State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Water distribution systems, Drainage Projects in NSW®ion=⊂=615 in region


AIRGATE BUSINESS PARK
Warehouses (2) - Building 3a & Building 3b project at 283 Coward St, Mascot, NSW 2020 In The Council Area Of Botany of Private. Site works and construction of 2 warehouse buildings incorporating ancillary office space. The new buildings are known as Building 3A & Building 3B. Building 3A comprise of 4097 sq m logistic warehouse, 3409 sq m freight warehouse, 100 sq m dispatch office, 150 sq m battery charging room, 2200 sq m 2 level office & a 200 sq m terrace. Building 3B comprises of 2280 sq m general cargo warehouse, 190 sq m recessed loading dock, 1000 sq m offices, 150 sq m cool room & 500 sq m perishables. Associated carparking for 166 vehicles. Click for more details...

PORT MACQUARIE POST OFFICE SITE - QUAY NORTH
A project in the NSW Within Port Macquarie-Hastings. The proposal is for an "art deco" style development comprising ground floor tourist related retail & function facilities including a restaurant fronting the Town Green, a new CWA facility with seating for 200, retail space, Australia post retail outlet & public amenities. The residential component includes 36 residential high quality apartments, associated carparking for 73 vehicles & landscaping. Click for more details...

ALBURY FIRE STATION
Fire Station project at 247 Kaitlers Rd (cnr Nagle Rd), Lavington, NSW 2641 In The Council Area Of Albury of Private. Construction of a new Fire Station. Click for more details...

ROOTY HILL RD MIXED DEVELOPMENT
Currently at the Planning stage In Blacktown is a project estimated to be $ 300000. This project Construction of a 2 storey mixed development consisting of restaurant & shops on ground floor & 2 residential units above. Associated carparking & landscaping. Click for more details...

LIBERTY GROVE CHILD CARE CENTRE
Liberty Grove Child Care Centre is currently at the Construction stage, valued at about $ 1000000 it is Construction of 40 place centre. Click for more details...

PORT BOTANY TERMINAL EXPANSION PROJECT
Currently at the Construction stage In Randwick is a project estimated to be $ 580000000. This project Proposed extensions to existing port facilities at Brotherston Dock North. Stage 1 comprises the construction & operation of a container terminal and associated infrastructure described generally as: an additional 550m plus 980m of berth face at approx 51 hectares of land to the west of Brotherson Dock North; provision for an extra 4 nominal berths; dedicated road access to foreshore Road via a bridge across the channel separating the terminal from the existing shoreline; rail access to the new terminal area by means of an extension to the existing Botany Freight Rail Line parallel to Foreshore Road, including a rail bridge & carriageway; 2 new rail sidings; an inter-terminal access road & 2 additional rail storage sidings parallel to the northern boundary of the Patrick Terminal; reclamation adjacent to Foreshore road to create a recreational boat ramp, tug & support vessel facility; restoration & enhancement of Foreshore beach and adjoining landscape area; and ecological habitat relocation and enhancement work within the Penrhyn Estuary. Stage 2 works will comprise the construction and operation of approx 12 hectares of additional terminal area of approx 320m of additional quay line to accommodate a nominal fifth berth. There are 3 different options for Stage 2 fifth berth: Western Option, Eastern Option & Northern Option. Click for more details...

SYDNEY SOUTH SUBSTATION
Henry Lawson Dr, Picnic Point, NSW 2213 Has Sydney South Substation currently at Construction stage. Design, manufacture, testing at Works, transport & erection at Sydney South Substation of a 3 phase, 50 Hz, 362kV, 10.89 ohm, 900MVAr throughput oil immersed Series Reactor. The supply of the Series Reactor is to include radiators & associated hardware, support structures, associated spare parts, tools & appliances & appropriate drawings & instruction manuals. Click for more details...


Units (69) - 6 Storey Subcontract project In The Sydney Council Area. 2 levels basement carparking, cafe at ground level, swimming pool & gymnasium on mezzanine/courtyard level. 6 x bedsitters, 50 x 1 bedroom, 11 x 2 bedroom, 2 x 3 bedroom. Reinforced concrete frame, brick infill, concrete slab roof. Click for more details...

BADGERYS CREEK LANDFILL
Waste Landfill Facility project at 320 (Lots 1-3) Badgerys Creek Rd (DP576709), Badgerys Creek, NSW 2171 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Clay Shale mining, solid & inert waste landfilling & associated works including workshop, material processing area, equipment shelter, water tank, carpark. Click for more details...

LATITUDE - WORLD SQUARE
644-690 George, Goulburn & Pitt Sts, Sydney, NSW 2000 Has Latitude - World Square currently at Construction stage. The proposal includes 88,000 sq m of office space in 3 buildings walled entirely in glass. The 3 buildings start from level 10 of the existing structure and range in height to a maximum of 51 storeys. The proposal includes partial demolition of existing structures. Building 1 will be 41 storeys above 10 level podium. Building 2 will be 13 storeys above 10 level podium. It will be a mid rise commercial building of 21,000 sq m. Building 3 wil be 5 storeys above 10 level podium. It will be a retail building of 8,000 sq m. Allocation of 550 carparking spaces will be from existing basement levels. Click for more details...

CAIRNCROSS WASTE MANAGEMENT FACILITY
Local Govt ownership Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Port Macquarie-Hastings Council Area for New development. Establishment of a waste management facility incorporating a solid waste landfill & extractive industry. Construction of: 2.1 kilometre access road; initial landfill placement area; ancillary site infrastructure; buildings. Click for more details...

LONG REEF MIXED COMMERCIAL/RESIDENTIAL
Units (8)/Retail - 3 Storey project at 998 Pittwater Rd (Lot 10 DP6777), Long Reef, NSW 2097 in the Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods). Demolition of existing 2 storey commercial building, and to erect a 3 storey predominantly residential development, with a single retail premises (78sq m) at ground level. Click for more details...

NORTH SYDNEY COUNCIL SEWERAGE
Public Utilities (Treatment plants, Sewerage reticulation) project In The North Sydney Council Area of State ownership. The supply & installation including construction project management of gross pollutant devices at up to four sites in the North Sydney Council Area. The stormwater lines to be rated are in Vernon St, Cammeray, Cammeray Rd, Cammeray at Folly Point, Manns Ave, Neutral Bay. Click for more details...

LINKS RD WAREHOUSE
Warehouse/Office project at 44 (Lot 34) Links Rd (DP31908), St Marys, NSW 2760 In The Council Area Of Penrith of Private. Construction of a 3,000sq m factory/warehouse with a 500sq m office to be built in 3 stages. Associated carparking and landscaping Click for more details...

CHRISTIAN REFORMED CHURCH RETIREMENT VILLAGE
Units (21)/Church project at 665 (Lot 1, 3, 6, 4,5) Cobbitty Rd (DP599327, & DP253184), Cobbitty, NSW 2570 in the Aged Care & Retired Developments (Retirement villages). Construction of new retirement village comprising 21 single storey units, church, hall, rector's residence & manager's residence. Associated carparking & landscaping. Click for more details...

MITCHELL - STAGE 4
Civil Engineering (Residential Subdivision) project In The Muswellbrook Council Area of Private ownership. (Lot 1;DP 798186) Click for more details...

RUSSELL ST APARTMENTS
New project of Residential (Units, apartments, flats, townhouses, villas) project at 47 Russell St, Vaucluse, NSW 2030. Demolition of existing residential flat building. Construction of a 3 storey residential flat building comprising 2 x 3 & 2 x 2 bedroom apartments. Basement carparking for 6 vehicles. Associated landscaping. Click for more details...

DON MOORE RESERVE
Park - Upgrade New project In The The Hills Shire Council Area. Upgrade of existing park including pedestrian boulevarde, relocation of BMX track, outdoor furniture, landscaping. Click for more details...

SHARP & EDGAR ST MIXED DEVELOPMENT - BELMONT CENTRAL
Sharp & Edgar St Mixed Development - Belmont Central is currently at the Construction stage, valued at about $ 17000000 it is Demolition of 7 existing houses. Construction of a 4/6 storey mixed used development comprising 1 x 2, 4 x 2 + study, 28 x 3 & 4 x 4 bedroom units & 798sq m retail/commercial space (3 units). Basement residential carparking for 67 vehicles. Ground floor commercial carparking for 27 vehicles. A communal private courtyard & pool are provided on level 1. The total area of communal space will be 640sq m including planter boxes, timber deck & seating. Click for more details...

NAN TIEN TEMPLE EDUCATION & CULTURAL FACILITIES
Currently at the Construction stage In Wollongong is a project estimated to be $ 27000000. This project First Phase of Stage 1: Construction at existing Nan Tien Temple of new education and cultural facilities, art gallery, gallery classrooms, roads, & central park. Level 1 will comprise carparking, administration, services Level 2 (entry level) will comprise library, cafeteria, foyer 1, gallery, gallery terrace, ceremonial forecourt green, forecourt stage/meditation space. Level 3 will comprise theatre, foyer & auditorium. Level 4 will comprise classroom & tutorial room. Plant on level 5. Concrete panel walls, panelled & feature walls, aluminium vertical louvres, anodised aluminium framed glass over operable timber screens & stabilised earth wall, metal deck & gravel roof. Basement carparking over 2 levels & on level 1 for 117 vehicles, 5 motorcycle spaces & 31 bicycle spaces. Landscaping. Click for more details...

ABBOTT RD FACTORY UNITS & CHILD CARE CENTRE
A project in the NSW Within Blacktown. Construction of 36 factory units & offices, & a child care centre for 90 children on the first floor. Click for more details...

WOODLAWN MECHANICAL BIOLOGICAL TREATMENT FACILITY (MBT)
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Lots 33-34, 69 & 97, Lot 4 Collector Rd (DP754919, DP830765), Tarago, NSW 2580 of Mechanical Biological Treatment Facility type of New development. Construction of an Mechanical Biologial treatment facility at the Woodlawn Eco-Precinct. Scope of work includes: civil & infrastructure. Major buildings. Site services. Click for more details...

BEAUCHAMP RD INDUSTRIAL DEVELOPMENT
Warehouse/Factory/Office project at 133-149 Beauchamp Rd, Matraville, NSW 2036 In The Council Area Of Randwick of Private. Demolition of existing building. Construction of warehouse development comprising 2 strata titled buildings (containing 23 units) 6 Torrens title buildings The proposed building will accommodate separate industrial/factory units 7334sq m warehouse, 2441sq m factory, 2710sq m ancillary office including cafe. Carparking for 156 vehicles Click for more details...

FARRELL RD CHILD CARE CENTRE
Child Care Centre project at Lots 101 & 102 Farrell Rd (DP1103278), Orange, NSW 2800 in the Education (Kindergartens, day nurseries, child care centres). Construction of a new Child Care Centre. Landscaping & carparking. Click for more details...

BOWDEN ST TOWNHOUSES
A project in the NSW Within Parramatta. Demolition of existing dwelling. Construction of 10 x 3 bedroom townhouses. Basement carparking fro 17 vehicles. Associated landscaping. Click for more details...

BEROWRA WATERS MARINA - DUSTHOLE BAY
Carpark/Parklands project at 129X Bay Rd & Dusthole Bay Reserve, Berowra Waters, NSW 2082 In The Council Area Of Hornsby of Private. Scope of work includes: the rationalisation, reconfiguration & refurbishment of the existing carpark at Dusthole Bay involving the construction of a 1 level carpark deck to establish 203 carparking spaces, 65 public car - trailer spaces & associated site drainage & landscaping; upgrading, reconfiguration & expansion of the existing open space at Dusthole Bay comprising an additional 105sw m of landscaped parklands & relocated park equipment & facilities; construction of new foreshore boardwalks & decks comprising a public boardwalk around the eastern edge of Dusthole Bay Foreshore Park & along Bay Rd between the Car Ferry & the Berowra Waters marina & new decks adjoining the Berowra Waters marina building & a new public boat sewage pump out facility at the Berowra Waters Marina Click for more details...

ALDI SUPERMARKET/COMMERCIAL COMPLEX - ALBURY
Supermarket/Shops(6)/Office/Carpark New project In The Albury Council Area. Demolition of the existing Matador Motel & former Mobil service station. Construction of a new 1,125sq m Aldi Supermarket, 6 small shops, offices & a 2 level carpark with 130 spaces. Click for more details...

SHABAN ST INDUSTRIAL UNITS
Currently at the Construction stage In Shellharbour is a project estimated to be $ 300000. This project Construction of 2 industrial units and carparking. Click for more details...

LEPPINGTON FUTURE TOWN CENTRE AND RAILWAY STATION
Currently at the Early Planning stage In Liverpool is a project estimated to be $ 10000000. This project To develop Integration Options & a Concept Masterplan to inform the designs & approvals being sought for the South West Rail Link to ensure the future planning & development of the Leppington Town Centre will integrate effectively & efficiently with the proposed Leppington Railway Station & Interchange. To meet the Government's commitment to the construction & operation of the South West Rail Link (SWRL) by 2012, the Environmental Assessment for the SWRL must be completed & exhibited in 2008. An Integration Options & Concept Masterplan for Leppington Town Centre is being prepared by the GCC in consultation with Transport Infrastructure Development Corporation (TIDC), Ministry of Transport (MoT), RailCorp, RTA, Department of Planning (DoP), Liverpool Council & Camden Council. This will inform the concept design process for Leppington Railway Station. Future detailed master planning for the town centre, including extensive community consultation is expected to occur when planning for the surrounding precincts takes place. The Integration Options & Concept Masterplan will be used to inform the Leppington Railway Station design & SWRL approval process being managed by TIDC. The purpose of preparing the work is to ensure the opportunity for effective integration of the railway station interchange & town centre can be achieved Click for more details...

SHELL REFINING
Shell Refining is currently at the Construction stage, valued at about $ 5000000 it is The proposed development provides a state of the art dedicated water cooling facility for the existing polypropylene plant. The efficiency of both the manufacturing plant & cooling tower will enhanced as a result of the new water cooling facility Click for more details...

GREAT WESTERN HIGHWAY - FORTY BENDS
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Great Western Highway from Hartley Valley to Forty Bends, Lithgow, NSW 2790 for New. Upgrade of approximately 11.9km of Great Western Highway improvements from Hartley Valley to Forty Bends. The Hartley Valley works consists of the upgrading & widening of approximately 7.4km of the highway. The River Lett Hill to Forty Bends improvements consists of the upgrading & widening of approximately 2.1km of the highway. Reconstruction at Forty bends consists of the reconstruction of approximately 2.4km of the highway. Scope of work includes: earthwork, bridgework, stormwater drainage, subsurface drainage, pavement, retaining walls, fauna crossings, pavement marking, signposting, utility relocations, property adjustments & ancillary works. Construction of twin 150m long bridges over White Creek & design & installation of bridge deck heating system. Click for more details...

BANKSTOWN LIDCOMBE HOSPITAL MEDICAL CENTRE
State ownership Commercial Premises (Offices) project In The Bankstown Council Area for Renovations, Refurbishments etc. development. Upgrade office accommodation to support aged care programs Click for more details...

VARDYS RD SELF STORAGE UNITS
Vardys Rd Self Storage Units is currently at the Construction stage, valued at about $ 1400000 it is Construction of a 3 storey building containing self storage units, with small office area. Metal walls, metal roof, concrete floor. Carparking for 11 vehicles. Click for more details...

WILLOUGHBY RD MIXED DEVELOPMENT
Willoughby Rd Mixed Development is currently at the Construction stage, valued at about $ 1750000 it is Substantial alterations & additions to an existing two storey commercial building to provide restaurants/cafe tenancies on the ground floor, offices on first floor & 2 x residential apartments on the new second floor. Brick veneer walls, new cement render & paint, new glass shop fronts, new metal awning. Click for more details...

ST SPYRIDON COLLEGE BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) New project at 80 Gardners Rd, Kingsford, NSW 2032. This type is Multipurpose Hall with Private ownership. Construction of multipurpose hall. Click for more details...

DANEBANK SCHOOL BER PROJECT
Currently at the Construction stage In Hurstville is a project estimated to be $ 2500000. This project Construction of classrooms & associated COLA to replace demountables Click for more details...

SONOMA BAKING COMPANY ALEXANDRIA
Sonoma Baking Company Alexandria is currently at the Construction stage, valued at about $ 350000 it is Use & fitout of existing warehouse building for the manufacturing & distribution of bakery products together with an ancillary cafe/shop. External works to the western & southern building facades include the modification of existing window & door openings, enlargement of existing vehicular crossovers and the painting of the face brick to charcoal. Ground floor of the building is to consist of warehouse storage space for ingredients & packaging, food preparation area, baking area, office space, staff kitchen, amenities at both the eastern and western ends of the building, freezer room, & washing & cleaning facilities. The eastern end of the building will be used for a cafe/shop consisting of kitchen, amenities, & indoor/outdoor seating. The mezzanine levels at the south west of the building and central to the site will provide office space, amenities & staff kitchen. Click for more details...

COMMERCIAL AVE GYMNASIUM
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 1 Commercial Ave, Dubbo, NSW 2830 for New. Construction of a gymnasium & fitout. Carparking & landscaping. Click for more details...

OUR LADY OF MERCY COLLEGE
A project in the NSW Within Parramatta. Minor alterations that will improve office utility in the Brigid Shelly building, improve student facilities in the Francis Kearney House, provide a new entry foyer for the Catherine McAuley library & provide an enhanced entry to the school along Ross St. Internal refurbishment to create music centre, business administration & student services centre Click for more details...

GRAYTHWAITE REHABILITATION CENTRE
Denistone Rd, Eastwood, NSW 2122 Has Graythwaite Rehabilitation Centre currently at Construction stage. Construction of a new carpark at Graythwaite Rehabilitation Centre Click for more details...

WENTWORTH TOWN HALL
Town Hall - Upgrade project at Lot 1 Adelaide St (DP630527), Wentworth, NSW 2648 In The Council Area Of Wentworth of Local Govt. Upgrade to the existing Town Hall. Internal amenities, ramp & balustrade to front of the building. Click for more details...

HILLTOP RD CHILD CARE CENTRE
Hilltop Rd Child Care Centre is currently at the Construction stage, valued at about $ 400000 it is Demolition of existing structures. Construction of a single storey child care centre for 36 children. Click for more details...

PRINCIPAL NURSING HOME QUAKERS HILL
A project in the NSW Within Blacktown. Reconstruction of Quakers Hill nursing home. Residential aged care facility comprising of 128 bed home with single & double rooms, dementia wing. Construction of a memorial garden. Click for more details...

KURING-GAI INDUSTRIAL ESTATE
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) Renovations, Refurbishments etc. project at 38 (Lot 50) Beaumont Rd (DP734749), Mount Kuring-Gai, NSW 2080. This type is Warehouse - 2 Storey - Altns & Fitout with Private ownership. Alterations & fitout for change of use of part of an existing warehouse. The existing warehouse has a floor area of 1598sq m & the fitout area will be installed in the north eastern end with a floor area of 300sq m for use as a pilot plant for the research & feasibility of "smart particle" technology with associated chemical storage within the building. The majority of the proposed work comprised the construction of internal walls & ceilings to accommodate the plant. The work also includes a new roller door for loading purposes & new fire exits. Click for more details...

UNSW RURAL CLINICAL SCHOOL
Education (Tertiary - colleges, institutes, universities) project In The Griffith Council Area of Private ownership. Alterations & additions to UNSW Rural Clinical School Click for more details...

SYMONDS RD SUBDIVISION
Residential Subdivision (58) Lots New project In The Blacktown Council Area. Proposed residential subdivision comprising 58 lots with lot sizes ranging from 350sq m to 450sq m. 2 drainage reserves. Construction of new roads. Click for more details...

PELICAN RD SUBDIVISION
Civil Engineering (Residential Subdivision) New project at 38 (Lot 13) Pelican Rd (DP31797), Schofields, NSW 2762. This type is Residential Superlots (2)/Roads with Private ownership. Proposed torrens title subdivision into 2 residential superlots, 1 drainage lot, 1 residue lot & 1 lot dedicated to council for public road. Construction of roads & stormwater drainage. Click for more details...

TORRYBURN BRIDGE
Bridge project at Torryburn Rd, Torryburn, NSW 2421 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Construction of a new bridge over the Allyn river. Click for more details...

ELARA - PRECINCT 2
A project in the NSW Within Blacktown. Proposed residential subdivision stages 15-23 comprising 635 lots with lot sizes ranging from 250sq m to 518sq m. 2 superlots. 4 residue lots. Civil construction. Temporary drainage & associated works. Stages 15 x 99, 16 x 97, 17 x 46, 18 x 82, 19 x 94, 20 x 73, 21 x 18, 22 x 37, 23 x 89 lots. Click for more details...

MINGARA ATHLETICS TRACK
Sports (Pavilions, Grandstands, Stadiums/halls) project In The Wyong Council Area of Grandstand type. Construction of a new shaded, tiered, concrete spectator seating to be able to accommodate up to 600 seated spectators adjacent to the existing outdoor athletics field at Mingara Recreation Club. The proposal seeks to provide stepped concrete tiered seats with 6 tiered rows proposed. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect