List of Administration facilities Projects in WA


BLAIR NICKEL MINE - RESOURCE
Operating Mine project at North of, Kambalda, WA 6442 In The Council Area Of Coolgardie of Private. Resource estimate is 109,000 tonnes of ore @ 5.19% Ni for 5,660 tonnes of contained nickel. Excavation of new decline to access the ore on the 460 level and below. Click for more details...

WORSLEY ALUMINA REFINERY CAPITAL DEVELOPMENT PROJECT
Mining - Support Facilities (Administration facilities) project at Near, Collie, WA 6225 for New. Temporary facilities for construction workers, includes offices, ablutions. Click for more details...

TELFER PROJECT
Mining - Support Facilities (Administration facilities) project In The Port Hedland Council Area of Gas Comresor Station/Vent/Offices type. Includes a storage room, control room, workshop,equipment room, foyer, kitchen and toilets, vent stack (5 metres high), turbines, scraper launcher, and other equipment for operation of the gas pipeline. The carpark and manouvering area will be sealed and includes four designated carparking spaces. Click for more details...

TARMOOLA GOLD OPERATIONS
Mining - Support Facilities (Administration facilities) project at 30 km northwest of, Leonora, WA 6438 of Gold Room (Construction) - 3 Levels type of Addition development. Work to mainly involve fabrication & cladding over a 3 level structure. Minimal site works required. Click for more details...

SUNRISE DAM GOLD OPERATIONS
Currently at the Construction stage In Laverton is a project estimated to be $ 1500000. This project Contract includes accommodation village for about 150 personnel, offices and ablution areas. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL INFRASTRUCTURE
Rail Infrastructure New project In The Port Hedland Council Area. Feasibility study has recommended a a 255 km railway line from Cloud Break to Port Headland port facility. A mine load out facility will be located at Cloud Break. There will be four train sets each comprising two locomotives and two hundred wagons. Supporting infrastructure will include sidings, passing bays and loading loops, train loader, temporary construction facilities, temporary track camps, administration offices and warehouses, trip servicing facilities, service and repair workshop, rail maintenance track, rail loops and marshalling yards, maintenance facilities, substations and communication systems. The proposed line does deviate where there are environmental, heritage and engineering constraints. Stage A PER covers the Port and North to South rail line. The Stage B PER covers the East to West rail spur. Click for more details...

MOUNT IDA PROJECT - GOLD RESOURCE
Mining - Support Facilities (Administration facilities) project at Via, Menzies, WA 6436 of Resource - Gold type of New development. Resource estimate for the Baldock, Meteor, Whinnen and Timoni ore bodies is 143,000 tonnes @ 24 g/t for 110,650 ounces of Au. Associated infrastructure includes camp, offices, refurbished shaft and mining equipment. Click for more details...

KALGOORLIE NICKEL SMELTER
A project in the WA Within Kalgoorlie-Boulder. Construction of approximately 2,200 sq m of new administration buildings & a control centre required. Some refurbishment works & all associated services included in this tender. Award anticipated late October 1995. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

HUNTLY BAUXITE OPERATIONS - MCCOY MINE RELOCATION PROJECT - ADDITIONS TO OFFICES
North Spur Rd, Pinjarra, WA 6208 Has Huntly Bauxite Operations - Mccoy Mine Relocation Project - Additions To Offices currently at Construction stage. Additional transportable buildings to site. Click for more details...

DEFLECTOR COPPER GOLD PROJECT - ACCOMMODATION VILLAGE
Mining - Support Facilities (Administration facilities) project at 150km SW of, Mount Magnet, WA 6638 for New. For the provision of an accommodation village including medical services & administrative management of the mine site & village. Click for more details...

KOOLAN ISLAND IRON ORE PROJECT - WORKSHOP/FUEL SUPPLY/OFFICES
Mining - Support Facilities (Administration facilities) project at On, Koolan Island, WA 6733 for New. The contractor will be required to establish appropriate facilities on site, including workshops, administation offices,laboratory, three fuel storage facilities, explosive magazine, washdown bay and hardstand area. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - SITE PREPARATION/TEMPORARY FACILITIES
Mining - Support Facilities (Administration facilities) project at Burrup Peninsula north of, Dampier, WA 6713 of Site Preperation/Temporary Facilities Services Contract - Erect type of New development. The contract involves the re-routing of existing roads near the site, the construction of new roads, rundown and drainage culverts. The provision of bulk earthworks. Removal of redundant process plant and structures on the site, the relocation of plant services and utilities. Installation of temporary facilities including security and safety infrastructure, offices, crib rooms and ablution areas. Click for more details...

INDEE GOLD PROJECT - ACCOMODATION/ADMINISTRATION/STORAGE FACILITY
80 Km South west of, Port Hedland, WA 6721 Has Indee Gold Project - Accomodation/Administration/Storage Facility currently at Tenders & Building stage. Construction comprises an accommodation building for 40 persons, ablution block, kitchen/mess facilities, administration building and an equipment storage facility. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - BULK EARTHWORKS
Bulk Earthworks project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Civil and Concrete Work comprises moving about 1 million cubic metres of dirt. More specifically the construction of the E deposit primary crushing area and mechanically stabilised earth wall (MSE). To construct a 7.5 km long overland conveyor from the E deposit primary crusher to a new Ore Handling Plant 2 (OHP 2), Stockyard 2 located within the rail loop, associated earthworks and heavy vehicle park-up and upgrade of the infrastructure for the operation. This will include office, amenities and waste water services. Click for more details...

COBURN MINERAL SANDS PROJECT - ACCOMMODATION CAMP/OFFICE CONTRACT
New project of Mining - Support Facilities (Administration facilities) project at South of, Hamelin Pool, WA 6532. For the construction of an accommodation camp and office. Click for more details...

WORSLEY ALUMINA EFFICIENCY & GROWTH PROJECT - CAMP & ACCOMMODATION
New project of Mining - Support Facilities (Administration facilities) project at 15 Km South east of, Collie, WA 6225. Contract includes busing workforce personnel. Camp and Accommodation construction includes civil works, water supply and sewage treatment plant. Accommodation village will comprise of 1000 person accommodation. Click for more details...

NULLAGINE GOLD PROJECT - ACCOMMODATION VILLAGE/ANCILLARY FACILITIES
Accommodation Village/Ancillary Facilities project at 10 km South of, Nullagine, WA 6758 In The Council Area Of East Pilbara of Private. A 120 person accommodation village and ancillary buildings to be constructed. Living units will be both two and four room transportable accommodation units with their own ensuite shower and toilet. Ancillary buildings and facilities to be constructed comprise a dry mess and kitchen including refrigeration and dry storage area, outdoor barbeque area, wet mess inclusive of a small retail facility, laundry facility, recreational room including TV, tea & coffee making facilities, gymnasium, sports court and equipment, resident phone facilities, 5 or 6 person transportable units for short term residents, additional ablutions for recreational areas and short term residential accommodation, LPG facility to provide gas for cooking and hot water systems, truck delivery and turn around area, parking area, transportable site administration office with capacity for approximately 12 offices and first aid facilities, small onsite laboratory to process treatment plant samples, workshop building housing electrical, mechanical and fabrication works, maintenance office and crib room, ablutions to service the site facilities. An onsite diesel power station will be installed by a contractor which will supply the power for the camp. Water will be pumped from bores and stored in water tanks and treated by osmosis processing facility. Sewage from the camp will be pumped into septic tanks into a sewage treatment plant and sewage from the processing plant will be pumped into sceptic tanks and then pumped to leach drains. Click for more details...

YANDI IRON ORE EXPANSION PROJECT - ADMINISTRATION FACILITIES
Mining - Support Facilities (Administration facilities) project at 80 Km North west of, Newman, WA 6753 of Administration Facilities type of New development. An administration facility comprising offices and conference rooms. The building will be airconditioned. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE PREPERATION PLANT
Mining - Support Facilities (Administration facilities) project at Cloud Break Mine Site, Pilbara area via, Newman, WA 6753 for New. Ore Preparation Plant (OPP) is to comprise a crushing and screening operations. The facilities include a screen house, crushers, stockpiles and trainloader. The operation will process ore transported by a conveyor firstly to a portable crusher and sizer located at the operating face of the Cloud Break mine. When the ROM ore has been crushed and sized it will be transported via a conveyor to the screener and crusher. Ore will be sorted into super value fines, high grade fines, high grade lump and lower grade ore. The first three types of ore will be conveyed to the train loading station and shipped to Port Hedland. The low grade will be stockpiled for the future when the Christmas Creek Beneficiation Plant is constructed. Operating facilities at the plant will comprise a Sample Tester, Plant/Workshop store, Communication Tower, High Voltage Switchyard, Sewage Treatment Plant, Potable Water Plant including a Water Tank, Temporary Diesel Power Station, Control Room, Workshops, Laboratories, Amenities area, OPP Administration area including a Store, Laboratory, Emergency Response Centre and Administration building, Mining administration area, Car Parks, two Fuel Farms and a Vehicle Washdown Facility including a washdown slab and an oil separator and automated facilities. A desliming plant will also be constructed. Future expansion of the OPP will include a Desand Plant and associated infrastructure. The developer is currently designing the Desanding plant. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Support Facilities (Administration facilities) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Mining - Support Facilities (Administration facilities) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

GREATER GORGON GAS PROJECT AIRPORT TERMINAL BUILDINGS
Mining - Support Facilities (Administration facilities) project at On, Barrow Island, WA 6712 for New. 78500006 Facilities for arrivals, check-in for departures, departures lounge, transfers to and from off-shore helicopters, offshore briefing rooms, quarantine, security screening, uni-comm, pilot and crew meeting and rest rooms. The contract will be Design and Construct with General Arrangement Drawings, Scope of Work and Functional Specifications provided by the Owner.Work included:Detailed design and engineering, Building License Application,Mobilisation to site (site offices by others), Clearing the site, Carry out earthworks and drainage to new grades, Carry out new roadworks and parking areas, Supply and install new terminal building including fit-out, Supply and install external lighting, Supply and install all services to battery limits at boundary of site, Commission and handover the works, Decommission, demolition and removal of existing terminal building to location on Barrow Island as directed by the Owner Demobilisation from site. Click for more details...

YANDICOOGINA SOUTH IRON ORE PROJECT EXPANSION - JUNCTION SOUTH WEST & OXBOW
Private ownership Mining - Support Facilities (Administration facilities) project In The East Pilbara Council Area for New development. Replacement upon exhaustion of existing open cut locations at Junction Central (JC) & Junction South East (JSE) with 2 replacement pits at Junction South West (JSW) & another further west at Oxbow. Continuation of drill, blast, load & haul methods to extract 320million tonnes (Mt) over a total of 12 years. New Run-of-Mine (ROM) pads & primary crushing & screening plants at JSW & Oxbow prior to overland conveyors taking ore to the existing processing plants at JC. New wet processing plant. New topsoil & subsoil stockpiles as well as out-of-pit waste dumps until space made in pits for backfilling. Reuse of groundwater from pit dewatering for processing with the surplus to be released to Marillana Creek. Associated infrastructure to include access & haul roads, refuelling facilities, extension of existing power & communications, administration buildings & maintenance workshop. Expansion also expected of existing wastewater treatment plants. Floodway across Marillana Creek. Click for more details...

PILBARA TRANSPORTABLE BUILDINGS SUPPLY CONTRACT
New project of Mining - Support Facilities (Administration facilities) project at Pilbara Region, ., WA 6999. Five year contract to construct at least 240 ancillary buildings annually including for administration units, crib rooms, administration units & security offices. Click for more details...

PORT HEDLAND BHP BILLITON NON-PROCESS INFRASTRUCTURE (PORT NPI) PHASE 1
Mining - Support Facilities (Administration facilities) project In The Port Hedland Council Area of Lubrication Facility/Office, Administration & Stores Buildings - Altn & Addns type. A Port Hedland Inner Harbour project to increase throughput by upgrading existing & construction of new support facilities. Construction of a new lube facility including lube storage & dispensing unit & storage area; a workshop with washdown pad, office & workstations along with an amenities block, traffic management, oily water separation system & bulk diesel storage. Upgrade after removal of some portable buildings of the belt store including new storage/laydown area, high bay belt workshop, portable offices & amenities block, a cool, dry storage facility, light vehicle car park & truck loading yard. Expansion of the existing administration building including offices, conference rooms, open plan work areas, amenities, crib room, tool lockers, secure & public car parking & relocation of the barbecue area. Refurbishment & internal refit of existing crib rooms & amenities at the Nelson Point Crushing Offices as well as the Emergency Services Office. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - SITE OFFICES & TOILETS
Private ownership Mining - Support Facilities (Administration facilities) project In The Ashburton Council Area for New development. For the hire (including installation & tear down) of temporary site offices & associated ablution facilities. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESSING INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) project for New development. For the development of heavy and light vehicle workshops, a washdown facility, a boilermaker workshop, tyre change facility, lube farm administration buildings and a gatehouse. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - MODULAR BUILDINGS
Modular Buildings project at 110km north of, Newman, WA 6753 in the Mining - Support Facilities (Administration facilities). For the provision of modular buildings. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - MODULAR BUILDING
Mining - Support Facilities (Administration facilities) project In The East Pilbara Council Area of Modular Buildings type. For the supply & installation of modular buildings. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SITE HV AREA
Currently at the Construction stage In East Pilbara is a project estimated to be $ 100000000. This project Construction of various non-process infrastructure buildings for the Roy Hill Iron Ore Mine, comprising three main works zones being Mine Services Area, a Gatehouse and Go-Line Facility and to include HV area. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - NORTH WEST OPERATIONS SHORE BASE & STAGING FACILITIES
Mining - Support Facilities (Administration facilities) project In The Ashburton Council Area of Private ownership. For the provision of North West Operations Shore Base Facility & North West Operations Staging Facility. Click for more details...

NOVA NICKEL PROJECT - NON-PROCESS INFRASTRUCTURE
Non-Process Infrastructure project at 30km north of Eyre Hwy 120km E/NE of, Norseman, WA 6443 in the Mining - Support Facilities (Administration facilities). For the provision of non-process infrastructure. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - MINE WORKSHOP & OFFICES
Mining - Support Facilities (Administration facilities) project for New development. For the provision of a mine workshop & offices. Click for more details...