State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Yards, Sidings, Loading docks, Railways, Container terminals. Projects in TAS®ion=⊂=1781 in region



Residential (Units, apartments, flats, townhouses, villas) project In The Burnie Council Area of Dwellings (2) type. 2 x 2 bedrooms. Click for more details...

PURITY SUPERMARKET
A project in the TAS Within Hobart. Concrete & brick construction, colorbond roof, aluminium shopfronts & associated carparking. Click for more details...


is currently at the Construction stage, valued at about $ 826000 it is 2 bedroom, single storey, brick veneer, colorbond roof, aluminium windows, concrete floor slab, driveways & landscaping. Click for more details...

DOMINIC COLLEGE/PRIMARY SCHOOL CAMPUS
New Primary School Campus New project In The Glenorchy Council Area. New Primary School Campus including 6 new buildings, carpark & sports court. Brick veneer, metal roof, concrete floors, aluminium windows. Click for more details...

YOLANDE RIVER GOLD PROJECT - DIAMOND HILL/MADAM HOWARDS - RESOURCES
Prospect - Gold/Base Metals project at 4 km north west of, Queenstown, TAS 7467 in the Mining (Exploration - airborne surveys etc.). This project is less than 3 km from the giant Mt Lyell copper/gold ore body currently being mined by Copper Mines of Tasmania. The Yolande River area is underlain by lithologies belonging to the Mt Read Volcanics which host several world class base metal/gold deposits in western Tasmania. The tenement covers the intersection of the NNE trending South Henty Fault and the east/west trending Firewood Siding Fault. Click for more details...

MOUNT BISCHOFF TIN OPERATIONS - PROCESSING PLANT REFURBISHMENT
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Waratah, TAS 7321 of Processing Plant - Refurbishment type of New development. A revised process flow sheet for the existing process plant has been produced and it will involve minimal engineering and processing modifications. Processing rate is expected to be 60,000 tonnes per month. New equipment proposed is a high gravity jig advancements with the addition of Falcon Ultra Fine concentrators. Processing plant when refurbished is expected to process 60,000 tonnes per month. Click for more details...

HELLYER METALS PROJECT - MILL/INFRASTRUCTURE
A project in the TAS Within Waratah-Wynyard. Includes a 1.5mtpa mill, designed for differential flotation. The existing concentrator and facilities will be used for reagent handling, preparation, maintenance and office areas. Click for more details...

HUON TOURIST DEVELOPMENT
Huon Tourist Development is currently at the Construction stage, valued at about $ 1500000 it is Construction of a tree canopy walkway. Click for more details...

CATAMARAN COAL PROJECT - RESOURCE
Near, Dover, TAS 7117 Has Catamaran Coal Project - Resource currently at Exploration, Drilling, Survey & Assessment stage. Previous developer stated that in situ resource of 5.5 million tonnes of open cutable coal and a further 11.5 million tonnes of shallow underground coal is also available to the south of the open cut resource. Click for more details...

SHORELINE DRIVE CARWASH
Carwash project at 10 Shoreline Drive, Howrah, TAS 7018 in the Industrial (Depot, Garages, Workshops, Carwashes, Hangars). Construction of car wash comprising of four manual wash bays and one auto wash bay. Concrete tilt panels, concrete floors and metal roof. Click for more details...

FENCES AND STRUCTURAL 2006-2008
Various locations statewide, ., TAS 7999 Has Fences And Structural 2006-2008 currently at Tenders & Building stage. The preparation and painting of steel fences on 49 bridges and the structural painting of an additional 4 bridges. Click for more details...

GEORGE TOWN MEMORIAL HALL CULTURAL CENTRE REDEVELOPMENT
Regent Square, Macquarie St, George Town, TAS 7253 Has George Town Memorial Hall Cultural Centre Redevelopment currently at Construction stage. Redevelopment of existing memorial hall. Click for more details...

COSGROVE PARK REDEVELOPMENT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Launceston Council Area of Private ownership. Demolition of existing building and construction of a 136 bed residential care unit. Brick and block construction, precast concrete, metal roof and concrete suspended slab. Click for more details...

SORELL COLES SUPERMARKET AND SPECIALTY SHOPS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Construction of a Coles supermarket, four specialty shops and car park variation. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Reservoir project at Forthside, Forth, TAS 7310 In The Council Area Of Devonport of State. Construction of a new concrete, aluminium roofed reservoir, required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant to the Paloona Water Supply System. The works include but are not necessarily limited to the following, construction of an access road to the reservoir site, clearing, grubbing and excavation works, importation of structural fill, construction of a 1ML (approx) reinforced concrete water storage reservoir, construction of an aluminium clad roof, inlet, outlet, overflow and scour and drainage pipelines, platforms and ladders, hardstand/access track and open drain around the reservoir, installation of a stock proof fence, miscellaneous civil works and provision of shop and as-executed drawings. Click for more details...

ROSEBERY/ZEEHAN TOILET BLOCKS AND SHELTER
New project of Social (Amenities, Dressing rooms) project at Rosebery And, Zeehan, TAS 7469. Construction of a toilet block in Rosebery and a toilet block and shelter in Zeehan. Click for more details...

DELORAINE PRIMARY SCHOOL - BER PROJECT
New project of Education (Schools - primary, secondary (up to Yr 12)) project at East Barrack Street, Deloraine, TAS 7304. Construction of a library and refurbishment of a kindergarten and swimming pool enclosures. Click for more details...

FORTH RIVER IRRIGATION SCHEME
Irrigation Scheme project at From FORTH to, Sheffield, TAS 7306 In The Council Area Of Kentish of State. The new irrigation scheme will deliver 19,000 ML p.a. to the communities of Forth, North Motton, Abbotsham, Sprent, Kindred, Melrose, Lower Barrington, Barrington and Sheffield with a irrigable area of 12,000 ha. Click for more details...

MARIA STREET SUB-STATION DEMOLITION
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project for New development. Demolition of a 360sqm transcend sub-station workshop building located in close proximity to the southern boundary on the 6.229ha site. Click for more details...

KINGBOROUGH COUNCIL TENDERS
Asphalt Surfacing project at Various Locations within the Municipality of Kingborough, Kingston, TAS 7050 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Asphalt surfacing at various locations within the municipality of Kingborough. Click for more details...

RICHARDSON AVENUE TOWNHOUSES
Residential (Units, apartments, flats, townhouses, villas) New project at 24A Richardson Av, Dynnyrne, TAS 7005. This type is Townhouses (3) with Private ownership. Construction of three, three bedroom two storey townhouses. Brick veneer, metal roof and suspended concrete slab. Click for more details...

TULLAH ROAD WAREHOUSE AND OFFICES
10 Tullah Rd, Mornington, TAS 7018 Has Tullah Road Warehouse And Offices currently at Construction stage. Construction of a warehouse and offices. Concrete tilt panels, concrete floor and metal roof. Click for more details...

ROSNY COLLEGE STORAGE AND RESEARCH CENTRE
4 Rosny Hill Rd, Rosny Park, TAS 7018 Has Rosny College Storage And Research Centre currently at Tenders & Building stage. Installation of new DDC controls and commissioning of a building management system (BMS) and its associated electrical services, field sensors and control devices. Installation and commissioning of air conditioning units and their associated electrical ducting and piping. Upgrade of the mechanical switchboard and replacement of humidifiers. Modification of zone ducting, installation of new ducted heater banks in some zones and installation of smart meters. Click for more details...

OGILVIE HIGH SCHOOL
Fire Hydrant Water Main - Upgrade New project In The Hobart Council Area. Supply and installation of approximately 450 metres of new fire hydrant water main. Click for more details...

DELORAINE WASTEWATER TREATMENT PLANT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at ., Deloraine, TAS 7304. This type is Bulk Earthworks - Stage 1 with State ownership. This contract comprises the first stage of major upgrading work at the Deloraine Wastewater Treatment Plant. The contract includes the supply, placement, compaction and trimming of over 18,000 cubic metres of bulk fill material, the construction of open drains and site landscaping. Click for more details...

LAUNCESTON COUNCIL PLUMBING AND DRAINAGE MAINTENANCE
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Launceston Council Area of Plumbing And Drainage Maintenance And Minor Works Standing Contract type. Expressions of interest for the hydraulic maintenance and other incidental minor hydraulic works associated with Council owned buildings. Click for more details...

NORTHERN NRM REGION STORMWATER MANAGEMENT PLAN
Public Utilities (Water distribution systems, Drainage) project In The Launceston Council Area of Private ownership. Expressions of interest invited from consultants to develop a Stormwater Management Plan for participating Councils in Tasmania?s Northern NRM Region. Click for more details...

STATEWIDE PROPERTY MAINTENANCE TENDERS
State ownership Medical (Hospitals & associated buildings, mortuaries) project In The Various Council Area for New development. Provision of preventative, corrective and statutory maintenance to its property portfolio (southern site only) for a period of three years. Click for more details...

NUBEENA FORESHORE PATH DEVELOPMENT (STAGE 1)
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Tasman Council Area for New development. Civil construction works for the Nubeena Foreshore Path Development (Stage 1) Works include intersection reconstruction at Clarke Street, Nubeena and Slip Road construction at Judd Park, Nubeena. Click for more details...

TASTE OF TASMANIA
Sports (Pavilions, Grandstands, Stadiums/halls) project In The Hobart Council Area of Temporary Structures - Install/Dismantle type. Hire of temporary structures for the 2013/2014 Taste of Tasmania including delivery, installation and dismantling. Click for more details...

HOBART COLLEGE
Currently at the Construction stage In Hobart is a project estimated to be $ 1473000. This project Refurbishment of existing science facilities. Click for more details...

ST PATRICK'S COLLEGE
Education (Schools - primary, secondary (up to Yr 12)) project for Addition development. Alterations and additions to middle school and arts department for new classrooms, art rooms and breakout areas. Click for more details...

UNITED PETROLEUM SERVICE STATION
40 Gordon St, Sorell, TAS 7172 Has United Petroleum Service Station currently at Construction stage. Demolition of the existing service station and construction of a new building and canopy with replacement of fuel pumps and forecourt paving. A Take-away food premise and convenience store will also be constructed. Click for more details...

ROAD SPECIFIC MAINTENANCE - PAVEMENT RESURFACING 2015/16 - SOUTH
Roadworks - Pavement Resurfacing project at Various locations throughout South Tasmania, Hobart, TAS 7000 In The Council Area Of Hobart of State. This contract involves Sprayed Bituminous and Asphalt Surfacings with associated Pavement Marking; delivery of Spring and Autumn Resurfacing Preparation work at nominated sites in the Southern Region of the State Road and National Highway networks. The proposed contract period is 10 months. Click for more details...

GEORGE TOWN NEIGHBOURHOOD HOUSE
Residential (Units, apartments, flats, townhouses, villas) Renovations, Refurbishments etc. project at 187 Agnes St, George Town, TAS 7253. This type is Neighbourhood House - Altns & Addns with Local Govt ownership. Renovation, alteration and extension of the George Town Neighbourhood House. Works include new paved concrete pathways and accessibility ramps as well as extensions to existing Neighbourhood House building. Click for more details...

WHITELEA COURT RESIDENTIAL SUBDIVISION
Civil Engineering (Residential Subdivision) project at Whitelea Ct, Sorell, TAS 7172 for New. Residential subdivision of 31 lots & associated civil works. Click for more details...

SUGARLOAF ROAD & DOWNHAMS ROAD RESIDENTIAL SUBDIVISION STAGE 2B
Currently at the Construction stage In Clarence is a project estimated to be $ 420000. This project Construction of stage 2B of a 14 lot residential subdivision. Associated roads and civil works. Click for more details...

ULVERSTONE PRIMARY SCHOOL
Addition project of Education (Schools - primary, secondary (up to Yr 12)) project at 2 Leven St, Ulverstone, TAS 7315. Alterations and additions to the current administration area. Click for more details...

ICON HOTEL REDEVELOPMENT
Hospitality (Hotels, Serviced Apartments) project at 55-59 Murray Street, Hobart, TAS 7000 of Hotel - Altns & Addns type of Addition development. Redevelopment of vacant hotel & retail space. Extension to hotel floor plate levels 5-11 & extension of glass line to Skybar level 12. Existing proposed glazing to NW corner of hotel is enlarged to become curtain wall glazing. Existing solid wall to SW corner of hotel tower is enlarged to become curtain wall glazing. Type of glazing proposed is translucent blue tones. Click for more details...

DEPARTMENT OF TREASURY & FINANCE BUILDING IV
A project in the TAS Within Hobart. Undertake air conditioning upgrades within building IV at 21 Murray Street, Hobart. The works will include the removal of existing air conditioning units & installation of new VRV units, along with new pipework to support the system. Click for more details...

GLEN HUON ROAD DAIRY FARM
Food & Beverage Processing (Abattoirs, Breweries, Dairies, Canneries, Bakeries, Wineries) project at 1092 Glen Huon Rd, Glen Huon, TAS 7109 of Dairy Farm/Shed type of New development. Proposed construction of dairy farm to include workshop machinery shed & hay shed. Timber wall cladding, roller door & steel roof cladding. Associated car parking & landscaping. Click for more details...

HUON VALLEY COUNCIL ANNUAL TENDERS 2016/17
Currently at the Construction stage In Huon is a project estimated to be $ 200000. This project Exclusive Tender for Pavement Stabilisation on Selected Roads 2016-2017 Click for more details...

CLARENCE CITY COUNCIL RESEAL & MICRO SURFACING PROGRAM
various locations within, Rosny Park, TAS 7018 Has Clarence City Council Reseal & Micro Surfacing Program currently at Construction stage. Construction of annual reseal & micro surfacing program for the 2016/2017 financial year for Clarence City Council. Click for more details...

ATKINSONS ROAD STORMWATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Local Govt ownership. Construction of the Atkinsons Street Stormwater upgrade. The work includes the following, Supply & installation of 269 m DN 300 Ribbed Polyethylene Pipe. Supply & installation of a 1050 manhole & heavy duty surround. Supply & installation of 245 m sub soil drain type FD. Supply & installation of 6 x Type "GP" pit. Construction of 175 m of concrete lined trapezoidal drain. Construction of 55 m concrete strip drain with heavy duty grate. Construction of 5 asphalt driveways. General reinstatement. Click for more details...

DON RESERVE BRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Devonport Council Area of Bridgeworks - Renewal type. Construction of renewal works on Sawdust Bridge at Don Reserve. Click for more details...

MAIN ROAD SHOPS
Shops (2) New project In The Northern Midlands Council Area. Construction of 2 shops to include hairdressing salon & general retail shop. Installation of signage. Roof cladding, wall cladding, powdercoated aluminium window frames, concrete block veneer & semi transparent window signage. Car parking for 4 vehicles & 2 bicycle bays. Associated landscaping. Click for more details...

PARNELLA DRIVE DRAINAGE UPGRADE
Public Utilities (Water distribution systems, Drainage) project at Parnella Dr, Stieglitz, TAS 7216 for New. Construction of Parnella Drainage Upgrade, Stieglitz. Click for more details...

WELLS PARADE & SUNCOAST AVENUE INTERSECTION IMPROVEMENTS
Wells Parade & Suncoast Avenue Intersection Improvements is currently at the Construction stage, valued at about $ 250000 it is Construct approximately 130sq m of new concrete footpath & 8 pedestrian ramps at the intersection of Wells Parade & Suncoast Avenue, together with the construction of new concrete perimeter kerbing around the roundabout at this location. Click for more details...

LILYDALE DISTRICT SCHOOL YEARS 11/12 REDEVELOPMENT
State ownership Education (Schools - primary, secondary (up to Yr 12)) project In The Launceston Council Area for New development. Construction of a facility including a general learning area with wet area, support spaces & toilet facilities. Click for more details...

GLEN ESK ROAD VISITOR ACCOMMODATION
Glen Esk Road Visitor Accommodation is currently at the Construction stage, valued at about $ 800000 it is Alterations & additions to the existing dwellings in order to facilitate the conversion into visitor accommodation. Minor demolition on the ground floor to provide for a new access guest room. New stair to provide access to all 3 floors. Enclosure of the existing attic stair. Reconstruction of the 3 internal non-structural walls. Insulation to the existing roof space. Upgrade of the existing roof lights. Provision of ensuites to bedrooms. Minor re-leveling of the existing paving to achieve an accessible path of travel. New amenities to replace garden shed on the west facade. New timber floor, glazed timber doors & sidelights fit flush to barn door frame. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect