State

Categories

Sub Categories

Click Here to Find Current Projects

List of Bridges, Aqueducts, Viaducts Projects


RINGWOOD RAILWAY STATION AND BUS INTERCHANGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Design and construction of Ringwood Station and Interchange. The existing historic brick station building nearest to Eastland Shopping Centre will be maintained, but other structures will be replaced with buildings sympathetic to Ringwood's heritage but with modern facilities. The upgrade includes; new station forecourt, heritage works on historic buildings; new shelter, lighting, seating, upgraded toilets, lifts and improved CCTV coverage. Maroondah Highway upgrades include: improved pedestrian crossing, landscaping, bicycle lanes and bus bays, wider signalised pedestrian crossing, short-term and special purpose parking. Station Street Upgrades include: improved footpath between Wantirna Road and the new footbridge along Station Street, new kiss and ride drop-off area. Materials; concrete, metal cladding, glazing, pavers. Click for more details...

MAIN ROADS WA - STRUCTURAL BRIDGE DESIGN SERVICES (SOUTH)
Civil Engineering (Bridges, Aqueducts, Viaducts) New project at Offices at Perth, Albany, Bunbury & Narrogin, ., WA 6999. This type is Structural Bridge Design Services - Period Contract with State ownership. Contract for provision of structural bridge design services to Main Roads Perth Metropolitan offices & to regional offices at Albany, Bunbury & Narrogin for two-year period. Click for more details...

REVESBY RAILWAY STATION - TURNBACK
Currently at the Construction stage In Bankstown is a project estimated to be $ 78000000. This project The project would call for a new track, turnback & crossover & new island platform. Easy access facilities including 3 lifts, new pedestrian footbridge, retaining walls, lighting, CCTV & embankment widening to support the new track & new bridge at the River Road to accommodate the new track Click for more details...

DEPT OF TRANSPORT
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Patawalonga Creek & RN5833 Tapleys Hill Rd, West Beach, SA 5024 for New. Roadworks, bridge over Brownhill Creek & causeway construction. Click for more details...

SOUTH EAST HIGHWAY - MAJOR IMPROVEMENTS (NEW ALIGNMENT)
Subcontract project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at South East Hwy (Glen Osmond - Crafers) Adelaide Plains, Adelaide, SA 5152. Post tensioning for bridge & underpass for 4.7 km approx x new route construction & 3.6 km x realignment & widening. Click for more details...

ORRONG ROAD/LEACH HIGHWAY INTERSECTION - OVERPASS
State ownership Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Canning Council Area for Addition development. Works comprise of construction of diamond interchange on Leach Hwy at Orrong Rd in Welshpool. Click for more details...

WATERFORD VALLEY/THE TERRACES
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Both stages of retirement village being built concurrently. Stage 1 - 9 dwellings. Stage 2 - 22 dwellings carparking and bridge. Click for more details...

F6 CORRIDOR
A project in the NSW Within Various. F6 corridor to run from St Peters to Loftus via Tempe, Kyeemagh, Banksia, Rockdale, Brighton Le Sands, Kogarah, Monterey, Ramsgate, Sans Souci, Sandringham, Taren Point, Miranda, Gymea & Kirrawee. Click for more details...

GOONGOONGUP (BUNBURY) RAIL BRIDGE
Over the Swan River from Burswood to, East Perth, WA 6004 Has Goongoongup (Bunbury) Rail Bridge currently at Construction stage. Approximately 2,560 narrow gauge prestressed concrete railway sleepers complete with fastening components to suit 50 kg/m rail, in insulated track. Click for more details...

ASHBURTON RIVER BRIDGE (BRIDGE 1565)
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Ashburton Council Area of Bridge/Road - Materials Technician Services type. Provision of materials technician services for Major Works Contract 1510/02 - Bridge 1565 over Ashburton River at Nanutarra & 2.5 km of roadworks, including realignment of North West Coastal Hwy from 1.7 km south to 0.8 km north of Ashburton River. Click for more details...


Civil Engineering (Bridges, Aqueducts, Viaducts) Supply & Install project at adj MR386 Moulamein Rd McKenzies Creek, Wakool, NSW 2710. This type is Bridge Units (12) - Supply & Deliver with Local Govt ownership. 12 precast pretensioned super-tee bridge units each 20,000 long x 2,000 wide (top flange). Click for more details...

DOMESTIC TERMINAL
Federal ownership Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Botany Council Area for New development. Elevated road 1100m long. 2 Cable stayed bridged with main spans of 105m approx. Click for more details...

MAWSON LAKES
Bridge For Commercial/Industrial/Residential Development - Stage 1b4 New project In The Salisbury Council Area. 1 x 60 m approx span bridge. Click for more details...

STINGRAY CREEK BRIDGE
Bridge New project In The Port Macquarie-Hastings Council Area. Construction of a new bridge across Stingray Creek, North Haven. The proposed bridge consists of a new 190 metre long, 2 lane, single carriageway crossing just north of the existing bridge. Once the bridge is built the original bridge will be demolished Click for more details...

SHELL CORNER DEVIATION
Roadworks project at Great Western Hwy between Albion St & Watson Way, Katoomba, NSW 2780 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Road deviation, comprising construction of 1.2 km. Work includes: earthworks; stormwater drainage; pavement; kerbing; pavement marking; signposting; design/construct of reinforced soil walls; construction of bridge over Main Western Railway Line; construction of bridge over Highway; construction of bridge over railway line at Medlow Bath, 4 km west of Shell Corner with associated roadworks; adjustments to local roads. Bridge construction must be carried out by contractors prequalified at B5. Pretensioned concrete component to be carried out by contractor prequalified at CR. Click for more details...

COLLINS BRIDGE
Kamilaroi Hwy (State Hwy 29), Wee Waa, NSW 2388 Has Collins Bridge currently at Construction stage. New bridge to replace existing Collins Bridge over Namoi River. 3 x 30.0 metres spans of modified Super-T girders composite with reinforced concrete deck. Single reinforced concrete columns, supported on reinforced concrete piles substructure, with headstocks. Bridge of 45 degree screw. Click for more details...

CITY BEACH TO FLOREAT BEACH DUNE BOARDWALK
City Beach To Floreat Beach Dune Boardwalk is currently at the Construction stage, valued at about $ 350000 it is Works comprise construction of raised pedestrian boardwalk through dunes that would link City Beach carpark with Floreat Beach carpark. Boardwalk would incorporate raised timber decking with handrails & minimum width of 2 m & would allow for disabled access. Approximate length is 220 m. Click for more details...

SHIRES OF TOODYAY & CHITTERING BRIDGE REFURBISHMENT
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Locations within Wheatbelt North Region, ., WA 6999 for Renovations, Refurbishments etc.. Works comprise of refurbishment of bridges no 4030 & 4089 with reinforced concrete overlay. Click for more details...

UPPER COLO ROAD BRIDGE
A project in the NSW Within Hawkesbury. Replacement of road bridge over Wheeney Creek. Click for more details...

BLAKEHURST PEDESTRIAN BRIDGE
Pedestrian Bridge New project In The Kogarah Council Area. Construction of a single span prestressed concrete super-T girder structure over Princes Highway adjacent to Blakehurst Public School. Project includes design, installation and commissioning of one lift and minor roadworks. The precast concrete component of the works must be performed by a contractor prequalified at Pretensioned Concrete Class CC and construction of the form work component of the work must be carried out by a contractor registered with the RTA at Class F or preqaulified for bridgeworks Click for more details...

PACIFIC HIGHWAY UPGRADE - TINTENBAR TO EWINGSDALE
Civil Engineering (Bridges, Aqueducts, Viaducts) New project at Pacific Hwy from Tintenbar to, Ewingsdale, NSW 2481. This type is Roadworks with State ownership. Proposed upgrade of approximately 17 km, starting at Ross Lane in Tintenbar & extending north to the existing Ewingsdale interchange, near the settlement of Ewingsdale. At Ross Lane, the proposed upgrade would connect to the north end of the proposed Ballina bypass. The proposed upgrade includes: Four-lane divided carriageways (2 lanes each way), with a wide median allowing for the future addition of a third lane in each direction. Connection to the northern end of the Ballina bypass at the proposed Ross Lane interchange. A new northbound on-ramp & a new southbound off-ramp would be provided. The remainder of this interchange will be constructed as part of the Ballina bypass project. Upgrading of the existing Ewingsdale interchange to provide full access between the modified local and regional road network & the highway. A half interchange at Ivy Lane. North-facing ramps would provide access between the local road network and the proposed upgraded highway to the north. A half interchange at Bangalow. South-facing ramps would provide access between the local road network, including to Bangalow and Lismore & the proposed upgrade to the south. This arrangement would replicate the arrangement with the existing Bangalow bypass which also has south-facing ramps only. Six twin bridges & 4 underpasses allowing roads and creeks to pass underneath the proposed upgrade. These would include twin bridges above Byron Creek and the existing Casino-Murwillumbah railway on the north side of Byron Creek. Two bridges carrying local roads over the proposed upgrade, one for Broken Head Road and one about 500 m north of Lawlers Lane providing access to several properties east of the upgrade. Protection screens would be provided on both bridges. The existing highway would be retained as a continuous road for local and regional traffic. Twin parallel tunnels under St Helena ridge (one tunnel for each carriageway). The tunnels would each be about 340 m long & about 45 m below St Helena Road. Click for more details...

SHIRE OF DERBY/WEST KIMBERLEY - CONCRETE FLOODWAY WORKS
Cherabun Rd, Christmas Creek via, Derby, WA 6728 Has Shire Of Derby/West Kimberley - Concrete Floodway Works currently at Construction stage. Works to comprise of construction of concrete floodway on Cherabun Rd at Christmas Creek. Click for more details...

SHIRE OF MOORA - BRIDGES 686 & 687
Currently at the Construction stage In Moora is a project estimated to be $ 1111000. This project Works to comprise of strengthening of Bridges 686 & 687 with reinforced concrete overlay & include associated approach road works & full guardrail upgrade. Click for more details...

GREAT NORTHERN HIGHWAY - BRIDGES 1307 & 1308
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Bridge 1307 & 1308 Great Northern Hwy, Kimberley Region, ., WA 6999 of Bridges (2) - Carbon Fibre Strengthening type of Renovations, Refurbishments etc. development. Works comprise of carbon fibre strengthening of bridges. Click for more details...

HARRIS ROAD BRIDGE REPLACEMENT
Harris Road, Shelbourne, VIC 3463 Has Harris Road Bridge Replacement currently at Tenders & Building stage. Replacement of the bridge over Spring Creek in Harris Road Shelbourne. Click for more details...

WHEATBELT NORTH REGION BRIDGE REPAIRS
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Various Council Area of State ownership. Works to comprise repairs to various timber bridges throughout Wheatbelt North Region. Click for more details...

PITT ST PEDESTRIAN BRIDGE
Pitt St Pedestrian Bridge is currently at the Planning stage, valued at about $ 5482000 it is Demolition of the two existing 2 level pedestrian bridges over Pitt Street Mall. Replacement with a single 2 level pedestrian bridge, internal reconfiguration of Westfield Sydney City (Centrepoint) and Sydney Central Plaza, and installation of 2ew window boxes to Sydney Central Plaza facade. Click for more details...

WEST GATE DISTRIBUTOR ROADWORKS FURTHER STAGE
Civil Engineering (Bridges, Aqueducts, Viaducts) New project at Hyde St and West Gate Fwy, Yarraville, VIC 3013. This type is Road/Bridge Works with State ownership. Further stage of West Gate Distributor road works will include; an upgrade and duplication of Whitehall Street between Francis Street and Somerville Road West, West Gate Freeway on-and-off ramps and an elevated road along Hyde Street, Yarraville. Click for more details...

SOUTH GIPPSLAND HIGHWAY COXS BRIDGE UPGRADE
Road Works And Bridge Works New project In The Wellington Council Area. Road and bridge construction associated with the South Gippsland Highway Cox's Bridge realignment from Swing Bridge Drive to May Street, Sale. Works include construction of a new three kilometre section of highway at an average of one metre above the existing height of the South Gippsland Highway, construction of a new 450 metre bridge to replace the existing Cox's Bridge, construction of another 660 metre bridge beside the Thomson River and relocation of utilities like a high pressure gas transmission pipeline, power poles and lines and Telstra cables. Click for more details...

FALLS CREEK ALPINE RESORT
Falls Creek Alpine Resort is currently at the Construction stage, valued at about $ 200000 it is Design and construction an elevated pedestrian stairway between Silverski and Frueauf Village, Falls Creek Alpine Resort. The solar lit stairway will be approximately 70m in length with a vertical rise of approximately 18m. Click for more details...

BIG MCPHEE BRIDGE REPLACEMENT & ROADWORKS
Big Mcphee Bridge Replacement & Roadworks is currently at the Construction stage, valued at about $ 25000000 it is To include demolition of the existing 55m bridge & construction of a new 108 m long bridge & associated approach roadworks. Click for more details...

MAIN ROADS WA - BRIDGE APPROACH SLABS - SHIRE OF KALAMUNDA (BRIDGES 1210 & 1211)
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Bridges 1210 & 1211, Tonkin Hwy, over Rail & Dundas Rd, Forrestfield, WA 6058 of Bridge Approach Slabs - Reconstruction type of Renovations, Refurbishments etc. development. To include reconstruction of reinforced concrete approach slabs & expansion joints for Bridges 1210 & 1211, on Tonkin Hwy, over Rail & Dundas Rd. Click for more details...

CASTRA RIVULET BRIDGE
Bridge/Culvert Replacement project at Gaunts Rd, Nietta, TAS 7315 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Design and Construction of a replacement concrete bridge/culvert. Click for more details...

CALTEX AUSTRALIA NEWPORT HORIZON
Caltex Australia Newport Horizon is currently at the Construction stage, valued at about $ 100000000 it is Buildings & works associated with installing new fuel storage tanks & upgrade works to an existing fuel bulk storage facility. The proposal incorporates eight new fuel storage tanks, an additional three bays to the tankwagon loading gantry, fire protection, an upgrade to the vapour recovery unit, a new kiosk substation & motor control centre, two new pipebridges over Douglas Parade & Burleigh Street & demolition of existing sheds & ancillary works. Click for more details...

DODDER RIVULET BRIDGE NO 3292
Bridge project at Over Dodder Rivulet, Old Paradise Rd, Sheffield, TAS 7306 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Design and construction of a replacement bridge No 3292 over Dodder Rivulet. Click for more details...

BONEGILLA BOARDWALK AND BIKE TRACK
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Improvements to 17 kilometres of gravel rail trail surface from Killara to Huon and the establishment of a 600 metre steel boardwalk across the Kiewa River floodplain, providing all-season access to Lake Hume and Tallangatta. Click for more details...

MELBOURNE PARK REDEVELOPMENT STAGE 2 - BATMAN AVENUE PEDESTRIAN BRIDGE
Bridge New project In The Melbourne Council Area. Melbourne Park Redevelopment, Stage 2, Batman Avenue Bridge. The new pedestrian bridge connection is intended to ?bring the precinct closer to the city?, creating an easier access route for patrons travelling from the city, and making their travel experience quicker, safer and more enjoyable. The key objectives of the pedestrian bridge include: Creation of a new entrance into Melbourne Park; provision of strong legible link from the CBD to Melbourne Park; improving access for pedestrians travelling from the CBD to Melbourne Park; and improving universal access and providing a safe route that eliminates the need for patrons to cross Batman Avenue at street level. Click for more details...

WARREGO HIGHWAY (DALBY-MILES) JINGI JINGI CREEK CULVERT REPLACEMENT JOB 222/18C/5
Civil Engineering (Bridges, Aqueducts, Viaducts) New project at Warrego Hwy, Dalby, QLD 4405. This type is Roadworks - Bridge with State ownership. Construction of Jingi Jingi Creek Bridge & its approaches on the Warrego Highway between Dalby & Chinchilla. Works to include pavement construction, piling, bridge construction, embankment construction, sealing works, asphalt works, earth works & installation of guidance delineation. Click for more details...

TIM NEVILLE ARBORETUM LAKE REHABILITATION WORKS
Tim Neville Arboretum Lake Rehabilitation Works is currently at the Construction stage, valued at about $ 500000 it is Tim Neville Arboretum lake rehabilitation works, Ferntree Gully. Works involve the following: desilting of lakes (510 cu m), earthworks (3165 cu m), imported clay liner (1417 cu m), imported growing medium (996 cu m), pipework (604 m), pits (22 no), diversion pits (2 no), drainage structures (3 no), baffle box (1 no), removal of brick pavers (262 sqm), demolition of timber pedestrian bridge (1 no), reinforced concrete paving (271 sqm), cantilever boardwalk structures (2 no), softscape works including tubestock (2415 no) & shrubs (12 no) & associated works. Click for more details...

MERCER STREET BRIDGE REMOVAL & STORMWATER UPGRADE
Mercer St, Geelong, VIC 3220 Has Mercer Street Bridge Removal & Stormwater Upgrade currently at Construction stage. Mercer Street Bridge Removal & Stormwater Upgrade. Scope: Part 1- Filling the void created by the tunnel (approximately 1,000 cubic meters) with expanded polystyrene (EPS) blocks inclusive of all materials, placement & void filling (Grouting) without the removal of the existing deck / road structure. It should be noted that a temporary retaining wall will be required to seal the tunnel entrance prior to grouting. This temporary retaining wall will be constructed from compressed sheet & supported to withstand the pressure from the grouting process. The sheets are to be fixed in such a manner to be remain to protect the grout & EPS to allow external filling to be placed against it up to road level. It should be noted that a Barwon Water strategic sewer is located within the tunnel & is to be protected at all times during works. The Level of protection required is identified within a GHD Report commissioned by Barwon Water & contained in Appendix D. Part 2- Replacement of approximately 170 of the existing 900 mm diameter brick drain with 900 mm diameter Stormpro or equivalent including supply & installation of pipes, pits & existing connections, as shown on Drawing No 13393-02 & CCTV Report. Part 3- Relining of approximately 60 m of existing 900 mm diameter brick drain with a suitable liner to restore the integrity of the pipeline. Click for more details...

GUNDAROO DR DUPLICATION - STAGE 1
Currently at the Construction stage In Act is a project estimated to be $ 31000000. This project Duplication of the carriageway between Gungahlin Dr to Mirrabei Dr. On road cycle lanes are provided with safe passages off-road around the two roundabouts are being provided. Reinstatement of existing shared paths displaced by the duplication of the road. Relocation of TransACT optic fibre. Relocations of Optus, IntACT and protection of Telstra assets. Relocation of four flag pole sculptures. Widening of I-Girder Bridge 1228. The structure will be widened by approximately 9m to accommodate a 2m wide on-road cycle lane, three 3.5m wide traffic lanes, two 3.5m wide turning lanes & a 2.8m wide shared path. A new Super T Bridge 1341 which will support the northbound carriageway Click for more details...

BANYO STATION PEDESTRIAN FOOTBRIDGE
Banyo Station Pedestrian Footbridge is currently at the Construction stage, valued at about $ 250000 it is Construction of a new pedestrian footbridge at Banyo train station. To include stairs, screens, handrails, lighting, service ducts & signage. New bollard & footing, Associated electrical works. Associated paving, fencing & landscaping. Click for more details...

HULBERTS BRIDGE REPLACEMENT
Maxwelton Rd, Maxwelton, QLD 4816 Has Hulberts Bridge Replacement currently at Construction stage. Replacement of existing bridge with a higher structure. Bridge will be approximately 6m wide & 80m long. Click for more details...

EAST BAINES BRIDGE UPGRADES
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Katherine Town Council Area of Bridge - Upgrade type. Upgrades works to the East Baines Bridge on the Victoria Highway. To include replacement of nuts & bolts. Click for more details...

HUME FREEWAY AND GOULBURN VALLEY HIGHWAY BRIDGEWORKS
Bridgeworks project at Hume Fwy & Goulburn Valley Hwy, Seymour, VIC 3660 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Bridge works associated with the strengthening of 9 bridges on the National Highway Network between Seymour & Chiltern on the Hume Freeway & south of Shepparton on the Goulburn Valley Highway in North Eastern Victoria. Click for more details...

MANESTAR ROAD BRIDGE REPLACEMENT
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Manestar Rd, Upper Beaconsfield, VIC 3808 for New. Design & Construction services for the replacement of the bridge over Cardinia Creek on Manestar Road in Upper Beaconsfield. Click for more details...

MIDLANDS ROAD BRIDGE
Bridge - Refurbishment project at Midlands Rd, Moora, WA 6510 In The Council Area Of Moora of State. Construction of substructure & superstructure repairs on Bridge 0782 SLK 22.68. To include the replacement of existing bridge deck, construction of new footpath & installation of extra piles. Click for more details...

MAIN ROADS BRIDGE 4363 CONCRETE OVERLAY
Bridgeworks - Concrete Overlay New project In The Serpentine-Jarrahdale Council Area. Works to include maintenance & installation of a concrete overlay to bridge number 4363. Click for more details...

COLAN ROAD BRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Colan Rd, North Warrandyte, Warrandyte, VIC 3113 for New. Design & construction of the Colan Road bridge in north warrandyte. Click for more details...

COLLINS ROAD FAUNA ROPE BRIDGES 1 & 2
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Collins Rd, Everton Hills, QLD 4053 for New. Construction of 2 fauna rope bridges on Collins Road. Scope of works include: installation of 4 hardwood poles. Construction of 8 anchor points. Connection of wires and ropes. Installation of monitoring equipment. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect