State

Categories

Sub Categories

Click Here to Find Current Projects

List of Bridges, Aqueducts, Viaducts Projects in NT



Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Upgrading 343.2km & construction of a bridge at King Billabong. Click for more details...

DARWIN BOTANIC GARDENS
Currently at the Construction stage In Darwin City is a project estimated to be $ 224000. This project Construct upper & lower creek channel, 2 bridges & concrete works for water feature. Click for more details...

ADELAIDE RIVER & SOUTH ALLIGATOR BRIDGES
Bridges (2) - Upgrading project at Adelaide River & Arnhem Hwy Area of, Darwin, NT 0800 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Repair & regrade to approaches, approach slabs & rails. Click for more details...

MCARTHUR RIVER BASE METALS MINE
A project in the NT Within Katherine Town. 38 week contract envisaged to construct the Batten Creek bridge and approaches. Click for more details...

WATARRKA NATIONAL PARK - KATHLEEN SPRINGS
A project in the NT Within Alice Springs Town. Replacement of infrastructure at the Day Use area, Walk & Viewing Platform area destroyed by recent fire. Click for more details...

PROFESSIONAL TEAM
Renovations, Refurbishments etc. project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Various sites & Larapinta Dr, Alice Springs, NT 0870. Supply professional Engineer & Technical Officer with 5 to 12 years relevant experience to Alice Springs region for the supervision of contract construction of civil/roads projects generally on Larapinta Drive. Click for more details...


is currently at the Construction stage, valued at about $ 153000 it is Construct new access road & boat ramp. Click for more details...

MANINGRIDA ROAD CONCRETE FLOODWAYS
Currently at the Tenders & Building stage In East Arnhem Shire is a project estimated to be $ 30000. This project Construct two (2) concrete floodways at Ch: 96.1 km & 96.3 km Maningrada Road. Click for more details...

NT BRIDGES
Civil Engineering (Bridges, Aqueducts, Viaducts) project at All main roads within Northern Territory, ., NT 8999 for Renovations, Refurbishments etc.. Inspect & assess all NT bridges & selectively measure environmental agressivity & concrete penetration. Click for more details...

KATHERINE REGION ROADWORKS/REPAIRS/MAINTENANCE
Civil Engineering (Bridges, Aqueducts, Viaducts) New project at Roads within region of, Katherine, NT 0852. This type is Drainage/Structures/Bridges/Grids - Repairs/Maintenance with State ownership. Repairs & maintenance of drainage, structures, bridges & grids for 12 month period. Click for more details...

CENTRAL ARNHEM ROAD MAINORU RIVER CROSSING
Currently at the Construction stage In East Arnhem Shire is a project estimated to be $ 5949000. This project Mainoru River Crossing on Central Arnhem Road - roadworks & bridgeworks (single lane). Click for more details...

STUART HIGHWAY RAIL OVERPASS
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Stuart Hwy & Santa Teresa Rd (Roger Vale Dr) approx 10.5km from, Alice Springs, NT 0870. Construction of rail overpass with double stack container clearances & allowing for 2 rail lines & road underneath. Associated civil & earthworks, electrical relocation, floodways, stormwater drainage including concrete lined channel & guard rail. Click for more details...

ROPER HIGHWAY ROPER RIVER & WILTON RIVER HIGH LEVEL CROSSINGS
High Level Crossings (2)/Road Realignment project at Roper Hwy (CH 177.38km) 174km south east of Katherine & (CH 182.58km) 183km south east of, Katherine, NT 0852 In The Council Area Of Katherine Town of State. Upgrade of Roper River & Wilton River low level crossings to high level crossings. To include single/double lane bridges & road realignment. Construction of permanent detour lane. Associated civil works. Click for more details...

TIGER BRENNAN DRIVE DUPLICATION FROM WOOLNER ROAD TO BERRIMAH ROAD
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Tiger Brennan Dr (from Woolner Rd to Berrimah Rd), Darwin, NT 0800. Construction of 9km duplication of Tiger Brennan Drive from Woolner Road to Berrimah Road. To include new bridge structure at Hidden Valley overpass & upgrade to all intersections for the length of duplication. Click for more details...

CENTRAL ARNHEM ROAD ROCKY BOTTOM CREEK HIGH LEVEL CROSSING & GOYDER RIVER BRIDGE RECTIFICATION
Currently at the Construction stage In East Arnhem Shire is a project estimated to be $ 9071000. This project Construction of Rocky Bottom Creek single lane bridge/high level crossing. To include 3.2km of 2 lane road approaches & realignment on Central Arnhem Road. Construction & high strain dynamic testing of 3 bored, rock socketed test piles at the Goyder Main Crossing & rectification works at Goyder West Crossing. Associated civil works. Click for more details...

FOG BAY ROAD LEVIATHAN CREEK CROSSING UPGRADE & SEAL
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Fog Bay Rd south west of, Dundee Beach, NT 0822 of High Level Crossing/Roadworks/Drainage - Upgrade type of New development. Construction of a 2 lane bridge & 1.1km of 2 lane sealed road at the Leviathan River crossing on the Fog Bay Road between Ch14.130km & Ch15.220km from the Cox Peninsula Road intersection. Drainage. Bitumen, base gravel, w-beam guardrail, concrete batter protection & asphalt. Wingwall, headstock, ballast, piles & socket. Click for more details...

TABLELANDS HIGHWAY BRIDGE UPGRADES PACKAGE 1
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Alice Springs Town Council Area of Bridges (6) - Upgrade - Package 1 type. Redecking & strengthening of 6 bridges on Tablelands Highway from chainage 0km to 222km. Click for more details...

VICTORIA HIGHWAY SADDLE CREEK CROSSING
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Construction of 2 x 13m span concrete plank bridge on existing eastern depression at chainage 399.35km & 3 x 13m span bridge that will replace current bridge at main channel at chainage 399.5km. To include raising the road level from 51.965m above sea level to 54.03m. Removal/demolition of existing culvert & bridge crossing. Associated civil works. Click for more details...

STUART HIGHWAY ALI CURUNG RAIL OVERPASS
Renovations, Refurbishments etc. project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Stuart Hwy 150 Km South Tennant Creek, Tennant Creek, NT 0860. Repairs to the Tennant Creek Region - Stuart Highway - Ali Curung Rail Overpass. Earthwork repairs to soured earth batters on the overpass, rehabilitate embankment, utilising sand-clay from pits on site. Overpass is 150km south of Tennant Creek township. Click for more details...

TABLELANDS HIGHWAY REDECKING OF BRUNETTE CREEK SOUTH, BRUNETTE CREEK NORTH & CRESWELL CREEK BRIDGES
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Tablelands Highway (Ch127.07, Ch127.17 & Ch224), Tennant Creek, NT 0860 of Bridges (3) - Redecking type of New development. Redecking of Brunette Creek South, Brunette Creek North & Creswell Creek Bridges on the Tablelands Highway at Ch127.07, Ch127.17 & Ch224km. To include the removal of the existing precast concrete bridge decks & replacement with stronger precast decks, installation of W-beam guardrail, provision of double coat seal as well as minor patch repair of several headstocks & replacement of missing or damaged bridge signs. Click for more details...

TABLELANDS HIGHWAY REDECKING OF PLAYFORD RIVER, BOREE CREEK & WHITEHOLE CREEK BRIDGES
State ownership Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Barkly Shire Council Area for New development. Redecking of Playford River, Boree Creek & Whitehole Creek Bridges on Tablelands Highway at Ch55, Ch100 & Ch105km). To include the removal of the existing precast concrete bridge decks & replacement with stronger precast decks, installation of W-beam guardrail, provision of double coat seal as well as minor patch repair of several headstocks & replacement of missing or damaged bridge signs. Click for more details...

EAST BAINES BRIDGE UPGRADES
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Katherine Town Council Area of Bridge - Upgrade type. Upgrades works to the East Baines Bridge on the Victoria Highway. To include replacement of nuts & bolts. Click for more details...

ROCKY CREEK BRIDGE
Bridge/Road New project In The Unincorporated North Council Area. Construction of a high level crossing over Rocky Creek on Fog Bay Road at Ch12.5. Scope of works includes: construction of a 15m dual lane high level bridge at Rocky Creek crossing & realignment of 400m of new sealed pavement Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - PILE CONSTRUCTION
Bridge Construction - Pile Construction - Wilton River project at Roper Hwy, Katherine, NT 0850 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Construction of 20 x 1016mm cased cast-in-place reinforced concrete piles with 900mm diameter rock sockets at the Wilton River High Level Crossing on the Roper Highway. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - PILE CONSTRUCTION
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Construction of 28 x 1016mm cased cast-in-place reinforced concrete piles with 900mm diameter rock sockets at the Roper River High Level Crossing on the Roper Highway. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - BRIDGE CONSTRUCTION
Currently at the Construction stage In Katherine Town is a project estimated to be $ 10000000. This project Construction of a 5 span rendered concrete bridge over the Wilton River on the Roper Highway. To include headstocks, beam, deck slab, kerbs, approaches & railings. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - BRIDGE CONSTRUCTION
A project in the NT Within Katherine Town. Construction of a 6 span rendered concrete bridge over the Roper River on the Roper Highway. To include headstocks, beam, deck slab, kerbs, approaches & railings. Click for more details...

FLOCKHART DRIVE PEDESTRIAN & CYCLE BRIDGE
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 408000. This project Construction of a shared pedestrian & cycle bridge at Flockhart Drive, Marlow Lagoon. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - ROAD CONSTRUCTION
Roper Hwy, Katherine, NT 0850 Has Roper & Wilton Rivers High Level Crossings & Road Upgrades - Road Construction currently at Construction stage. Supply & installation of W-beam guardrailing for the Roper River & Wilton River High Level Crossings on the Roper Highway. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - ROAD CONSTRUCTION
State ownership Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Katherine Town Council Area for New development. Provision of line marking at the Roper River & Wilton River High Level Crossings on the Roper Highway. Supply & installation of reflective pavement markers. Click for more details...

TODD RIVER BOARDWALK
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Tuncks Rd, Alice Springs, NT 0870. Construction of a boardwalk & connecting pathway between Tuncks Road & Stott Terrace along the banks of the Todd River, Alice Springs. To include 2.5m wide concrete pathway with 2 sections of raised boardwalk with steel grating & wire railings. Supply & installation of temporary protection barriers. Click for more details...

STUART HIGHWAY BRIDGES
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Stuart Hwy, Tennant Creek, NT 0860 of Bridges (3) type of New development. Supply & install steel beam guardrails complete on the Stuart Highway at the following 3 locations: Chainage.696.99 North Newcastle Creek Bridge, Chainage.697.47 Middle Newcastle Creek Bridge & Chainage.697.95 South Newcastle Creek Bridge. Click for more details...

COX PENINSULA ROAD
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 146000. This project Reconstruct batters & install guardrails at Pioneer Creek Bridge. Scope of work includes: remove existing ski-jump type guard rail at Pioneer Creek Bridge on Cox Peninsula Road. Cut longitudinal existing fretted seal edge, to not less than 100mm, using a mechanical cutter to form a uniform edge, remove existing shoulder base of at least 200mm thick, widen the shoulders to minimum 2m width to allow for installation of guardrails. Remove 30m long on either side of the bridge, with compacted batters at a slope of 1:4. Import base material for new shoulders and compact to 200mm thickness at 100 MMDD. Supply & erect new galvanised steel W-Beam guardrails and posts, 24m long on each side, complete with coldmix bund in front of rails and delineators attached, primer seal 10mm on shoulders. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect