State

Categories

Sub Categories

Click Here to Find Current Projects

List of Projects in Norther Territory


NORTHERN TERRITORY TENTED CAMP
Tourism (Caravan parks with assoc facilities, Camping grounds) project for New development. Construction of Tented Camp for corporate & tourism groups. Click for more details...

FAIRWAY WATERS
Residential (Units, apartments, flats, townhouses, villas) project In The Palmerston Town Council Area of Private ownership. Ideal for retirement village, nursing home, medium density housing, cluster development. Click for more details...

DESERT KNOWLEDGE PRECINCT
Industrial (Factories & Factory Units) project In The Alice Springs Town Council Area of Consultants For Conveyancing/Land Development/Developers type. Consultants for Desert Knowledge Precinct Development Report. Click for more details...

TARGET - PALMERSTON SHOPPING CENTRE
Discount Department Store - Fitout New project In The Palmerston Town Council Area. Work to include: Electrical, shop fitout, installation of ceramic tiles & carpet. Click for more details...

ROBERTSON BARRACKS
Military (Military installations & facilities) project at Robertson Barracks (formerly Waler Barracks), Palmerston, NT 0830 of Base Radio Station/Antenna Farm - Apin - Stage 2 type of New development. Work to include: Construction of an antenna farm & associated equipment in accordance with Army standards. Construction & installation of OLOS system. Construction of a suitable building to house radio equipment. Click for more details...

STUART HIGHWAY ROADWORKS REHABILITATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Renovations, Refurbishments etc. project at Stuart Hwy (Ch: 1474-1478 & Ch: 1709-1727 km) Region of, Alice Springs, NT 0870. This type is Resealing Works - Upgrade with State ownership. Resealing works Stuart Hwy (Ch: 1474 km -1478 km, 1710.9 km -1739.9 km) Tanami Rd (Ch: 54.74 km - 65.78 km), Luritja Rd (Ch: 22.54 km-28.54 km, 78.2 km - 91.0 km) Kings Canyon Ranger Housing Access Ch: 0.0 km - 2.2 km) Highway. Click for more details...

STUART HIGHWAY
Stuart Highway is currently at the Construction stage, valued at about $ 31000 it is Asphalt overlay to various location of highway. Click for more details...

NORTHERN TERRITORY UNIVERSITY
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Ellengowan Ave, Casuarina, NT 0810 for New. Roadworks. Click for more details...

KAKADU NATIONAL PARK
Currently at the Construction stage In Darwin City is a project estimated to be $ 100000. This project Upgrading of campground ablution block at Gunlom. Proposed works include upgrade shower & toilet cubicles, replace existing internal walls, provide new internal wall linings to shower & toilet cubicles, plumbing works, electrical works including solar electrics, various carpentry work, painting, tiling. Click for more details...

FAIRWAY WATERS
Civil Engineering (Residential Subdivision) New project at Pt lot 4635 University Ave (Town of Palmerston) Durack, NT 0830. This type is Roadworks/Services For Subdivision - Residential - Stage 7.2 with J/V - Private & Govt ownership. To create 49 lots approx. Roadworks, drainage, water, sewerage & electrical services. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

DARWIN PORT CORPORATION
Renovations, Refurbishments etc. project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Fisherman's Wharf, Darwin, NT 0800. Proposed corrosion protection to steel piles & repairs to landings. Click for more details...

ALICE SPRINGS IHANT PROGRAM
Houses (190) - Upgrading project at Town Camps within Municipal Area of, Alice Springs, NT 0870 in the Residential (Units, apartments, flats, townhouses, villas). Tangentyere Council provides housing services to 18 Town Camps. Provision of Cyclical repairs & maintenance to 190 houses & tin sheds. Click for more details...

FRANCES BAY UNITS
Units (14) - 3 Storey New project In The Darwin City Council Area. 12 x 3 & 2 x 2 bedroom flats in 3 storeys with sub - basement carparking. Click for more details...

COLLEGE ROAD DEVELOPMENT
Commercial Premises (Offices) project at 2 College Rd (Secn 4920 Hund of Bagot), Berrimah, NT 0828 for New. Construction of 8 warehouse units with ancillary offices & showroom in 5 buildings. Steel frame & steel clad, concrete floor, metal deck roof, aluminium framed windows. Carparking & landscaping. Click for more details...

DESERT KNOWLEDGE PRECINCT BUSINESS & INNOVATION CENTRE
Business/Innovation Centre project at Desert Knowledge Precinct Stuart Hwy (6 km south of The Gap), Alice Springs, NT 0870 In The Council Area Of Alice Springs Town of State. Construct business & innovation centre, for Desert Knowledge Precinct. Click for more details...

WEST MACDONNELL NATIONAL PARK FACILITIES EXPANSION PART 1
Facilities Expansion - Part 1 Renovations, Refurbishments etc. project In The Alice Springs Town Council Area. Upgrade & expand park facilities including walking tracks & car parks within park. Click for more details...

DARWIN REGION - RURAL AREA SEALED PAVEMENT REPAIRS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Sealed Pavement - Repairs type. 12 month period contract for sealed pavement repairs. Click for more details...

POWER & WATER CORPORATION ALICE SPRINGS YULARA & KINGS CANYON CIVIL/HYDRAULIC WORKS
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Alice Springs Town Council Area for Renovations, Refurbishments etc. development. Three year period contract for provision of civil & hydraulic works & services to water & wewerage infrastructure. Click for more details...

RAAF BASE DARWIN C17 HEAVY AIRLIFT FACILITIES AIRFIELD WORKS/ASSOCIATED FACILITIES
Federal ownership Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Works for infrastructure support for C17 Globemaster III aircraft based at Amberley: aircraft aprons & taxiways & potentially runway works, explosive ordinance loading bays & associated taxiways, other associated airfield works (including but not limited to airfield lighting & air cargo/movement facilities), extension of existing Air Movements building to provide substantial cargo handling capacity, introduction of hjydrant refuelling into new apron, new vehicle washbay. Click for more details...

POWER & WATER CORPORATION WEDDELL POWER STATION
Power Station project at Darwin River Dam Rd, Weddell, NT 0822 in the Public Utilities (Power stations, Substations, Windfarms, Phone exchanges). Construct new power station at Weddell, to service Darwin & Katherine, consisting of 2 identical sections. Click for more details...

ROYAL DARWIN HOSPITAL COWDY WARD HIGH DEPENDENCY AREA MODIFICATION (CONTRAC T07-1317)
New project of Medical (Hospitals & associated buildings, mortuaries) project at Rocklands Dr, Casuarina, NT 0810. Modification of high dependency area within Cowdy Ward at Royal Darwin Hospital. Click for more details...

CASUARINA SECONDARY COLLEGE GYMNASIUM
Education (Schools - primary, secondary (up to Yr 12)) Renovations, Refurbishments etc. project at Parer Dve, Casuarina, NT 0811. This type is Gymnasium - Upgrade with State ownership. A structural upgrade of roofs, walls, doors and associated services to comply with Category 4 Cyclone standards. Click for more details...

ALICE SPRINGS CONCRETE FOOTPATHS
Currently at the Tenders & Building stage In Alice Springs Town is a project estimated to be $ 400000. This project Construction of concrete footpaths. Click for more details...

BERRIMAH ROAD WAREHOUSE
Industrial (Warehouses, cargo sheds, distribution centres) project In The Darwin City Council Area of Private ownership. Construction of a warehouse to include railway track running into warehouse. Parking for 6 cars. Associated landscaping. Click for more details...

PEKO MAGNETITE PROJECT - TOPSOIL REMOVAL
New project of Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at 10 km from, Tennant Creek, NT 0862. Topsoil removal for 5 hours per day for 12 months using a 22m scraper. Click for more details...

MALUKA VIEWS DEVELOPMENT
Commercial Premises (Commercial complexes - shops, offices) project at Lots 9, 30 & 4896 Maluka Dr & Roystonea Ave, Palmerston, NT 0830 of Residential/Commercial Development type of New development. Development of inner city mixed-use precinct. To include retail, commercial, residential apartments & quality homes. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

RAAF NATIONAL AIRFIELDS MAINTENANCE PROJECTS
Military (Military installations & facilities) project at RAAF Base Darwin, RAAF Base Tindal Robertson Barracks & various RAAF sites SA NSW QLD VIC WA, ., NT 8999 of Airfields - Upgrades type of New development. The 25 Defence airfields will be separated into 2 Construction Packages as follows: Construction Package 1: HMAS Albatross, RAAF Base Amberley, RAAF Base East Sale, Holsworthy Luscombe Airfield, Jervis Bay Airfield, AAC Oakey, Samuel Hill Airfield, RAAF Base Richmond, RAAF Base Scherger, RAAF Base Townsville, RAAF Base Wagga Wagga, Williamson Airfield, RAAF Base Williamtown, and Wyoming Airfield. Construction Package 2: RAAF Base Curtin, RAAF Base Darwin, RAAF Base Edinburgh, RAAF Base Gin Gin, RAAF Base Learmonth, RAAF Base Pearce, Robertson Barracks, HMAS Stirling, RAAF Base Tindal, RAAF Williams (Point Cook) & Woomera Test Range Click for more details...

GROOTE EYELANDT MANGANESE OPERATIONS EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) project at At, Groote Eylandt, NT 0822 for New. Part of a project to expand production from 4.2 million tonnes per annum (Mtpa) to 4.8Mtpa along with road & port capacity to 5.9Mtpa. Processing plant upgrade to include replacement of desliming screens with banana screens & a new lump bypass facility in the heavy media circuit. Replacement of stacker & hopper cars at the port stockpile. Increase of the ship loading conveyor & road train receival capacities. Upgrade of 2 intersections on the Rowell Highway. Click for more details...

ABORIGINAL HOSTELS LIMITED REFURBISHMENT OF TOP END HOSTELS
Residential (Student & group accommodation) Renovations, Refurbishments etc. project at Tiwi, Nightcliff, Larrakeyah, Nhulunbuy &, Darwin, NT 0800. This type is Hostels (5) - Refurbishment with Private ownership. Refurbishment of 5 hostels located in the Top End. Hostels included are Nhulunbuy Hostel in Nhulunbuy, Daisy Yarmirr Hostel in Tiwi, Galawu Hostel in Darwin, Nagandji Nagandji-Ba Hostel in Nightcliff & Silas Roberts Hostel in Larrakeyah. Click for more details...

COFFEY STREET WAREHOUSE
Warehouse New project In The Unincorporated North Council Area. Construction of warehouse (1008sq m) with ancillary office & showroom (200sq m). To include mezzanine open storage area (190sq m). Concrete slab, colour-coated ribbed cladding, sealed precast concrete, powdercoated vent louvres, aluminium clad awning, commercial glazed windows, colour-coated roof sheeting. Parking for 24 cars. Associated landscaping. Click for more details...

ATKINS DRIVE CABLE LANDING STATION FACILITY
Industrial (Ship building facilities, marine industries) New project at 10 Atkins Dr (Portion of Lot 5229 Proposed Lot 10064), The Gardens, NT 0820. This type is Cable Landing Station Facility with Private ownership. Construction of cable landing station facility with associated single storey prefabricated building & equipment shelters for termination of offshore submarine cable. Construction of Controlled Environment Vault with ballistic sandwich panel wall (12.0m length x 3.5m wide x 3.6m height). To include 500sq m (20m x 25m) fenced compound with 2.1m high galvanised security fence topped with barbed wire & 4.2 metre wide double gate. Installation of backup diesel generators. Associated landscaping & access track. Click for more details...

TANAMI ROAD PAVEMENT REINSTATEMENT
New project of Public Utilities (Water distribution systems, Drainage) project at Tanami Rd, Alice Springs, NT 0870. Reinstatements of gravel pavements & floodways on Tanami Road from Ch 282 to Ch 685. Concrete Margins for flood-ways at Ch 282.15, Ch 320.52 & Ch 360.6. To include earthworks, easements, stabilisation & resealing of floodways. Click for more details...

GEORGE STREET TOWNHOUSES
Townhouses (4) - 2 Storey project at 1 George St (Lot 12443), Johnston, NT 0832 in the Residential (Units, apartments, flats, townhouses, villas). Construction of 4 x 3 bedroom townhouses in 3 x 2 storey buildings. To include 4 x double garages, 2 x visitor car parks & open space. Masonry blockwall, steel columns, glass balustrades, metal roof sheeting, metal louvres & metal fencing. Associated landscaping. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
Retail (Shops, shopping centres & arcades, supermarkets) project In The Palmerston Town Council Area of Private ownership. Ceiling & partitions package for Gateway Shopping Centre Stage 1. To include ceilings & partitions to Woolworths, Big W brief, mall ceilings & amenities. Acoustic walls & ceilings to cinema. External cladding. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
Retail (Shops, shopping centres & arcades, supermarkets) project In The Palmerston Town Council Area of Private ownership. Glazing & Aluminium for Gateway Shopping Centre Stage 1. To include shopfront & clearstory glazing to suit Catergory C windloads. Cyclone debris proofing required for Woolworths & Big W. Inclusive of façade engineering. Click for more details...

MULGA PARK ROAD GRAVEL RESHEETING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Mulga Park Rd, Ghan, NT 0872. This type is Roadworks - Resheeting with State ownership. Gravel resheeting to Ch233.4 - Ch223.18 Mulga Park Road, located 350km South West of Alice Springs. To include clearing of sand & silt from drains. Supply, lay & compact gravel to 150mm to create base course layer. Box out floodways & gravel sheet to 300mm with a 1% cross fall. Provision of traffic control. Click for more details...

WOODROFFE AVENUE SALVATION ARMY OFFICE EXTENSION
Woodroffe Avenue Salvation Army Office Extension is currently at the Construction stage, valued at about $ 200000 it is Construction of an office extension to the existing Salvation Army Community Centre at Woodroffe. To include the removal of the existing 50sq m office & replacement with 108sq m office. Office to include open plan office area, storage room, conference room & 3 x closed offices. Metal cladded windows & doors, sliding glass window & aluminium framed windows. Existing car parking for 19 cars. Associated landscaping. Click for more details...

JACARANDA HOUSE LEVEL 2 REFURBISHMENT
Commercial Premises (Offices) Renovations, Refurbishments etc. project at 71 Woods St, Darwin, NT 0800. This type is Office - Refurbishment with State ownership. Refurbishment of Level 2 of Jacaranda House at 71 Woods Street, Darwin. To include the refurbishment of open office area, offices, meeting rooms, interview rooms, store rooms & amenities. Modifications to existing building services including electrical, mechanical, hydraulic, fire & ICT. Installation of new carpet, acoustic walls, vinyl frosted windows & doors. Click for more details...

TIO STADIUM COLD ROOMS & FREEZER ROOMS
New project of Sports (Pavilions, Grandstands, Stadiums/halls) project at 10 Abala Rd, Marrara, NT 0812. Replacement of cold rooms & freezer rooms at the TIO Stadium in the Marrara Sporting Complex. To include demolition of bar room cold room, kitchen cold room, kitchen freezer room & level 2 cold room. Removal of existing floor tiles, tundish, pipework & associated equipment. Design, supply & installation of cold rooms & freezer rooms with 75mm or 100mm PIR insulation, doubles glazed doors, shelving & CFC floor coating. Supply & installation of floor tiles, ceiling, tundishes & lighting. Painting & make good walls surrounding cold rooms. Click for more details...

NAKARA PRIMARY SCHOOL SCIENCE & IT ROOMS
Science & It Rooms - For School project at Goodman St, Nakara, NT 0810 in the Education (Schools - primary, secondary (up to Yr 12)). Design & construction of new science, IT & multipurpose rooms at Nakara Primary School. Design team to include Architect, Structural Engineer, Mechanical Engineer, Electrical Engineer, Hydraulic Engineer, Civil Engineer, Stormwater Engineer & Quantity Surveyor. Click for more details...

MITCHELL STREET MIXED USE DEVELOPMENT
A project in the NT Within Darwin City. Construction of a 20 storey mixed use development with 19 x 1 bedroom apartments, 20 x 2 bedroom apartments, 31 x 3 bedroom apartments, 2 x 4 bedroom apartments & 55 x 2 bedroom dual key serviced apartments. Ground floor to include bottle shop, cold room, foyer, sub station & cafe. Mezzanine level to include storage area, office, laundry, fire tanks & pumps. Podium levels 1 - 3 to include car parking for 202 cars & 11 motor bikes. Podium level 4 to include swimming pool (239.86sq m), pool deck, barbecue deck, gymnasium (100.37sq m), 5 x 1 bedroom apartments & 5 x 2 bedroom apartments. Levels 5 & 6 to include 5 x 2 bedroom apartments & 7 x 1 bedroom apartments. Levels 7 - 16 to include 6 x 2 bedroom apartments & 3 x 3 bedroom apartments. Level 17 & 18 to include 3 x 2 storey penthouse apartments with 3 x swimming pools. Click for more details...

COMMUNITY 360 STAGE 1
Medical (Rehabilitation Centres, Youth Care Accommodation) project In The Darwin City Council Area of Community Hub - 2 Storey - Stage 1 type. Construction of Stage 1 of the Community 360 hub to provide community services. To include 2 storey administration office hub with conference rooms, interview rooms, offices, store rooms, library, seminar rooms, amenities & kitchen. Early intervention centre to include therapy rooms, storage rooms, offices & amenities. Recreation building to include 2 x studio rooms, 2 x multiurpose rooms, gymnasium, cafe, kitchen, creche & amenities. Day respite building to include dining areas, kitchen, lounge, offices, therapy rooms & conference rooms. 2030sq m car parking for 160 vehicles. Associated landscaping. Click for more details...

RAYMANGIRR ROAD REPAIRS
Roadworks - Repairs project at Raymangirr Rd near, Nhulunbuy, NT 0880 In The Council Area Of East Arnhem Shire of Local Govt. Road repairs along various locations on Raymangirr Road. To include road repairs, gravel patching & drainage works. Click for more details...

NORTHERN GAS PIPELINE WELDING ENGINEERING SERVICES
Mining (Onshore - oil & gas) project at Warrego & Mica Creek, ., NT 8999 for New. For the provision of welding engineering advice. Click for more details...

TITJIKALA REMOTE COMMUNITY HOUSING
State ownership Residential (Units, apartments, flats, townhouses, villas) project In The Macdonnell Shire Council Area for New development. Demolition of one dwelling. Construction of 2 x 2 bedroom dwellings on Lot 8 in the community of Titjikala Click for more details...

TRANSPORTABLE RENAL CLINIC
Renal Clinic project at Lot 21 Peterson St, Mt Liebig, NT 0872 In The Council Area Of Macdonnell Shire of Local Govt. Construct, deliver to site & connect a new transportable renal clinic Click for more details...

TENNANT CREEK HOSPITAL
Tennant Creek Hospital is currently at the Construction stage, valued at about $ 484000 it is Refurbishment of the bedroom, kitchen & bathroom in the Nurses quarters Click for more details...

NGUKURR GOVERNMENT EMPLOYEE HOUSING
Currently at the Construction stage In Roper Gulf Shire is a project estimated to be $ 596000. This project Various upgrades & repairs to 20 Government Employee Housing (GEH) dwellings. Site of Works are Lots: 361B, 361A, 395A, 395B, 415, 414A, 414B, 431B, 431A, 430A, 430B, 412B, 362A, 362B, 229, 219, 397A, 397B, 228, 262. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect