List of Administration facilities Projects


HUNTER VALLEY COAL OPERATIONS - HUNTER VALLEY/HOWICK/LEMINGTON
Office - Alterations & Additions project at Via, Singleton, NSW 2330 In The Council Area Of Singleton of Private. To extend available area. Click for more details...

COAL & ALLIED OPERATIONS
Airconditioner Maintenance For Mobile And Fixed Plant project at Various sites Hunter Valley via, Lemington, NSW 2330 in the Mining - Support Facilities (Administration facilities). Includes professional services for the safe and effective maintenance of air conditioners installed to mobile or fixed plant at the above locations. All works will comply to Coal and Allied safety and standards. The work required will involve planned maintenance, servicing and breakdown repairs. Coal & Allied operates open cut coal mines and coal preparation plants in the Hunter Valley, New South Wales, these being Mount thorley Operations, Hunter Valley Operations ( Howick Hunter Valley and lemington), Warkworth and Bengalla mines. Click for more details...

WORSLEY ALUMINA REFINERY CAPITAL DEVELOPMENT PROJECT
Mining - Support Facilities (Administration facilities) project at Near, Collie, WA 6225 for New. Temporary facilities for construction workers, includes offices, ablutions. Click for more details...

TELFER PROJECT
Mining - Support Facilities (Administration facilities) project In The Port Hedland Council Area of Gas Comresor Station/Vent/Offices type. Includes a storage room, control room, workshop,equipment room, foyer, kitchen and toilets, vent stack (5 metres high), turbines, scraper launcher, and other equipment for operation of the gas pipeline. The carpark and manouvering area will be sealed and includes four designated carparking spaces. Click for more details...

ULAN NO 2 COAL MINE
New project of Mining - Support Facilities (Administration facilities) project at off Cassilis Rd, Ulan, NSW 2850. Concrete slab, steel frame and metal clad walls and roof. Includes air conditioning to offices. Click for more details...

TARMOOLA GOLD OPERATIONS
Mining - Support Facilities (Administration facilities) project at 30 km northwest of, Leonora, WA 6438 of Gold Room (Construction) - 3 Levels type of Addition development. Work to mainly involve fabrication & cladding over a 3 level structure. Minimal site works required. Click for more details...

MOUNT TODD GOLD MINE
Mining - Support Facilities (Administration facilities) Addition project at 45 km northeast of, Katherine, NT 0850. This type is Mine - Site Offices - Phase 2 with Private ownership. Contract to construct site offices & ablutions blocks for mine upgrade. Tender expected to involve all site services & electrical requirements. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL INFRASTRUCTURE
Rail Infrastructure New project In The Port Hedland Council Area. Feasibility study has recommended a a 255 km railway line from Cloud Break to Port Headland port facility. A mine load out facility will be located at Cloud Break. There will be four train sets each comprising two locomotives and two hundred wagons. Supporting infrastructure will include sidings, passing bays and loading loops, train loader, temporary construction facilities, temporary track camps, administration offices and warehouses, trip servicing facilities, service and repair workshop, rail maintenance track, rail loops and marshalling yards, maintenance facilities, substations and communication systems. The proposed line does deviate where there are environmental, heritage and engineering constraints. Stage A PER covers the Port and North to South rail line. The Stage B PER covers the East to West rail spur. Click for more details...

ROLLESTON COAL PROJECT - COAL HANDLING/INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) New project at 16km west of, Rolleston, QLD 4702. This type is Crushing & Mine Site Infrastructure with Private ownership. Initial development will be for 6mtpa. Expansion to 8 mtpa allowed for. Click for more details...

TARAWONGA COAL PROJECT - RESOURCE
Resource - Coal project at Maules Creek & Goonbri Rds, 15 km north east of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. The expected mine life between 8 to 10 years, will yield close to 12 million tonnes of export quality low sulphur, low ash, high-energy semi-soft coking coal from the Forest View, Thuin and Nagero properties east of Boggabri (formerley named East Boggabri Coal Project). Click for more details...

MOUNT IDA PROJECT - GOLD RESOURCE
Mining - Support Facilities (Administration facilities) project at Via, Menzies, WA 6436 of Resource - Gold type of New development. Resource estimate for the Baldock, Meteor, Whinnen and Timoni ore bodies is 143,000 tonnes @ 24 g/t for 110,650 ounces of Au. Associated infrastructure includes camp, offices, refurbished shaft and mining equipment. Click for more details...

KALGOORLIE NICKEL SMELTER
A project in the WA Within Kalgoorlie-Boulder. Construction of approximately 2,200 sq m of new administration buildings & a control centre required. Some refurbishment works & all associated services included in this tender. Award anticipated late October 1995. Click for more details...

PHOSPHATE HILL OPERATIONS
Mining - Support Facilities (Administration facilities) project at Phosphate Hill approx 190 km south east of Mount Isa via, Cloncurry, QLD 4824 for New. Workshop, store & control building. Concrete slab & likely to be metal cladding. Click for more details...

BALLERA GAS CENTRE - SOUTH WEST QUEENSLAND GAS PROJECT
Mining - Support Facilities (Administration facilities) project at Ballera, ., QLD 4999 of Electrical Installation For Operations Village/Workshops & Admin. Facilities type of Subcontract development. Includes workshop, offices for permanent camp Click for more details...

COORANBONG COLLIERY - LIFE EXTENSION PROJECT
New project of Mining - Support Facilities (Administration facilities) project at South west of, Morisset, NSW 2264. Infrastructure to include administration buildings, concrete works, surface workshop, paving, dams, compressor buildings. Click for more details...

MOUNT ARTHUR NORTH COAL PROJECT
Administration Buildings/Bath House For Industrial Area project at 5 km south of, Muswellbrook, NSW 2333 In The Council Area Of Muswellbrook of Private. Architectural design work complete. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS
Surface Infrastructure project at via, Texas, QLD 4385 in the Mining - Support Facilities (Administration facilities). Likely to be small scale infrastructure requirements, including demountables. Some demountables are already in place for administration of exploration project. Only 1-2 additional demountables likely to be required. Likely to be sourced locally. NO accommodation requirements, as the project is located only 7 km from Texas. Heap leach operation will require earthworks to prepare leach pads. Likely to be part of mining operation. Click for more details...

COWAL GOLD PROJECT
Site Office project at North west of, West Wyalong, NSW 2671 In The Council Area Of Bland of Private. Includes the construction/supply of buildings and services required to establish a site office at the Cowal Gold Project. Capabilities required include-supply/fabrication of steel industrial shed, construction management, transportable office accommodation, fencing, electrical, concrete works, sewerage plant and plumbing. Click for more details...

NEW BENDIGO GOLD PROJECT - INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) project In The Greater Bendigo Council Area of Infrastructure type. Infrastructure includes upgrading power and dewatering facilities. Surface facilities include a new vent site, security building, workshop, muster room, car parks. A new evaporation pond is to be constructed at Woodvale which is 16 km from the mine. Click for more details...

HUNTLY BAUXITE OPERATIONS - MCCOY MINE RELOCATION PROJECT - ADDITIONS TO OFFICES
North Spur Rd, Pinjarra, WA 6208 Has Huntly Bauxite Operations - Mccoy Mine Relocation Project - Additions To Offices currently at Construction stage. Additional transportable buildings to site. Click for more details...

COLLINGWOOD TIN PROJECT - PLANT/INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) project at 35 km south of, Cooktown, QLD 4871 for New. Water only gravity concentration process. Click for more details...

COPPABELLA ACCOMMODATION CENTRE
Mining - Support Facilities (Administration facilities) project In The Isaac Regional Council Area of Mining Camp type. Proposed 558 Units (1200 rooms) accommodation centre to be constructed. Associated infrastructure includes kitchen, dining room, administration rooms, training rooms and car parking. Click for more details...

INDEE GOLD PROJECT - ACCOMODATION/ADMINISTRATION/STORAGE FACILITY
80 Km South west of, Port Hedland, WA 6721 Has Indee Gold Project - Accomodation/Administration/Storage Facility currently at Tenders & Building stage. Construction comprises an accommodation building for 40 persons, ablution block, kitchen/mess facilities, administration building and an equipment storage facility. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - BULK EARTHWORKS
Bulk Earthworks project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Civil and Concrete Work comprises moving about 1 million cubic metres of dirt. More specifically the construction of the E deposit primary crushing area and mechanically stabilised earth wall (MSE). To construct a 7.5 km long overland conveyor from the E deposit primary crusher to a new Ore Handling Plant 2 (OHP 2), Stockyard 2 located within the rail loop, associated earthworks and heavy vehicle park-up and upgrade of the infrastructure for the operation. This will include office, amenities and waste water services. Click for more details...

COBURN MINERAL SANDS PROJECT - ACCOMMODATION CAMP/OFFICE CONTRACT
New project of Mining - Support Facilities (Administration facilities) project at South of, Hamelin Pool, WA 6532. For the construction of an accommodation camp and office. Click for more details...

NULLAGINE GOLD PROJECT - ACCOMMODATION VILLAGE/ANCILLARY FACILITIES
Accommodation Village/Ancillary Facilities project at 10 km South of, Nullagine, WA 6758 In The Council Area Of East Pilbara of Private. A 120 person accommodation village and ancillary buildings to be constructed. Living units will be both two and four room transportable accommodation units with their own ensuite shower and toilet. Ancillary buildings and facilities to be constructed comprise a dry mess and kitchen including refrigeration and dry storage area, outdoor barbeque area, wet mess inclusive of a small retail facility, laundry facility, recreational room including TV, tea & coffee making facilities, gymnasium, sports court and equipment, resident phone facilities, 5 or 6 person transportable units for short term residents, additional ablutions for recreational areas and short term residential accommodation, LPG facility to provide gas for cooking and hot water systems, truck delivery and turn around area, parking area, transportable site administration office with capacity for approximately 12 offices and first aid facilities, small onsite laboratory to process treatment plant samples, workshop building housing electrical, mechanical and fabrication works, maintenance office and crib room, ablutions to service the site facilities. An onsite diesel power station will be installed by a contractor which will supply the power for the camp. Water will be pumped from bores and stored in water tanks and treated by osmosis processing facility. Sewage from the camp will be pumped into septic tanks into a sewage treatment plant and sewage from the processing plant will be pumped into sceptic tanks and then pumped to leach drains. Click for more details...

PROMINENT HILL GOLD/COPPER PROJECT - MINING CONTRACT
100 Km South East of, Coober Pedy, SA 5723 Has Prominent Hill Gold/Copper Project - Mining Contract currently at Construction stage. Work comprises the extraction of approximately 153 million cubic metres of overburden and waste, and 38 million tonnes of treatable ore over six years. The open pit is expected to be 1.2 kms wide, 1.4 kms long on the surface and 500 metres deep. Click for more details...

MOUNT PORTER GOLD PROJECT - PORTABLE OFFICES
A project in the NT Within Victoria Daly Shire. For the supply of portable buildings for the mine site. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE PREPERATION PLANT
Mining - Support Facilities (Administration facilities) project at Cloud Break Mine Site, Pilbara area via, Newman, WA 6753 for New. Ore Preparation Plant (OPP) is to comprise a crushing and screening operations. The facilities include a screen house, crushers, stockpiles and trainloader. The operation will process ore transported by a conveyor firstly to a portable crusher and sizer located at the operating face of the Cloud Break mine. When the ROM ore has been crushed and sized it will be transported via a conveyor to the screener and crusher. Ore will be sorted into super value fines, high grade fines, high grade lump and lower grade ore. The first three types of ore will be conveyed to the train loading station and shipped to Port Hedland. The low grade will be stockpiled for the future when the Christmas Creek Beneficiation Plant is constructed. Operating facilities at the plant will comprise a Sample Tester, Plant/Workshop store, Communication Tower, High Voltage Switchyard, Sewage Treatment Plant, Potable Water Plant including a Water Tank, Temporary Diesel Power Station, Control Room, Workshops, Laboratories, Amenities area, OPP Administration area including a Store, Laboratory, Emergency Response Centre and Administration building, Mining administration area, Car Parks, two Fuel Farms and a Vehicle Washdown Facility including a washdown slab and an oil separator and automated facilities. A desliming plant will also be constructed. Future expansion of the OPP will include a Desand Plant and associated infrastructure. The developer is currently designing the Desanding plant. Click for more details...

ENSHAM CENTRAL UNDERGROUND COAL PROJECT
New project of Mining - Support Facilities (Administration facilities) project at 40 km north east of, Emerald, QLD 4720. A project to extend Ensham's Life-Of-Mine by 20-30 years by expanding into underground mining. Operations at around 7.6 million tonnes per annum (Mt/y) expected initially to be bord & pillar. New surface facilities likely to include access roads, workshop & vehicle servicing facilities, administration building, accommodation camp, washplant, tailings dams, conveyors, coal stockpile areas, coal handling & preparation facilities, ventilation shafts & access boreholes. A new conveyor to connect the underground product coal stockpile to the existing conveyor serving the train loading bin. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Support Facilities (Administration facilities) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION
Mining - Support Facilities (Administration facilities) project at 17km northeast of, Boggabri, NSW 2382 of Operating Mine - Expansion - Stage 2 type of New development. Expansion of existing Boggarbri open cut coal operations. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 1.5 million tonnes per annum (Mtpa) to 2.5Mtpa in 2011 & 4.3Mtpa in 2013. Installation of a new 132kV switchyard/sub-station/overhead power lines. Installation of modular buildings for offices & bathhouse extension. Construction of a light vehicle workshop, a heavy vehicle workshop with warehouse & a car park. 150 construciton jobs expected as well as 500 operational jobs. Click for more details...

ROCGLEN COAL PROJECT - ADMINISTRATION BUILDINGS
Rocglen Coal Project - Administration Buildings is currently at the Construction stage, valued at about $ 1000000 it is For the provision of administration buildings. Click for more details...

PATRICIA-BALEEN GAS PLANT UPGRADE
Mining - Support Facilities (Administration facilities) project for New development. For the upgrade to the existing Patricia-Baleen Gas Plant. The works include: installation of a condensate separation and stabilisation system, installation of condensate storage tanks and truck load-out facility, installation of hydrocarbon dew point control facilities for the gas, reconfiguration of the existing compressors to increase compression capacity, upgrade to the sales gas dehydration system to accommodate higher gas rates and minimise glycol carryover, installation of monoethylene glycol (MEG) storage and injection facilities to prevent hydrate formation in the offshore pipeline and selected plant process locations, and associated MEG regeneration facilities. Installation of a corrosion inhibitor injection system for the offshore pipeline, installation of a hot oil heater and hot oil circulation system to provide process heat to the processing facilities, installation of a n"off-gas" compressor to recycle gas vented from the condensate stabilisation system to eliminate operations flaring. Installation of new flare systems and removal of existing flare system, modifications to the drainage system, including a new API Separator and extension of the storm water system. Installation of a water vaporiser to dispose of excess produced water that cannot be reused or naturally evaporates. Modifications to various plant utilities, namely, the fuel gas system, odourisation system, compressed air system and plant process control system. Upgrade of the fire and gas protection facilities including installation of fixed firewater pumps and foam systems. Exte4nsion of office facilities and installation of a laboratory, and the construction of a new workshop/warehouse facility. Click for more details...

GREATER GORGON GAS PROJECT AIRPORT TERMINAL BUILDINGS
Mining - Support Facilities (Administration facilities) project at On, Barrow Island, WA 6712 for New. 78500006 Facilities for arrivals, check-in for departures, departures lounge, transfers to and from off-shore helicopters, offshore briefing rooms, quarantine, security screening, uni-comm, pilot and crew meeting and rest rooms. The contract will be Design and Construct with General Arrangement Drawings, Scope of Work and Functional Specifications provided by the Owner.Work included:Detailed design and engineering, Building License Application,Mobilisation to site (site offices by others), Clearing the site, Carry out earthworks and drainage to new grades, Carry out new roadworks and parking areas, Supply and install new terminal building including fit-out, Supply and install external lighting, Supply and install all services to battery limits at boundary of site, Commission and handover the works, Decommission, demolition and removal of existing terminal building to location on Barrow Island as directed by the Owner Demobilisation from site. Click for more details...

GLADSTONE LIQUID NATURAL GAS (GLNG) PROJECT - TEMPORARY SUPPORT BUILDINGS
Temporary Support Buildings project at ., Curtis Island, QLD 4680 in the Mining - Support Facilities (Administration facilities). Construction of temporary support buildings that require a shelf life of 5 years. 20 plant infrastructure buildings including plant offices, medical facility, workshops, store rooms, equipment rooms, crib rooms & recreation rooms. Accommodation camp providing for 1860 persons in 48 pods. Click for more details...

MOUNT COLIN COPPER GOLD OPERATIONS EXPANSION
Mining - Support Facilities (Administration facilities) project at North of Barkly Hwy 50km west of, Cloncurry, QLD 4824 for New. A project located on the Mount Roseby station & based on a resource estimate (indicated, inferred) of 1.9 million tonnes (Mt) containing 50,000t of copper & 26,000 ounces (oz) of gold. Expansion of 130,000tpa open cut operations to 350,000tpa including progressing to new underground workings for an additional 7 year life-of-mine (LoM). Expansion over 18 months of the existing pit using excavators & dump trucks with ore trucked to run-of-mine (ROM) stockpiles prior to trucking by double or triple road trains for off-site processing at the Great Australian Operations Cloncurry. Once the pit is expanded (440m along strike x 220m wide x 170m deep), underground operations (open & backfilled longhole stoping) to commence via a portal to be located within the pit. Workings to include twin boom development jumbos, production drills & ventilation including auxiliary fans & vent ducting in working areas. Underground loaders (boggers) & haul trucks to bring ore from the decline to the surface. Upgrade of the 8.7km unsealed road from the Barkly Highway as well as internal haul & access roads. Water to be sourced from workings dewatering, a surface water management system & truck deliveries to site. Power to continue to be supplied by diesel generators with associated fuel storage. Some 80 operational staff expected to be bussed in from Cloncurry or Mt Isa. Click for more details...

DOYLES CREEK COAL PROJECT - MINE SAFETY & TRAINING SCHOOL
Mining - Support Facilities (Administration facilities) project In The Singleton Council Area of Training School type. Establishment of a stand alone mine safety & training school for around 30 staff & 100 students a year. Construction of dedicated surface infrastructure to include a training room, on site accommodation modules for 8 visiting students & a large building to simulate underground mining conditions. Subsequent development to include a separate portal to the West Borehole Seam plus a network of first workings with 20m centre pillars at a rate of 400m a year (8,000 tpa) for more than 21 years. Click for more details...

BOWEN BASIN ACCOMMODATION VILLAGE PACKAGES
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project Packages for supplier & construction involvement in The Mac's Developed-Owned-Operated accommodation village projects in the Bowen Basin (non-mining sites). To include civil site & road works, accommodation village transportable buildings as well as on site construction of kitchen/dining rooms, taverns, administration & retail facilities. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - SITE OFFICES & TOILETS
Private ownership Mining - Support Facilities (Administration facilities) project In The Ashburton Council Area for New development. For the hire (including installation & tear down) of temporary site offices & associated ablution facilities. Click for more details...

BARALABA COAL OPERATIONS EXPANSION MIA
Mining - Support Facilities (Administration facilities) project at near, Baralaba, QLD 4702 for New. Construction of all infrastructure associated with 20 year expansion for central, south & north pits. To include workshops, wash down area, administration, fuel tanks, water & sewerage treatment & other civil infrastructure. Concrete, structural steel, civil/earthworks, hydraulics & drainage, piling & electrical works. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

DUGALD RIVER BASE METAL PROJECT - MINE INDUSTRIAL AREA & PLANT BUILDINGS
Private ownership Mining - Support Facilities (Administration facilities) project In The Mt Isa City Council Area for New development. Construction of Plant & Industrial buildings. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESSING INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) project for New development. For the development of heavy and light vehicle workshops, a washdown facility, a boilermaker workshop, tyre change facility, lube farm administration buildings and a gatehouse. Click for more details...

ICHTHYS GAS PROJECT - ONSHORE - SITE FACILITIES BLD1 - CEILINGS PARTITIONS & LININGS SUBCONTRACT
Ceilings/Partitions/Linings - Supply & Install New project In The Darwin City Council Area. Supply, delivery & installation of all new ceilings, partitions & linings to buildings in the gatehouse, operations & warehouse/workshop zones. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - DREDGING
Mining - Support Facilities (Administration facilities) project In The Weipa Shire Council Area of Private ownership. For the provision of dredging works for the following locations: Hey River Terminal, Humbug Terminal, Amrun Export Terminal, Berth pocket, & Wharf area. The scope is fully inclusive of all requirements to complete the works in accordance with the contract including mobilisation, any temporary works & navigation aids, any requirements to comply with quarantine or other statutory conditions, & demobilisation. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - MODULAR BUILDING
Mining - Support Facilities (Administration facilities) project In The East Pilbara Council Area of Modular Buildings type. For the supply & installation of modular buildings. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SITE HV AREA
Currently at the Construction stage In East Pilbara is a project estimated to be $ 100000000. This project Construction of various non-process infrastructure buildings for the Roy Hill Iron Ore Mine, comprising three main works zones being Mine Services Area, a Gatehouse and Go-Line Facility and to include HV area. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - MINE & BARGE LOADING INFRASTRUCTURE
35km North of, Mapoon, QLD 4876 Has Bauxite Hills Bauxite Dso Project - Mine & Barge Loading Infrastructure currently at Construction stage. Barge loading facility on the Skardon River for the Bauxite Hills DSO Project. Vessels of between 60,000 to 80,000 t each will be loaded at the transhipment anchorage site. Vessels will be loaded in approximately four to six days with barges having a capacity of between 3500 - 6500t. Mine infrastructure Area (MIA) to include the run of mine (ROM) stockpile, bauxite stockpiles, barge loading, conveyor load point, earthmoving equipment hard park, administration offices, workshops & fuelling facilities. Raw & potable water supply from great artesian basin & shallow alluvial aquifers. Sewage treatment plant. Power requirements sourced from onsite generators located within the MIA. Click for more details...

NORTHERN GAS PIPELINE CONTROL & SWITCHROOM BUILDINGS
Mining - Support Facilities (Administration facilities) New project at Warrego & Mount Isa, ., NT 8999. This type is Control/Switchroom Buildings with Private ownership. For the provision of 2 control room buildings at Warrego & Mount Isa. Click for more details...