State

Categories

Sub Categories

Click Here to Find Current Projects

List of Projects in Tasmania


HARVEY NORMAN HOMEMAKER CENTRE
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at Cnr Bass Hwy & Edwards St, Burnie, TAS 7320 for New. An expanded Harvey Norman store, Spotlight and three other businesses still to be confirmed, are proposed for this 11,250 sqm corner site with national highway frontage, close to Burnie commercial and industrial centres. Convenient access to port, rail, airport and natural gas. Post tensioned concrete floor slab, precast concrete walls, metal roof, aluminium shop fronts. Click for more details...


New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Abbottsfield Rd, Claremont, TAS 7011. Reconstruction of approx 200 m of roadway, kerb & channel. Includes minor stormwater work. Click for more details...

MARY OGILVY HOME
Electrical/Communications For Home project at 51 Pirie St, New Town, TAS 7008 in the Aged Care & Retired Developments (Nursing homes). Electrical services & nurse call. Click for more details...

GETSMART HOMES HOUSING PROJECT
Homes (6) project at 5 Colac Ct, Ulverstone & 83-87 Madden St, Devonport, TAS 7310 In The Council Area Of Devonport of State. Two (2) bedroom, brick veneer, metal roof, concrete floor, aluminium windows & associated civil works. Click for more details...

BLACK RIVER BRIDGE NO 216
Bass Hwy Black River Northern, ., TAS 7999 Has Black River Bridge No 216 currently at Planning stage. Design & construction of a replacement Black River bridge No 216, associated road approaches, demolition of existing bridge & all other works required by this contract. Click for more details...

ABC LAUNCESTON
Commercial Premises (Offices) project In The Launceston Council Area of Offices & Studio Refurbishment type. Internal refurbishment to office, public spaces & radio station. Click for more details...

MOUNT READ PROJECT - GOLD/BASE METALS PROJECT
A project in the TAS Within West Coast. Resource estimate is 180,000 tonnes grading 11.0% Pb, 4.0% Zn, 0.2% Cu and 11.0 oz/ton Ag. The estimate has beeen calculated from studies of old mine production and drilling records. Click for more details...

ZEEHAN SLAG DUMP BASE METALS RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) New project at Near, Zeehan, TAS 7469. This type is Resource - Base Metals with Private ownership. The Zeehan slag dump contains residue material from lead smelting over 100 years ago. It includes 450,000 tonnes of material grading 13.4% zinc, 1.7% lead, 54g/t silver and 50g/t iridium. It is located approx 90 km southwest of the Hellyer metals project by road. Click for more details...

BASS HIGHWAY PAVEMENT REHABILITATION
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Meander Valley Council Area for New development. Construction of approximately 500 metres of gravel overlay. Click for more details...

PENGUIN TO ULVERSTONE SEWER & PUMP STATION
Pipeline project at Not known Penguin &, Ulverstone, TAS 7315 in the Public Utilities (Pumping Stations). Construction of approx 11.5 klms of pipeline from Penguin to Ulverstone. Click for more details...

LILYDALE EFFLUENT RE-USE SCHEME
Waste Water Treatmemt Plant, Lilydale, TAS 7268 Has Lilydale Effluent Re-Use Scheme currently at Construction stage. Construction of a storage dam. The works relate to irrigating treated effluent from the Lilydale WWTP on to an adjacent dairy farm.. Click for more details...

MARINOVA PROCESSING FACILITY
Currently at the Construction stage In Clarence is a project estimated to be $ 1500000. This project New 1000 sqm plant for processing seaweed, milling blending & packaging. Also facility for seaweed extraction. Cleanroom facility for pharmaceutical products for final stage isolation & packaging. Extensive air handling & filtration systems. Waste water handling on site. Click for more details...

PATERSON STREET CENTRAL (PERIMETER) ROAD AND FOOTPATH WORKS
New project of Public Utilities (Water distribution systems, Drainage) project at Paterson St, Launceston, TAS 7250. Construction of a road, footpath and relocation of services around the perimeter of Paterson Street Central Carpark. Scope of works include construction of 100m of 225mm diameter sewer main, manholes and gully pits, 85m of 100mm watermain, installing street lighting conduits and posts, building demolition, pavement construction, asphalt sealing and miscellaneous associated works. Click for more details...

MOUNT LYELL COPPER GOLD OPERATIONS - UNDERGROUND MINE DEVELOPMENT & ORE PRODUCTION WORK
Currently at the Construction stage In Lyell is a project estimated to be $ 10000000. This project Mine development to include decline & level of development at variable grades. This includes drill, blast, ground support, load, haul and dump of ore/waste. Ore production including drill, blast, load, haul and dump of stope ore. Crushing and conveying of the ore from the primary crusher to the skip loading station. The Developer intends to produce 2.85Mt of ore pre annum (+/- 10%) and 250 metres of development per month (+/-10%) for three years in underground development. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Currently at the Construction stage In Devonport is a project estimated to be $ 1400000. This project Construction of a new rising main, a new gravity main and other associated works, required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant and to the Paloona Water Supply System. The works include but are not necessarily limited to the following, construction of a new DN 375 PN 35 DICL rising main (approx 3700m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, modification of the existing pumping station building and pipeline manifold to accommodate the installation of the new rising main, construction of a new reinforced concrete flow meter pit, aerial crossings to carry the pipeline across waterways, scour and air valve pits and property connection(s). The rising main will interface with two new pumps in the Pumping Station Building at the Forth Water Treatment Plant and the new pipe work at the Forthside Hill Reservoir. Construction of a new DN 300stormwater pipeline. Construction of a new DN 450 PN 20 DICL gravity main (approx 5200m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, aerial crossings to carry the pipeline across waterways, construction of a new reinforced concrete flow control valve pit, scour, air valve, fore hydrant and property connections, connection to the existing Paloona Trunk main. The Gravity main will interface with new pipe work at the proposed Forthside Hill reservoir (to be constructed under separate contract). Click for more details...

OATLANDS DISTRICT HIGH SCHOOL - BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project at Church Street, Oatlands, TAS 7120 of Multi Purpose Hall type of New development. Construction of a new multi purpose hall. Click for more details...

BUELL DRIVE UNITS
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Launceston Council Area for New development. Construction of two dwellings. Two bedrooms, brick veneer, metal roof, concrete floor and aluminium windows. Click for more details...

MARIA STREET SUB-STATION DEMOLITION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for New development. Demolition of a 360sqm transcend sub-station workshop building located in close proximity to the southern boundary on the 6.229ha site. Click for more details...

STATEWIDE RAIL LEVEL CROSSINGS - NATION BUILDING PROGRAM
Active Warning Systems project at Various Roads Statewide, ., TAS 7999 In The Council Area Of Various of State. Supply and installation of active warning systems at various locations for rail level crossing sites. Click for more details...

REPATRIATION CENTRE
Medical (Hospitals & associated buildings, mortuaries) project at Davey St, Hobart, TAS 7000 for New. Upgrade of the Lower Statton Clinics, including the refurbishment of some existing clinics and offices and construction of new clinics, a reception area and a meeting room. Click for more details...

DELORAINE WASTEWATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) New project at ., Deloraine, TAS 7304. This type is Bulk Earthworks - Stage 1 with State ownership. This contract comprises the first stage of major upgrading work at the Deloraine Wastewater Treatment Plant. The contract includes the supply, placement, compaction and trimming of over 18,000 cubic metres of bulk fill material, the construction of open drains and site landscaping. Click for more details...

BANJO'S BAKERY CAFE NEW NORFOLK
Food & Beverage Processing (Abattoirs, Breweries, Dairies, Canneries, Bakeries, Wineries) project In The Derwent Valley Council Area of Bakery Cafe type. Internal fitout of existing premises. Work includes joinery, floor coverings, painting, mechanical, electrical and plumbing services. Click for more details...

GUY STREET STORMWATER ASSET UPGRADE
Guy St (Bond st to Ryton St), Kings Meadows, TAS 7249 Has Guy Street Stormwater Asset Upgrade currently at Construction stage. The proposed works span a distance of 180 metres from Bond Street to Ryton Street and involve the installation of 180 metres of 450mm diameter pipe, manholes and gully pits. Due to the location of the pipe, there will also be kerb and channel replacement, reinstatement of the existing roadway and nature strip and minor associated works. Click for more details...

BROOKS HIGH SCHOOL REDEVELOPMENT
School - Redevelopment project at George Town Rd, Rocherlea, TAS 7248 in the Education (Schools - primary, secondary (up to Yr 12)). Redevelopment of school to include extension of two existing buildings to become Learning Plazas that will house social and informal learning areas, outdoor learning areas, project rooms, senior staff rooms and student amenities. Other buildings will be completely refurbished including the administration block, to add a student lounge, principals office and conference room and demolition of some out dated facilities. Click for more details...

WATERMARK
Residential (Units, apartments, flats, townhouses, villas) project at 14, 16 & 30 Cambridge Rd, Bellerive, TAS 7018 for New. Construction of four apartments, gym, kiosk and a cafe. Concrete skeleton, concrete block party walls. Lift. Lightweight construction, weatherboards, metal deck roofing. On ground carparking for 9 cars. Click for more details...

LENAH VALLEY MEDICAL CENTRE UPGRADE
Medical Centre - Addns & Altns New project In The Hobart Council Area. Alterations & Extension to Consulting Rooms & Car Parking at the existing Medical Centre. Click for more details...

MORTIMER AVENUE VISITOR ACCOMMODATION
Mortimer Avenue Visitor Accommodation is currently at the Construction stage, valued at about $ 190000 it is Construction of 1 x 2 storey cabin for the use of self contained visitor accommodation. Double car port. Associated landscaping. Click for more details...

UNIVERSITY OF TASMANIA STUDENT ACCOMMODATION
104-110 Murray St, Hobart, TAS 7000 Has University Of Tasmania Student Accommodation currently at Construction stage. Demolition of existing building and construction of a 14-storey accommodation building to house the Education Malaysia Australia students. Levels 1-13 comprising 110 student apartments with ensuite bathrooms. Also to include kitchen & amenities, laundry & storage rooms. Mezzanine floor to be used as student common room and prayer room with associated facilities. Click for more details...

ST PAULS RIVER BRIDGE, ESK MAIN ROAD AND FINGAL RIVULET CULVERT REPLACEMENT
Esk Main Rd - St Pauls River Bridge - Fingal Rivulet, Fingal, TAS 7214 Has St Pauls River Bridge, Esk Main Road And Fingal Rivulet Culvert Replacement currently at Construction stage. The project involves the demolition and replacement of St Paul River Bridge and Fingal Rivulet Culvert, plus minor road works on the approaches on Esk Main Road. The proposed contract has three seperate portions with a total contract period of 48 weeks. Click for more details...

ROSNY ZONE SUBSTATION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 124 Cambridge Rd, Rosny Park, TAS 7018 for New. Construction works for Rosny Zone Substation. Works to include civil and building works. Click for more details...

ROSNY ZONE SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at 124 Cambridge Rd, Rosny Park, TAS 7018 for New. Construction works for Rosny Zone Substation. Works to include civil and building works. Click for more details...

LUCAS STREET DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) project at 15 Lucas St, Howrah, TAS 7018 for New. Construction of 4 single storey dwellings. 3 bedrooms. Shared paved driveway with double car space garages for dwellings 1-3, dwelling 4 with single car space garage. 2 visitor parking spaces. Pitch tiled roofing, brick veneer walls. Landscaping. Click for more details...

REECE HIGH SCHOOL DETENTION BASIN REHABILITATION WORKS
Detention Basin Rehabilitation Works Renovations, Refurbishments etc. project In The Devonport Council Area. Detention Basin Rehabilitation Works, Reece High School. Click for more details...

SOUTH HOBART LIVING ARTS CENTRE
Arts Centre Addition project In The Hobart Council Area. Alterations & additions to existing community buildings, car park, offices, meeting spaces & community hall for the use of the Living Arts Centre, South Hobart. Click for more details...

LAUNCESTON HEALTH HUB & CAR PARK
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Launceston Council Area of Private ownership. Demolition of existing building & construction of a new 2 storey building for medical consulting rooms on the ground level with provision for a future pharmacy on the 1st floor and a 58 vehicle new patient/staff car park for Launceston Health Hub. Click for more details...

WATTLE AVENUE ROAD CONSTRUCTION
Road Works New project In The Glenorchy Council Area. Wattle Avenue, Lutana - Road Construction. Click for more details...

AUSTRALIAN MARITIME COLLEGE TASMANIA
A project in the TAS Within Launceston. Upgrade of existing sports field and construction of four light poles at the Australian Maritime College, Newnham. Click for more details...

FAIRWAY RISE LIFESTYLE VILLAGE
Renovations, Refurbishments etc. project of Aged Care & Retired Developments (Aged units, seniors units) project at 55 and 75 Gordons Hill Rd, Lindisfarne, TAS 7015. Modifications to six existing single bedroom units to make four double bedroom units at Fairway Rise Lifestyle Village. Click for more details...

ALANVALE ROAD COMMUNITY CENTRE
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Launceston Council Area of Community Centre type. Reconfiguration of a 2.9 HA lot into 2 lots. Construction of 507m2 community centre, out building, community gardens, open space & play areas on lot 1 4758 m2. Car parking for 25 vehicles. Associated landscaping. Materials to be used included powder coated aluminium window frames, aluminium roof sheeting, scion vertically grooved cladding, exposed block & pavers, aggregate building blocks, roller doors & concrete block work. Click for more details...

KENTISH COUNCIL BITUMEN RESEALING OF ROADS
Currently at the Construction stage In Kentish is a project estimated to be $ 300000. This project Bitumen resealing of various road in the Municipality of Kentish. Click for more details...

LOOP ROAD SHED
Industrial (Warehouses, cargo sheds, distribution centres) project at 415 Loop Rd, Glengarry, TAS 7275 for New. Proposed construction of shed. Click for more details...

HAMILTON LOCAL STREETS STABILISATION
Currently at the Construction stage In Central Highlands is a project estimated to be $ 250000. This project Stabilisation works to approximately 2,000m of local streets in Hamilton. Click for more details...

VALLEY ROAD SOCCER GROUND CAR PARK
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Devonport Council Area of Local Govt ownership. Valley Road Soccer Ground Car Park Seal. Click for more details...

ROMAINE DAM UPGRADE
A project in the TAS Within Burnie. Construction of the Romaine Dam Upgrade. Click for more details...

WARRANE PRIMARY SCHOOL
Currently at the Construction stage In Clarence is a project estimated to be $ 261000. This project Demolition & carpark construction at Warrane Primary School. Click for more details...

BELLERIVE PRIMARY SCHOOL
Currently at the Construction stage In Clarence is a project estimated to be $ 396000. This project Works to include the construction of new amenities at Bellerive Primary School. Click for more details...

CALTEX SERVICE STATION SMITHTON
Service Station project at 21 Nelson St, Smithton, TAS 7330 in the Industrial (Service stations). Demolition of the existing bitumen, fuel dispensers, kerbs & buildings. Construction of Caltex Service Station to include new canopy, fill point, control room, above ground tank & associated hardstand. Signage. Concrete bund, stainless steel knee operated wash basin, galvanised structural steel, metal roof sheeting, painted concrete block wall & concrete bollards. Associated car parking & landscaping. Click for more details...

PAWLEENA ROAD ROADWORKS
Pawleena Road Roadworks is currently at the Construction stage, valued at about $ 150000 it is Works to include the re-construction of a segment of Pawleena Road. Associated civil works. Click for more details...

ME WAH RESTAURANT FITOUT
Renovations, Refurbishments etc. project of Hospitality (Restaurants, Canteens) project at 410 Sandy Bay Rd, Sandy Bay, TAS 7005. Fitout for the Me Wah Restaurant at Wrest Point Hotel Casino. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect