State

Categories

Sub Categories

Click Here to Find Current Projects

List of Bridges, Aqueducts, Viaducts Projects in SA


DRY CREEK LINEAR PARK
Local Govt ownership Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Port Adelaide Enfield Council Area for Renovations, Refurbishments etc. development. Work includes: bulk earthworks, relocation of existing footpath & fencing, adjust existing scour protection to suit gabion & mattressing works, construct rock filled mattresses (408 sq m) & gabions (578 linear m) for bank protection & 5 weirs, reinstatement of areas disturbed by excavations & construction activity. Click for more details...


Civil Engineering (Bridges, Aqueducts, Viaducts) Renovations, Refurbishments etc. project at University Bridge (over River Torrens) Victoria Dve, Adelaide, SA 5000. This type is Bridge - Upgrade with Local Govt ownership. Repairs & maintenance. Click for more details...

DEPT OF TRANSPORT
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Patawalonga Creek & RN5833 Tapleys Hill Rd, West Beach, SA 5024 for New. Roadworks, bridge over Brownhill Creek & causeway construction. Click for more details...

DEPT OF TRANSPORT
Currently at the Tenders & Building stage In Various is a project estimated to be $ 1000000. This project Contractors for Departmental roadworks &/or bridgeworks above certain financial limits. Click for more details...

SOUTH EAST HIGHWAY - MAJOR IMPROVEMENTS (NEW ALIGNMENT)
Subcontract project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at South East Hwy (Glen Osmond - Crafers) Adelaide Plains, Adelaide, SA 5152. Post tensioning for bridge & underpass for 4.7 km approx x new route construction & 3.6 km x realignment & widening. Click for more details...

BOWERING HILL ROAD BRIDGE
Bridge - Replacement Renovations, Refurbishments etc. project In The Onkaparinga Council Area. Upgrading/replacement of creek crossing comprising precast concrete culverts & associated civil works. Click for more details...

WALTHAM FOREST TRAIL
Pedestrian Bridge For Trail Supply & Install project In The Tea Tree Gully Council Area. Construction & installation of pedestrian bridge. Click for more details...

MAWSON LAKES
Bridge For Commercial/Industrial/Residential Development - Stage 1b4 New project In The Salisbury Council Area. 1 x 60 m approx span bridge. Click for more details...

ADELAIDE BRIDGE
Renovations, Refurbishments etc. project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Adelaide Bridge King William Rd (over River Torrens), Adelaide, SA 5000. Major rehabilitation & improvement works to reinforced concrete, 1930 built significant heritage landmark bridge to include: repair all structural dilapidations, strengthen bridge deck, upgrade lighting & restore architectural elements. Click for more details...

PORT RIVER EXPRESSWAY (PORT RIVER BRIDGE) STAGES 2 & 3
Bridge - Stages 2 & 3 New project In The Various Council Area. Stage 2: 4 lane road bridge across Port River between Docks 1 & 2 with opening span of 30 m approx for river traffic & linking directly to Victoria Rd & Francis St. Stage 3: single track rail bridge across Port River adj new road bridge with opening span of 30 m approx & connections to existing rail system. Wingfield-Port Adelaide rail freight line will be re-routed via new river crossing. Click for more details...


Currently at the Construction stage In Marion is a project estimated to be $ 1000000. This project Structural steel frame, concrete decking & railing bridge. Click for more details...

RIVER WAKEFIELD
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Bridge over River Wakefield on RN3500 Port Augusta - Port Wakefield Rd, Port Wakefield, SA 5550 for Renovations, Refurbishments etc.. Replace bridge railing & install w-beam guard fence. Click for more details...

TRANSPORT SA - SOUTHERN EXPRESSWAY
Footbridges - (5) project at Darlington -, Reynella, SA 5161 In The Council Area Of Noarlunga of State. Construction 5 footbridges for Southern Expressway Click for more details...

TRANSPORT SA - SOUTHERN EXPRESSWAY
Bridges (2) - Stage 2 New project In The Noarlunga Council Area. Comprising 2 bridges. Click for more details...

TRANSPORT SA - SOUTHERN EXPRESSWAY
Transport Sa - Southern Expressway is currently at the Construction stage, valued at about $ 100000 it is Comprising 4 bridges & associated civil works. Click for more details...

HOPE VALLEY AQUEDUCT OPEN CHANNEL SECN
Btwn 800 m twin pipelines from Gorge Weir & Hope Valley Tunnel that leads up to Hope Valley Reservoir, Hope Valley, SA 5090 Has Hope Valley Aqueduct Open Channel Secn currently at Construction stage. Replace existing 3.5 km open channel secn of aqueduct with buried gravity flow pipeline laid within confines of River Torrens Linear Park. Minimum flow capacity of 210 Ml/day, gravity flow pipeline constructed below ground & to commence near old chlorination building & complete at Hope Valley Reservoir Tunnel with associated connection works including any necessary upgrades to Hope Valley Tunnel to achieve specified flow capacity. On commissioning of pipeline, existing open channel to be decommissioned in situ & area rehabilitated as far as practicable to natural grade lines. Click for more details...

MOUNT BARKER INTERCHANGE BRIDGE
A project in the SA Within Mount Barker. Clean & repaint steel girders after removing existing lead paint. Click for more details...

MARLU CURU INDUSTRIAL PARK
Industrial Park project at ., Salisbury North, SA 5108 In The Council Area Of Salisbury of Federal. Construct road, bridges & associated works. Click for more details...

TRANSPORT SA - SOUTHERN EXPRESSWAY - STAGE 2
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Christies Creek, Noarlunga Downs, SA 5168 of Footbridge type of New development. Construct footbridge. Click for more details...

STRATHALBYN BRIDGES
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Alexandrina Council Area of Bridges (5) - Upgrade type. Maintenance of 5 bridges. Click for more details...

VICTOR HARBOR INNER RING ROUTE
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Adelaide Rd to George Main Rd, Victor Harbor, SA 5211 of Ring Route type of Renovations, Refurbishments etc. development. Approx 5 km roadworks incorporating 3 bridges, earthworks, pavement, roundabouts, intersections, & drainage. Click for more details...

PARINGA BRIDGE - CORROSION MANAGEMENT SYSTEM UPGRADE
State ownership Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Renmark-Paringa Council Area for New development. Upgrade bridge corrosion management system includiing: remove existing lead based paint & re-paint. Click for more details...

BIRKENHEAD BRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Port Adelaide Enfield Council Area of Electrical/Electronic Inspection For Bascul Spans type. Electrical/electronic inspection & 24 hour breakdown service for bridge as required. Click for more details...

BIRKENHEAD BRIDGE
Renovations, Refurbishments etc. project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Birkenhead Bridge over Port River RN5800 Victoria Rd, Port Adelaide, SA 5015. Mechanical inspection & 24 hour breakdown service for bridge as required. Click for more details...

SOUTH SHORES - BOARDWALK
Boardwalk New project In The Yankalilla Council Area. Construct/install precast boardwalk. Click for more details...

SAHT - PORT ADELAIDE
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Port Adelaide Enfield Council Area of State ownership. Concrete paving for properties within Port Adelaide region. Click for more details...

INMAN RIVER FOOT & BIKE BRIDGE
Currently at the Construction stage In Victor Harbor is a project estimated to be $ 440000. This project Construct pedestrian/cycling bridge. Click for more details...

MONARTO ZOOLOGICAL PARK VIEWING PLATFORMS
Currently at the Construction stage In Murray Bridge is a project estimated to be $ 150000. This project Construction of viewing platforms. Click for more details...

BROWNHILL CREEK BRIDGE REPLACEMENT
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Angas Rd, Hawthorn, SA 5062 for Subcontract. Replace vehicular bridge over Brownhill Creek & associated retaining walls. Click for more details...

DTEI - STURT HIGHWAY ROADWORKS/BRIDGEWORKS
A project in the SA Within Light Regional. Construction of roadworks, earthworks, drainage & bridgeworks as part of the overall upgrade of the Sturt Highway between Gawler & Nuriootpa. Click for more details...

NORTHERN CONNECTOR ROAD (NORTH SOUTH CORRIDOR)
Roadworks/Bridgeworks project at South Rd to Northern Expressway, Virginia, SA 5120 in the Civil Engineering (Bridges, Aqueducts, Viaducts). The Design & Construction of the North-South Corridor, Northern Connector Project. Project Scope: The Northern Connector Project will ultimately form an integrated rail & road corridor in the northern Adelaide metropolitan area. (The rail component of the project has been deferred for future implementation.) The Northern Connector project scope includes: 1) A new 110km/h non-stop motorway standard road with three lanes in each direction between the Northern Expressway & the South Road Superway; 2) A system interchange, the Northern Interchange, at Northern Expressway/Port Wakefield Rd to enable the following movements: i) Motorway mainline connection of the Northern Connector to the Northern Expressway (southbound & northbound); ii) On ramp (southbound) from Port Wakefield Rd to the Northern Connector; iii) Off ramp (northbound) from the Northern Connector to Port Wakefield Rd (north); iv) Off ramp (southbound) from the Northern Expressway to Port Wakefield Rd (south) (existing); & v) On ramp (northbound) from Port Wakefield Rd (north) to the Northern Expressway (existing); 3) A system interchange, the Southern Interchange, at South Rd Superway/Port River Expressway/Salisbury Hwy to enable the following movements: A) Motorway mainline connection between the Northern Connector & the South Rd Superway (southbound & northbound); B) Motorway mainline connection between Salisbury Hwy & the Port River Expressway (eastbound & westbound); C) Off ramp (westbound) from Northern Connector to the Port River Expressway; D) On ramp (northbound) from Port River Expressway to the Northern Connector; E) On ramp (southbound) from Port River Expressway to the South Rd Superway; F) Off ramp (westbound) from the South Rd Superway to the Port River Expressway (existing); G) Off ramp (eastbound) from the South Rd Superway to Salisbury Hwy; & H) On ramp (southbound) from Salisbury Hwy to the South Rd Superway (existing); 4) A service interchange at Waterloo Corner Rd to enable the following movements to/from the Northern Connector: AA) On ramp (northbound); AB) On ramp (southbound); AC) Northbound off ramp; AD) New road connection with Robinson Rd to facilitate access to/from the west of the Northern Connector, including to St Kilda Rd; AE) New arterial road connection to the intersection of Port Wakefield Rd & Waterloo Corner Rd; & AF) Intersection upgrade to Port Wakefield Rd/Waterloo Corner Rd intersection to/from the Northern Connector; 5) A service interchange at Bolivar Rd to enable the following movements; BA) On ramp (southbound); BB) Off ramp (eastbound); & BC) Intersection upgrade to Port Wakefield Rd/Bolivar Rd intersection; 6) Maintain existing connectivity at the Hanson Rd interchange on the Port River Expressway; 7) Structures associated with interchanges, wetlands, mangroves, North Arm Creek, Dry Creek, shared use path & stormwater management; 8) A 16 kilometre shared-use (pedestrian & cyclist) path connecting from Northern Expressway to South of Salisbury Hwy: 9) Local road accommodation & modifications works; 10) Designed to enable the future construction of: I) Freight rail corridor, predominately to the west of the Northern Connector; II) Globe Derby Interchange; III) Commercial service centre; IV) Additional access at Waterloo Corner Rd & Bolivar Rd interchanges; V) Heavy vehicle safety inspection facility; 11) Intelligent Transport Systems (ITS), integrated with DPTIs Norwood Traffic Control Centre; 12) Construction of an earth embankment for future rail, that serves to protect the low lying lands through Dry Creek from future sea level rise (ie partial sea wall); 13) Stormwater management infrastructure to manage the regional flood flows including 1-in-100 year flood immunity; 14) Road drainage & water quality improvement infrastructure to re Click for more details...

SMYTH ROAD BRIDGEWORKS
Smyth Rd, Tanunda, SA 5352 Has Smyth Road Bridgeworks currently at Construction stage. Remedial work to the concrete structure & installation of new guard rails. Click for more details...

CITY OF PLAYFORD FOOTBRIDGES
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Various, Playford, SA 5999 of Footbridges type of New development. Design & Construct three footbridges - Garlick Rd, Elizabeth Park, Grenadier Rd, Elizabeth East & Yorktown Rd, Elizabeth Downs. Click for more details...

ADELAIDE RIVERBANK PEDESTRIAN BRIDGE
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Riverbank Cityside across Torrens Lake to Adelaide Oval precinct, Adelaide, SA 5000. Construction of footbridge to connect north & south banks of the Torrens Lake in the Riverbank Precinct. Concept design with two landing points transitioning to a landscaped terrace with a signature waterfall. Approx 150 m in length, spanning 8-10 metres wide, launching from west of Dunstan Playhouse at level of Adelaide Railway Station concourse. The northern landing point will create an extended plaza area linked on event days to the redeveloped southern entrance of the Adelaide Oval via the closure of War Memorial Drive. Click for more details...

SOUTH ROAD NORTH SOUTH CORRIDOR UPGRADE TORRENS ROAD TO RIVER TORRENS & ASHWIN TERRACE
State ownership Civil Engineering (Bridges, Aqueducts, Viaducts) project In The West Torrens Council Area for New development. $896 million project to include: 3.7 km section of South Road between Torrens Rd & River Torrens (2.5 km of the road will be non-stop travel between Hurtle St & Ashwin Pde). This work will include sinking of 1.4 km of the road below surface under Grange & Port Rd to provide a non-stop route through the area for passing traffic & reduce delays to east-west travel. A parallel surface road along the length of the lowered road to connect the majority of local roads & arterial roads to South Road. A rail overpass bridge over South Rd,upgrade Croydon Station for the Outer Harbor line to ensure the service does not interrupt traffic on the new route. Dedicated off-road shared path for cyclists & pedestrians connecting to other local cycling & walking paths. the lowered non-stop carriageway will provide 3 lanes in each direction in an approx 8 m deep cutting. This lowered road will be constructed mostly on the western side of the existing South Rd. Two new grade separated interchanges to be included at Port & South Rd intersection & South & Grange Rd intersection. New Plans for the 3km upgrade from Torrens Rd to the River Torrens were displayed 28.4.15 & show an exit point north of Hawker St has been added to the motorway style section. Additional 1 km of roadway to extend beyond Torrens Road intersection to Pym St & South Rd intersection (previously ending at Dartmouth St), which builds upon an earlier 600 m boost to the project revealed in April 2015. Click for more details...

SOUTH ROAD NORTH SOUTH CORRIDOR DARLINGTON UPGRADE PROJECT
South Road North South Corridor Darlington Upgrade Project is currently at the Construction stage, valued at about $ 620000000 it is Further stage of the North-South Corridor for upgrade of 2.3 km section of road between the Southern Expressway & Ayliffes Road at Darlington. Work to include the following components - . A new lowered road on the western side of South Road that will allow non-stop flow of traffic from the Southern Expressway to the Ayliffes Road intersection with South Road. A parallel surface road (an upgraded South Road) along the current South Road alignment to ensure all existing arterial & local road connections remain in place & operate as they do now. The extension of Flinders Drive from South Road to Sturt Road will enable more efficient access to Flinders Medical Centre, Flinders Private Hospital & Flinders University. Upgrades to cycle & pedestrian routes for safer movement of people within the Darlington precinct & for improved connection to other local cycling & walking paths. Improvements to the intersections of Marion Road & Sturt Road, South Road & Daws Road & localised upgrading of South Road through Edwardstown. The lowered non-stop carriageway will provide three lanes in each direction in an approximately eight metre deep excavation. The lowered road will be constructed on the western side of the existing South Road. This solution has been designed with he future transport needs in mind; the design allows for connection to the non-stop North-South Corridor when the sections north of Darlington is upgraded in the future. The design of the project has changed in a number of areas as a result of further design development, community feedback and the procurement process. A summary of the most significant changes is outlined below: Extension of the non-stop motorway 1km further north along Main South Road, also grade separating the Ayliffes Road/Shepherds Hill Road and Tonsley Boulevard intersections. Inclusion of a bridge between Sutton Road and Mimosa Terrace to provide enhanced east-west connectivity. Inclusion of a right turn out of Brookside Road onto Main South Road for northbound motorists. Removal of impact on Warriparinga - the project will no longer encroach into the Warriparinga area. Realignment of the Flinders Drive extension to connect to Birch Crescent. The junction of Birch Crescent and Sturt Road will be signalised to enable safe traffic movements in and out of Clovelly Park. This will also provide enhanced connectivity for pedestrians and cyclists between Tonsley/Clovelly Park and the Flinders precinct through a dedicated path and bicycle path along the Flinders Drive extension. Realignment of Sturt Road/Main South Road intersection to retain on-street parking in front of Sturt Road businesses and left turn into Maple Avenue. This will also ensure that the remnant vegetation immediately west of this building is not impacted. Enhanced cycling and walking facilities through the provision of separated, two-way cycling paths and dedicated footpaths along both sides of the corridor. Removal of the proposed new road connection from Flinders Drive through the Francis Street Reserve. Flinders Link - This project will include extending the existing Tonsley rail line to Flinders Medical Centre, creating new connections to the health precinct & Flinders University. The project will include: 1) A 650 metre extension of the Tonsley rail line linking the Flinders medical Centre & Flinders University to the rail network, including 520 meters of elevated single track over Sturt Road, Laffers Triangle & Main South Rd; 2) A new station next to the Flinders Medical Centre; 3) An integrated shared pedestrian/cycle path adjacent the rail line; & Station review. Click for more details...

PATAPINDA ROAD BRIDGE REPAIRS
Bridgeworks Renovations, Refurbishments etc. project In The Onkaparinga Council Area. This project is to restore & preserve the underside of the superstructure for the Patapinda Road Bridge in Old Noarlunga. Project objectives are to stabilise the superstructure; repair & re-construct each pier skirt; repointing/grouting of the stone masonry pier joints/ reconstruct/replace timber fender planks; removal of any paint proved to be lead based within the under-deck steel beams & associated steelwork (including service pipes) before repainting; implementation of scour protection works to prevent erosion & undercutting of the bridge piers & abutments; commentary regarding environmental risk management plan requirements during construction; commentary regarding heritage requirements; geophysical information/documentation; assessment of potential boardwalk replacement. Click for more details...

GLOBE DERBY FOOTBRIDGE
Globe Derby Footbridge is currently at the Construction stage, valued at about $ 400000 it is The Work under the Tender comprises: Construction or installation of a pedestrian/cyclist footbridge across a drainage channel at Chainage 700.00 along the planned pathway from the Whites Road Wetland to Salisbury Hwy in Globe Derby Park, UBD Mat 60 reference L9. The structure will have a 30m span and 3m width, & may be a standard/existing design on piers & abutments selected for site conditions. It will include handrails & linkages to the adjacent paths. The Tenderer shall, unless the Tender otherwise expressly provides, supply at the Tenderers cost & expense everything necessary for the proper completion of the Works & proper performance of all the Tenderers obligations under the Tender. Click for more details...

GOMERSAL ROAD BRIDGEWORKS
A project in the SA Within Barossa. Structural remediation of the bridge. Click for more details...

MOYHALL ROAD BRIDGEWORKS
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Moyhall Rd via, Naracoorte, SA 5271. Replacement of a two bridge culvert crossings. Click for more details...

MARGARET DOWLING CREEK INLET & WETLANDS - PHASE 2
Civil Engineering (Bridges, Aqueducts, Viaducts) New project at Lock 5 Rd, Paringa, SA 5340. This type is Wetlands - Bridge/Footbridge/Fishway with State ownership. The Principal invites tenders from Tenders for the provision of Margaret Dowling Creek Inlet & Wetlands Phase 2 construction management services. The construction management services sought will support the delivery of the following two projects: Margaret Dowling Creek Inlet - As part of the South Australian Riverland Floodplains Integrated Infrastructure Program 9SARFIIP) Early Works, a new inlet to the Pike River Floodplain at Margaret Dowling Creek has been designed & approval given to tender for construction. Margaret Dowling Creek is located 3.5km east of Renmark Paringa. Most of the designed works will be in Bert Dix Park, which is approximately 100m south of the Renmark Paringa road bridge. Proposed construction works will comprise: a) Demolition & reconstruction of Lock 5 Road bridge; b) Construction of a new flow regulator & fishway; c) Demolition of an existing flow regulator; d) Design & Construction of a new footbridge; & e) Reinstatement of high value amenity park land. Plus Wetlands Phase 2 - As part of the Riverine Recovery Project (RRP), a construction contract award for site activities is proposed to commence in January 2016 for infrastructure at eleven wetland sites. Construction Management Services are required for preparation of the construction tender, review of tendered documentation, assistance in tender evaluation, preparation of management plans & assessment & review of borrow pit locations. Scope of Works: Margaret Dowling Creek - A new inlet to the Pike River Floodplain at Margaret Dowling has been designed & construction funding approved. Construction Management Services are required for preparation of the construction tender to review documentation, prepare the tender documents & assist in tender evaluation. On site construction surveillance is then required as part of the Construction Contract, to manage risks including WH&S, cost, schedule, quality & environmental compliance. Wetlands Phase 2 - Construction Management Services are also required during the preparation of the construction tender for Wetlands Phase 2, which includes construction of wetland management infrastructure at eleven wetland sites. Assistance is required with preparation of management plans & assessment of borrow pit sites. Click for more details...

SIMMOS BRIDGE UPGRADE
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Hazeleigh Rd, Saddleworth, SA 5413. Replace a one lane bridge with a two lane multi-cell box culvert bridge. Click for more details...

KANGAROO ISLAND BRIDGES 10 & 11 UPGRADE
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Kangaroo Island Council Area of Local Govt ownership. Strengthening & widening of two bridges to support heavy vehicles. Click for more details...

LONDON STREET BRIDGE REPLACEMENT
A project in the SA Within Port Lincoln. Expressions of Interest invited from registrants for the provision of general civil contractor services for the construction of the new London St Bridge. The project scope of work includes but is not limited to: 1) Demolition of existing bridge & associated structures; 2) Construction of the replacement bridge deck; 3) Construction of the footings/abutments; 4) Geometric construction of the proposed road approaches along London Bridge; 5) Underground stormwater drainage; 6) Earthworks & geotechnical construction; 7) Pavement construction; 8) New Street Lighting; & 9) Construction of service relocations that may be required, including telecommunications, electrical, water & sewer. Click for more details...

CAPE JAFFA JETTY REPAIRS
Civil Engineering (Bridges, Aqueducts, Viaducts) project at next to Bernouilli Conservation Reserve, Cape Jaffa, SA 5275 of Jetty type of New development. This tender is for repair works to the Cape Jaffa Jetty between Bents 20 to 45. Works are required to maintain the jettys long term structural integrity & provision additional safety improvements for all users. Repairs to the jetty shall consist of the following: a) Replacement of approximately 148m of steel railway kerbing (eastern side) with timber kerbing (between Bents 20 to 45); b) Replacement of timber keck timbers between Bents 35 to 45; c) Replacement of timber girders where required; & d) Bolt re-tightening at a later date after new timber has seasoned. Supply of Materials - The following Principal supplied materials shall be collected by the Tenderer from DPTIs Depot, 1 Wright Rd, Walkley Heights. All unused materials supplied by the Principal shall remain the property of the Principal & be returned to the Depot at the Tenderers expense. All other materials shall be supplied by the Tenderer. Quantities shown are indicative only: Timber Decking (165 units) 225mm x 75mm x 2.4m; Timber Decking ( 85 units) 225mm x 75mm x 3.0m; Timber Decking (5 units) 300mm x 150mm x 6.2m; & Timber Decking (33 units) 150mm x 100mm x 4.5m. Click for more details...

PORT RIVER PASSENGER RAIL BRIDGE REPAIRS
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Port River Passenger Rail Bridge, Port Adelaide, SA 5015. SCOPE OF CONTRACT DESCRIPTION OF WORK This Contract is for the Repairs to the Port River Passenger Rail Bridge currently being operated by the Principal as part of the Outer Harbor line. The Works include the following: (a) Repair of the piles, this requires cleaning then forming & grouting around the piles; This requires: i) Water blasting, removal & disposal of miscellaneous materials from the surface of the piles. ii) Apply anti-chloride coating to piles, pile caps & abutments. iii) Forming, fibre reinforced polymer laminate wrapping & cementitious grouting around the piles. The Port River Rail bridge includes 144 piles, in 9 groups of 16 piles (not including abutments). The Contractor is required to strengthen the critical piles identified for repair, this includes: 1) 39 piles with exposed reinforcing on two corners; 2) 32 piles with exposed reinforcing on three corners; 3) 13 piles with exposed reinforcing on four corners. A Provisional Quantity has been established for the repair of the remaining piles. In pricing this Provisional Quantity, the price must be presented as the extra over cost to provide the extra pile repairs to the 77 non-critical piles. The Provisional Quantity is to include overheads & profit. (b) Refurbishment of the bridge superstructure, this requires removal of the existing bridge deck, repair of the pile caps (also known as crossheads), the supply & installation of a new bridge deck & reconstruction of the rail track. This requires: i) Removal, transport & disposal of; the existing structural steelwork, redundant walkway & bearings. ii) Salvage of the existing maintenance walkway. iii) Repair of the piers & pile caps. iv) The supply of new structural steelwork & application of protective coatings. v) The installation of new mortar pads, bearings & structural steelwork. vi) The installation of the existing maintenance walkway. (c) Railway Signalling: i) Design of disconnection & reconnection of track circuits. ii) Disconnection & reconnection of track circuits, testing & commissioning of circuits. iii) Identify & protect signal cables. (d) Installation of continuously welded track, including: i) Removal & delivery of the existing timber transoms to the Principals depot. ii) Supply & installation of new timber transoms. iii) Removal & reuse of the existing rails. iv) Undertake rail stressing to specification. (e) Other works including: i) Pedestrian Management. ii) Elevated access e.g. scaffolding. iii) Protection & containment works. (f) Environmental protection, including: i) Application of environmental protection procedures. ii) Air & water monitoring to verify effectiveness of environmental protection procedures. SUPPLY OF MATERIALS The following materials will be ordered by the Principal: (a) Welded girders ? The Principal will place an order for all 40 no. 900WB282 beams & this contract will be novated to the Contractor. The Contractor is to inspect the girders & arrange transport from the suppliers factory. The Contractor must complete all other fabrication of the girders. (b) Timber transoms ? The Principal will order 450 transoms & this contract will be novated to the Contractor. The Contractor is to inspect the transoms at the suppliers yard & arrange loading & transport to site. (c) Elastomeric bearings ? The Principal will order elastomeric bearings & this contract will be novated to the Contractor. The Contractor must arrange transport of the bearings to site. All other materials must be supplied by the Contractor. SALVAGE OF TRANSOMS The Contractor must carefully salvage & deliver the existing timber transoms to the Principals depot in Dry Creek at the end of Churchill Rd. North & Bradford Way. SEPARABLE PORTIONS Separable Portion Click for more details...

CITY OF PLAYFORD ROAD BRIDGE UPGRADES
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Various locations within the boundaries of the City of, Playford, SA 5999. The Principal invites tenders for the provision of remedial/upgrade works to Old Pt Wakefield Rd Bridge, Heaslip Rd Bridge & Winterslow Rd Bridge, which includes but is not limited to the following: 1) Setting out the works from established bench marks & boundaries; 2) Cleaning/repainting of existing steelwork; 3) Concrete repair works; 4) Demolition of existing vehicle bridge & approach barriers; 5) Construction of new vehicle bridge & approach barriers; 6) Construction of new pedestrian bridge balustrading & approach fencing; 7) Resealing existing road pavement; 8) Installation of linemarking; & 9) Traffic management. Site Location & Access The locations of the sites are: a) Old Pt Wakefield Rd Bridge - where Old Pt Wakefield Rd crosses Gawler River, approximately 18km north west of Elizabeth; b) Heaslip Rd Bridge - where Heaslip Rd crosses Gawler River, approximately 10km north of Elizabeth; c) Winterslow Rd Bridge - where Winterslow Rd crosses the Gawler Railway Line. It is the Contractors responsibility to obtain any mandatory permits for the works; in particular, rail access will be required for Winterslow Rd Bridge. Click for more details...

NORMANVILLE PEDESTRIAN BRIDGE & SHARED USE TRAIL
Normanville Pedestrian Bridge & Shared Use Trail is currently at the Construction stage, valued at about $ 800000 it is The township of Normanville is located in the south coastal region of South Australia within the precinct of Yankalilla Council. As part of the Councils ongoing capital works associated with delivery of community improvements to the local amenities & with the purpose of providing outdoor trails & improving community integration / interconnectivity across the township of Normanville, Council is proposing to build a new pedestrian foot bridge in the existing Bungala Road & Carrickaling Road Normanville South Australia. Scope of Works: A) Without limiting the generality of the General Conditions of Contract (AS2124) & except as otherwise expressly provided herein the Contract & specification documentation, the successful Contractor shall provide the following deliverables but not limited to; all necessary design & shop fabrication detail drawings, plant & equipment, project & construction management, labour, supervision, supply, fabrication, surface treatment, installation, support services & consultants, surveying, testing, inspection & quality control, warehousing, transportation, site office & ablution facilities, storage, security, insurances, permits, taxes, etc deemed necessary for the total & safe delivery of the works. B) The Contractor shall, unless the Contract expressly provides otherwise, supply at the Contractor?s cost & expense everything necessary for the proper completion of the works & perform all obligations under the Contract. C) All minor items or services which are obviously necessary for the performance of the works or which could be reasonably inferred to be included shall be provided at the Contractors scope & at his cost & expense even though such items may not be specifically stated. D) The Contractors scope of work shall include but not be limited to the following: (a) Design & Shop Detailing - completion of all shop detail / fabrication drawings for the bridge steelwork, hand-railing & Cosset EverDeck decking material which includes the design & detailing of all connection details for the structural steel / hand-railing / decking, night light posts, crane lifting points, temporary assembly supports, etc; (b) Bridge Concrete Works - supply & install all concrete works associated with the bridge?s abutments walls, intermediate pier footings, sumps, spoon drains; (c) Pedestrian Bridge - supply, fabricate, surface protect, transport & installation of all bridge structural steelwork, support columns, bracing, hand-railing & plastic wood composite decking for the bridge; (d) General Earthworks - all earthworks, pier works, trenching, excavations, supply & installation of blinding materials / back fill materials, placement & compaction, load, cart away to waste surplus / spoils which cannot be re-used behind abutment walls, rock breaking, preparation of foundation bases, supply / installation & compaction of specified fill material behind abutment / retaining walls, placement & levelling of loam cover across new & disturbed areas include seeding with a general purpose replacement lawn, stormwater drains pits & associated pipes; (e) Block Retaining Wall - supply & installation of block retaining wall located in-front of the bridge?s western abutment wall including protection hand-railing including supply & installation of concrete strip footing to support the retaining wall & placement of aggregate filler materials & agridrain; (f) Pedestrian & Bicycle Trails - supply & installation of dual use pedestrian & bicycle trails comprising of; (i) Trails located on norther side of the bridge having approx. chainage length 35 mtrs; & (ii) Trails located on southern side of the bridge having approx. chainage length 185 mtrs. Click for more details...

MEMORIAL PARK BRIDGE REPLACEMENT
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Yankililla Oval access road, Yankalilla, SA 5203 of Bridgeworks type of New development. Tenders are invited for the Yankalilla Bridge upgrade, which includes but is not limited to the following: 1) setting out the works from established bench marks & boundaries; 2) demolition of the existing bridge; 3) construction of a new road bridge; 4) construction of a new footbridge; 5) construction of road pavement; 6) construction of bridge barriers & bollards; 7) construction of pedestrian fencing; 8) construction of concrete kerbing; 9) linemarking & traffic management. Click for more details...

CHAPEL STREET BRIDGE REPLACEMENT
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Goyder Council Area of Local Govt ownership. The Principal invites tenders for the provision of Chapel Street Bridge Replacement. Council plans to replace the existing timber bridge with a pre cast concrete bridge, in Chapel Street, Burra. It is in accordance to Councils asset management plan to replace old dilapidated bridge infrastructure in the township to improve access & public safety. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect