List of Accommodation - units, housing, group accom. Projects in WA


LUDLOW MINERAL SANDS PROJECT - ON SITE BUILDINGS RELOCATION
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 34 km south of, Bunbury, WA 6230. This type is On Site Buildings - Relocation (From Yarloop & Sandalwood) with Private ownership. On site buildings include: office/cribb room; plant buildings. Click for more details...

YANDI - IRON ORE
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Yandi Operations 90 km northwest of, Newman, WA 6753 of Mine - Plant - Upgrade & Infrastructure - Epc & M Contract type of Addition development. Proposal expected to increase throughput from 25mtpa to 35mtpa. Some minor works undertaken in order to increase capacity of existing plant to more than 12mtpa. Additional processing & mine site village facilities to be constructed as required. A new 10mtpa fixed plant, 10 km of rail spur line terminating in a loop & new train loading facility also proposed. Project contains a previously advised overall resource of 1,800mt grading 58% iron, 1.3% alumina, 5% silica & 0.04% phosphorus. EPA assessment conducted on the consultative environmental review (CER). Contract to involve power generation, dewatering systems, offices & accommodation requirements. Click for more details...

LEINSTER - NICKEL/GOLD
Site operations via, Leinster, WA 6437 Has Leinster - Nickel/Gold currently at Construction stage. Contract to involve site works, provision of services & construction of a transportable (or insitu) 186-room self contained village. Concrete verandah floors, earthworks, roadworks & drainage included in tender. Services include termite treatment, plumbing, LPG connections & electrical requirements. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL INFRASTRUCTURE
Rail Infrastructure New project In The Port Hedland Council Area. Feasibility study has recommended a a 255 km railway line from Cloud Break to Port Headland port facility. A mine load out facility will be located at Cloud Break. There will be four train sets each comprising two locomotives and two hundred wagons. Supporting infrastructure will include sidings, passing bays and loading loops, train loader, temporary construction facilities, temporary track camps, administration offices and warehouses, trip servicing facilities, service and repair workshop, rail maintenance track, rail loops and marshalling yards, maintenance facilities, substations and communication systems. The proposed line does deviate where there are environmental, heritage and engineering constraints. Stage A PER covers the Port and North to South rail line. The Stage B PER covers the East to West rail spur. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINDY MINDY
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 60 km Northwest of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Resource estimate is 44.8 Mt @ 55.2% Fe. The ore at Mindy Mindy will be directly shipped. Strip mining with progressive backfilling of the open pit will be the preferred mining method. Infrastructure to be constructed will comprise a semi-mobile crusher; sealed haul road or overland conveyor system from crushing/screening plant to rail loading facility ; secondary crushers; iron ore product stockpile and train loading facilities; administrative and maintenance hub; connection to the proposed 132 kv transmission line to Newman with capcity upgrade at Newman or a 6 MW power station (to be provided and maintained by an external supplier); Mine dewatering pumps and pipeline; airstrip upgrade at Mindy Mindy and an Accommodation village. Click for more details...

COYOTE GOLD PROJECT - RESOURCE
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Halls Creek Council Area for New development. Production rate is expected to be at least 60,000 tonnes per annum. The preferred development plan is based upon a three stage open pit at Coyote to be mined over a year followed by decline development off the base of the pit. Preferred mining method is high grade narrow vein techniques. Infrastructure proposed for the development will be waste rock dumps, tailings storage facility, gold treatment plant, mining contractors area, workshops and stores, office complex, airstrip, accommodation village, haul roads and access roads. Recent resource estimates are 4 metres at 70 g/t Au. The Coyote gold project includes Coyote and the jv Kookaburra and Sandpiper deposits at Larraganni. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - JACKSON/WINDARLING/BUNGALBIN/MAYFIELD
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at 5km north east of, Southern Cross, WA 6426. Limited infrastructure including a single persons camp and communications requirements: computer, phone (microwave link). Click for more details...

OREBODY 18 IRON ORE PROJECT
Accommodation project at In, Newman, WA 6753 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). BHP plans to mine 116 million tonnes of ore over the next 12 - 15 years. Part of the development will be the construction of workforce accommodation in Newman, approx 30 km from the mine. Click for more details...

RAVENSTHORPE NICKEL PROJECT - BANDALUP HILL - INFRASTRUCTURE
Infrastructure project at 50km north of, Hopetoun, WA 6348 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). A combination of multi user regional infrastructure and project infrastructure. The multi user infrastructure includes upgrade of local roads, new shire airstrip, emergency services, sewered land, housing, power and water. Project infrastructure includes site buildings, communication, plant roads, construction camp and port facilities at Esperance. Click for more details...

PAULSENS GOLD PROJECT
Mining - Support Facilities (Accommodation - units, housing, group accom.) Renovations, Refurbishments etc. project at Approx 186 km west of, Paraburdoo, WA 6754. This type is Mining Camp - Supply& Management with Private ownership. Since a mill is not involved with the project, this will be a smaller 50-60 person camp. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - ACCOMMODATION
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The East Pilbara Council Area of Private ownership. Part of a proposed additional expansion to145Mtpa. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

BHP BILLITON IRON ORE - NEWMAN ACCOMMODATION VILLAGE
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The East Pilbara Council Area of Accommodation Village - 1000 Person type. A 1000 person accommodation village north of Les Tutt Drive, which is to be closed. Camp to have expected three year duration. Click for more details...

ROCKLEA PALMS TRANSIENT WORKERS ACCOMMODATION - ALTERATIONS/ADDITIONS
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Lot 61 McRae Avenue, Paraburdoo, WA 6754 for Addition. Modifications and alterations to three existing, two storey buildings within the Rocklea Palms complex. Proposal includes complete repartitioning of the interior to increase accommodation from 115 to 168 beds and external modifications including external walkways, balconies and re-roofing. Also includes conversion of the ground floor space (currently TAFE) to workers accommodation. Construct a walkway/balcony at first floor level on each buildings, reconfigure existing wall openings to conform iwth the internal room layout, extend the existing eaves 450mm past the balcony line, replace teh existing tile roofs with colour bond roofing. No changes to car parks of landscaping proposed. Click for more details...

KOOLAN ISLAND PROJECT - ACCOMMODATION VILLAGE
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Derby-W Kimberley Council Area of Accommodation Village type. A temporary construction accommodation camp will be built for the mining construction. The permanent village will accommodate 220 persons. The personnel will be fly in fly out. Click for more details...

RAVENSTHORPE NICKEL PROJECT - PERMANENT VILLAGE BUILDINGS
Permanent Village Buildings New project In The Ravensthorpe Council Area. Development comprises 36 x 1 storey houses of three and four bedrooms, two bathrooms and air conditioning. Click for more details...

TOM PRICE MINE CONSTRUCTION CAMP EXPANSION
A project in the WA Within Ashburton. 120 persons construction camp is under construction. Click for more details...

MINE ROAD TRANSIENT WORKERS ACCOMMODATION FACILITY/CARAVAN PARK
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Mine Road, Paraburdoo, WA 6754 of Transient Workers Accommodation/Caravan Park type of New development. Proposed to construct a 120 persons transient workers accommodation camp and incorporate a small caravan park for community use. The camp will comprise thirty four bedroom units, community areas, laundry, wet and dry mess, administration office, toilet block, small gym and recreational facilities. The caravan park will comprise six caravan sites, 600 sqm of tent area, laundry, toilet block and associated car parking. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...

INDEE GOLD PROJECT - ACCOMODATION/ADMINISTRATION/STORAGE FACILITY
80 Km South west of, Port Hedland, WA 6721 Has Indee Gold Project - Accomodation/Administration/Storage Facility currently at Tenders & Building stage. Construction comprises an accommodation building for 40 persons, ablution block, kitchen/mess facilities, administration building and an equipment storage facility. Click for more details...

WINDIMURRA VANDIUM OPERATION - PROCESSING PLANT
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at 80 Km East South East of, Mount Magnet, WA 6638 for New. New equipment has been purchased for the plant and a tender has closed for a SAG Mill. The present plant infrastructure at the site is a 126m Rotary Gas Fired Kiln and cooler, Plant earthworks and Concrete, Crusher Area structure and ROM pad, Grinding Area Concrete and Footings, Beneficiation area including Rare Earth Magnetic Separators, Leach Vats, Leaching Area Concrete, Fusion Area, Fusion furnace, Flaking Wheel, Hot pan Conveyor, Packaging Plant, Process design and engineering, Tailings Dam, Road Works, Bore fields, Communication services, Building and Workshop equipment and Accommodation Village. The plant infrastructure, design and processing operations have been studied and improvements have been recommended. The design will look at power station configuration, upgrade of the material handling in parts of the plant which were found to be production bottlenecks. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - TRANSIENT WORKERS CAMP
Accommodation Camp (24 Units) project at Lot 2444 Great Northern Highway, Port Hedland, WA 6721 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). A 100 person, 24 unit accommodation camp for workers who will construct a railway line from near Newman to Port Hedland port and also constuct port facilities for the export of iron ore. Click for more details...

COBURN MINERAL SANDS PROJECT - ACCOMMODATION CAMP/OFFICE CONTRACT
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at South of, Hamelin Pool, WA 6532. For the construction of an accommodation camp and office. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL WORKERS CAMP
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The East Pilbara Council Area for New development. A 280 person accommodation camp to be constructed for rail workers. The camp will comprise 70 accommodation units containing 4 rooms with their own ensuite. Other buildings will be a camp management/office building, dry mess, a wet mess with covered beer garden, a recreation complex, 3 laundry buildings, fully equiped gymnasium, a first aid post with ambulance shelter and other ancillary buildings. A sports court, BBQ area and swimming pool with associated toliets and change rooms will be constructed. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL WORKERS CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at 15 Km North of Wodgina via, Newman, WA 6753 of Accommodation Camp type of New development. A 280 person accommodation camp to be constructed for rail workers. The camp will comprise 70 accommodation units containing 4 rooms with their own ensuite. Other buildings will be a camp management/office building, dry mess, a wet mess with covered beer garden, a recreation complex, 3 laundry buildings, fully equiped gymnasium, a first aid post with ambulance shelter and other ancillary buildings. A sports court, BBQ area and swimming pool with associated toliets and change rooms will be constructed. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - TRANSIENT WORKERS CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. A 704 persons accommodation camp to be constructed. The camp will comprise 126 permanent accommodation units containing 4 rooms with their own ensuites and 66 temporary accommodation units containing 4 rooms with their own ensuites. Other buildings will be a dry mess, a wet mess with covered beer garden, maintenance sheds, laundry buildings, fully equipped gymnasium, a first aid post with ambulance shelter. A sports court, BBQ area and swimming pool with associated toilets and change rooms will be constructed. Other ancillary buildings will also be constructed. Click for more details...

WORSLEY ALUMINA EFFICIENCY & GROWTH PROJECT - CAMP & ACCOMMODATION
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at 15 Km South east of, Collie, WA 6225. Contract includes busing workforce personnel. Camp and Accommodation construction includes civil works, water supply and sewage treatment plant. Accommodation village will comprise of 1000 person accommodation. Click for more details...

BODDINGTON GOLD MINE EXPANSION - CONSTRUCTION/ACCOMMODATION CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. A 1250 person construction camp and associated civil works to be constructed. Facilities will include a permanent dry and wet mess and recreation facilities. The initial 200 person fly camp has been constructed. Click for more details...

NULLAGINE GOLD PROJECT - ACCOMMODATION VILLAGE/ANCILLARY FACILITIES
Accommodation Village/Ancillary Facilities project at 10 km South of, Nullagine, WA 6758 In The Council Area Of East Pilbara of Private. A 120 person accommodation village and ancillary buildings to be constructed. Living units will be both two and four room transportable accommodation units with their own ensuite shower and toilet. Ancillary buildings and facilities to be constructed comprise a dry mess and kitchen including refrigeration and dry storage area, outdoor barbeque area, wet mess inclusive of a small retail facility, laundry facility, recreational room including TV, tea & coffee making facilities, gymnasium, sports court and equipment, resident phone facilities, 5 or 6 person transportable units for short term residents, additional ablutions for recreational areas and short term residential accommodation, LPG facility to provide gas for cooking and hot water systems, truck delivery and turn around area, parking area, transportable site administration office with capacity for approximately 12 offices and first aid facilities, small onsite laboratory to process treatment plant samples, workshop building housing electrical, mechanical and fabrication works, maintenance office and crib room, ablutions to service the site facilities. An onsite diesel power station will be installed by a contractor which will supply the power for the camp. Water will be pumped from bores and stored in water tanks and treated by osmosis processing facility. Sewage from the camp will be pumped into septic tanks into a sewage treatment plant and sewage from the processing plant will be pumped into sceptic tanks and then pumped to leach drains. Click for more details...

BUNGAROO IRON ORE PROJECT - RESOURCE
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Ashburton Council Area for New development. Development comprises trial mining of the Bungaroo deposit for three years starting in third quarter 2007. Resource estimate is 15 Mt of Fe ore. Infrastructure proposed for the site include a crushing and screening plant, new haul road, dewatering pipeline, diesel generators for power supply, fuel storage area, refuelling areas, waste water treatment facilities, communication infrastructure and laydown area. A construction camp is also under consideration. Click for more details...

HALLEYS EAST GOLD PROJECT
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at via Diemals Station Rd 200km north of, Southern Cross, WA 6426. A project based on a Resource Estimate (Inferred) at Halleys East of 678,000 tonnes containing 68,800 ounces (oz) gold. Construction of a haul road to Diemals Station Road for trucking of ore via Menzies to the Greenfields Mill 3km east of Coolgardie for processing. Click for more details...

MESA A/WARRAMBOO IRON ORE PROJECT - CONSTRUCTION CAMP
Currently at the Construction stage In Ashburton is a project estimated to be $ 20000000. This project For the manufacture and installation of an additional 400 rooms and associated facilities. Click for more details...

ADMIRAL BAY PROJECT - EXPLORATION CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at 140km South of, Broome, WA 6725 of Exploration Camp type of New development. To construct a worker's camp to be used for the durationof the exploration project. The works camp is proposed to have 9 x 4 bedroom accommodation units for 36 works. A site office, laundry, kitchen/dining building and a recration building. Septic tanks and leach drains are also going to be installed. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

SOLOMON IRON ORE PROJECT - EXPLORATION CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. For the construction of the exploration camp. Click for more details...

IRON ORE RAPID GROWTH 5 PROJECT - ACCOMMODATION VILLAGE EXPANSION
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. The contract is for the supply of an additional 600 rooms. Click for more details...

SINO IRON ORE PROJECT - ACCOMMODATION VILLAGE
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. For the construction of a 600 man accommodation village facility. The facility comprises accommodation units, staff canteens, a tavern, gymnasium and associated facilities. Click for more details...

PILBARA IRON ORE PROJECT - CHRISTMAS CREEK - CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. The scope of works includes the installations, fit out and commissioning of three-room accommodation modules. Other on site facilities will include a recreation area, football oval, pool, wet mess and kitchen. Click for more details...

RAPID GROWTH 5 IRON ORE PROJECT - RAIL
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Between Port Hedland and, Newman, WA 6753 for New. The works include construction of more than 1 000 camp rooms complete with kitchens and recreation facilities, 1.2 million cubic metres of earthworks, construction of 10 new dual track bridges, laying of all required track to duplicate the existing 200km railway line and installation of 840 km of fibre optic cable. Click for more details...

PANNAWONICA ACCOMMODATION & FACILITIES UPGRADE
Mining - Support Facilities (Accommodation - units, housing, group accom.) Renovations, Refurbishments etc. project at at, Pannawonica, WA 6716. This type is House Refurbishment/Office Refurbishment/Service Station/Workshop with Private ownership. Refurbishment of 233 houses. Upgrade & refurbishment of 19 existing commercial & infrastructure buildings. Construction also of a new service station & light vehicle workshop within the town. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1/PHASE A
Civils/Piping Works/Offices/Roads/Accommodation - Stage 1/Phase A New project In The City Of Karratha Council Area. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages (phases A 7 B) of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Construction of a 920m long jetty & a 2-berth wharf along with new shiploading facilities. Associated piping works expected to include relocation of the natural gas pipeline feeding the Cape Lambert power station, the Cape Lambert landfill site & a transmission line. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Click for more details...

TOM PRICE SINGLE DETACHED HOUSES
A project in the WA Within Ashburton. Works to include construction of 4 x 3 single detached houses on Lot 481 Coolibah Street, Lot 744 Mungarra Street, Lot 239 Kurrajong Street & Lot 97 Oleander Street. Click for more details...

BANROCK DRIVE & GIPPSLAND WAY SINGLE DETACHED HOUSES
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 51 (Lot 7022) & 65 (Lot 7028) Banrock Dr & 15 (Lot 7283) Gippsland Wy, Ellenbrook, WA 6069. This type is Single Detached Houses (3) with State ownership. Works to include construction of 3 single detached houses. Click for more details...

MOUNT MAGNET GOLD OPERATIONS
Resource - Gold New project In The Murchison Council Area. A project based on a Resource Estimate of 41.8 million tonnes (Mt) containing 2.96 million ounces (oz) of gold. Base case production of 520,000t over 6 years. Expansion through cut back of existing pits for production from Mars & Saturn pits for 2 years then eventually from 6 pits. Infrastructure required includes plant upgrade & accommodation camp with messing facilities. Click for more details...

GRUYERE JOINT VENTURE GOLD PROJECT - CENTRAL BORE - ACCOMMODATION CAMP
A project in the WA Within Laverton. For the provision of an accommodation camp containing both temporary & permanent facilities to be located 6km southwest of the process plant. The works will comprise the supply & installation of 600 accommodation rooms consisting of 300 temporary rooms, support services buildings including administration, wet mess & dry mess & 300 permanent rooms. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - TRUNKLINE SECONDARY STABILISATION - ACCOMMODATION OFFSHORE
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Ashburton Council Area for New development. For the provision of offshore accommodation. Click for more details...

MULGA DOWNS IRON ORE PROJECT
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Ashburton Council Area for New development. A direct shipping ore (DSO) project based on the 14 million tonnes (Mt) Murray Hill bedded & detrital ore deposit at the Mulga Downs pastoral station. A single, above watertable open pit (2.5km x 1.8km) worked at a rate of 5 million tonnes per annum (Mtpa) for a life-of-mine (LoM) of 5 years. Conventional drill & blast, excavators & loader methods with ore trucked to a run-of-mine (ROM) stockpile prior to crushing & screening (mobile or modular/skid-mounted plant). Product ore to be trucked along the upgraded, 30km long Fenceline Rd to the Great Northern Highway for haulage 60km to join the proposed Roy Hill Infrastructure Railway by either the Coonarie or Two Camel roads. Associated infrastructure to include waste rock dumps, explosives store, generator power supply with associated double-skinned diesel storage tanks (18 x 110kL) & lined refuelling pads, potable water borefield & turkeys nest storage dam, access roads. A mines operation centre of transportable buildings plus contractor's facilities (offices, amenities, ablutions, fuel storage, refuelling area, heavy & light vehicle workshops, washdown area, laydown areas, parking). Permanent on site accommodation for up to 400 workers fly-in fly-out via Newman. Packaged wastewater treatment plant. Click for more details...

BHP BILLITON WORKER ACCOMMODATION
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Barramine Loop & Limestone St, South Hedland, WA 6722. Construction of 28 x 3, 4 & 5 bedroom detached, single level dwellings. Concrete slab on ground, steel frame, metal or lightweight sheeting walls, metal roof. Click for more details...

NOVA NICKEL PROJECT - ACCOMMODATION CAMP
Accommodation project at 30km north of Eyre Hwy 120km E/NE of, Norseman, WA 6443 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). For the provision of a 492 room permanent village. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - ACCOMMODATION
Accommodation Village - Relocation project at 120km South of, Port Hedland, WA 6721 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). For the provision of the relocation of the Roy Hill Rail Camp 3. The camp will be relocated in 2 stages. Click for more details...

PILGANGOORA LITHIUM PROJECT - ACCOMMODATION CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. For the provision of an accommodation camp. Click for more details...