State

Categories

Sub Categories

Click Here to Find Current Projects

List of Bridges, Aqueducts, Viaducts Projects in Australian Capital Territory


BRIDGE 3075
Bridge - Strengthening project at Melrose Dr over Yarralumla Creek, Phillip, ACT 2606 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Bridge 3075 strengthening. Click for more details...

ACT AREAS BRIDGES JOINTS REPAIR PROGRAM
Currently at the Tenders & Building stage In Act is a project estimated to be $ 500000. This project 2003/04 bridge joints repair program. Click for more details...

ACT AREAS BRIDGE UPGRADE
Renovations, Refurbishments etc. project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at various within ACT areas, Canberra, ACT 2601. Upgrade of 10 precast bridges design & superintendance. Click for more details...

HORSE PARK DRIVE EXTENSION
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Act Council Area of Roadworks type. Horse Park drive extension from Burramarra Av to Mirrabei Dr. Construction of the final section of Horse Park Drive. These works will improve traffic flow in the north western sector of the Gungahlin area & facilitate the future development of the Moncrieff &Taylor suburbs. Scope of work involves: Construction of approximately 1,800 metres of single, two way carriageway. Construction of 2 three way intersections, one of which is signalized. Construction of 1,600 metres of 300mm diameter water main & other hydraulic services. Construction of approximately 16 metres long by 19 metres wide bridge over flood way. Construction of approximately 2,000 metres of trunk cycleway. Construction of shared services trench & installation of street lighting. Landscape works. Click for more details...

BELCONNEN WAY KINGSFORD SMITH DR & HINDMARSH DR BRIDGES
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Act Council Area of Bridges (10) - Strengthening type. Strengthening of 10 precast bridges, located on Belconnen Way, Kingsford Smith Drive & Hindmarsh Drive. Click for more details...

VFT SYDNEY TO CANBERRA
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Act Council Area of Private ownership. Construction of a very fast train track between Sydney & Canberra via Goulburn. Click for more details...

2004-2007 ACT BRIDGES INSPECTION PROGRAM
Consultancy For Bridge Inspection project at various within ACT areas, Canberra, ACT 2601 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Provision of engineering consultant services for the inspection of bridges in the ACT over a period of 3 years. Click for more details...

ACT AREA BRIDGES
Civil Engineering (Bridges, Aqueducts, Viaducts) project at various within ACT areas, Canberra, ACT 2601 of Bridges - Upgrade type of Renovations, Refurbishments etc. development. Upgrade of 8 bridges, design & superintend. Click for more details...

ACT AREA BRIDGES
Currently at the Tenders & Building stage In Act is a project estimated to be $ 500000. This project Bridge rail painting: painting of hand rails & kerb rails on selected bridges in the ACT. Click for more details...

ACT AREA BRIDGES ASSESSMENT
Consultancy For Assessment - Bridges project at various within ACT areas, Canberra, ACT 2601 In The Council Area Of Act of State. Assessment of 22 bridges. Click for more details...

CANBERRA CIVIC SITE REDEVELOPMENT PRECINCTS A & B DOUBLE ENTRY REFER PROJECT ID2202941
Canberra Civic Site Redevelopment Precincts A & B Double Entry Refer Project Id2202941 is currently at the Planning stage, valued at about $ 105000000 it is Construction of 2 X mixed use buildings. Building A comprising of approx 28,279sq m of retail development and 22,200sq m of office development with a cinema complex of 4460sq m. Building B comprises of 17,909sq m of shops with a 4 level carpark above. Construction of a bridge connecting the 2 buildings. Associated carparking and landscaping Click for more details...

CANBERRA TRANSITWAY
Civil Engineering (Bridges, Aqueducts, Viaducts) project at College St, Barry Dr & Belconnen Way to CBD,, Canberra City, ACT 2601 for New. Proposed construction of a 6.9 kilometre, 7 metre wide bus only transitway from Belconnen to Canberra City, works include a tunnel through Bruce & O'Connor Ridge. Click for more details...

ACT AREA BRIDGES
Renovations, Refurbishments etc. project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at various within ACT areas, Canberra, ACT 2601. Strengthening of 4 bridges. Click for more details...

BRIDGES 2034
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Act Council Area of Bridge - Strengthening type. Strengthening of Bridges 2034. Click for more details...

THARWA BRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) New project at Tharwa Dr across the Murrumbidgee River, Tharwa, ACT 2620. This type is Bridge - Restoration - Stage 2 with State ownership. Restoration of the Allen Truss spans of the existing bridge. Click for more details...

DISCOVERY HOUSE - IP CAMPUS
Civil Engineering (Bridges, Aqueducts, Viaducts) project at 47 ( Blk 1 Secn 4) Bowes St, Phillip, ACT 2606 of Office - Altns & Addns - 5 Storey type of New development. Construction of 5 storey office building over the existing carpark comprising of ground floor 2,359sq m, 1st floor 2,379sq m, 2nd floor 2,505sq m, 3rd floor 2,505sq m, 4th floor 2,322sq m with 2 levels of basement carparking. The A-grade building will have a 4.5 ABGR energy rating. Spaces will be provided for 108 bicycles. Upgrade to the existing building foyer and repainting of the building. An access bridge will be built linking the two buildings. Associated landscaping. Click for more details...

CANBERRA MONORAIL SYSTEM
Civil Engineering (Bridges, Aqueducts, Viaducts) project at linking town centres, Canberra, ACT 2600 of High Speen Monorail type of New development. Proposed construction of a monorail transport system linking Civic to the ACT town centres of Tuggeranong, Woden, Belconnen & Gungahlin, undergrounding of Northbourne Avenue, construction of road bridges, construction of a civic plaza below City Hill. Click for more details...

MAJURA PARKWAY UPGRADE
A project in the ACT Within Act. Majura Parkway upgrade - construction of 11.5kms of dual carriageway with 2 x 3.5 metres traffic lanes & 1 s.5m roadside shoulder & 1 x 1m offside shoulder. The parkway will replace the Majura Rd linking the Monaro Hwy & Federal Hwy. Construction of bridges in each direction over the Molonglo River & Morsehead Dr connecting to Fairburn Av with an at grade intersection. Upgrade of Duntroon Defence Oval No 1; scope of work includes - removal of existing grass & topsoil & removal of the turf wicket; install subsoil & stormwater drainage; install irrigation system; install perimeter picket fence; concrete paths; carpark & lighting Click for more details...

MOLONGLO INFRASTRUCTURE STAGE 1
A project in the ACT Within Act. The proposed Molonglo Stage 1 works include the design of the following keyroad connections & associated works. A first stage carriageway along the North-South arterial road alignment from the intersection of Cotter Rd & Streeton Dr to the northwest of Suburbs 1 & 2A (a distance of approximately 3km). Approximately quarter of this work is an upgrade of the existing Cotter Rd; Cotter Rd upgrade between Streeton Dr & Tuggeranong Parkway; Unwin place extension from Unwin Pl to the Cotter Rd intersection with Kirkpatrick St; new upgraded intersection at Streeton Dr/Cotter Rd. Construction of a new intersection near the Cotter Rd/Kirkpatrick St intersection (referred to as intersection 3) to allow for access north & south of Cotter Rd. Construction of a new intersection (referred to as intersection 1) of Cotter Rd & North-South arterial Rd. Bridge/culvert over Weston Creek, other culverts & stormwater drainage Click for more details...

GUNGAHLIN DRIVE DUPLICATION - SOUTH
Roadworks/Bridges - Stage 2 project at Gungahlin Dr between Barton Hwy & Glenrock Interchange, Gungahlin, ACT 2912 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Duplication of Gungahlin Drive between Barton Highway & Glenrock Interchange. Scope of work includes construction of roads & bridges including demolition of an existing redundant bridge. Click for more details...

FEDERAL GOLF CLUB
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Construction of 4 water holding ponds & a pedestrian bridge. Click for more details...

BELCONNEN BUS INTERCHANGE PROJECT
Currently at the Construction stage In Act is a project estimated to be $ 525000. This project Cohen St extension & replacement of pedestrian bridges from Churches Centre to Westfield Shopping Mall. Click for more details...

KINGSTON FORESHORE STAGE 4
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Act Council Area of State ownership. Kingston Stage 4 Infrastructure civil works relating to Eyre Street Bridge, extension of Eyre Street to The Causeway, civil works for common services, subdivision & ancillary works. Eyre Street, which presently terminates at Eastlake Parade, is to be extended across the southern end of the harbour on a bridge and continue as a road to join at the existing junction of Newcastle St & The Causeway. This bridge must also incorporate a weir to maintain a half meter height differential between the level of Lake Burley Griffin and the existing Eco Pond which is an important part of the stormwater environmental control system for Kingston and areas upstream. The road known as The Causeway is also to be extended north of Newcastle Street but only as a single carriageway. Click for more details...

BELCONNEN WAY & GUNGAHLIN DR EXTENSION STAGE 2
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Construction of a 100 metres long balanced cantilever bridge over a 6 lane road intersection Click for more details...

GUNGAHLIN DRIVE DUPLICATION - BARTON HWY BRIDGE
Bridge project at Barton Hwy, Gungahlin, ACT 2912 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Construction of a 62m twin span voided slab bridge over Barton Highway Click for more details...

GUNGAHLIN DRIVE DUPLICATION - NORTH
Gungahlin Drive Duplication - North is currently at the Construction stage, valued at about $ 13128000 it is Gungahlin Drive Extension Stage 2 - North. Stage 2 (North) comprises:Construction of the southbound bridge over the Barton Hwy. Construction of a new southbound 2-lane carriageway from Barton Hwy to Ginninderra Dr. Duplication of the super tee overpasses at Ellenborough St & Ginninderra Dr plus a pre-cast concrete arch fauna underpass at Lyneham Ridge. Additional lanes north & south bound carriageways between Ginninderra Dr & Belconnen Way. Duplication of Belconnen Way overpass. Duplication of the road works from Belconnen Way through to the Aranda flora underpass Click for more details...

KINGSTON PEDESTRIAN & CYCLE BRIDGE
A project in the ACT Within Act. Construction of a minor pedestrian & cycle bridge spanning the canal adjacent to Kingston harbour at Kingston. Bridge cladding, galvanised steel webforge decking, steel mesh balustrades, brushed stainless steel handrails, flexible LED strip lighting. Click for more details...

KAMBAH P-10 SCHOOL - NAMADGI
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Act Council Area of Local Govt ownership. Construction of a pedestrian link across Drakeford Drive to provide a safer means for students to access the new Kambah P-10 School - Namadgi, as well as improved links for other pedestrians & cyclists. Eastern approach comprises 3.0m wide concrete paths connect to the existing concrete paths in the eastern approaches. Western spiral approach spans of the proposed bridge connect to a concrete path supported on a retaining wall that curves around an existing mound. The retaining wall to have a mortared stone finish. At the point were the wall matches the existing surface level a concrete path is extended at existing surface level to connect to the existing 2.0m wide concrete path behind the school The bridgeworks comprise 2 elements, the main cabletayed bridge structure over Drakeford Drive & the ramp structure on the east side of the crossing. The cable stayed bridge comprises a single steel portal framed type pylon with 6 pairs of stay cables supporting the bridge deck. The bridge deck consist of a trapezoidal shape steel ttrough section that acts compositely with the reinforced concrete decks slab on top. The stay cables are set in a radial shaped arrangement whereby all the cables are connected to the top of the pylon. The approach ramp structure comprises of 7 spans of approximately equal length of up to approximately 11m. The ramp is curved structure & comprises a cast in -situ reinforced concrete deck having a similar cross-sectional profile to that of the main cable stayed bridge. A transition pier is provide at the interface between the cable stayed bridge & the ramp structure. As an alternative to pedestrians using the ramp provision has been made in the design for a stair structure. The colours proposed for the bridge complement the school colour scheme,with greys, blacks & silvers, & the nominated orange together with the deep red used at the school will provide an important landmark within the area. Main steel girder, cable anchor beams, pedestrian fence posts & Securemax Mesh, Anitprojectile screen posts, galvanised handrails, galvanised stay cables, Anti Graffiti coating on exposed concrete. Landscaping Click for more details...

TUGGERANONG WEIR
Civil Engineering (Bridges, Aqueducts, Viaducts) project at over Tuggeranong Weir, Tuggeranong, ACT 2900 of Pedestrian Bridge - Strengthening type of New development. Pier strengthening of pedestrian bridge 5082 over Tuggeranong Weir. Scope of work inlcudres: Removal of cracked mortar render on the curved top edges of the concrete piers. Preparation & filling of cracks in the concrete piers, particularly in sections immediately over the weir. Preparation & reinstating of the curved top face of the concrete piers to the original configuration Click for more details...

ACT BRIDGES
Currently at the Construction stage In Act is a project estimated to be $ 600000. This project Crack filling repairs to various bridges in the ACT Click for more details...

GREENWAY LAKESIDE - SOUTHQUAY
Currently at the Construction stage In Act is a project estimated to be $ 20000000. This project Proposed 2 Estate Development Plans of 8 superlots (Lakeside West - stage 1 & Lakeside East - stage 2), public open space with a central park, pedestrian bridge over the Isabella Weir, roads & sewer. The project delivers medium density residential development of approximately 1000 dwellings, with active frontage on the ground levels of Anketell Street, and activity nodes on the Lake Tuggeranong foreshore. Click for more details...

MOLONGLO 2 LINK BRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) New project at Molonglo River, Weston, ACT 2611. This type is Bridge/Sewer with Local Govt ownership. Scope of work is to provide a high elevation combined sewer, pedestrian & cycleway bridge crossing of the Molonglo River. The link bridge will be across the Molonglo River & the connecting sewer from the bridge to the Molonglo Valley Interceptor Sewer (MVIS) on the north side of the river. The bridge will also provide for pedestrian & cycleway access to link future development & playing fields on the north side of the river to the Group Centre & Molonglo 2 development on the south side of the river. The width of the bridge is preferred to be 4.0m. The sewer work includes: an integral 600mm sewer within the bridge; the connection of the 600mm sewer to the MVIS (approximately 425m) & connection of the sewer draining to Coppins Crossing sewer pumping station to the sewer across the bridge. Construction of Sewer 3 Central - scope of work includes: construction of a 2.2km long trunk sewer man from MH C24 to D1 near the link bridge abutment; the sewer will range in sizes from 300mm to 525mm diameter & the typical depth of the sewer main is between 1.6m & 4.3m. Click for more details...

SMITHS ROAD BRIDGE
Bridge project at Over the Gudgenby River, Tharwa, ACT 2620 In The Council Area Of Act of Local Govt. Demolition & removal of remnants of the existing bridge excluding the Bailey Bridge. Construction of a replacement bridge. Scope of work includes: new bridge construction. Approach road construction. Removal & reinstatement of existing road pavement. Landscaping including tree removal, protection & plantation Click for more details...

HORSE PARK DRIVE EXTENSION - CONSULTANCY
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Horse Park Dr from Burramurra Dr to Mirrabei Dr, Ngunnawal, ACT 2913 of Roadworks type of New development. Contract administration & superintendent services for Horse Park drive extension from Burramarra Av to Mirrabei Dr. Click for more details...

ACT BRIDGES 2012-2013 - PACKAGE 1
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at various locations in the ACT, Canberra, ACT 2600. Concrete repairs to various bridges in Canberra Click for more details...

ACT BRIDGES
Currently at the Construction stage In Act is a project estimated to be $ 55000. This project Spraysealing of bridge decks on bridges 1216, 1217 & 1218 in the ACT Click for more details...

GUNDAROO DR DUPLICATION - STAGE 1
Currently at the Construction stage In Act is a project estimated to be $ 31000000. This project Duplication of the carriageway between Gungahlin Dr to Mirrabei Dr. On road cycle lanes are provided with safe passages off-road around the two roundabouts are being provided. Reinstatement of existing shared paths displaced by the duplication of the road. Relocation of TransACT optic fibre. Relocations of Optus, IntACT and protection of Telstra assets. Relocation of four flag pole sculptures. Widening of I-Girder Bridge 1228. The structure will be widened by approximately 9m to accommodate a 2m wide on-road cycle lane, three 3.5m wide traffic lanes, two 3.5m wide turning lanes & a 2.8m wide shared path. A new Super T Bridge 1341 which will support the northbound carriageway Click for more details...

AHSLEY DRIVE UPGRADE
Pedestrian Bridge project at over Monks Creek between Isabella Plains &, Richardson, ACT 2905 In The Council Area Of Act of Local Govt. Construction of a pedestrian bridge over Monks Creek. Construction of a three span concrete plank and insitu concrete deck pedestrian bridge with piered foundations providing access over Monks Creek. Earthworks at each abutment & finishing of batters. All temporary works associated with constructing the pedestrian bridge. Reinstatement of the site after completion of construction of the pedestrian bridge Click for more details...

ACT BRIDGES
various locations in the ACT, Canberra, ACT 2600 Has Act Bridges currently at Construction stage. Repair, maintenance & replacement of existing damaged bridge joints and bearing on a range of sites across the ACT. The works also include cleaning, sealing of cracks & miscellaneous bridge abutment repairs. Separable Portion 1 - Bridge Joints - Bridge 1004 ? Copland Dr Spence over pedestrian underpass; Bridge 1148 - William Hovell Dr rural Belconnen westbound over pedestrian underpass; Bridge 1161 - Kreft St Florey over pedestrian underpass; Bridge 1164 - Dodwell St Giralang over drain; Bridge 4004 ? Tuggeranong Parkway Stromlo over Molonglo River; Bridge 4012 - Streeton Dr Weston SB over Weston Creek; Bridge 4013 ? Streeton Dr Weston NB over Weston Creek; Bridge 5041 -Erindale Dr Farrer over pedestrian underpass; Bridge 5054 ? Bugden Ave Gowrie over pedestrian underpass near Dalziel St; Bridge 5083 ? Point Hut Rd Paddys River over Murrumbidgee River; Bridge 5162 -Drakeford Dr Greenway NB over Isabella Pond; Bridge 5176 ? Athlon Dr Kambah over floodway; Bridge 5188 - Athlon Dr Greenway Tuggeranong Dam Bridge & Bridge 5235 - Tharwa Dr Gordon over floodway. Separable Portion 2 - Bearings - Bridge 1104 - Baldwin Dr Lawson over Ginninderra Creek; Bridge 1119 -Chandler St Belconnen over pedestrian underpass; Bridge 2010 - Goodwin St Lyneham over Sullivan?s Creek; Bridge 2039 - David St Turner over Sullivan?s Creek; Bridge 2116 ? Parkes Way Acton WB over Sullivan?s Creek & Bridge 3152 - Phillip footbridge over Yarralumla Creek Click for more details...

MAJURA LINK ROAD & BRIDGE CONSTRUCTION
Civil Engineering (Bridges, Aqueducts, Viaducts) project at from Majura Pky, Majura, ACT 2609 of Road/Bridge type of New development. Construction of a 1.3km Link Road from Majura Parkway to the IKEA access road (Meddhung Road), single span bridge over Woolshed Creek and a major drainage structure (3 x Bebo Arches). The new piece of infrastructure will consist of an off ramp from the southbound Majura Parkway carriageway, pavement over one single span bridge and one triple precast arch bridge, eventually joining to the recently constructed Meddhung road Click for more details...

MONARO HIGHWAY BRIDGE 3161
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Monaro Hwy, Canberra, ACT 2600 for New. Strengthening of Bridge 3161 Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect