State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Water distribution systems, Drainage Projects in NT®ion=⊂=615 in region


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

ROYAL DARWIN HOSPITAL
Building 10 Fire Pump Room, Darwin, NT 0800 Has Royal Darwin Hospital currently at Tenders & Building stage. Replace existing diesel engine & controller ensuring existing pump flows are maintained & commission new diesel engine & controller. Click for more details...

ROPER HIGHWAY CLEARING/GRUBBING
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Katherine Town Council Area of State ownership. Clear & grub Roper Highway between 92km & 100 km. Click for more details...

KATHERINE HOSPITAL & MACFARLANE PRIMARY SCHOOL AIRCONDITIONING CONDENSERS
Katherine Hospital Gorge Rd & MacFarlane Primary School Grevillea Dr, Katherine, NT 0850 Has Katherine Hospital & Macfarlane Primary School Airconditioning Condensers currently at Construction stage. Replace airconditioning condensers for hospital & primary school. Click for more details...

CENTRAL ARNHEM ROAD ROADWORKS
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Katherine Town Council Area for Renovations, Refurbishments etc. development. Maintenance grading of Central Arnhem Road & various station access roads for 12 months. Click for more details...


Private ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Palmerston Town Council Area for New development. Construction of initial sewer connection works which will include 510M of 225 dia sewer & 9 R.C. man holes. Click for more details...

ANMATJERE COMMUNITY GOVERNMENT COUNCIL
Houses (7) New project In The Alice Springs Town Council Area. 3 bedroom each 100 sq m approx. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

MITCHELL'S CHASE
New project of Civil Engineering (Residential Subdivision) project at Lot 4040 Chung Wah Tce (Town of Palmerston), Palmerston, NT 0830. To create 38 lots. Roads, water, sewerage & telephone services. Click for more details...


Renovations, Refurbishments etc. project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Jungawa Rd, Darwin, NT 0800. Reformation & regravelling Chainage 0km - 5km. Click for more details...

ALICE SPRINGS HOSPITAL
Alice Springs Hospital is currently at the Tenders & Building stage, valued at about $ 30000 it is Various building repairs. Click for more details...

KUNBARLLANJNJA/OENPELLI HEALTH CLINIC
Renovations, Refurbishments etc. project of Medical (Surgeries, Medical centres) project at Kunbarllanjnja, Oenpelli Health Clinic, Oenpelli, NT 0822. Internal & external painting. Click for more details...


Bathurst Island, NT 8999 currently at Construction stage. 1 x 2 & 1 x 3 bedroom. Click for more details...

FAIRWAY WATERS
Civil Engineering (Residential Subdivision) project for New development. 38 lots approx. Click for more details...

MELALEUCA ON MITCHELL
Backpackers Hostel/Shops (6) - 4 Storey New project In The Darwin City Council Area. Construction of 4 storey Back Packers Hostel comprising 98 strata titled units with 6 shops at street level 2 leisure decks, bar, kitchen & dining room. Click for more details...

WALER BARRACKS
Military (Military housing & accommodation, Military colleges) project In The Litchfield Shire Council Area of Federal ownership. Accommodate building facilities for 1st Armoured Regiment. Click for more details...


, Oenpelli, NT 0822 currently at Construction stage. Steel framed & steel clad construction, metal deck roof, 6 roller doors. Click for more details...

JULALIKARI BURAMANA HOUSING PROGRAM
A project in the NT Within Barkly Shire. Repairs & maintenance to up to 10 houses at Imangarra (Murray Downs). Click for more details...

CLUB ALICE
Residential (Units, apartments, flats, townhouses, villas) project In The Alice Springs Town Council Area of Sporting Complex/Residential Subdivision For Golf Club - Redevelopment type. Plans are to expand with an extra 18 holes, plus new 18 hole short course under lights. Likely to include bowling greens, squash & tennis courts. Urban development would include: child care centre, swimming pool, barbecue areas, convenience store, function & gaming rooms, bars, gyms & offices as well as houses. Golf club rooms would be relocated & extra 18 holes & housing development would be built on north side of Stephens Road between Lasseters Hotel Casino & existing housing in new suburb in Mt John Valley. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS - MRM EXPANSION PROJECT
Mining (Underground - including longwall) project for New development. Looking at options from a feasability study. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

POWER & WATER
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Various Council Area of General Engineering Services Consultants For Various Sites type. Panel contract for general engineering services for 2 year period. Click for more details...

1ST AVIATION REGIMENT ROBERTSON BARRACKS
Military (Military installations & facilities) New project at Robertson Barracks, Darwin, NT 0800. This type is Administration Building For Command Precinct - Major Works - Package 3 with State ownership. Construct Administration building for Command Precinct. Click for more details...

WALLACE ROCKHOLE COMMUNITY GOVERNMENT COUNCIL
Currently at the Tenders & Building stage In Alice Springs Town is a project estimated to be $ 500000. This project General housing & building maintenance, plumbing repairs & septic tank maintenance, general electrical installation & maintenance, airconditioner servicing. Click for more details...

WAGAMAN PRIMARY SCHOOL GROUNDS MAINTENANCE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Darwin City Council Area of Grounds Maintenance For School type. Grounds maintenance contract. Click for more details...

NT BRIDGES
Civil Engineering (Bridges, Aqueducts, Viaducts) project at All main roads within Northern Territory, ., NT 8999 for Renovations, Refurbishments etc.. Inspect & assess all NT bridges & selectively measure environmental agressivity & concrete penetration. Click for more details...

JABIRU COURT HOUSE
Public Buildings & Facilities (Law Courts) project In The Darwin City Council Area of Court House - Upgrade type. Replace toilet suites throughout, remove lime & staining to wet area floor tiles, replace ceramic floor tiles to nominated area, replace kitchen joinery, replace carpet to nominated areas & minor repairs & painting. Click for more details...

BULMAN & BLYTH RIVER GRADING GRAVEL ROADS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. Grading of gravel roads between Bulman & Blyth River for 12 month period. Click for more details...

TELEGRAPH TERRACE SITE REDEVELOPMENT
Residential (Units, apartments, flats, townhouses, villas) project In The Alice Springs Town Council Area of Private ownership. Zoned R3 with approval for 4 x 2 & 3 bedroom 2 storey units. Click for more details...

RON GOODIN POWER STATION - PIELSTICK GOVERNORS
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Within, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Replacement of pielstick governors at Ron Goodin Power Station. Click for more details...

POWER & WATER CORPORATION - BEN HAMMOND COMPLEX REDEVELOPMENT - NEW BUILDING
Currently at the Construction stage In Darwin City is a project estimated to be $ 1000000. This project Construct new building for office complex. Click for more details...

KATHERINE REGION ROADWORKS/REPAIRS/MAINTENANCE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Roads within region of, Katherine, NT 0852. This type is Drainage/Structures/Bridges/Grids - Repairs/Maintenance with State ownership. Repairs & maintenance of drainage, structures, bridges & grids for 12 month period. Click for more details...

BATCHELOR SUBSTATION - CIVIL/EARTHING WORKS
A project in the NT Within Darwin City. Work comprises civil and drainage works, earth grid and connection tails, fencing, installed certified and fully serviced crib room, new poles, nominated structures, and foundations for HV structures. All structures to include hold down bolts measured to ensure they will accommodate the future installation of electrical equipment that will be relocated from the Edith River substation. Click for more details...

KAKADU NATIONAL PARK - URANIUM CONTAINMENT FACILITY
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project at Kakadu Park, Kakadu National Park, NT 0822 for New. Design a containment facility and undertake related planning work to manage former uranium mining and milling operations in Kakadu National Park. Click for more details...

MILLNER VILLAGE PLAZA STAGES 1 & 2
New project of Residential (Units, apartments, flats, townhouses, villas) project at 348 Bagot Rd (Lot 9240), Millner, NT 0810. Construction of a village plaza providing mixed use commercial tenancies (1600sq m) in 1, 2 & 3 storeys with 54 apartments located behind the commercial areas. 48 x 2 bedroom & 6 x 3 bedroom apartments in 1 x 2 , 1 x 1 & 3 x 3 storey buildings. 2 x 2 storey showrooms & warehouses, shops, gymnasium & offices in 2 stages. Cement slab, rendered concrete blockwork & metal roof. Parking for 208 cars. Associated landscaping. Click for more details...

VEREKER STREET SHOWROOM & WAREHOUSE
New project of Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at 6 (Lot 2561) Vereker St, Humpty Doo, NT 0836. Construction of showroom & warehouse. Steel framed & metal cladding. Parking for 16 cars & additional handicap carpark. Associated landscaping. Click for more details...

FOG BAY ROAD LEVIATHAN CREEK CROSSING UPGRADE & SEAL
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Fog Bay Rd south west of, Dundee Beach, NT 0822 of High Level Crossing/Roadworks/Drainage - Upgrade type of New development. Construction of a 2 lane bridge & 1.1km of 2 lane sealed road at the Leviathan River crossing on the Fog Bay Road between Ch14.130km & Ch15.220km from the Cox Peninsula Road intersection. Drainage. Bitumen, base gravel, w-beam guardrail, concrete batter protection & asphalt. Wingwall, headstock, ballast, piles & socket. Click for more details...

MACFARLANE PRIMARY SCHOOL AIR CONDITIONING REPLACEMENT
Education (Schools - primary, secondary (up to Yr 12)) project at Grevillea Rd East, Katherine, NT 0850 for New. Replacement of air conditioning in Administration Building & Block D. To include supply & installation of fresh air damper 500mm x 500mm, 2 full face coils, valve liquid control, solenoid valves, digital thermometer, flexible joints & LED Fault Lights for compressor, high pressure & AHU faults. Associated piping & ductwork. Electrical & mechanical services. Click for more details...

FOGG DAM WOODLANDS TO LILLY WALK REPAIRS
Walking Track - Upgrade project at Fogg Dam Conservation Reserve, Middle Point, VIA, Humpty Doo, NT 0836 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Repair to 100m section of Lilies Walking track & installation of fire breaks at Fogg Dam. To include additional repairs to existing board walks 7 rebuild of gravel path. Stainless steel/concrete footings & aluminium decking. Click for more details...

ALICE SPRINGS YOUTH & COMMUNITY CENTRE STAGES 3 & 4
A project in the NT Within Alice Springs Town. Construction of the Youth Wellbeing Centre as part of the Alice Springs Youth & Community Centre (ASYCC) stage 3 & 4 redevelopment. To include demolition of concrete slab, vinyl flooring, partition wall & veranda structure with asbestos lining. Construction of new office building to include 4 x counselling rooms, 2 x consult rooms, group counselling room, main meeting place, reception, managers office & welcome court. Refurbishment works to existing to include amenities, kitchen, servery & multipurpose room. Construction of plant room with aluminium louvers on existing roof. Glazed pergola over courtyard area & new veranda sheet metal roof. Vinyl flooring, ceramic floor & wall tiles. Concrete blockwork retaining walls & 2m high steel picket fence. Associated landscaping. Click for more details...

RAMINGINING DWELLING (NPARIH)
Dwelling (2) project at Lots 122 & 139, Ramingining, NT 0822 In The Council Area Of East Arnhem Shire of State. Construction of 2 x 3 bedroom slab on ground dwellings. Concrete slab, steel, vertical end cladding, lining, reinforced block & metal roof sheeting. Associated car parking & landscaping. Click for more details...

JUNGAWA ROAD UPGRADE & SEAL
Roadworks - Reseals New project In The Darwin City Council Area. Upgrade & seal to the Jungawa Road between Ch6.5 & Ch9.326 in the Douglas-Daly region. Works to include earthworks, pavements & shoulders, drainage works & protection works. Construction of road formation by cut & fill earthworks, preparation & maintenance of subgrade, construction of gravel pavements & construction of culverts with protection works. Spray seal of single seal throughout length. Provision of traffic control. Click for more details...

GOOD SHEPHERD LUTHERN COLLEGE ACCESS ROAD
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Litchfield Shire Council Area of Private ownership. Construction of an access road to connect Stow Road to the Good Shepherd Lutheran College, Howard Springs. To include vegetation clearing, removal of earth berm & re-alignment of open unlined drain. Widening of existing bus interchange area. Table drains & reinforced concrete box culverts. To include 2.5m wide drop off zone & 2.5m wide footpath. Parking for 17 cars. Associated landscaping. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - ROAD CONSTRUCTION
Road Construction - Culvert/Concrete Works New project In The Katherine Town Council Area. Construction of 13 culvert structures & reinforced concrete pipeline at the Roper River & Wilton River High Level Crossings on the Roper Highway. Click for more details...

NORTHERN GAS PIPELINE - MOTOR CONTROL CENTRES
Mining - Support Facilities (Industrial buildings) New project at Tennant Creek to Mount Isa, ., NT 8999. This type is Motor Control Centres with Private ownership. For the provision of 2 motor control centres. Click for more details...

MUSEUM AND ART GALLERY OF THE NORTHERN TERRITORY
Museum - Thermal Plant New project In The Darwin City Council Area. Construction of a new thermal plant system at the Museum and Art Gallery of he Northern Territory. Scope of work includes: decommissioning, removal & relocation of the existing thermal plant systems serving the facility. Provision of new chilled water pumps, new condenser water pumps, new cooling towers, new feed & expansion system, new chilled water, condenser water reticulation systems, and new DDC controls for complete & operating systems. Installation of a new chiller provided by others Click for more details...

STUART HIGHWAY RAIL OVERPASS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Alice Springs Town Council Area of Batter Stabilisation type. Various repair works to the existing erosion control mat (approximately area 400sq m) including repairs to areas of scour, straightening of existing mat & refixing. Click for more details...

ERNEST GILES ROAD
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 395000. This project Gravel resheet & drainage repairs to various sections of Ernest Giles Rd Click for more details...

ALICE SPRINGS HOSPITAL - STAFF ACCOMMODATION
Medical (Hospitals & associated buildings, mortuaries) project at Gap Rd, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Remove & dispose off site decommissioned air handling plant. Remove decommissioned hot water plant & associated redundant components & dispose offsite. Reconnect existing infrastructure into newly installed hot water plant, commission & test Click for more details...

ARAFURA STADIUM
Currently at the Construction stage In Darwin City is a project estimated to be $ 113000. This project Construction of a shade structure at Arafura Stadium Click for more details...

DARWIN REGION ROADWORKS
Darwin Region Roadworks is currently at the Construction stage, valued at about $ 2356000 it is Urban asphalt replacement on various roads & highways in the Darwin region Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect