State

Categories

Sub Categories

Click Here to Find Current Projects

List of Administration facilities Projects


HUNTER VALLEY COAL OPERATIONS - HUNTER VALLEY/HOWICK/LEMINGTON
Office - Alterations & Additions project at Via, Singleton, NSW 2330 In The Council Area Of Singleton of Private. To extend available area. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF - SURFACE BUILDINGS
Tasman Project - Mount Sugarloaf - Surface Buildings is currently at the Construction stage, valued at about $ 1000000 it is Administration, worker amenities and stores, workshop, bunded fuel area. Click for more details...

COAL & ALLIED OPERATIONS
Airconditioner Maintenance For Mobile And Fixed Plant project at Various sites Hunter Valley via, Lemington, NSW 2330 in the Mining - Support Facilities (Administration facilities). Includes professional services for the safe and effective maintenance of air conditioners installed to mobile or fixed plant at the above locations. All works will comply to Coal and Allied safety and standards. The work required will involve planned maintenance, servicing and breakdown repairs. Coal & Allied operates open cut coal mines and coal preparation plants in the Hunter Valley, New South Wales, these being Mount thorley Operations, Hunter Valley Operations ( Howick Hunter Valley and lemington), Warkworth and Bengalla mines. Click for more details...

WORSLEY ALUMINA REFINERY CAPITAL DEVELOPMENT PROJECT
Mining - Support Facilities (Administration facilities) project at Near, Collie, WA 6225 for New. Temporary facilities for construction workers, includes offices, ablutions. Click for more details...

ULAN NO 2 COAL MINE
New project of Mining - Support Facilities (Administration facilities) project at off Cassilis Rd, Ulan, NSW 2850. Concrete slab, steel frame and metal clad walls and roof. Includes air conditioning to offices. Click for more details...

SUNRISE DAM GOLD OPERATIONS
Currently at the Construction stage In Laverton is a project estimated to be $ 1500000. This project Contract includes accommodation village for about 150 personnel, offices and ablution areas. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL INFRASTRUCTURE
Rail Infrastructure New project In The Port Hedland Council Area. Feasibility study has recommended a a 255 km railway line from Cloud Break to Port Headland port facility. A mine load out facility will be located at Cloud Break. There will be four train sets each comprising two locomotives and two hundred wagons. Supporting infrastructure will include sidings, passing bays and loading loops, train loader, temporary construction facilities, temporary track camps, administration offices and warehouses, trip servicing facilities, service and repair workshop, rail maintenance track, rail loops and marshalling yards, maintenance facilities, substations and communication systems. The proposed line does deviate where there are environmental, heritage and engineering constraints. Stage A PER covers the Port and North to South rail line. The Stage B PER covers the East to West rail spur. Click for more details...

ROLLESTON COAL PROJECT - COAL HANDLING/INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) New project at 16km west of, Rolleston, QLD 4702. This type is Crushing & Mine Site Infrastructure with Private ownership. Initial development will be for 6mtpa. Expansion to 8 mtpa allowed for. Click for more details...

TARAWONGA COAL PROJECT - RESOURCE
Resource - Coal project at Maules Creek & Goonbri Rds, 15 km north east of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. The expected mine life between 8 to 10 years, will yield close to 12 million tonnes of export quality low sulphur, low ash, high-energy semi-soft coking coal from the Forest View, Thuin and Nagero properties east of Boggabri (formerley named East Boggabri Coal Project). Click for more details...

PHOSPHATE HILL OPERATIONS
Mining - Support Facilities (Administration facilities) project at Phosphate Hill approx 190 km south east of Mount Isa via, Cloncurry, QLD 4824 for New. Workshop, store & control building. Concrete slab & likely to be metal cladding. Click for more details...

CENTURY ZINC MINE
Buildings project at North west of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. Change-house, workshop, laboratory & administration. 36 week contract period. Click for more details...

BALLERA GAS CENTRE - SOUTH WEST QUEENSLAND GAS PROJECT
Mining - Support Facilities (Administration facilities) project at Ballera, ., QLD 4999 of Electrical Installation For Operations Village/Workshops & Admin. Facilities type of Subcontract development. Includes workshop, offices for permanent camp Click for more details...

DEPARTMENT ENVIRONMENT & HERITAGE
Facilities Plan Consultancy For Accomodation Solutions In The Various Council Area. Facilities plan survey to decide on right accommodation, cost efficient for long term future. Click for more details...

COORANBONG COLLIERY - LIFE EXTENSION PROJECT
New project of Mining - Support Facilities (Administration facilities) project at South west of, Morisset, NSW 2264. Infrastructure to include administration buildings, concrete works, surface workshop, paving, dams, compressor buildings. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Surface Works New project In The Banana Shire Council Area. Includes excavation of box cut. Click for more details...

TARONG NORTH POWER STATION
New project of Mining - Support Facilities (Administration facilities) project at Tarong Rd adjacent to existing power station, Tarong, QLD 4615. Building with office component to include over head crane. Concrete, concrete block, steel cladding & metal roof. Click for more details...

MOUNT ARTHUR NORTH COAL PROJECT
Administration Buildings/Bath House For Industrial Area project at 5 km south of, Muswellbrook, NSW 2333 In The Council Area Of Muswellbrook of Private. Architectural design work complete. Click for more details...

COWAL GOLD PROJECT
Site Office project at North west of, West Wyalong, NSW 2671 In The Council Area Of Bland of Private. Includes the construction/supply of buildings and services required to establish a site office at the Cowal Gold Project. Capabilities required include-supply/fabrication of steel industrial shed, construction management, transportable office accommodation, fencing, electrical, concrete works, sewerage plant and plumbing. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

HUNTLY BAUXITE OPERATIONS - MCCOY MINE RELOCATION PROJECT - ADDITIONS TO OFFICES
North Spur Rd, Pinjarra, WA 6208 Has Huntly Bauxite Operations - Mccoy Mine Relocation Project - Additions To Offices currently at Construction stage. Additional transportable buildings to site. Click for more details...

COLLINGWOOD TIN PROJECT - PLANT/INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) project at 35 km south of, Cooktown, QLD 4871 for New. Water only gravity concentration process. Click for more details...

TWIN HILLS GOLD PROJECT - PERMANENT CAMP
Twin Hills Gold Project - Permanent Camp is currently at the Construction stage, valued at about $ 2000000 it is 40 person camp and associated office building. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - SITE PREPARATION/TEMPORARY FACILITIES
Mining - Support Facilities (Administration facilities) project at Burrup Peninsula north of, Dampier, WA 6713 of Site Preperation/Temporary Facilities Services Contract - Erect type of New development. The contract involves the re-routing of existing roads near the site, the construction of new roads, rundown and drainage culverts. The provision of bulk earthworks. Removal of redundant process plant and structures on the site, the relocation of plant services and utilities. Installation of temporary facilities including security and safety infrastructure, offices, crib rooms and ablution areas. Click for more details...

MOUNT ETNA MINE - PURCHASE & REMOVAL OF OFFICE BUILDING & ASSOC INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) project In The Rockhampton Regional Council Area of Office Building & Assoc Infrastructure - Purchase & Removal type. Purchase and removal of timber and fibro office building and associated infrastructure. Click for more details...

COPPABELLA ACCOMMODATION CENTRE
Mining - Support Facilities (Administration facilities) project In The Isaac Regional Council Area of Mining Camp type. Proposed 558 Units (1200 rooms) accommodation centre to be constructed. Associated infrastructure includes kitchen, dining room, administration rooms, training rooms and car parking. Click for more details...

INDEE GOLD PROJECT - ACCOMODATION/ADMINISTRATION/STORAGE FACILITY
80 Km South west of, Port Hedland, WA 6721 Has Indee Gold Project - Accomodation/Administration/Storage Facility currently at Tenders & Building stage. Construction comprises an accommodation building for 40 persons, ablution block, kitchen/mess facilities, administration building and an equipment storage facility. Click for more details...

NULLAGINE GOLD PROJECT - ACCOMMODATION VILLAGE/ANCILLARY FACILITIES
Accommodation Village/Ancillary Facilities project at 10 km South of, Nullagine, WA 6758 In The Council Area Of East Pilbara of Private. A 120 person accommodation village and ancillary buildings to be constructed. Living units will be both two and four room transportable accommodation units with their own ensuite shower and toilet. Ancillary buildings and facilities to be constructed comprise a dry mess and kitchen including refrigeration and dry storage area, outdoor barbeque area, wet mess inclusive of a small retail facility, laundry facility, recreational room including TV, tea & coffee making facilities, gymnasium, sports court and equipment, resident phone facilities, 5 or 6 person transportable units for short term residents, additional ablutions for recreational areas and short term residential accommodation, LPG facility to provide gas for cooking and hot water systems, truck delivery and turn around area, parking area, transportable site administration office with capacity for approximately 12 offices and first aid facilities, small onsite laboratory to process treatment plant samples, workshop building housing electrical, mechanical and fabrication works, maintenance office and crib room, ablutions to service the site facilities. An onsite diesel power station will be installed by a contractor which will supply the power for the camp. Water will be pumped from bores and stored in water tanks and treated by osmosis processing facility. Sewage from the camp will be pumped into septic tanks into a sewage treatment plant and sewage from the processing plant will be pumped into sceptic tanks and then pumped to leach drains. Click for more details...

PROMINENT HILL GOLD/COPPER PROJECT - MINING CONTRACT
100 Km South East of, Coober Pedy, SA 5723 Has Prominent Hill Gold/Copper Project - Mining Contract currently at Construction stage. Work comprises the extraction of approximately 153 million cubic metres of overburden and waste, and 38 million tonnes of treatable ore over six years. The open pit is expected to be 1.2 kms wide, 1.4 kms long on the surface and 500 metres deep. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE PREPERATION PLANT
Mining - Support Facilities (Administration facilities) project at Cloud Break Mine Site, Pilbara area via, Newman, WA 6753 for New. Ore Preparation Plant (OPP) is to comprise a crushing and screening operations. The facilities include a screen house, crushers, stockpiles and trainloader. The operation will process ore transported by a conveyor firstly to a portable crusher and sizer located at the operating face of the Cloud Break mine. When the ROM ore has been crushed and sized it will be transported via a conveyor to the screener and crusher. Ore will be sorted into super value fines, high grade fines, high grade lump and lower grade ore. The first three types of ore will be conveyed to the train loading station and shipped to Port Hedland. The low grade will be stockpiled for the future when the Christmas Creek Beneficiation Plant is constructed. Operating facilities at the plant will comprise a Sample Tester, Plant/Workshop store, Communication Tower, High Voltage Switchyard, Sewage Treatment Plant, Potable Water Plant including a Water Tank, Temporary Diesel Power Station, Control Room, Workshops, Laboratories, Amenities area, OPP Administration area including a Store, Laboratory, Emergency Response Centre and Administration building, Mining administration area, Car Parks, two Fuel Farms and a Vehicle Washdown Facility including a washdown slab and an oil separator and automated facilities. A desliming plant will also be constructed. Future expansion of the OPP will include a Desand Plant and associated infrastructure. The developer is currently designing the Desanding plant. Click for more details...

ENSHAM CENTRAL UNDERGROUND COAL PROJECT
New project of Mining - Support Facilities (Administration facilities) project at 40 km north east of, Emerald, QLD 4720. A project to extend Ensham's Life-Of-Mine by 20-30 years by expanding into underground mining. Operations at around 7.6 million tonnes per annum (Mt/y) expected initially to be bord & pillar. New surface facilities likely to include access roads, workshop & vehicle servicing facilities, administration building, accommodation camp, washplant, tailings dams, conveyors, coal stockpile areas, coal handling & preparation facilities, ventilation shafts & access boreholes. A new conveyor to connect the underground product coal stockpile to the existing conveyor serving the train loading bin. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Support Facilities (Administration facilities) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION
Mining - Support Facilities (Administration facilities) project at 17km northeast of, Boggabri, NSW 2382 of Operating Mine - Expansion - Stage 2 type of New development. Expansion of existing Boggarbri open cut coal operations. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 1.5 million tonnes per annum (Mtpa) to 2.5Mtpa in 2011 & 4.3Mtpa in 2013. Installation of a new 132kV switchyard/sub-station/overhead power lines. Installation of modular buildings for offices & bathhouse extension. Construction of a light vehicle workshop, a heavy vehicle workshop with warehouse & a car park. 150 construciton jobs expected as well as 500 operational jobs. Click for more details...

ROCGLEN COAL PROJECT - ADMINISTRATION BUILDINGS
Rocglen Coal Project - Administration Buildings is currently at the Construction stage, valued at about $ 1000000 it is For the provision of administration buildings. Click for more details...

DAWSON MINE OFFICE ACCOMMODATION/BATH HOUSE
Mining - Support Facilities (Administration facilities) New project at 10 km north west of, Theodore, QLD 4719. This type is Office Accommodation/Bath House with Private ownership. Construction of office accommodation & bath house amenities. Click for more details...

PATRICIA-BALEEN GAS PLANT UPGRADE
Mining - Support Facilities (Administration facilities) project for New development. For the upgrade to the existing Patricia-Baleen Gas Plant. The works include: installation of a condensate separation and stabilisation system, installation of condensate storage tanks and truck load-out facility, installation of hydrocarbon dew point control facilities for the gas, reconfiguration of the existing compressors to increase compression capacity, upgrade to the sales gas dehydration system to accommodate higher gas rates and minimise glycol carryover, installation of monoethylene glycol (MEG) storage and injection facilities to prevent hydrate formation in the offshore pipeline and selected plant process locations, and associated MEG regeneration facilities. Installation of a corrosion inhibitor injection system for the offshore pipeline, installation of a hot oil heater and hot oil circulation system to provide process heat to the processing facilities, installation of a n"off-gas" compressor to recycle gas vented from the condensate stabilisation system to eliminate operations flaring. Installation of new flare systems and removal of existing flare system, modifications to the drainage system, including a new API Separator and extension of the storm water system. Installation of a water vaporiser to dispose of excess produced water that cannot be reused or naturally evaporates. Modifications to various plant utilities, namely, the fuel gas system, odourisation system, compressed air system and plant process control system. Upgrade of the fire and gas protection facilities including installation of fixed firewater pumps and foam systems. Exte4nsion of office facilities and installation of a laboratory, and the construction of a new workshop/warehouse facility. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Support Facilities (Administration facilities) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Support Facilities (Administration facilities) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

JEEBROPILLY COAL TO LIQUIDS PLANT
Private ownership Mining - Support Facilities (Administration facilities) project In The Ipswich City Council Area for New development. Construction of a proof of concept coal to liquids (CTL) plant at the existing Jeebropilly Coal Mine site. Click for more details...

MAULES CREEK COAL PROJECT - OFFICES & BATHHOUSE
Administration Offices/Bathhouse project at 20km NE of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. For the provision of administration offices & bath house. Click for more details...

DOYLES CREEK COAL PROJECT - MINE SAFETY & TRAINING SCHOOL
Mining - Support Facilities (Administration facilities) project In The Singleton Council Area of Training School type. Establishment of a stand alone mine safety & training school for around 30 staff & 100 students a year. Construction of dedicated surface infrastructure to include a training room, on site accommodation modules for 8 visiting students & a large building to simulate underground mining conditions. Subsequent development to include a separate portal to the West Borehole Seam plus a network of first workings with 20m centre pillars at a rate of 400m a year (8,000 tpa) for more than 21 years. Click for more details...

PORT HEDLAND BHP BILLITON NON-PROCESS INFRASTRUCTURE (PORT NPI) PHASE 1
Mining - Support Facilities (Administration facilities) project In The Port Hedland Council Area of Lubrication Facility/Office, Administration & Stores Buildings - Altn & Addns type. A Port Hedland Inner Harbour project to increase throughput by upgrading existing & construction of new support facilities. Construction of a new lube facility including lube storage & dispensing unit & storage area; a workshop with washdown pad, office & workstations along with an amenities block, traffic management, oily water separation system & bulk diesel storage. Upgrade after removal of some portable buildings of the belt store including new storage/laydown area, high bay belt workshop, portable offices & amenities block, a cool, dry storage facility, light vehicle car park & truck loading yard. Expansion of the existing administration building including offices, conference rooms, open plan work areas, amenities, crib room, tool lockers, secure & public car parking & relocation of the barbecue area. Refurbishment & internal refit of existing crib rooms & amenities at the Nelson Point Crushing Offices as well as the Emergency Services Office. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - SITE OFFICES & TOILETS
Private ownership Mining - Support Facilities (Administration facilities) project In The Ashburton Council Area for New development. For the hire (including installation & tear down) of temporary site offices & associated ablution facilities. Click for more details...

BARALABA COAL OPERATIONS EXPANSION MIA
Mining - Support Facilities (Administration facilities) project at near, Baralaba, QLD 4702 for New. Construction of all infrastructure associated with 20 year expansion for central, south & north pits. To include workshops, wash down area, administration, fuel tanks, water & sewerage treatment & other civil infrastructure. Concrete, structural steel, civil/earthworks, hydraulics & drainage, piling & electrical works. Click for more details...

GROSVENOR COAL PROJECT - MINE INFRASTRUCTURE AREA (MIA)
Support Buildings New project In The Isaac Regional Council Area. Construction of 7 separate buildings to provide support infrastructure. To include workshops, training room, administration buildings, amenities buildings & truck wash area. Concrete slab, steel portal frame, lightweight cladding, metal roof. Click for more details...

STORMONT JOINT VENTURE GOLD PROJECT
Mining - Support Facilities (Administration facilities) New project at off Cradle Mountain Rd west of, Moina, TAS 7306. This type is Resource - Gold with Private ownership. Mining of 80,000t approx of the Stormont skarn-style gold-silver-bismuth deposit to 50m deep using conventional methods (drill & blast, excavators, articulated trucks). Ore to be trucked from a run-of-mine (RoM) stockpile over 130km for processing at BCD's Beaconsfield carbon-in-leach (CIL)/Bacox plant. An on-site mobile crusher may be required in addition to a hydraulic rock-breaker. Associated temporary waste rock dump, office, crib room/amenities, workshop (open ended shed with laydown area) & diesel fuel/oil storage system. Rehabilitation at completion of campaign. Expected employment for 14 people plus truck haulers. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

DUGALD RIVER BASE METAL PROJECT - MINE INDUSTRIAL AREA & PLANT BUILDINGS
Private ownership Mining - Support Facilities (Administration facilities) project In The Mt Isa City Council Area for New development. Construction of Plant & Industrial buildings. Click for more details...

ICHTHYS GAS PROJECT - ONSHORE - SITE FACILITIES BLD1 - CEILINGS PARTITIONS & LININGS SUBCONTRACT
Ceilings/Partitions/Linings - Supply & Install New project In The Darwin City Council Area. Supply, delivery & installation of all new ceilings, partitions & linings to buildings in the gatehouse, operations & warehouse/workshop zones. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - MODULAR BUILDING
Mining - Support Facilities (Administration facilities) project In The East Pilbara Council Area of Modular Buildings type. For the supply & installation of modular buildings. Click for more details...

NOVA NICKEL PROJECT - NON-PROCESS INFRASTRUCTURE
Non-Process Infrastructure project at 30km north of Eyre Hwy 120km E/NE of, Norseman, WA 6443 in the Mining - Support Facilities (Administration facilities). For the provision of non-process infrastructure. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect