State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Water distribution systems, Drainage Projects in NSW®ion=⊂=615 in region


WARUDA ST UNITS
Renovations, Refurbishments etc. project of Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at 25 Waruda St, Kirribilli, NSW 2061. Refurbishment of 5 storey, early 20th Century waterfront apartment block. Demolition of existing entrance walkway, front fence & old laundry due to lack of compliance with codes. Replace entrance, mail boxes, front fence, garbage enclosure & laundry. Refurbish existing facade, landscaping & extensions of balconies. Click for more details...

COPELAND ST TOWNHOUSES
Copeland St Townhouses is currently at the Construction stage, valued at about $ 1000000 it is Construction of 12 x 3 bedroom townhouses. Brick & tile construction. 28 on-site parking spaces. Associated landscaping. Click for more details...

GREAT WESTERN HWY UNITS
Aged Care & Retired Developments (Aged units, seniors units) project In The Blue Mountains Council Area of Units (12) - Sepp 5 type. (Lot 6,Lot 7,Lot 1 ; DP4754,DP78456,DP77109) Demolition of most structures & construction of 13 units & upgrade of existing heritage listed dwelling, Verna. Unit configuration will be 1 x 1 storey x 3 bedroom unit to reflect Verna; 1 x 1 storey x 2 bedroom units with garage underneath; 8 x 1 storey x 3 bedroom units; 1 x 1 storey x 3 bedroom unit with split level garage. Upgrade of Verna which is a 2 bedroom unit. Landscaping, fencing, driveways, on-site stormwater detention & visitor parking facilities. Click for more details...

GLORIA PARK
Renovations, Refurbishments etc. project of Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Lester Ave, Hazelbrook, NSW 2779. Proposed general upgrade of park, stormwater drainage works. Click for more details...

THE AVENUE COMMERCIAL DEVELOPMENT
Office - 8 Storey project at 7-11 The Avenue & 6 & 10 Park Rd, Hurstville, NSW 2220 in the Retail (Shops, shopping centres & arcades, supermarkets). Construction of a commercial/retail development of a 8 storey & 4 levels of basement parking, 2 of which will be council parking, the other 2 levels will be for the commercial component of the building. The 2 levels of council carpark will result in 98 parking spaces. Click for more details...

PACIFIC HWY DWELLINGS - ILLOURA RESIDENTIAL
901-903 Pacific Hwy (former La Mancha Caravan Park site), Berowra, NSW 2081 Has Pacific Hwy Dwellings - Illoura Residential currently at Construction stage. Construction of 29 dwellings. Associated carparking & landscaping. Click for more details...

TILLEY LANE OFFICE
Commercial Premises (Offices) project at Lots 12 & 13 Tilley Ln (DP270323), Frenchs Forest, NSW 2086 for New. Construction of a 3-4 storey office building with 50 offices with a total GFA of 5,070sq m and basement carparking & associated landscaping. Click for more details...

PALOMAR PDE UNITS
Units (8) - 3 Storey project at 7 Palomar Pde, Yagoona, NSW 2199 in the Residential (Units, apartments, flats, townhouses, villas). Demolition of existing structures and construction of a 3 storey residential flat building comprising 8 x 2 bedroom units. Associated landscaping and 13 basement carparking spaces. Click for more details...

THE FATHOMS
Holiday Apartments - Stage 2 New project In The Shoalhaven Council Area. 20 seaside holiday units with cantilevered balconies within precast concrete structure. Airconditioning via mechanical ventilation, swimming pool. Extensive landscaping. 20 garages. Click for more details...


Units (3)/Duplex project at 5-7 John Miller & 21 Bird St, Ryde, NSW 2112 in the Residential (Units, apartments, flats, townhouses, villas). 4 x 3 bedroom, 1 x 2 bedroom. Brick veneer, tiled roof. Associated carparking & landscaping. Click for more details...

ST ALBANS RD TOWNHOUSES
Residential (Units, apartments, flats, townhouses, villas) project at 66-68 (Lot B) Rooty Hill Rd North (DP363560), Rooty Hill, NSW 2766 of Townhouses (9) - 2 Storey type of New development. (Lot B; DP363560) Demolition of existing & construction of 9 townhouses. Associated carparking & landscaping. Click for more details...

NOWRA MALL
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Shoalhaven Council Area of Private ownership. Proposal includes the construction of a supermarket including 3,000 sq m of floor space plus specialty shops and a 2 level carpark comprising an undercroft at ground level and a suspended concrete floor for a second level (carpark located across the road from mall). Click for more details...


Currently at the Construction stage In Lake Macquarie is a project estimated to be $ 675000. This project Construction of 9 x 3 bedroom units, walls brick veneer, concrete floor, tile roof, associated carparking & landscaping. Click for more details...

WIGRAM ST UNITS
Units (9) project at 213A Wigram Rd (Lot B DP397795), Glebe, NSW 2037 In The Council Area Of Leichhardt of Private. Construction of 9 x 2 bedroom units with lift & associated carparking & landscaping. Click for more details...

LONG REEF GOLF CLUB
Club - Altns & Addns Addition project In The Warringah Council Area. Extension of the existing bar/lounge areas of the eastern side of the Club building, focusing on the outlook over the Collaroy Basin beachfront. Introduction of a new bar to serve the extended lounge area, introduction of new operable walls to enable the lounge to be broken up into smaller areas. Construction of new, external verandah areas on the eastern side of the building, construction of a back-of-house extension on the southern side of the building. Click for more details...

GOOD ST UNITS
Units (15) - 3 Storey project at 25A,B & C Good St (lot E DP102647), Westmead, NSW 2145 In The Council Area Of Holroyd of Private. Demolition & construction of 9 x 2 & 6 x 3 bedroom units, associated carparking & landscaping. Click for more details...

TEMPE LANDS REMEDIATION & DEVELOPMENT PROJECT
Tempe Lands Remediation & Development Project is currently at the Construction stage, valued at about $ 500000 it is Water & sewerage services or electrical LV services respectively on a disused municipal waste site owned by Marrickville Council. The works will include the supply, construction & commissioning of services as follows: Water & Sewerage Services: approx 750m of new water main, connection to existing main in a side street & associated valve work, approx 650m of new sewer rising main, connection to Sydney Water sewer & 2 new 1000 litre packaged pump stations. Electrical LV Services: external LV switchboard, consumer mains, street lighting, electrical & communications infrastructure. Click for more details...

SINGLETON EQUESTRIAN CENTRE
Industrial (Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)) project at not yet determined, Singleton, NSW 2330 of Equestrian Centre type of New development. Proposed construction of an equestrian facility. Click for more details...

UNIVERSITY OF SYDNEY FACULTY OF LAW BUILDING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at between Eastern Ave & Barff Rd, Camperdown, NSW 2050 for New. Civil contractor works will consist of: site establishment, relocation of services, modification to City Road entry, demolition of existing buildings - Stephen Roberts Lecture Theatre & Edgeworth David Building, bulk excavation, shoring & piling works. Click for more details...

MELODY LN & KARIBOO LN DWELLINGS
A project in the NSW Within Lake Macquarie. Construction of 21 x 2 storey, 11 x single storey & 7 x split level x 3 bedroom dwellings & small lot subdivision. Associated carparking & landscaping. Click for more details...

CHARLES STURT UNIVERSITY
Education (Tertiary - colleges, institutes, universities) project In The Bathurst Council Area of State ownership. Construction of 2 x 8 bedroom self contained student accommodation including common area, kitchen, laundry & 2 bathrooms Click for more details...

VICTORIA RD INDUSTRIAL COMPLEX
Industrial (Factories & Factory Units) project at 168-180 (Lot 21) Victoria Rd (DP632076), Marrickville, NSW 2204 for Addition. Demolition of existing buildings & structures except for the warehouse at the rear. Alterations & additions to create a new 2 storey industrial complex comprising 24 factory units. The proposed factory units will have floor area ranging from 147sq m to 634sq m to make a total gross floor area of 3915sq m plus 562.5sq m loading area. Each unit will be equipped with disabled facilities including stairs that are able to accommodate a stair inclinator. Associated off-street carparking spaces for 46 cars. Click for more details...

DELL RD FACTORY DEVELOPMENT
Industrial (Factories & Factory Units) project In The Gosford Council Area of Factories (3) type. Construction of 3 factory units. Associated carparking Click for more details...

MARTIN ST VILLAS
Residential (Units, apartments, flats, townhouses, villas) project at 49-51 (Lots A & B) Martin St (DP157477), Warners Bay, NSW 2282 for New. Demolition of existing building. Construction of 6 detached single storey villas, 2 x 2, 4 x 3 bedroom, each with a double garage. Associated landscaping. Click for more details...

VICTORIA PARK MIXED DEVELOPMENT - SITE 1 - VICTORIA PARK CENTRAL - EAST VILLAGE
Victoria Park Mixed Development - Site 1 - Victoria Park Central - East Village is currently at the Construction stage, valued at about $ 151851000 it is Construction of a new mixed use development. incorporating a 4 storey podium of residential, retail, commercial & carparking uses with residential units accommodated within 4 buildings located above, total GFA 41,647.7sq m + 680sq m for Section 96 additional retail/commercial floorspace. The proposal has a maximum height of 7 to 8 storeys. The proposal accommodates a total of 206 residential apartments, 1 x studio, 78 x 1, 68 x 2 bedroom standard, 49 x 2 bedroom large & 10 x 3 bedroom, 11,417sq m of commercial floor space, including a car service centre, gymnasium & 17 serviced apartments; 10,804.7sq m of retail floor space on the ground floor level, including a supermarket of approximately 3,500sq m. Stage 1 will comprise early works - site preparation works, including perimeter shoring & excavation. Stage 2 will comprise retail & commercial -construction of the basement levels, including carparking & plant; construction of the podium building up to level 4, including retail areas, residential entrance lobbies, service vehicle areas & loading dock; & all streetscape and public domain works. Stage 3 will comprise residential - construction of all levels above podium, being residential units on levels 5 to 8 (Buildings A, B, C and D); completion & fitout of residential & serviced apartments on level 3; & associated landscaping, communal open space & recreation facilities. The project will target a 5 Star Green Star rating. Precast concrete walls, green wall, shadow box glazed wall, high performance generally clear single & double glazing with powdercoated aluminium frames, timber blades, metal, bluestone & timber cladding, timber fins, glazed & solid awning with steel trim, aluminium framed balustrades with translucent glass infill, aluminium louvres, metal cladding. Basement carparking over 2 levels, total of 1185 carparking spaces & 63 motorcycle spaces. Landscaping & public domain works, including the provision of a landscaped podium skypark of approx 6,000sq m & a public plaza at the intersection of Gadigal/Defries Av. Click for more details...

FIVE ISLANDS RD WAREHOUSE
Workshop/Warehouse/Office New project In The Wollongong Council Area. Construction of a new industrial building for rental of commercial vehicles & sale of related parts. Building to comprise a workshop of 1120sq m, warehouse 300sq m & office of 435sq m. Associated carparking & manoeuvring areas & landscaping. Click for more details...

SYDNEY CRICKET GROUND - NOBLE & BRADMAN GRANDSTANDS REDEVELOPMENT
A project in the NSW Within Sydney. Replacement of the existing Noble, Bradman & Messenger stands & the construction of new Northern Stand. Redevelopment incorporates the following: Four levels of seating and accommodation with a total capacity of 13,360 seats. New VIP & Corporate Suites. New Media facilities. New secure players area in basement. New facilities for catering & ground maintenance in basement. New Videoboard Click for more details...

ENERGYAUSTRALIA TRAINING FACILITY
Education (Tertiary - colleges, institutes, universities) New project at 48-50 Holker St & Lot 1 Giffard St, Silverwater, NSW 2128. This type is Training Facility - 3 Storey with State ownership. Demolition of 2 existing industrial building & substation structures, site consolidation & remediation. Construction of a 1-3 storey training facility for EnergyAustralia, the site will be a state-of-the-art accredited learning centre, with training provided for a range of specialised jobs including lineworkers, cable joiners, customer supply, electricians, motor mechanics & engineers. The building will contain roof plant deck, learning centre & associated amenities, cafeteria, administration offices, auditorium, energy efficient centre, lobbies, yards, workshops , display & learning facilities, building plant & plant rooms. Installation of training poles/pits & associated electrical infrastructure to training yards. The design layout involves construction of 4 pavilion-style buildings connected by walkways & based on a campus-like model around central courtyard spaces with creation of distinctly different campus zones identified as: the Forecourt, Hub, Recreation Court & Training Yard. The Hub will act as an orientation space upon arrival & will form a 3 storey meeting space with common galleries & lounges; the Energy Efficiency Centre will be fully integrated with the lobby, lounge & circulation areas & will provide an informal exhibition space. A cafe facility will be located centrally within the Hub, providing internal & external seating & a meal preparation room will be provided for apprentices, & a trainers meal room, lounge & locker room will be provided on the second level. The office & admin area will be located within the Hub, the office area takes the form of a pavilion building surrounded by various lobby & exhibition spaces. The Hub will also contain multipurpose computer rooms & conference room. An external recreation landscaped court is located adjacent to the Hub with outdoor cafe seating, with further seating & BBQ facilities. High risk external & undercover training requiring supervision will be located within the Training Yard, including the power worker pole yard & cable joining pits. Implementation of internal & external roads & civil works. Basement carparking for 203 cars. Landscaping. Click for more details...

ST MARGARET MARY'S PRIMARY SCHOOL BER PROJECT
7 Chetwynd Rd, Merrylands, NSW 2160 Has St Margaret Mary's Primary School Ber Project currently at Construction stage. Refurbishment of a multi-purpose Hall & library Click for more details...

NSW SOCIAL & COMMUNITY HOUSING - NBESP
Currently at the Construction stage In Orange is a project estimated to be $ 3672000. This project Construction of 17 units comprising 10 x 1 & 7 x 2 bedroom units. Associated carparking & landscaping Click for more details...

NSW SOCIAL & COMMUNITY HOUSING - NBESP
33-41 Larool St, Tamworth, NSW 2340 Has Nsw Social & Community Housing - Nbesp currently at Construction stage. Construction of 3 units & associated works Click for more details...

WAGGA WAGGA BASE HOSPITAL
A project in the NSW Within Wagga Wagga. Renovations & extensions to the existing renal services building in the hospital Click for more details...

HEATHCOTE ENGADINE & PEPPERMINT GROVE TUNNELS
Currently at the Construction stage In Sutherland is a project estimated to be $ 915000. This project Rehabilitation of the Heathcote Engadine & Peppermint Grove tunnels. Scope of Work ? common to both sites - includes but is not necessarily limited to: Site establishment; reinstatement of access tracks if required to provide safe vehicle access; provision of all confined spaces measures including access, ventilation and odour control (if necessary) to facilitate the internal rehabilitation; removal of any silt, fretted rock & debris generated from internal surface preparation and cleaning as well as any existing silt within the area of work; coordination with Sydney Water, any other relevant authorities & the adjoining property owners to arrange access & manage pedestrian movements necessary to implement the rehabilitation & site restoration. Scope of Work ? Heathcote-Engadine Carrier which includes but is not necessarily limited to: Erection of scaffold over Scouts Creek to minimise potential impacts on the creek and to provide safe access for personnel & equipment from the site establishment area to the manhole; coordination with Sydney Water in regard to flow management strategies and wet weather requirements; set-up of a flow management regime to /or internal bypass to deal with incoming flows from the rising main of SP0275 & SP0589; removal of root ingress 9 m downstream of manhole; internal patch repairs of areas with severe deterioration of the 19m of unreinforced concrete lining of the sewer starting from and including the upstream manhole, this includes cleaning & surface preparation of internal concrete & brick surfaces, reinstatement in areas of degradation as required in readiness for application of protective coating system; removal & replacement of cast iron 2 part watertight access covers and cast in frame & removal & replacement of all step irons in upstream manhole. Scope of Work ? Peppermint Grove Carrier which includes but is not necessarily limited to: localised patch repairs with mesh & shotcrete over seam for a total of approximately 18m at CH149-CH161 & CH590-CH596; repairs with mesh & shotcrete to the walls only for approximately 102m at CH172-CH274; localised patch repairs with mesh & shotcrete to roof only for approximately 3m at CH492-CH495; full perimeter repairs with mesh & shotcrete for approximately 63m at CH527-CH590 & possible construction of a temporary 300mm service shaft in Cutler Rd to assist with completion of the shotcrete work. Click for more details...

SECOND AV BOARDING HOUSE
Residential (Student & group accommodation) project at 51 (Lot 46) Second Av (DP31423), Kingswood, NSW 2747 of Boarding House type of New development. Demolition of existing cottage. Construction of an 8 room boarding house. Carparking for 1 vehicle. Landscaping. Click for more details...

SAMANTHA RILEY DRIVE AFFORDABLE HOUSING - KELLYVILLE GARDENS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at 85-89 Samantha Riley Dr & 1-3 Highbury Rd, Kellyville, NSW 2155 for New. Demolition of existing structures. Construction of proposed Highbury Rd. Construction of a 2 storey residential development consisting of 4 buildings, each building containing 10 x 2 bedroom units. 20 of the units are nominated for Affordable Housing (SEPP). Metal roofing, cavity brick & clay bricks, painted render, aluminium framed doors & windows, glass balustrades, plastered brickwork & ceramic tiles. Basement parking for 45 vehicles. Landscaping. Click for more details...

TWIN CREEKS - STAGE 8
Rural/Residential Subdivision (22) Lots project at 54 Twin Creeks Dr (DP270417), Luddenham, NSW 2745 in the Civil Engineering (Rural Subdivision). Proposed rural/residential subdivision of 22 lots with lot sizes ranging from 4,000sq m to 7,000sq m. 1 residual lot & sewer reticulation Click for more details...

LAHC - COMMUNITY CENTRE
Community Centre - Altns & Addns Addition project In The Wagga Wagga Council Area. Alterations & additions to existing building to create a community centre. Associated carparking. Construction of a community garden Click for more details...

PYMBLE LADIES COLLEGE
Carpark/Piazza/Terrace/Landscaping New project In The Ku-Ring-Gai Council Area. Relocation of the existing the Mollie Dive sports field. Raise the finished level of the relocated field for the provision of a 6660sq m carpark underneath with parking spaces for 232 vehicles. Construction of a new terrace to the new aquatic & fitness centre. Construction of a new piazza & connecting avenues between the existing Lang House & Goodlet House. Landscaping. Click for more details...

ST AUGUSTINES COLLEGE
A project in the NSW Within Warringah. Demolition & removal of existing primary school classrooms & associated play spaces. Demolition of existing open staff carpark. Demolition of the existing residence at 18 Gulliver St. Alterations & additions to existing school comprising construction of a 2 storey science facility & a primary school learning centre over the carpark. Internal refurbishment of the existing Cameron House building at 20 Gulliver St. Refurbishment works to the existing Mendel Wing building, located to the north of the new buildings. Double brick, fibre cement, steel & aluminium panels, galvanised steel gates & balustrades, acrylic awning, green wall, bagged & painted brickwork, colorbond roof, concrete floor. Construction of a ground level carpark for 102 vehicles. Landscaping. Click for more details...

NORTH RYDE STATION PRECINCT MIXED DEVELOPMENT - CENTRALE
Commercial Premises (Commercial complexes - shops, offices) project at 1-17 (Lot 4) Delhi Rd (DP131774), North Ryde, NSW 2113 for New. Demolition of an existing temporary carpark structure. Construction of 14 storey x 4 building mixed use development for 380 residential units comprising 174 x 1, 185 x 2 & 21 x 3 bedroom units & 350sq m commercial area on the ground floor comprising 1 x 111, 1 x 103 & 1 x 112 sq m tenancies. Total GFA of 29,840sq m including residential GFA of 29,514sq m. The 350sq m of commercial area has frontages to Delhi Rd & Station St & the public plaza. Two levels of basement with parking spaces for 424 vehicles including car-wash bays & 2 car share spaces, 160 bicycle spaces, an end of journey facility, 1 service vehicle loading bay & residential storage areas. Public domain works include construction of a 3,150sq m plaza comprising 2,520sq m public accessible central plaza to connect Delhi Rd, the North Ryde station entry & Station St & 630sq m of shared public plaza on Station St, 1,080sq m of footpaths & 1,815 communal courtyards. Landscaping of 2,330sq m of publicly accessible area, 3,913sq m of communal residential garden areas. Click for more details...

HOXTON PARK RD UNITS
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Liverpool Council Area for New development. Demolition of existing structures. Construction of a 5 storey residential flat building comprising 1 x 1, 15 x 2 & 2 x 3 bedroom units. Brick & rendered concrete block walls, powdercoated aluminium framed windows & doors, stainless steel balustrades with glass infill panels, concrete roof, concrete floor. Basement carparking for 21 vehicles. Landscaping. Click for more details...

GYMEA HOTEL
Hospitality (Clubs (licensed), licensed premises, casinos, taverns) project at 41-45 Gymea Bay Rd, Gymea, NSW 2227 for Addition. Alterations & additions to an existing hotel for refurbishment & reconfiguration of the gaming areas for the provision of an outdoor smoking area. The work will increase the GFA of the hotel from 1770 to 1920sq m. The work includes the relocation of the gaming room to the north-east corner of the building for the addition of an outdoor area, a new hotel entry, refurbishment of the existing bistro & a small extension of the bistro outdoor dining area. New powdercoat to the existing louvres, new frosted glass panels, new rendering to some walls & painting. External work includes reconfiguration of the carparking area with the provision of 2 more parking spaces & an upgrade of the waste management facility. Landscaping upgrade & conservation. Click for more details...

TOONGABBIE RD & AURELIA ST UNITS - SYNERGY
Currently at the Construction stage In Holroyd is a project estimated to be $ 17882000. This project Demolition of existing structures. Consolidation of 7 lots into 1. Construction of 3 x 4 storey residential flat buildings comprising 74 units. The mix of units is 11 x 1, 59 x 2 & 4 x 3 bedroom units. Two separated basement carparks accommodating 90 carparking spaces & 48 bicycle bays. Landscaping. Click for more details...

CATHCART ST 20 LOT SUBDIVISION
Residential Subdivision (20) Lots New project In The Goulburn Mulwaree Council Area. Proposed 20 lot residential subdivision. This includes the construction & creation of road reserves, installation of stormwater drainage, along with the extension of councils sewerage & water supply systems. Click for more details...

KYOGLE WATER SUPPLY AUGMENTATION
Public Utilities (Treatment plants, Sewerage reticulation) New project at ., Kyogle, NSW 2474. This type is Mechanical/Electrical Works with State ownership. Mechanical and electrical works associated with the Water Supply Augmentation works & minor civil works. Scope of work includes: modifications to the existing Water Treatment Plant (WTP) to provide for improved performance & refurbishment & modernisation of the facility. Construction of the mechanical & electrical aspects within the new off stream storage site. Modifications to the existing raw water pump station. Click for more details...

LAHC - ADAMSTOWN & JESMOND
Civil Engineering (Retaining walls, Seawalls) project In The Newcastle Council Area of State ownership. Replacement of retaining wall & other associated works. Click for more details...

BANKSTOWN CIVIC TOWER
Commercial Premises (Offices) Renovations, Refurbishments etc. project at 66-72 Rickard Rd, Bankstown, NSW 2200. This type is Office - Mechanical Upgrade with Local Govt ownership. Upgrade of mechanical services at Bankstown Civic Tower Click for more details...

MILTON ULLADULLA HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) project In The Shoalhaven Council Area of Hospital - Extn type. Extension of the satellite dialysis unit & palliative care Click for more details...

WOLLONGBAR SKATEPARK
New project of Sports (Sports ground hard surface (tennis courts,netball courts, basketball & skateparks)) project at Plateau Dr, Wollongbar, NSW 2477. Design & construction of a new skatepark in Wollongbar. Associated landscaping. Click for more details...

MUSWELLBROOK CBD FOOTPATH RECONSTRUCTION
Muswellbrook Cbd Footpath Reconstruction is currently at the Construction stage, valued at about $ 200000 it is Footpath reconstruction works on the northern and southern sides of Brook Street, from the intersection with Bridge St to the steps on the central median. Work comprises: Removal of existing concrete and brick paved footpath surface. Removal of existing nominated sections of concrete kerb and gutter. Backfill to rear of kerb. Construction of kerb and gutter and kerb. Construction of new concrete footpath. Construction of retaining walls, pram ramps, driveways and driveway laybacks. Construction of footing and plinth to site Beersheba memorial bronze statue. Supply and installation of street furniture including fencing and handrails. Construction of electrical supply and installation of electrical conduits and up lighting. Construction and installation of garden beds, planter boxes including provision of plants and trees. Reinstatement of private stormwater drainage outlets. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect