YUENDUMU HOUSING PROJECT
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 1100000. This project Major renovations to existing 9 houses. Click for more details...

DEPARTMENT OF THE ENVIRONMENT & HERITAGE - PARKS AUSTRALIA NORTH
Parks Australia North, ., NT 8999 Has Department Of The Environment & Heritage - Parks Australia North currently at Tenders & Building stage. Programmed maintenance & repairs to electrical systems. Click for more details...


Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Upgrading 343.2km & construction of a bridge at King Billabong. Click for more details...

KATHERINE BOARDING HOUSE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Provision of access carpark & hydraulic services. Click for more details...


Shops (6) project at Proposed Lot 4556 (Town of Palmerston) Essington Ave, Gray, NT 0830 in the Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods). 2 large & 4 small shops. Steel frame & block-work construction, concrete floor, metal deck roof, aluminium framed windows, partial airconditioning, fire services. Carparking & landscaping. Click for more details...

URBAN REGION - ROAD REHABILITATION
Currently at the Construction stage In Darwin City is a project estimated to be $ 280000. This project Period contract for pavement markings to 31 December 2002. Click for more details...

WOODCUTTERS BASE METALS MINE
Addition project of Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800. Supply & installation of steelwork for shaft extension. Works to be carried out over 325m from the RL730 to the RL405 level. Click for more details...

MOUNT TODD GOLD MINE
Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) Addition project at 45 km northeast of, Katherine, NT 0850. This type is Mine - Site Offices - Phase 2 with Private ownership. Contract to construct site offices & ablutions blocks for mine upgrade. Tender expected to involve all site services & electrical requirements. Click for more details...

LEANYER RECREATION PARK
New project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Off Vanderlin Dr, Darwin, NT 0800. Construct skate bowl, half pipe, street course, moguls, graffiti walls, stage, electrical & lighting, shade structures, associated walkways & drainage. Click for more details...

ALICE SPRINGS HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) project for Renovations, Refurbishments etc. development. Hospital Kitchen E9 - clean entire kitchen exhaust system. Stafford & Dennison Buildings - clean entire supply, return & fresh air distribution systems of airconditioning plant. Click for more details...


341 Bagot Rd (Proposed lots 9622 & 9623 Town of Nightcliff), Coconut Grove, NT 0810 currently at Construction stage. 2 x 3 & 4 x 2 bedroom. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Carports, carparking & landscaping. Click for more details...


Civil Engineering (Residential Subdivision) project for New development. 3 commercial & 32 housing lots. Roads, stormwater drainage, water supply, sewerage, power & street lighting. Click for more details...

TOMS GULLY GOLD OPERATIONS - QUEST 29
Toms Gully Gold Operations - Quest 29 is currently at the Construction stage, valued at about $ 3000000 it is Over the first 2-3 years of the project ore will be mined from a number of small open pits at Quest 29, approx 17 km from Tom's Gully. Approx 250,000 tpa of higher grade ore will be hauled to Tom's Gully for processing through the existing CIL processing plant. Lower grade ore will be dump leached on site. The final length of the contract will be dependent on further exploration success within the company's prospective tenement holdings. The open pit mining contract will include mainly drill & blast mining, ore & waste haulage & maintenance of haul roads. Mining will be a rate of about 2000 bcm per day. Other services will include pit de-watering & the construction of siltation ponds & a diversionary berm. Click for more details...

BATCHELOR MAGNESIUM PROJECT - WINCHESTER
Mining (Open Cut) project In The Darwin City Council Area of Private ownership. Construction of a small pit and extraction of a sample of 2,000 tonnes approx for stockpiling and use as required for testing at Mintek pilot plant. Click for more details...

COLLEGE ROAD DEVELOPMENT
Industrial (Warehouses, cargo sheds, distribution centres) project at 2 College Rd (Secn 4920 Hund of Bagot), Berrimah, NT 0828 for New. Construction of 8 warehouse units with ancillary offices & showroom in 5 buildings. Steel frame & steel clad, concrete floor, metal deck roof, aluminium framed windows. Carparking & landscaping. Click for more details...

1ST AVIATION REGIMENT ROBERTSON BARRACKS
Currently at the Construction stage In Darwin City is a project estimated to be $ 6500000. This project Construction of live-in accommodation for SNCO/JO. Click for more details...

CASUARINA STREET PRIMARY SCHOOL GROUNDS MAINTENANCE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project for Renovations, Refurbishments etc. development. Grounds maintenance contract of Casuarina Street Primary School for 12 month period with option for extension. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Civil Services (Power stations, Power generation) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

WADEYE LAND SERVICING FOR FUTURE HOUSING
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Darwin City Council Area for New development. Civil worksof land servicing for future housing. Click for more details...

AQUASCENE KIOSK ADDITION
Kiosk - Addn project at Lot 6574 Doctors Gully Rd, Larrakeyah, NT 0820 in the Hospitality (Restaurants, Canteens). Kiosk addition to outdoor entertainment (fish feeding) facility. Click for more details...

NATIONAL ABORIGINAL HEALTH SCHEME HOUSING PROGRAM WADEYE TOWNSHIP
Federal ownership Residential (Units, apartments, flats, townhouses, villas) project In The Unincorporated North Council Area for New development. Construct 6 houses for NAHS, concrete tilt-slab construction. Click for more details...

POWER & WATER CORPORATION KATHERINE REGION MECHANICAL POWER STATION EQUIPEMENT
Mechanical Power Station Equipment Panel Contract- Repairs/Maintenance/New Works project at Remote communities within region of, Katherine, NT 0850 in the Public Utilities (Power stations, Substations, Windfarms, Phone exchanges). Provide repairs, maintenance & new works of mechanical power station equipment within Katherine's remote communities, for period of 36 month. Click for more details...

PETER MCAULAY CENTRE - SECURITY SCREENS (CONTRACT T07-1350)
New project of Public Buildings & Facilities (Police Stations) project at 814 McMillams Rd, Berrimah, NT 0828. Replace existing window & sliding glass door insect screens to 45 accommodation units opeing windows & sliding screen doors including escape screen to bedroom window. Click for more details...

DAWSON STREET WAREHOUSE OFFICE COMPLEX
Industrial (Warehouses, cargo sheds, distribution centres) project for New development. Construction of warehouse (1399sq m) & office (229sqm) complex. Cement slab, rendered concrete blockwork, metal roof. Parking for 23 cars. Associated landscaping. Click for more details...

FLYNN CIRCUIT MIXED USE DEVELOPMENT
Units (30)/Serviced Apartments (36)/Childcare Centre/Commercial - 4 Storey project at 127 Flynn Cct (Lot 10281), Bellamack, NT 0832 In The Council Area Of Palmerston Town of Private. Construction of mixed use commercial & residential development in 1 x 1 & 2 x 4 storey buildings with ground floor & undercroft parking. To include childcare centre (3000sq m), ground floor commercial (1333sq m) & 3 floors of residential above. 6 x 1 bedroom, 18 x 2 bedroom & 6 x 3 bedroom units. 6 x 1 bedroom, 24 x 2 bedroom & 6 x 3 bedroom serviced apartments. Swimming pool. 2 lifts. Concrete blockwork, glass & steel. Parking for 276 cars. Associated landscaping. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
Steel Trusses project at 5, 15 & 11 Yarrawonga Rd (Cnr Roystonea Ave & Stuart Hwy ) (Lots 7765, 7766 & 11037), Palmerston, NT 0830 In The Council Area Of Palmerston Town of Private. Design & fabrication of steel truss restaurant roofs for the Gateway Shopping Centre. Click for more details...

BOOTU CREEK MANGANESE PROJECT - POWER STATION CONTRACT EXTENSION
Mining - Civil Services (Power stations, Power generation) project for New development. Extension of 4MW power station generation supply contract for further 2 years. Click for more details...

ROYAL DARWIN HOSPITAL EMERGENCY DEPARTMENT WAITING AREA
New project of Medical (Hospitals & associated buildings, mortuaries) project at Rocklands Dr (Lot 9731), Tiwi, NT 0810. Construction & refurbishment works to the entrance & external waiting area at the Royal Darwin Hospital Emergency Department. To include the construction of an outdoor extension to the existing waiting area to include metal sheeting roof, concrete slab & landscaping. Demolition of existing garden shed. Alterations to the existing internal waiting area to include new vinyl flooring, new store room & air lock. Construction of new covered walkway to drop off area. 1500mm high glass fence & 1500mm high pool style fence. Rendered concrete block work, automatic glass doors & aluminium framed doors. Click for more details...

GUNN POINT ROAD RESHEETING
Roadworks - Resheeting project at Gunn Point Rd, Gunn Point, NT 0822 In The Council Area Of Palmerston Town of State. Resheeting work to various locations on Gunn Point Road. Locations to include Ch10.5 - Ch11.6, Ch18 - 18.5, Ch29.4 - Ch30.5 & Ch31.3 - Ch31.6. Supply & lay 150mm thick subgrade compacted to 95% MMDD. Supply & lay 1500mm thick type 2 gravel base course compacted to 95% MMDD. Construction of trapezoidal flat bottom drains 400mm below surface. Compaction of table drain block & offlets to 95% MMDD. Provision of traffic control. Click for more details...

KATHERINE TOWN COUNCIL PAVEMENT REPAIRS
Various locations within, Katherine, NT 0850 Has Katherine Town Council Pavement Repairs currently at Construction stage. Pavement repairs at various locations in Katherine Town Council. To include resealing or both urban streets & rural streets. Click for more details...

ROBINSON RIVER WATER STORAGE UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The Roper Gulf Shire Council Area of Water Tank - Upgrade type. Design, supply & installation of a 277KL potable water storage tank with roofing at Robinson River. To include excavation & benching, sub base preparation including filling, compaction & back fill. Construction of concrete tank foundation. Supply & installation of tank pipework, fittings & valves. Tank pipework to include overflow pipe outlet, scour box & outlet pipe to transfer pumps. Click for more details...

BELYUEN SFNT HOUSING UPGRADES
Residential (Units, apartments, flats, townhouses, villas) Renovations, Refurbishments etc. project at Belyuen, Darwin, NT 0800. This type is Houses (23) - Upgrade with State ownership. Upgrade works to 23 dwellings at Belyuen under the National Partnership Agreement for Stronger Futures in the NT (SFNT). To include the removal & replacement of pipework with stainless sleet pipes, louvers, glass partitions & solid core doors. Supply & installation of ceramic floor tiles & skirting. Painting of ceilings, external walls & internal walls. Supply & installation of solar hot water systems. Click for more details...

ARAPUNYA ROAD RESHEETING & DRAINAGE WORKS
Arapunya Rd, Alice Springs, NT 0870 Has Arapunya Road Resheeting & Drainage Works currently at Construction stage. Resheeting & drainage works to Arapunya Road between Ch70.7 & Ch94.78 located 340km North East of Alice Springs. To include clearing & grubbing. Lift & reformation of existing sandclay road formation to 150mm x 8m wide. Gravel resheeting to 150mm x 7m wide. Reinstatement of trapezoidal drains, offlets & blocks. Provision of traffic control. Click for more details...

ALICE SPRINGS BUS SHELTERS
New project of Public Buildings & Facilities (Passenger terminals (aiport, bus, rail & sea), Air control towers) project at Lyndavale Dr, Alice Springs, NT 0870. Construction of 4 bus shelters at 108, 88 & 28 Lyndavale Drive & appositive Bougainvillea Avenue. To include supply & lay 30mm thick N25 concrete slab on waterproof membrane. Supply & installation of sheet metal panels & roofing. Click for more details...

BAKEWELL PRIMARY SCHOOL AIR CONDITIONING UPGRADES
Air Conditioning Upgrades - For School project at 5 Hutchinson Tce, Bakewell, NT 0832 in the Education (Schools - primary, secondary (up to Yr 12)). Upgrades works to the air conditioning system at Bakewell Primary School. To include demolition & removal of existing ducted fan coil units, condensing units & associated pipework. Supply & installation of chilled water air conditioning system with air cooled chiller, chilled water pumps, chilled water tank & chilled water pipework. Associated electrical & hydraulic works. Click for more details...

KATHERINE SOUTH CARAVAN PARK
Caravan Park project at 214 Victoria Hwy (Lot 2975), Katherine South, NT 0850 In The Council Area Of Katherine Town of Private. Construction of a caravan park to accommodate 100 people in 20 x 5 bedroom demountable structures for the labour personnel involved with the construction of the Tindal RAAF Base. To include 480sq m communal space & carp parking for 170 vehicles. Click for more details...

NORTHERN GAS PIPELINE PIPE LAYDOWN CIVIL WORKS
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Barkly Shire Council Area for New development. Construction of laydown to store the line pipe for the Northern Gas Pipeline in Tennant Creek. To include drainage work & earthworks. Supply, placement & compaction of quarry material. Installation of sand berms to place line pipe. Construction access roads & turnouts. Supply & installation of perimeter fencing. Click for more details...

VICTORIA RIVER RESEARCH STATION AMENITIES BLOCK EXTENSION
Social (Amenities, Dressing rooms) project at Buchanan Hwy, Victoria River Downs, NT 0852 of Amenities Block - Extn type of Addition development. Extension of existing amenities at the Victoria Research Station. To include construction of amenities & laundry with steel stud frame, concrete footings & slab. To include electrical, drainage & plumbing works. Click for more details...

TOP END TACKLE WORLD
Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) Addition project at 425 Stuart Hwy (Lot 1401), Coolalinga, NT 0835. This type is Showroom - Addns with Private ownership. Addition of showroom to an existing activity centre. Car parking for 23 vehicles. Associated landscaping. Click for more details...

NORTHERN GAS PIPELINE - PROVISION OF MONOLITHIC INSULATION JOINT
Private ownership Non-Construction Items (Supply/fabrication) project In The Various Council Area for New development. For the provision of 15 Monolithic Insulation Joints size DN300 to 15,350 kPag design pressure, 0 to 65 degrees C design temperature. Click for more details...

GATEWAY SHOPPING CENTRE TAVERN & RESTAURANT
Addition project of Hospitality (Clubs (licensed), licensed premises, casinos, taverns) project at 5, 15 & 11 Yarrawonga Rd (Lots 7765, 7766 & 11037), Palmerston, NT 0830. Proposed addition to an existing shopping centre to comprise hotel (tavern), function room, nightclub, restaurant, gaming rooms & shops. Concrete floor, cladding, timber pergola & rendered planter wall. Car parking for 31 vehicles. Associated landscaping. Click for more details...

WURRUMIYANGA AIRPORT SUBDIVISION
Civil Works/Drainage - Upgrade New project In The Tiwi Islands Shire Council Area. Various repairs to the Airport Subdivision at Wurrumiyanga including: 3 floodway extensions; grouted stone pitching; concrete drop structures; kerbing; general concrete & other works; signage; topsoiling & grassing Click for more details...

JABIRU & GUNBALANYA
A project in the NT Within West Arnhem Shire. Upgrade to Jabiru health centre. Upgrades to Gunbalanya health centre & morgue Click for more details...

WAGAMAN PRIMARY SCHOOL
School - Upgrades project at ., Wagaman, NT 0810 In The Council Area Of Darwin City of State. Construction of a Multipurpose building. Construction of an Amphitheatre structure as an extension to the existing Assembly structure. Civil upgrades to the outdoor area adjacent to the new building and amphitheatre, including paving, site drainage, and required upgrades to the existing spoon drain/stormwater pit and car parking/driveway adjacent to the existing Assembly hall affected by these works. Click for more details...

KATHERINE HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) project at Gorge Rd, Katherine, NT 0850 for New. Installation of new ceiling grid system & replacement of ceiling tiles in Maternity Unit at Allan Bromwich Foyer. Works include: removal of existing ceiling tiles. Install a new suspended ceiling grid system. Install new LED lights, smoke alarms & thermal detectors. Click for more details...

POWER & WATER CORPORATION
Commercial Premises (Offices) project at 115 Standley St, Tennant Creek, NT 0860 for Renovations, Refurbishments etc.. Redevelopment of the Tennant Creek office. Scope of work includes: construction of female & PWD ablutions; Power Networks Office; Water Services Office; Meeting Room: Covered Outdoor Area. Construction of ramps and stairs. Installation of sewerage treatment plant. Upgrade of site electrical supplier; extension of data & communications from existing offices to the new office precinct. Construction of a wash down bay Click for more details...

WURRUMIYANGA GOVERNMENT EMPLOYEE HOUSING
Duplex project at Lot 746, Wurrumiyanga, Darwin, NT 0800 in the Residential (Units, apartments, flats, townhouses, villas). Construction of a 1 x 2 bedroom duplex residence on Lot 746 in Wurrumiyanga. Fencing & gates. Concrete driveway, patio, paths & mowing strips. Landscaping. Connection of external services including electrical, communications, water & sewerage disposal. Internal services including electrical, air conditioning, mechanical ventilation, water & sewerage disposal. Design & construction of a proprietary steel garden shed inclusive of concrete slab & power connection. Click for more details...

ROOM TO BREATHE
Residential (Units, apartments, flats, townhouses, villas) Addition project at ., Ngukurr, NT 0852. This type is Early Works Program with State ownership. Room to Breathe early works program for Ngukurr. Creation of new living spaces in existing homes Click for more details...

SPILLETT ELECTORATE OFFICE
Zuccoli Plaza, Zuccoli, NT 0832 Has Spillett Electorate Office currently at Construction stage. Fitout of office space for the Spillett electorate Click for more details...