State

Categories

Sub Categories

Click Here to Find Current Projects

List of Bridges, Aqueducts, Viaducts Projects in NSW


FLAT ROCK CREEK BRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Turpentine Rd, Tomerong, NSW 2540 of Bridge/Roadworks type of New development. Construction of a new reinforced concrete bridge to replace bridge burnt out by fire, roadworks including road widening & raising the approach road to bridge crossing. Click for more details...

RTA PROFESSIONAL SERVICES - TENDER DOCUMENTATION
Civil Engineering (Bridges, Aqueducts, Viaducts) New project at various within NSW, ., NSW 2999. This type is Consultancy For Tender Documentation with State ownership. Preparation of detailed tender documentation necessary for any or all of the following as requested by the Authority: road & bridge maintenance & construction contracts, the engagement of professional service contractors & consultants, minor physical works & services & other similar documentation. Click for more details...

JOHNSONS BRIDGE
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Johnson Bridge Main Road 105, Nemingha, NSW 2340. Staged replacement of existing 62 metre bridge with pre-fabricated steel for piers & girders comprising 2 lanes of 4.3 metres each plus a 3 metre wide cycleway & footpath, construction of detours. Click for more details...

MOONA MOONA CREEK BRIDGE
over Moona Moona Creek Huskisson, Huskisson, NSW 2540 Has Moona Moona Creek Bridge currently at Construction stage. Construction of single span bridge, 8.2 m long x 9.7 m wide. Work includes: precast prestressed voided planks, with in-situ reinforced concrete topping slab; precast driven piles; earthworks only for access roads on either side, across soft marine sediments. Click for more details...

NORTHERN BEACHES EXPRESS TUNNEL
Civil Engineering (Bridges, Aqueducts, Viaducts) project at from Burnt Bridge Deviation to Warringah Freeway, Seaforth, NSW 2092 for New. Proposed construction of a tunnel under Middle Harbour for a distance of 6.5 kilometres connecting the lower north shore to the northern peninsula. Click for more details...

TOWRADGI CREEK PEDESTRIAN BRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project at from Towradgi Park to Lake Pde,, Towradgi, NSW 2518 of Bridge/Pipeline type of New development. Reconstruction of pedestrian bridge, construction of a waste water pipeline under the western edge of the footbridge. Click for more details...

ORANGE BYPASS
Civil Engineering (Bridges, Aqueducts, Viaducts) New project at Leeds Parade to The Escort Way,, Orange, NSW 2800. This type is Roadworks - Vehicle Diversion Roadway with Local Govt ownership. Construction of diversion road & bridge round Orange known as the Northern Distributor Road & being a route for through traffic & a diversion for heavy vehicles. Click for more details...

TAMWORTH CITY COUNCIL
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Tamworth Council Area of Culvert Units/Base Slabs - Supply & Delivery type. 1815 x 122m long culvert unit. 1800 x 122 m long base slab. Click for more details...

JOHNSON BRIDGE
A project in the NSW Within Tamworth. Reconstruction of existing timber bridge to construct a pedestrian pathway & cycleway. Click for more details...

EDWARD RIVER BRIDGE
A project in the NSW Within Murray. Proposed construction of a new concrete bridge over the Edward River. Click for more details...

SPRING CREEK BRIDGE
Spring Creek Bridge is currently at the Construction stage, valued at about $ 5000000 it is Construction of a bridge/archway over Evans Plains rd. Click for more details...

THE GALLERIES VICTORIA
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at 275 Pitt St, Sydney, NSW 2000. Construction of pedestrian bridge connecting shops on level 1. Click for more details...

WINDSOR FLOOD EVACUATION ROUTE
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Hawkesbury Council Area of State ownership. Construction of a 1km long incrementally launched bridge across the South Creek flood plain and 2 smaller bridges of 40 m and 25 m long. Construction of reinforced soil walls on embarkment, earthworks, stormwater drainage, pavement with lean mix and asphalt, kerbing, pavement marking and signposting. Reconstruction of Forbes St, Day St and Railway Rd North. Reconstruction of the existing intersection between Macquarie St and Richmond Rd with traffic control signals Click for more details...

BUCKLEY'S BRIDGE
Local Govt ownership Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Tumut Council Area for New development. Single span bridge. Work comprises: removal of existing bridge; construction of new prefabricated bridge. Click for more details...

WENONA SCHOOL
A project in the NSW Within North Sydney. Construction of a 3 storey building, with 2 levels below street level, carparking, outdoor recreation facilities & elevated pedestrian bridge over Elliott St for school purposes. Construction of netball & volleyball courts on lower level. Click for more details...

WILLIAM ST BRIDGE
Bridge project at over Blackmans Swamp Creek, Orange, NSW 2800 In The Council Area Of Orange of Local Govt. Construction of 15 m long bridge. 39 sq m waterway area. Click for more details...

BARNARD COMMERCIAL/RETAIL CENTRE
Civil Engineering (Bridges, Aqueducts, Viaducts) project at 24 Florence St, Hornsby, NSW 2077 of Commercial/Retail - 4 Storey type of New development. Proposal includes the construction of 4 levels of commercial/retail space including basement level underground linkage to neighbouring Westfield redevelopment, retail floorspace of 216 sq m and 138 sq m of commercial space. Level 2 (street level) will be an arcade with 3 retail tenancies and a coffee shop with a mezzanine floor for extra seating. Level 3 will have a pedestrian link to the Westfield development and have 50.5 sq m retail space and a circulation area. Level 4 is comprised of commercial uses, amenities and foyer. This level incorporates a "cupola" structure. Materials used will primarily be reinforced concrete floor slabs and a substantial amount of glass to the external walls and pedestrian awning. Click for more details...

WALSH BAY WHARVES
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Pier 1 Walsh Bay,, The Rocks, NSW 2000 of Pedestrian Bridge type of New development. Construction of a pedestrian bridge linking Pier 1 to Piers 2 & 3. Click for more details...

COOPERNOOK TO HERONS CREEK PACIFIC HIGHWAY UPGRADE
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Pacific Hwy, Coopernook to, Herons Creek, NSW 2443 of Roadworks type of New development. Construction of a 33km dual carriageway upgrade of the Pacific Highway from Coopernook to Herons Creek. The scope of work includes 33km of separated dual carriageway generally following the existing highway; western bypasses of the villages of Moorland & Johns River & an eastern bypass of Kew; new twin bridges at Two Mile Creek, Moorland Railway bridge, Forest Road overbridge,Pipe Clay Creek, Holey Flat Creek, Tom Cat Creek, Stewarts River Road overbridge, Stoney Creek, Ross Glen railway bridge, Camden Haven River, Ocean Drive overbridge, Walkers Creek & Herons Creek; protection & management of fauna movement across the highway will include fauna crossings & fauna exclusion fencing; truck lay-bys, emergency telephone bays & cross-carriageway accesses, urban design & landscaping along the length of the new highway & traffic noise attenuation measures Click for more details...

BOATFALL BRIDGE
Currently at the Construction stage In Dungog is a project estimated to be $ 250000. This project Construction of 12 m single span bridge over Boatfall Creek. Precast concrete planks. Click for more details...

DUVAL CREEK BRIDGE
New England Hwy, Armidale, NSW 2350 Has Duval Creek Bridge currently at Construction stage. Realignment of road for a distance of 1.5 kilometres. Design/construction of new bridge of Duval Creek. Click for more details...

PRINCE HENRY HOSPITAL SITE
1430 Anzac Pde, Little Bay, NSW 2036 Has Prince Henry Hospital Site currently at Construction stage. Proposed construction of buffers, realignment of water courses, establishment of riparian zones, construction of a new pedestrian bridge. Click for more details...

KYOGLE COUNCIL - BRIDGEWORKS
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Findon Creek Rd Flowers Bridge, Kyogle, NSW 2474 of Bridgeworks type of New development. Replacement of bridge. Click for more details...

PENRITH RIVERSIDE WALKING TRAIL
Walkway/Creek Crossing project at 2166 (Lot 3) Castlereagh Rd (DP1067795), Penrith, NSW 2751 In The Council Area Of Penrith of Local Govt. Proposed construction of a riverside walk & creek crossing. Click for more details...

UPPER COLO ROAD BRIDGE
A project in the NSW Within Hawkesbury. Replacement of road bridge over Wheeney Creek. Click for more details...

SYDNEY TO MELBOURNE MAIN SOUTH RAIL LINE-RAIL INFRASTRUCTURE UPGRADE
Rail Line - Upgrade project at Sydney to Melbourne, Sydney, NSW 2000 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Package 1 to comprise 220 kilometres of new rail track proposed to follow existing track, extensive sleeper replacement & track geometry improvement, project includes existing track & construction of new sections. Details of the works program include: The construction of 16 passing lanes consisting of double track sections of around 10km to 15km of a standard configuration at approx 10 minute running time intervals with around 220kms total length of new line construction; New concrete sleepers on selected curves allowing trains to run at faster speeds. This will involve about 290,000 new sleepers & recanting to maximum superelevation to facilitate maximum train speeds; Ballast top-up & tamping of existing concrete sleepers over 130 kms to achieve maximum train speeds; Boosting capacity to the Dynon/Melbourne precinct by increasing to three the number of bi-direction tracks between Tottenham Junction to Dynon; Construction of a direct standart gauge connection between Brooklyn & Sunshine in Melbourne to provide direct access between the North-South & East-West corridors; and Installation of eight sets of facing cross overs to minimise operational delays during upgrading & future renewal projects. Click for more details...

JOHN HUNTER HOSPITAL
Roadworks project at 2 (Lot 132) Lookout Rd (DP1053492), New Lambton, NSW 2305 in the Civil Engineering (Bridges, Aqueducts, Viaducts). New vehicular bridge, internal access road & carpark. Proposed works include : The provision of a new internal link road connecting to the existing roundabout & running approximately northeast adjacent to the existing bank, connecting to the proposed second access road (DA 02/2198). The provision of a new overpass providing grade separation between the new internal circulation road & the existing service loop road. The provision of a pedestrian pathway from the Stage 3 multi-level carpark at the east of the Bone & Joint centre building connecting across to the Rankin Park campus. Reorganisation & sealing of the existing on grade carparking, including required stormwater drainage works. Click for more details...

AVALON & KINGS CREEKS BRIDGES
Bridges New project In The Greater Taree Council Area. Construction of a bridge. Reinforced concrete structures or other suitable construction materials are to replace the old structures. The Avalon bridge will comprise 4 spans of 4.9m in width & 43.7m in length. Click for more details...

BROADMEADOW RAILWAY STATION - EASY ACCESS
36 Graham Rd, Broadmeadow, NSW 2292 Has Broadmeadow Railway Station - Easy Access currently at Construction stage. Demolition of pedestrian underpass. Scope of work includes: Construction of a pedestrian overbridge including 3 walk-through easy access lifts, new entry stairs & roof to adjoin the ticket office building, additional canopies connecting new lift locations to existing canopies,new landscaping & improve lighting & CCTV Click for more details...

CONJOLA CREEK BRIDGE REPLACEMENT & APPROACHES
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Shoalhaven Council Area of State ownership. Construction of a bridge Click for more details...

MINIMBAH THIRD TRACK PROJECT
Railway Track - Stage 1 project at Main Northern Line, Minimbah, NSW 2312 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Construction & operation of a 3rd track adjacent to the existing Main Northern Railway Line. The major elements of the project include approximately 10.8 km of track & earthworks, 3 new rail under bridges, grade separation of Range Road level crossing, replacement & realignment of the Golden Highway overbridge, services relocation & signalling works Click for more details...

TOOHEYS BREWERY
Civil Engineering (Bridges, Aqueducts, Viaducts) project at 17-19 Percy & 29 Nyrang Sts, Auburn, NSW 2144 for New. Demolition of existing structures. Construction of a 20,000sq m warehouse & distribution facility, ancillary offices & amenities totalling 600sq m. Demolition of existing bridge over Haslams Creek & construction of a new bridge upstream. 13 loading docks suitable for trucks up to & including B-doubles. Construction of a gatehouse with access to & from Percy St. On site carparking for 62 vehicles. Ancillary works include extensive landscaping especially along the Percy St frontage. Click for more details...

ROSSI BRIDGE
Bridge - Strengthening project at Range Rd, Goulburn, NSW 2580 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Bridge strengthening Click for more details...

BRADLEY STREET BRIDGE - MULGOA RISE
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Construction of a bridge & roadworks across Surveyors Creek. Click for more details...

GLENMORE PARK BRIDGE
Bridge project at 93-131 Ridgetop Dr, Glenmore Park, NSW 2745 In The Council Area Of Penrith of Private. Construction of a vehicular & pedestrian bridge across the Surveyors creek corridor with connection to Precincts A & B Click for more details...

NORTHERN SYDNEY FREIGHT CORRIDOR - EPPING TO THORNLEIGH THIRD TRACK (ETTT)
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Hornsby Council Area of Rail Track/Railway Stations/Civil Works type. The proposal involves the construction of an additional track (or third track) on the western side of the existing tracks between Epping & Thornleigh. Scope of work also includes: modifications to 4 stations, including construction of new lifts & footbridges. Modifications to road, rail & pedestrian bridges. Construction of a new rail bridge over the M2 Motorway. Construction of cuttings, embankments, viaducts & retaining walls. Construction of new maintenance access roads adjacent to some lengths of the new track. Modifications to the existing overhead wiring and signalling systems. Associated civil & rail systems works. Track work involves the construction of a third track (approximately 6 km) within the Main North Line corridor on the western side of the existing tracks; the proposal would connect into the Down Suburban line just to the north of Epping Station and the Down Main (via a turnout) to the south of Thornleigh Station; the new track would generally be at the same level as the existing tracks; the alignment would be positioned as close to the existing tracks as possible with the exception of in the vicinity of the M2 Motorway where the alignment is located further to the west due the constraints of constructing a new bridge for the third track across the M2 Motorway. Station works - to accommodate the new third track some works are required at and in the vicinity of the following stations: Cheltenham - new footbridge, lifts & stairs, platform modification and station electrical systems. Reconfigured car parking & footpath; Beecroft ? modifications to existing pedestrian tunnel; reconfigured carparking & footpath; Pennant Hills - extended station concourse (northern footbridge); new lift & stairs; modifications to existing footpath, roadway & southern footbridge; Epping - minor platform adjustments. Bridge works would be required at Works would be required at the following locations: bicycle underpass at Epping; Devlins Creek culvert crossing (underbridge); M2 Motorway underbridge; Cheltenham Road overbridge; Copeland Road overbridge; Chapman Avenue overbridge; Pennant Hills Road overbridge; Pennant Hills Station footbridge. The proposal would also involve construction of & modification to signalling huts, communications facilities & other rail services infrastructure, the construction or modification of cuttings, embankments & retaining walls Click for more details...

TRACKER RILEY CYCLEWAY PEDESTRIAN BRIDGE
A project in the NSW Within Dubbo. Construction of 64.5m x 2.93m pedestrian bridge. Scope of work includes: 5 x cast in place bored piles; 2 x reinforced concrete abutments; 3 x reinforced concrete piers; 16 x pre stressed concrete planks, each spanning 16m; reinforced concrete bridge decking & steel hand railings Click for more details...

SCHOFIELDS ROAD UPGRADE
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Schofields Rd between Windsor & Tallowong Rds, The Ponds, NSW 2769 of Roadworks type of New development. Upgrade of Schofields Rd from Windsor Rd to Tallawong Rd. Road will be upgraded to a 4 lane divided carriageway. The works will include construction of a twin 53m long prestressed concrete super-T girder bridge over Second Ponds Creek. Click for more details...

OLD WALLGROVE ROAD WIDENING
Currently at the Construction stage In Blacktown is a project estimated to be $ 50000000. This project Proposed upgrade of Old Wallgrove Road - Roberts Rd to M7 interchange. Upgrade Old Wallgrove Road (approximately 1.5km). Construct a new road (approximately 0.4km) & widen Wallgrove Rd (approxroximately 1Km) at the M7 interchange. This work consists of utilities relocation/protection, earthworks, pavement construction, traffic management, stormwater/subsurface drainage, retaining walls, street lighting & landscaping. Click for more details...

MALDON TO DOMBARTON RAIL LINK
Maldon To Dombarton Rail Link is currently at the Planning stage, valued at about $ 255000 it is Professional Services Contractor to estimate the costs of constructing the line. This will involve estimating the cost of constructing items already fully designed, items for which only scoping level estimates will be available, as well as updating the estimates as the design is developed. Professional Services Contractors are therefore being sought to provide cost estimating services for the duration of the TfNSW works. Click for more details...

UPPER CANAL BRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project at 184B Raby Rd, Gledswood Hills, NSW 2557 for New. Proposed construction of a bridge over Sydney Catchment Water Upper Canal. Construction of 2 lane vehicular bridge crossing & providing a connection in the Turner Rd precinct. The bridge is 5.7m in length & 21m in width. Associated palisade fencing. The proposed bridge construction is over the Molles Main tunnel which forms part of the Upper Canal system. Click for more details...

WARRUMBUNGLE SHIRE BRIDGES
Currently at the Construction stage In Warrumbungle is a project estimated to be $ 1271000. This project Demolition of existing bridges. Construction of 3 new bridges. Baradine Creek bridge will be on a horizontal alignment & flat vertical alignment with minimum length of bridge being 61.5m and minimum width 8.2m, constructed with concrete vertical wall abutments & concrete relieving slabs on both approaches. Kenebri Bridge - is a one lane bridge on the straight horizontal alignment & flat vertical alignment with minimum length of 6m & width of 4.5m; constructed with concrete vertical wall abutments & concrete relieving slabs on both approaches. Worrigal Creek bridge is a one lane bridge on a straight horizontal alignment & flat vertical alignment with minimum length of bridge being 10 m & width being 4.5m; constructed with concrete vertical wall abutments & concrete relieving slabs on both approaches Click for more details...

WAMBELONG CREEK BRIDGE
National Park Rd, Gilgandra, NSW 2827 Has Wambelong Creek Bridge currently at Construction stage. Construction of a new bridge across the Wambelong Creek. Scope of work involves: demolition & removal of the existing Gumin bridge & replacement with a new pre-cast concrete 2 lane bridge structure. The new bridge will be 45.95m long x 8.6m wide. Click for more details...

BULGANDRAMINE BRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Narromine Council Area of Bridge - Replacement type. Replacement of the existing single lane timber & concrete bridge with a two lane structure. Scope of work includes: demolition of the existing bridge & construction of the replacement bridge. Foundations & support structures. Deck, safety barriers & abutment protection. Widening of the shoulders and the necessary earthworks at the approaches to allow for the construction of the new bridge. Click for more details...

CARRINGTON FALLS BRIDGE
A project in the NSW Within Kiama. Replacement of the existing timber bridge. Construction of a new concrete bridge should have an overall width of 5m with in situ concrete decking supported on prestressed concrete girders. The new bridge should have two spans which only one row of columns/piers is allowed to be constructed in the middle of the waterway. Click for more details...

BICENTENNIAL PARK BRIDGE 8
Bridge - Refurbishment project at Bicentennial Park, Sydney Olympic Park, NSW 2127 In The Council Area Of Auburn of State. Refurbishment of an existing steel framed timber decked pedestrian light weight vehicle bridge inclusive of approach & departure asphalt pathways Click for more details...

BURNETT WALK FOOTBRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project at at Darvall Park, Eastwood, NSW 2122 for New. Remove the existing footbridge. Supply & installation of a new footbridge at Darvall Park Click for more details...

CUDGEGONG RIVER FOOTBRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Mid Western Regional Council Area of Local Govt ownership. Construction of a cycleway/pedestrian bridge over the Cudgegong River in Mudgee. The bridge will be 2.4m in width & 100m in length Click for more details...

KELLY'S BRIDGE & BUCKETTS WAY UPGRADE
Kelly's Bridge & Bucketts Way Upgrade is currently at the Construction stage, valued at about $ 900000 it is Replace existing timber culvert with RC pipe culvert, bridge approaches & realignment/reconstruction of Bucketts way including but not limited to the provision of traffic control measures, installation & maintenance of sediment erosion control measures, earth works, surface drainage, guard rails, tree clearing, road signage and line marking with minimal disruption to road users Click for more details...

EURIMBLA BRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Demolition of existing bridge. Construction of a new bridge Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect