State

Categories

Sub Categories

Click Here to Find Current Projects

List of Accommodation - units, housing, group accom. Projects


LUDLOW MINERAL SANDS PROJECT - ON SITE BUILDINGS RELOCATION
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 34 km south of, Bunbury, WA 6230. This type is On Site Buildings - Relocation (From Yarloop & Sandalwood) with Private ownership. On site buildings include: office/cribb room; plant buildings. Click for more details...

TASSIE SHOAL METHANOL PROJECT - ACCOMMODATION & CONTROL PLATFORM
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. Key components of the Tassie Shoal Methanol project include accommodation and control platform for personnel living quarters. Click for more details...

LEINSTER - NICKEL/GOLD
Site operations via, Leinster, WA 6437 Has Leinster - Nickel/Gold currently at Construction stage. Contract to involve site works, provision of services & construction of a transportable (or insitu) 186-room self contained village. Concrete verandah floors, earthworks, roadworks & drainage included in tender. Services include termite treatment, plumbing, LPG connections & electrical requirements. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at Between St Ives and, Norseman, WA 6443. This type is Resource - Gold with Private ownership. The developer is planning to construct a 1 Mtpa treatment plant in 2007 to be completed by 2008. The project includes 36 tenement including the Trident deposit. Resource estimate from the project is 8.7 Mt @ 4.0 g/t Au for 1.1 million ounces of gold. Resource estimate for Trident are 4.3 million tonnes at 6.2 g/t gold for 855,000 ounces and the Athena lodes is 960,000 tonnes @ 11.1 g/t Au for 343,000 ounces. Click for more details...

MOUNT TODD GOLD MINE
45 km northeast of, Katherine, NT 0850 Has Mount Todd Gold Mine currently at Construction stage. Contract to provide 3 x meals per day over 7 days a week for approximately 350 personnel. Tender includes linen & cleaning services plus associated camp facilities. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL INFRASTRUCTURE
Rail Infrastructure New project In The Port Hedland Council Area. Feasibility study has recommended a a 255 km railway line from Cloud Break to Port Headland port facility. A mine load out facility will be located at Cloud Break. There will be four train sets each comprising two locomotives and two hundred wagons. Supporting infrastructure will include sidings, passing bays and loading loops, train loader, temporary construction facilities, temporary track camps, administration offices and warehouses, trip servicing facilities, service and repair workshop, rail maintenance track, rail loops and marshalling yards, maintenance facilities, substations and communication systems. The proposed line does deviate where there are environmental, heritage and engineering constraints. Stage A PER covers the Port and North to South rail line. The Stage B PER covers the East to West rail spur. Click for more details...

COMALCO - WEIPA
off Duyfken Crescent, Trunding, Weipa, QLD 4874 Has Comalco - Weipa currently at Planning stage. Development of a vacant 7ha parcel of land off Duyfken Crescent in the residential area of Trunding within the Weipa township. It is envisaged that the proposed development site will contain at least 40 residential dwellings ranging from 2 - 4 bedroom low-set style homes. Consideration would also will be given to having the proposed development staged over a (2) year period. Click for more details...

RAVENSTHORPE NICKEL PROJECT - CONSTRUCTION CAMP
50 km north of, Hopetoun, WA 6348 Has Ravensthorpe Nickel Project - Construction Camp currently at Construction stage. Construction camp. Click for more details...

GASCOYNE PROJECT - ARTHUR RIVER/BERYL HILL
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at via, Gascoyne Junction, WA 6705. A 50 tonne per hour jig plant to assess production potential for columbite and alluvial tantalite. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - ACCOMMODATION
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The East Pilbara Council Area of Private ownership. Part of a proposed additional expansion to145Mtpa. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

ROCKLEA PALMS TRANSIENT WORKERS ACCOMMODATION - ALTERATIONS/ADDITIONS
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Lot 61 McRae Avenue, Paraburdoo, WA 6754 for Addition. Modifications and alterations to three existing, two storey buildings within the Rocklea Palms complex. Proposal includes complete repartitioning of the interior to increase accommodation from 115 to 168 beds and external modifications including external walkways, balconies and re-roofing. Also includes conversion of the ground floor space (currently TAFE) to workers accommodation. Construct a walkway/balcony at first floor level on each buildings, reconfigure existing wall openings to conform iwth the internal room layout, extend the existing eaves 450mm past the balcony line, replace teh existing tile roofs with colour bond roofing. No changes to car parks of landscaping proposed. Click for more details...

MORANBAH NORTH COAL OPERATIONS - WORK CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Isaac Regional Council Area of Private ownership. Extension of 21 rooms in 7 portables to an existing 400 room camp site. Click for more details...

PANNAWONICA WORKERS ACCOMMODATION FACILITY
Pannawonica Workers Accommodation Facility is currently at the Construction stage, valued at about $ 500000 it is Construct a 40 person camp with ten four person structures with three associated buildings for recreational activities. Click for more details...

MINE ROAD TRANSIENT WORKERS ACCOMMODATION FACILITY/CARAVAN PARK
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Mine Road, Paraburdoo, WA 6754 of Transient Workers Accommodation/Caravan Park type of New development. Proposed to construct a 120 persons transient workers accommodation camp and incorporate a small caravan park for community use. The camp will comprise thirty four bedroom units, community areas, laundry, wet and dry mess, administration office, toilet block, small gym and recreational facilities. The caravan park will comprise six caravan sites, 600 sqm of tent area, laundry, toilet block and associated car parking. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...

COBURN MINERAL SANDS PROJECT - ACCOMMODATION CAMP/OFFICE CONTRACT
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at South of, Hamelin Pool, WA 6532. For the construction of an accommodation camp and office. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL WORKERS CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at 15 Km North of Wodgina via, Newman, WA 6753 of Accommodation Camp type of New development. A 280 person accommodation camp to be constructed for rail workers. The camp will comprise 70 accommodation units containing 4 rooms with their own ensuite. Other buildings will be a camp management/office building, dry mess, a wet mess with covered beer garden, a recreation complex, 3 laundry buildings, fully equiped gymnasium, a first aid post with ambulance shelter and other ancillary buildings. A sports court, BBQ area and swimming pool with associated toliets and change rooms will be constructed. Click for more details...

WORSLEY ALUMINA EFFICIENCY & GROWTH PROJECT - CAMP & ACCOMMODATION
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at 15 Km South east of, Collie, WA 6225. Contract includes busing workforce personnel. Camp and Accommodation construction includes civil works, water supply and sewage treatment plant. Accommodation village will comprise of 1000 person accommodation. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - MINING CONTRACTORS COMPOUND
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Near, Grassy, TAS 7256. For the provision of mining contractors compound. Click for more details...

COPPABELLA ACCOMMODATION CENTRE - CENTRAL FACILITIES BUILDING - STAGE 2
Central Facilities Building - Stage 2 New project In The Isaac Regional Council Area. Likely to include gymnasium, additional meeting rooms, pool rooms & recreation areas. Click for more details...

HALLEYS EAST GOLD PROJECT
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at via Diemals Station Rd 200km north of, Southern Cross, WA 6426. A project based on a Resource Estimate (Inferred) at Halleys East of 678,000 tonnes containing 68,800 ounces (oz) gold. Construction of a haul road to Diemals Station Road for trucking of ore via Menzies to the Greenfields Mill 3km east of Coolgardie for processing. Click for more details...

MESA A/WARRAMBOO IRON ORE PROJECT - CONSTRUCTION CAMP
Currently at the Construction stage In Ashburton is a project estimated to be $ 20000000. This project For the manufacture and installation of an additional 400 rooms and associated facilities. Click for more details...

MURRAY BASIN STAGE 2 MINERAL SANDS PROJECT - CIVIL WORKS & BULK EARTHWORKS
Murray Basin Stage 2 Mineral Sands Project - Civil Works & Bulk Earthworks is currently at the Construction stage, valued at about $ 5000000 it is For the provision of site-wide civil works & bulk earthworks. Click for more details...

SINO IRON ORE PROJECT - ACCOMMODATION VILLAGE
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. For the construction of a 600 man accommodation village facility. The facility comprises accommodation units, staff canteens, a tavern, gymnasium and associated facilities. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE STAGE 3 EXPANSION
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Maranoa Regional Council Area of Gas Pipeline - Stage 3 type. As part of the QSN Link project (QSN3), construction of a 935km loop pipeline parallel to the existing South West Queensland Pipeline (SWQP) between Wallumbilla & Moomba. Construction also at the Wallumbilla hub of 2 additional compressor stations at existing scraper station sites & an upgrade to the existing Wallumbilla compressor station. The pipeline is anticipated to have a diameter of between 400-500mm approx. Construction crews will be housed in temporary construction camps that will be progressively moved ahead of construction activity. Each main camp will house up to 200 people & the smaller fly camps will house up to 150 people. Each camp will contain accommodation units & mess & recreation huts. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

RAPID GROWTH 5 IRON ORE PROJECT - RAIL
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Between Port Hedland and, Newman, WA 6753 for New. The works include construction of more than 1 000 camp rooms complete with kitchens and recreation facilities, 1.2 million cubic metres of earthworks, construction of 10 new dual track bridges, laying of all required track to duplicate the existing 200km railway line and installation of 840 km of fibre optic cable. Click for more details...

SINO IRON ORE EXTENSION PROJECT - ACCOMMODATION UPGRADE
Sino Iron Ore Extension Project - Accommodation Upgrade is currently at the Construction stage, valued at about $ 2000000 it is For the construction of accommodation for 200 permanent personnel (upgraded from existing facilities for workforce of 600). Click for more details...

GLADSTONE LIQUID NATURAL GAS (GLNG) PROJECT - TEMPORARY SUPPORT BUILDINGS
Temporary Support Buildings project at ., Curtis Island, QLD 4680 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). Construction of temporary support buildings that require a shelf life of 5 years. 20 plant infrastructure buildings including plant offices, medical facility, workshops, store rooms, equipment rooms, crib rooms & recreation rooms. Accommodation camp providing for 1860 persons in 48 pods. Click for more details...

BASSGAS OPERATIONS - YOLLA MID-LIFE ENHANCEMENT PROJECT STAGE 1
Tasmanian waters 147km off the Victorian coast, Bass Basin, TAS 7999 Has Bassgas Operations - Yolla Mid-Life Enhancement Project Stage 1 currently at Construction stage. A project to maximise gas recovery from the operating Yolla field which provides gas, condensate & LPG through the Lang Lang processing facility. Conversion of the currently unmanned 8000t, 50m x 50m x 120m high Yolla A platform by installation of living quarters along with safety related systems & equipment. Installation also of pumping & compression equipment. Click for more details...

PANNAWONICA ACCOMMODATION & FACILITIES UPGRADE
Mining - Support Facilities (Accommodation - units, housing, group accom.) Renovations, Refurbishments etc. project at at, Pannawonica, WA 6716. This type is House Refurbishment/Office Refurbishment/Service Station/Workshop with Private ownership. Refurbishment of 233 houses. Upgrade & refurbishment of 19 existing commercial & infrastructure buildings. Construction also of a new service station & light vehicle workshop within the town. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - NORTHERN RAIL
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Port Hedland Council Area of Private ownership. It is proposed to develop a railway of approximately 320km to transport iron ore from the Roy Hill 1 mine to facilities at Port Hedland and the proposed Boodarie multiuser stockyard area which is to be vested in the PHPA (Port Hedland Port Authority). The railway proposal includes: a marshalling yard (with associated workshops and maintenance facilities storage and laydown areas, rail welding yard), passing loops and sidings, construction water bores and 'turkeys nest' dams, borrow and ballast areas for construction material, communications cable, towers and signalling system, construciton works accommodation camps and amenities for workers, access roads and construction power supplies. Five train sets will be required to transport 55 Mtpa, with each train consisting of two diesel electric locomotives and 232 iron ore wagons. When spares are included, this will entail a fleet of 17 locomotives and 1790 wagons. Fuel supply trains will require one additional AC locomotive and 12 tanker cars. An unsealed, at-grade access road will run adjacent to and generally parallel to the proposed railway for its entire length, for the purposes of railway access and maintenance. The road pavement width will be approximately 9m wide. Seven sidings are expected to be required along the entire length of the railway to allow trains travelling in opposite directions to pass. Additional sidings called "back-tracks" will be provided on the back to eh passing sidings along the alignment as required to allow removal of 'bad-order' wagons (mechanical fault). Road crossings will be at grade or grade separated in accordance with the requirements of Main Roads of Western Australia. Level crossings on access roads will be protected with signs that comply with this standard. To preserve current land uses in a way that is compatible with the proposed railway, fencing and/or controls will need to be installed at occupational rail crossings, vehicle the paths, livestock grids and in other areas where access requires controlling or restricting. Watercourses crossings will consist of culverts or bridges. Culverts will be used in preference to bridges. For bridges, to provide a simple and efficient method of construction, the design of the rail bridges will be standardised for fast construction requiring a minimum quantity of in situ concrete. The span length proposed is 25m. The construction methodology will be to at 25m intervals drive circular steel pier columns as a "trestle" consisting of three members with the two outer members raking and the central pier column vertical. A heavy hardstand granular pavement is required for installation of piled substructure over the full length of each bridge primarily to provide safe, stable access for heavy plant and equipment. The width of the hardstand on both the upstream and downstream sides of the piers will be approximately 20m, ie a total fo 40m wide. Hardstand will remain in service until superstructure units are placed by heavy cranage. Prefabricated steel headstocks will be lifted into place by a crane and site welded to the pier columns. Decks will consist of prefabricated composite girders or steel through girder construction. The marshalling yard will be adjacent to the main line and will incorporate 10 rail tracks. The site is expected to accommodate a rolling-stock workshop and washdown bay, locomotive provisioning hall, rail infrastructure yard, diesel fuel storage, electrical substation, communications tower, administration building, car parks, potable and wastewater treatment units and fire-water storage and access roads. The rolling stock workshop will be a single storey building with a heavy duty concrete slab, overhead travelling cranes, high pressure water wash-down facilities and various pieces of maintenance equipment including a wheel lathe Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS FIELD DEVELOPMENT - ACCOMMODATION CAMPS
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Condabri & Reedy Creek via, Miles, QLD 4415. Design & construction of worker accommodation camps for 130 persons at Condabri & 230 persons at Reedy Creek. Click for more details...

BANROCK DRIVE & GIPPSLAND WAY SINGLE DETACHED HOUSES
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 51 (Lot 7022) & 65 (Lot 7028) Banrock Dr & 15 (Lot 7283) Gippsland Wy, Ellenbrook, WA 6069. This type is Single Detached Houses (3) with State ownership. Works to include construction of 3 single detached houses. Click for more details...

DAISY STREET WORKERS ACCOMMODATION & TOWNHOUSES - CIVIL WORKS
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at Daisy St (Lot 3 SP197442), Miles, QLD 4415. This type is Civil Works - For Accommodation Village with Private ownership. Civil works, including road widening & reticulation of services, for a workers' accommodation village to cater for up to 340 people. Click for more details...

ROLLESTON ACCOMMODATION VILLAGE EXPANSION
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at via Dawson Hwy 10km northwest of, Rolleston, QLD 4702 of Bedrooms/Dining Hall/Parking/Water Treatment/Dam Relocation type of New development. Doubling of the existing 350 person accommodation village with another 200 rooms in stage 1 & 150 rooms in stage 2. New mess hall. Upgrades to the existing sewerage & water treatment facilities. Expansion of car parks. Relocation of existing silt retention dam. Click for more details...

MOUNT BOPPY GOLD MINE RECOMMENCEMENT
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 46km East of, Cobar, NSW 2835. This type is Mine - Recommencement with Private ownership. Mount Boppy Mine recommencement. Ore to be delivered to the recently refurbished Manuka Silver Mine (formerly Wonawinta Silver Mine) Processing Plant for processing. Click for more details...

LADY LORETTA BASE METALS OPERATIONS- ACCELERATED DEVELOPMENT
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Mt Isa City Council Area for New development. A project to increase ore production at Lady Loretta to 1.6 million tonnes (Mtpa) by developing the upper ore bodies independently of the deeper underground resources. To include larger ore handling facilities, increased mobile & fixed plant equipment with associated expanded ventilation system. Upgraded or expanded infrastructure including concrete batch plant, paste plant, warehouse, fuel farm & power station. Increased village accommodation & utility upgrades. Click for more details...

HERA-NYMAGEE GOLD PROJECT - ACCOMMODATION CAMP
Accommodation Camp project at Via, Nymagee, NSW 2831 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). Staged construction of worker accommodation. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - ACCOMMODATION SUPPLY
Australia Pacific Lng (Aplng) Project - Accommodation Supply is currently at the Construction stage, valued at about $ 6000000 it is Provision of 200 ensuited rooms across the Surat Basin. Click for more details...

THE MAC ACCOMMODATION CENTRE BOGGABRI STAGE 1
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 262 Carloola Rd, Boggabri, NSW 2382. This type is Accommodation Modules/Administration/Kitchen/Dining/Laundry/Civils/Reservoir with Private ownership. Construction of stage 1 of an accommodation village to provide 328 rooms & laundry facilities in prefabricated modules. Construction also of an office/administration building & a kitchen/dining building with concrete floors & metal walls & roofs. Civil works package expected to include bulk earthworks, roadworks, stormwater & construction of an 8ML reservoir. Click for more details...

YWHEATSTONE DEVELOPMENT PROJECT - TRUNKLINE SECONDARY STABILISATION - ACCOMMODATION ONSHORE
Accommodation Onshore project at Vicinity of, Onslow, WA 6710 In The Council Area Of Ashburton of Private. For the provision of onshore accommodation. Click for more details...

DUGALD RIVER BASE METAL PROJECT - TEMPORARY ACCOMMODATION CAMP
A project in the QLD Within Mt Isa City. Construction of a 100 bed temporary worker's village. Click for more details...

FORTESCUE RIVER GAS PIPELINE
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at From DBNGP to SOLOMON HUB 150km south of, Karratha, WA 6714 of Pipeline - Gas type of New development. Construction of a 16 inch diameter, 270km long, 64 TJ/day capacity pipeline from an Inlet Station on the Dampier to Bunbury Natural Gas Pipeline (DBNGP) compressor station 1 to a Delivery Station at TransAlta's 125MW power station at Fortescue Metal Group's Solomon Hub. To allow for conversion of the Solomon power station from diesel. Associated access track along the construction corridor & a temporary accommodation camp (demountable buildings, ablutions, laundry, food mess, wet mess/bar, recreation rooms) in the central portion. Click for more details...

YARRABEE ACCOMMODATION FACILITY
Currently at the Construction stage In Central Highlands Regional is a project estimated to be $ 20000000. This project Build, own & operate a 250 man accommodation facility at Yarrabee. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - ACCOMMODATION CAMP
A project in the QLD Within Mapoon Shire. Accommodation camp/village for the Bauxite Hills DSO Project. Click for more details...

NOVA NICKEL PROJECT - ACCOMMODATION CAMP
Accommodation project at 30km north of Eyre Hwy 120km E/NE of, Norseman, WA 6443 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). For the provision of a 492 room permanent village. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - ELECTRICAL WORKS
Mining - Support Facilities (Accommodation - units, housing, group accom.) Renovations, Refurbishments etc. project at Barrarda Estate, Onslow, WA 6710. This type is Electrical Works with Private ownership. For the installation of mains cables from street to house, connection of AC & HWS for 50 modular houses. Includes excavation & backfill. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - ACCOMMODATION
Accommodation Village - Relocation project at 120km South of, Port Hedland, WA 6721 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). For the provision of the relocation of the Roy Hill Rail Camp 3. The camp will be relocated in 2 stages. Click for more details...

MOUNT MORGANS GOLD OPERATIONS RECOMMENCEMENT - ACCOMMODATION VILLAGE
Currently at the Construction stage In Laverton is a project estimated to be $ 20800000. This project For the provision of a 416 room accommodation village. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect