hydraulic works Click for more details...

BERRIMAH FARM COMMERCIAL & RESIDENTIAL REDEVELOPMENT - NORTHCREST
Civil Engineering (Commercial Subdivision) project at Sec 7349, 100 of Baget, Berrimah, NT 0828 of Residential/Commercial Subdivision (144) Lots - Stage 1 type of New development. Redevelopment of Berrimah Farm for commercial & residential purposes. To include 24ha for Department of Primary Industries & Fisheries research & education facilities. Stage 1: subdivision works 144 lots. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect