TASMAN PROJECT - MOUNT SUGARLOAF - SURFACE BUILDINGS
Tasman Project - Mount Sugarloaf - Surface Buildings is currently at the Construction stage, valued at about $ 1000000 it is Administration, worker amenities and stores, workshop, bunded fuel area. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Infrastructure (Bunding) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

LAKE LINDSAY COAL PROJECT - EARTHWORKS PACKAGE - ACCESS ROAD & DAMS & WATER MANAGEMENT ET AL
Private ownership Mining - Infrastructure (Bunding) project In The Isaac Regional Council Area for New development. Now includes prep for industrial area hardstand. Click for more details...

LAKE LINDSAY COAL PROJECT
New project of Mining - Infrastructure (Bunding) project at Approx 25 km from, Middlemount, QLD 4746. Overburden removal to commence July 2006; coal will be washed in existing washplant & construction on site will commence shortly. Production of export coking coal, & pulverised coal injection coal, expected to reach its peak in 2008. Coal to be hauled by truck or overland conveyor to German Creek. Blasting necessary prior to conventional truck and shovel strip mining. Dragline operations to 80 metres later in the mine life. Flood levee banks to be constructed parallel to Oaky Creek. Click for more details...

POITREL COAL MINE PROJECT - CREEK DIVERSION/LEVEE BANKS
A project in the QLD Within Isaac Regional. The proposal includes diversion of New Chum Creek to the east of the mine and levee banks along the flood plain of the Isaac River to the south and New Chum Creek to the east. Click for more details...

FIMISTON GOLD MINE OPERATIONS EXTENSION STAGE 3
Gold Mine Expansion project at Goldfields Highway Via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Development will comprise the expansion of the open pit, waste rock dumps and Tailings Storage Facility (TSF). The open pit expansion known as the Golden Pike Cutback will be widened and deepened to approx 670 metres and therby extending the life of the mine until 2017. The Golden Pike Cutback is estimated to hold 2 million ounces of gold. There a number of options for tailings disposal. Option preferred is to heighten the level of the two existing TSF from 30 metres to 40 metres. Other options include recommissioning the Kaltails TSF or constructing Fiminsto 3 TSF. This would cover an area of 150 hectares and would comprise associated infrastructure such as roads and recant ponds. Associated infrastructure include the realignment of the environmental noise bund, extension of the loopline railway. Click for more details...

LAKE LINDSAY COAL PROJECT - CIVIL WORKS FOR MINE SITE
Civil Works - For Mine Site project at Approx 25 km from, Middlemount, QLD 4746 in the Mining - Infrastructure (Bunding). Various civil & concrete works for the mine site. Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - DALBY COMPRESSOR STATION
A project in the QLD Within Western Downs Regional. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Installation at the Dalby Compressor Station of 2 additional 4570kW Centaur 50 solar gas turbine compressors along with inlet/exhaust systems, cooler units, fuel gas skids, pipework & valves. Associated works to include a diesel engine alternator for cold start up power, a bunded 6000l fuel store facility, oil store, control room, access road, car park & amenities. Click for more details...