State

Categories

Sub Categories

Click Here to Find Current Projects

List of Banks Projects in New South Wales


NATIONAL AUSTRALIA BANK
Commercial Premises (Banks) project In The Sydney Council Area of Bank - Fitout type. Ground floor retail bank fitout & signs. Click for more details...

COMMONWEALTH BANK
Commercial Premises (Banks) project at 324 Griffith Rd, Lavington, NSW 2641 for Addition. Alterations to the partial shopfront & fitout of the existing Commonwealth Bank. Click for more details...

CBA BANK
Bank - Fitout project at 25 (Lot 1) Church St (DP559832), Lidcombe, NSW 2141 In The Council Area Of Auburn of Private. Refurbishment of the CBA Bank. Click for more details...

ANZ BANK
Private ownership Commercial Premises (Banks) project In The Coffs Harbour Council Area for Renovations, Refurbishments etc. development. Fitout of premises for use as a ANZ Bank. Click for more details...

COMMONWEALTH BANK
Commercial Premises (Banks) project In The Fairfield Council Area of Private ownership. Alterations to the existing Commonwealth Bank. Click for more details...

ST GEORGE BANK
Commercial Premises (Banks) Renovations, Refurbishments etc. project at 354 Oxford St, Paddington, NSW 2021. This type is Bank - Refurbishment with Private ownership. Fitout of the existing St George Bank. Click for more details...

TUCKS RD OFFICE - COMMONWEALTH BANK
Commercial Premises (Banks) New project at 7 (Lot 21) Tucks Rd (DP245831), Seven Hills, NSW 2147. This type is Bank - Altns - Conversion Of 2 Industrial Units with Private ownership. Conversion of 2 industrial units into a Commonweath bank. Click for more details...

COMMONWEALTH BANK
Commercial Premises (Banks) project In The The Hills Shire Council Area of Bank - Fitout type. Fitout for bank. Click for more details...

ANZ BANK
Commercial Premises (Banks) project In The Auburn Council Area of Private ownership. Alterations & internal fitout to the ANZ Bank. Click for more details...

ANZ BANK
Anz Bank is currently at the Planning stage, valued at about $ 326000 it is Fitout of ground floor for use as an ANZ Bank. Click for more details...

COMMONWEALTH BANK
Commercial Premises (Banks) Refurbishment project at 1-29 Court Rd, Fairfield, NSW 2165. This type is Bank - Fitout with Private ownership. Fitout of the existing Commonwealth Bank. Click for more details...

ANZ BANK DEE WHY
Bank - Fitout project at 880 (Lot 39) Pittwater Rd (SP76355), Dee Why, NSW 2099 in the Commercial Premises (Banks). Fitout of existing vacant ground floor tenancy for ANZ Bank. Proposed works will comprise new partitions, fixtures, fittings & finishes; new suspended plasterboard and grid ceilings throughout; new light fittings; modifications to existing services to suit new layout; alterations to shop including removal of existing concrete and glazed partitions and installation of new full height aluminium framed glass shopfront and automatic sliding door entry; installation of ATM unit to front of tenancy; and relocation of existing disabled unisex sanitary facility to new location within tenancy. Click for more details...

BANKWEST CARINGBAH
Bank - Fitout project at 355-359 Kingsway, Caringbah, NSW 2229 In The Council Area Of Sutherland of Private. Fitout of existing office for use as bank. Click for more details...

ANZ BANK
Anz Bank is currently at the Construction stage, valued at about $ 300000 it is Use of premises as an ANZ bank including associated fitout. Click for more details...

VICTORIA ST BANK
Victoria St Bank is currently at the Construction stage, valued at about $ 265000 it is Proposed fitout and use of existing 1st floor, suite 101 for a banking office facility. Click for more details...

ING DIRECT CUSTOMER INFORMATION CENTRE
Commercial Premises (Banks) project for Renovations, Refurbishments etc. development. Refurbishment works to the ground floor lobby area to create a new security entry, a reception & waiting area & a customer information centre for "ING Direct" Click for more details...

ANZ BANK HUSKISSON
Commercial Premises (Banks) Renovations, Refurbishments etc. project at 57 (Lot 36) Owen St Level 2, shops 1 & 2 (DP1091643), Huskisson, NSW 2540. This type is Bank - Fitout with Private ownership. Commercial fitout of ANZ Bank to occupy shops 1 & 2 within a new development. The extent of works are to provide a new banking branch. Install new single glass sliding entry door, a new ATM machine and signage to the shopfront on the southern building facade. Within the branch there shall be 3 tellers including the cash area, sales and interview rooms, utility room, lunch and common areas. The scope of works shall also include all services modifications to facilitate the fitout, electrical, hydraulic, voice and data installations, mechanical and fire services. Building materials will comprise of walls of steel frame and brick, concrete frame and floors. Click for more details...

NAB HOUSE
Commercial Premises (Banks) project for Renovations, Refurbishments etc. development. Refurbishment of ground floor lobby and reconfiguration of existing NAB building, relocation of cafe, new mezzanine and sections of the facade. Demolition of existing amenities and construction of cyclist amenities in basement. The proposed development comprises: demolition of the existing amenities at basement, level 1, the existing ground floor and mezzanine floors and associated structures, parts of the ground floor façade and awning. Refurbishment of the ground floor lobby including reconfiguration of the existing NAB tenancy (not including fitout), relocation of the existing café, provision for a new café and preparation area, a new mezzanine and sections of the façade. Construction of new garbage room, cyclist parking and cyclist amenities in basement level 2 and reinstatement of parking in basement Level 1. A total of 132 bicycle parking spaces are to be provided on the site and car parking provision will be reduced by 6 spaces. Click for more details...

COMMONWEALTH BANK - MANLY
Bank - Refurbishment - 2 Storey project at 29-31 The Corso, Manly, NSW 2095 in the Commercial Premises (Banks). Refurbishment of existing Commonwealth Bank. This will include alterations to the ground floor shopfronts including removal of the automatic teller machines and installation of glazing and reconfiguration of shopfronts associated with the awning. The internal refurbishment will involve the new fit out to current CBA standards. The works will include provision of new internal walls and joinery. New signage will be provided. Click for more details...

WESTPAC BANK WESTMEAD
Commercial Premises (Banks) project for Renovations, Refurbishments etc. development. Demolition of existing shop-front entry and construction of new automatic sliding doors. New branch ground floor fitout includes full internal fitout with plasterboard lined walls & plasterboard doors, equipment and furniture, staff room, meeting rooms, secured teller counters installation of new flooring finishes, refurbishment of toilet facilities and installation of ATM. Signage & glazing graphics. Installation of digital CCTV cameras, internally & externally. Click for more details...

ANZ BANK GEORGE ST
A project in the NSW Within Sydney. Use and fit out of tenancies 2 & 3 (ground floor and mezzanine level) as an ANZ bank branch including internal fitout, external signage & 2 external ATM machines. Ground floor consists of 360.2sq m & the mezzanine level 90.1sq m. Works comprise new floor finishes, new wall finishes, new set plasterboard ceiling and ceiling tiles, new tellers, workstations, offices, enquiries desks, ATM Bunker, cash count, access toilet, break room, storage and communications room, partial removal of existing shopfront, to be replaced by new framed glass shopfront with auto clear glass sliding entry doors. Click for more details...

ANZ BANK GEORGE ST
Currently at the Construction stage In Sydney is a project estimated to be $ 500000. This project Fitout of tenancies 2 & 3 (ground floor & mezzanine level) as an ANZ branch. Internal fitout includes the installation of partition walls, staff kitchenettes, toilets, utilities, new sliding glass entry doors, equipment & furniture. External works include signage & installation of 2 ATMs. Click for more details...

NATIONAL AUSTRALIA BANK GEORGE ST
Commercial Premises (Banks) project at 243-257 George St (ground floor), Sydney, NSW 2000 for Renovations, Refurbishments etc.. Fitout of new National Australia Bank express bunker on the ground floor comprising ATM's, glazing & associated signage at the Grosvenor Street elevation. Click for more details...

WESTPAC BANK HURSTVILLE
Commercial Premises (Banks) project In The Hurstville Council Area of Bank - Altns & Addns type. Alterations & additions to heritage item - extend internal first floor mezzanine & minor external works Click for more details...

WESTPAC NORWEST
Renovations, Refurbishments etc. project of Commercial Premises (Banks) project at 4 Century Cct, Baulkham Hills, NSW 2153. Upgrade of existing Westpac tenancy involving new glazed shopfront & internal refiguration to provide additional customer service facilities, including 5 new sales/interview offices & a relocated back of house office area, upgrade of finishes throughout. Click for more details...

WESTPAC BANK - PARRAMATTA
Commercial Premises (Banks) Addition project at 126 Church St, Parramatta, NSW 2150. This type is Bank - Altns & Adds with Private ownership. Alterations & additions to Westpac Bank Click for more details...

NATIONAL AUSTRALIA BANK HAYMARKET
Private ownership Commercial Premises (Banks) project In The Sydney Council Area for Renovations, Refurbishments etc. development. Fitout of former Chinatown cellars in the Aarons Hotel development & use as retail tenancy for NAB bank. Works involve installation of new shopfronts, internal fitout, associated services, changes to facade & new signage. Click for more details...

ST GEORGE BANK DEE WHY GRAND PLAZA SHOPPING CENTRE
Renovations, Refurbishments etc. project of Commercial Premises (Banks) project at 834 (Lot 1) Pittwater Rd (DP1146740) (Shops 12 & 13), Dee Why, NSW 2099. Fitout of Shops 12 & 13 for a new St George Bank. Works comprise construction of plasterboard partition walls & joinery, new plasterboard ceiling, shopfront glazing. Click for more details...

WESTPAC ALBION PARK
Commercial Premises (Banks) project at 131 Tongarra Rd, Albion Park, NSW 2527 for Renovations, Refurbishments etc.. Alterations and additions to the ground floor of the existing premises. Tenancy fitout of part of the premises for retail banking. Click for more details...

WESTPAC BANK HAYMARKET
Bank - 3 Storey - Refurbishment project at 671-675 George St, Haymarket, NSW 2000 in the Commercial Premises (Banks). Internal refurbishment and building upgrade to existing Westpac Bank. External works comprise upgrade of paintwork to upper walls & windows. Ground floor works comprise cosmetic work, new carpets, paintwork & joinery items. First floor works comprise removal of teller line & addition of new sales offices & waiting area. works to second floor comprise rearranged office space. slaes office & reduced size training area, with new carpets, paint & ceilings. Click for more details...

CBA TOUKLEY
Commercial Premises (Banks) project In The Wyong Council Area of Bank - 2 Storey - Altns & Addns type. Alterations & additions to existing Commonwealth Bank to current CBA standards & corporate image. External work includes demolition of part of the existing shop front & the construction of a new shop front & entry with new framed safety glass automatic doors. Other external work consists of cleaning the existing brickwork & tiles, new paint to the existing awnings, reparation of the existing louvres & new signage to the whole building. Internal work includes renovation of the interior & a new fitout with new partitioning, walls & joinery, new carpeting & new vinyl flooring & upgrading of the existing facilities. Click for more details...

COMMONWEALTH BANK MARTIN PLACE - MACQUARIE GROUP
Commercial Premises (Banks) project In The Sydney Council Area of Private ownership. Refurbishment works to the former Commonwealth Bank Building including internal restoration & renovation work & rooftop addition. Building will target the following sustainability ratings: 5 Star NABERS Energy & 5 Star Green Star Office As Built v3, the building has also been designed with the potential to achieve 6 Star Green Star subject to specific tenant requirements. The proposal includes works to the 2 basement levels, retail banking chamber, grand hall, lift lobby, office levels, atria, & roof. Works to the lower basement include new stairs & lift lobby; reconfiguration of existing service area; new lavatories & change rooms; & installation of a Green Star recycled waste area. Works to upper basement include: creation of secure cycle storage area; reinstatement of the original access path from Castlereagh St to banking chamber & safe custody area; refurbishment of lift core, provision of new lifts; creation of office entrance vestibule; & installation of new shuttle lift & goods lift. Works to the banking chamber include: removal of the 1980?s marble stair; adapting northern end of banking chamber for lobby & reception for office tenancies in upper levels; modification of lift & services area to accommodate new lifts; installation of speed stiles & security devices; smoke separation between banking chamber & grand hall in existing openings, these works include reconstruction of bronze-framed pivoting doors; & compliance modification of disabled ramp & stairs. Works to grand hall largely relate to BCA compliance to include: installation of glazed smoke screening between grand hall & the banking chamber; installation of frameless glass security doors on the north eastern & north western stair landings at level 1; removal of concrete slab above leadlight glazed section of vaulted ceiling. Works to the Castlereagh St lift lobby include: retention of existing access & reinstatement of original access to the banking chamber & safe deposit area; reconstruction of original south wall; installation of frameless structural glass mezzanine bridge above lift lobby to provide direct access from the banking chamber to lifts; creation of new openings. Works to the office levels include: demolition of all office, storage & staff amenity fabric introduced from the 1980s & later, including additions to the fire stair in the south eastern corner of the building; installation of new raised service floors on levels 1-9; reconfiguration of plant & services on level 1, new plant room is to be constructed at the northern end of the tenancy space, flanked by new male & female toilets, the atrium is to be extended into level 1 & the opening to the laylight above the banking chamber reconstructed; new lavatories on levels 1-9; modification of service area & goods lift; removal of existing suspended ceilings; installation of new mechanical services that include chilled beams & displacement air supply through a new access floor; installation of new fire safety equipment; construction of small service riser; installation of a stair at northern end of atrium linking levels 9-10. Works to roof terrace involve:partial demolition of services structure; replacement of pavers; installation of glazed walls/doors/mechanical services plant. Click for more details...

GREATER BUILDING SOCIETY
Bank - Altns & Addns project at 238 Summer St & Colvin Ln, Orange, NSW 2800 In The Council Area Of Orange of Private. Alterations & additions to the existing Greater Building Society. Click for more details...

NAB BANK LANE COVE
Bank - Fitout project at 2 Lane Cove Plz, Lane Cove, NSW 2066 in the Commercial Premises (Banks). Refurbishement & full fitout of existing 2 storey bank including new corporate signage. Steel walls with curtain glass, concrete floor & steel frame. Click for more details...

ANZ BANK ULLADULLA
Commercial Premises (Banks) project for Renovations, Refurbishments etc. development. Internal fitout of a retail bank within an existing mixed use development. Associated corporate signage. Plasterboard & glass walls, timber, steel & aluminium frame. Click for more details...

BANK OF WESTERN AUSTRALIA SYDNEY
Currently at the Construction stage In Sydney is a project estimated to be $ 648000. This project Change of use & fit out of ground floor shop as a retail bank including shop-front alterations. Work includes removal of internal partition walls, replacement of existing doors with new bi-sliding doors, removal of existing glazing & auto sliding doors to the shop-front & the installation of new aluminium composite clad doors, removal of internal floor tiles & a new floor finish, relocation of 2 internal water supply points & new 24 hour access lobby. Clear glazing along the front boundary, ACM2 wall cladding. Associated singage. Click for more details...

NATIONAL AUSTRALIA BANK BELMORE RD RANDWICK
Private ownership Commercial Premises (Banks) project In The Randwick Council Area for Renovations, Refurbishments etc. development. Refurbishment of existing bank including new internal fitout & shop front. Click for more details...

COMMONWEALTH BANK GOSFORD
Commercial Premises (Banks) project In The Gosford Council Area of Private ownership. Alterations & fitout of an existing commercial building for use as a Commonwealth Bank branch in tenancy 1 & business banking branch in tenancy 2. Work comprises demolition of existing internal walls, doors & front entry. Fitout work consist new shop front entry, partition walls, secure back of house & staff kitchen & amenities. New benches, desks, cupboards, working stations & customer waiting areas. New corporate signage. Click for more details...

GREATER BUILDING SOCIETY
Greater Building Society is currently at the Construction stage, valued at about $ 335000 it is Alterations & additions to the existing Greater Building Society Click for more details...

WESTPAC CHATSWOOD
Commercial Premises (Banks) project at 425 Victoria Av, Chatswood, NSW 2067 for Addition. Alterations to the ground floor of an existing 2 storey bank building. The work includes removal of the existing ATMs & replacement with new ATMs, removal of existing window blinds, demolition of the existing floor finish & make good, existing CDM to be relocated & make good existing wall area, relocation of existing banking kiosks, demolition of part of the existing shopfront & automatic door & replace with new glazed auto-door & new dynamic door to operable wall, new plasterboard ceiling & upgrade of lighting, new wall tile cladding to external wall, new internal partitioning, new floor tiles to ramp, relocate existing greeter desk & associated furniture & relocation of waiting room furniture. New corporate signage. Click for more details...

COMMONWEALTH BANK NEUTRAL BAY
202-212 (Lot 1) Military Rd (DP802102) (Shop 12A), Neutral Bay, NSW 2089 Has Commonwealth Bank Neutral Bay currently at Construction stage. Alterations to existing premises change of use to bank branch. demolition of brick wall, plasterboard wall, & partition walls. Demolition of step up slab to level entire slab; new shopfront with recess; new ATM facilities; provision of staff room, self service area with after-hours lobby, sales rooms, accessible WC & waiting room area. Click for more details...

COMMONWEALTH BANK ORAN PARK TOWN CENTRE
Currently at the Construction stage In Camden is a project estimated to be $ 575000. This project Internal & external alterations & additions & internal fitout of an existing commercial premises for use a bank. Signage. Click for more details...

VICTORIA AV COMMERCIAL BUILDING & ST GEORGE BANK
Commercial Premises (Banks) Addition project at 366-368 (Lot 12) Victoria Av (DP740145), Chatswood, NSW 2057. This type is Commercial/Bank - 4 Storey - Altns & Addns with Private ownership. Alterations & additions to existing commercial building. An additional one & a half levels of commercial floor space is proposed to be provided with associated upgrades & new lift. Minor demolitions to the existing building are proposed to be undertaken as part of the alterations. The demolition works are predominantly internal with the exception of the removal of the structures located on the roof & existing louvers on the front elevation. Ground level works comprise new lift; replacement of existing ATM with lift lobby; installation of additional ATMs in an internal lobby area; new staff lunch room; garbage storage area at the rear. First floor: installation of partitioning on the first floor level to create 2 suites; proposed Suite 2 is part of existing bank with internal existing stair access; new plant room; installation of a new lift & upgrade of the existing toilets; new internal fire passage. Second floor: extension of second level to provide additional commercial floor space; removal of existing plant room; addition of a new plant room & new toilets; installation of new lift & internal fire passage; addition of a balcony at the front. Third Floor: addition of an entire level of commercial floor space; installation of a new lift & internal fire passage; addition of a new plant room & new toilets; addition of new balconies at the front & rear. Alucobond clad walls, anodised aluminium framed windows, frameless glass balustrade with aluminium handrail. Click for more details...

CBA HIGHLANDS MARKETPLACE
Renovations, Refurbishments etc. project of Commercial Premises (Banks) project at 193-203 (Lot 1) Old Hume Hwy, Shop T25 (DP1142703), Mittagong, NSW 2575. Alterations and additions to shop T25 Highlands Marketplace. External works; demolish and replace existing glass shopfront, replace main entrance auto door, install illuminated wall logo, install locality graphic, paint and clad parts of primary frontage facade, install ATM. Internal works; strip out existing fitout, install a full height internal wall to create 2 tenancies. Fit out of western tenancy as CBA bank branch, after hours lobby, teller counter, self service area, sales waiting area, offices, staff room and WC. Click for more details...

ST GEORGE BANK HAYMARKET
Bank - Altns & Addns Renovations, Refurbishments etc. project In The Sydney Council Area. Alterations & additions to an existing bank tenancy for modification to the existing shop front & secondary entry & refurbishment & modifications of the internal ground floor layout to include the creation of a 24 hour ATM area. The work includes new pedestrian entry comprising automated sliding glass doors, fixed glazing in front of secure wall at the existing entry, replacement of glazing section with tiled wall, provision of 6 internal ATM's to be separated by a secure stackable door for after hours use. New signage. Click for more details...

COMMONWEALTH BANK
Private ownership Commercial Premises (Banks) project In The Sydney Council Area for Renovations, Refurbishments etc. development. Internal & external alterations to the ground & first floor of the existing bank tenancy, including new fitout, internal extension of mezzanine, replacement of shopfront sections. Internal works comprise remodeling of the internal fitout; increasing the level 1 floor area to facilitate additional banking services; new finishes throughout; entryway to be remodeled to provide increased accessibility. External works include removing the current shopfront sections & replacing with new entry & shopfront; installation of external ACM cladding in Commonwealth Bank of Australia corporate colors; installation of new compliant glazed entry doors & sidelights. Click for more details...

BANK OF SYDNEY MAROUBRA
Bank - Fitout project at 205 Maroubra Rd (shops 3 & 4), Maroubra, NSW 2035 in the Commercial Premises (Banks). Fitout of ground floor shops 3 & 4 as a bank (8 storey residential above). Works will comprise internal fitout including ceilings, walls, floor finishes, joinery room, meeting room & services. Click for more details...

BROKEN HILL COMMUNITY CREDIT UNION
Renovations, Refurbishments etc. project of Commercial Premises (Banks) project at 2 Chloride St, Broken Hill, NSW 2880. Refurbishment & fitout to existing Credit Union. Scope of work includes: interior demolition & construction of approximately 1,300sq m to existing offices & customer service area. New mechanical plant to entire area. Upgrade to electrical services & banking equipment Click for more details...

HUME BANK
Commercial Premises (Banks) Addition project at 492 Oliver St (Lot 1 DP1194110), Albury, NSW 2640. This type is Bank - Altns & Addns with Private ownership. Alterations & additions to the existing bank premises to include, refurbishment of the ground floor service centre. Internal walls & ceiling to be removed & reconfigured. Existing air conditioning facility to the ground floor is to be upgraded & configured to the new layout. Northern boundary wall glazed roof is to be up-graded with double glazing & enhanced framing. Click for more details...

WESTPAC BANK ORANGE
Commercial Premises (Banks) Renovations, Refurbishments etc. project at 195 Summer St, Orange, NSW 2800. This type is Bank - Altns & Addns with Private ownership. Proposed minor alterations & additions to the existing bank premises. Signage update. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect