State

Categories

Sub Categories

Click Here to Find Current Projects

List of Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks Projects


CALTEX SERVICE STATION
Currently at the Construction stage In The Hills Shire is a project estimated to be $ 800000. This project Demolition of existing service station, removal of all fuel infrastructure & remediation of any contaminated soils & validation of the site Click for more details...

SIR JAMES MITCHELL PARK - FORESHORE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Mill Point Rd, South Perth, WA 6151 of Park - Foreshore/Beaches type of Renovations, Refurbishments etc. development. Construction of series of beaches immediately to west of Ellam St that will enhance accessibility to river from park, to enhance existing eroded beach west of Mends St Jetty & create series of beaches long eroded foreshore between Captain Stirling Memorial & eastern end of South Perth Esplanade. Click for more details...

RANDWICK ENVIRONMENTAL PARK
New project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 6 Argyle Cr, Kingsford, NSW 2032. Establishment of an environmental park comprising conservation areas, infrastructure & passive recreation areas, bushland regeneration, landscaping works, construction of pedestrian pathways, cycleways, park furniture picnic shelters, fencing, construction of timber bridge & viewing platforms. Click for more details...

FORMER GASWORKS SITE
Local Govt ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Shoalhaven Council Area for New development. Proposed remediation of former gasworks site. Scope of work includes: excavation, remediation, testing & independent certification, filling, in-ground services & car park sub upgrade. Click for more details...

MALLOKUP ROAD BRIDGE (BRIDGE 3497A)
New project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Mallokup Rd, over Capal River nr, Peppermint Grove Beach, WA 6271. Works invlolve construction of new Bridge (3497A). Click for more details...

KOSCIUSZKO NATIONAL PARK
Civil/Road - Maintenance project at various within Kosciuszko National Park Reserve, ., NSW 2999 In The Council Area Of Various of State. Pre-qualification scheme for civils works & road reserve maintenance (less than $250,000) in Kosciuszko National Park. Click for more details...

AUSTRALIAN NATIONAL
New project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Whyalla &, Tarcoola, SA 5710. 35,000 tonne to Whyalla & 16,000 tonne to Tarcoola. Click for more details...

FORTESCUE AVENUE UNITS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 56 Fortescue Av, Seaford, VIC 3198 for New. Proposed removal of existing dwelling & construction of 3 x single storey dwellings with all to have 3 bedrooms. Construction materials will include brick with pitched roofs & feature rendering and weatherboard cladding Click for more details...

CATHEDRAL PLACE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Bounded by 592 Ann St Gipps St 112 Gotha St & Wickham St, Fortitude Valley, QLD 4006 of Earthworks For Residential/Commercial Complex type of New development. Area of land 15,057 sq m. Click for more details...

SCOTT GROVE UNITS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Darebin Council Area of Private ownership. Proposed construction of three single storey attached brick veneer units. The units will be constructed on a concrete slab with tiled roofs. Each unit will have 2 bedrooms. Click for more details...

VICTORIA ROAD DEVELOPMENT
Victoria Road Development is currently at the Early Planning stage, valued at about $ 1000000 it is Major tourist development with main reception building, function rooms and restaurant and 10 chalet/residence visitor accommodation and a caretaker's house with 148 car parking spaces. Proposal to develop site with: (1) Conversion of existing residence into accommodation (2) Construction of 9 chalet style accommodation buildings (3) Demolition of the old commercial building (near Warburton Highway) (4)Erection of a single storey reception building (total 640sqm) with function room of 184sqm (accommodating upto 180 persons) and restaurant for 120 persons (5) A walkway from receiption building to car parking area at rear of site. The site area is 3.87ha and is located on the junction of Victoria Road and the Warburton Highwy on the edge of the Wandin North township. Click for more details...

MURRAY BRIDGE TOWNSHIP DEVELOPMENT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Murray Bridge Council Area of Local Govt ownership. Landscaping. Roads. Upgrade railway tracks. Click for more details...

EARLY CHILDHOOD PROGRAM 2001
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Various Council Area for New development. Work comprises modifications & siteworks in order to establish Pre-Primary transportable units on selected school sites together with associated site facilities. Click for more details...

KRS/KEW COTTAGES REDEVELOPMENT
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Boroondara Council Area for New development. Staged Development over approximately 5 years. Display home and information centre have been constructed. Likely to consist of 10 stages in all. Twenty community homes and around 220 double storey custom built townhouses will be first to commence. The community development will be situated in the north eastern corner of the site. To include hydrotherapy pool and other facilities. There will be a total of around 500 houses, townhouses and apartments. The apartments will be constructed in 4 x blocks with 6 apartments in each in a mansion style development. Three heritage buildings at the centre of the site will remain.. Community recreation facilities will include a piazza, cafes and playground. Walking and bike paths will make the site accessible to the public. Extensive landscaping and conservation and retention of the 1100 trees on the 27 ha site. Click for more details...

CRONULLA TO SUTHERLAND RAIL LINE
Rail Line - Upgrade/Duplication project at Cronulla to Sutherland Rail Line, Cronulla, NSW 2230 In The Council Area Of Sutherland of State. Duplication of 8km of existing line between Sutherland, Gymea, Caringbah & Cronulla & configuration of Sutherland Junction. New stabling yards at Cronulla. re-signalling, new communications & electrification of the entire line. upgrade of Sutherland. Kirrawee, Woolooware & Cronulla stations, 8 new or modified road & rail bridges. Extensive track possession works & environmental & public domain works. Click for more details...

GLENCOE STREET DWELLINGS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Greater Bendigo Council Area of Private ownership. Demolition of existing dwelling and construction of five new dwellings Click for more details...

HASTINGS ENTERTAINMENT ARTS & CONFERENCE CENTRE
Local Govt ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Port Macquarie-Hastings Council Area for New development. Demolition of existing 2 storey building, services, landscaping and civil infrastructure. Provision of facilities/services and excavation for archeological investigation Click for more details...

QUIX SERVICE STATION SITE
Private ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Fairfield Council Area for New development. Remediation of service station site, remediation of the on-site impacted groundwater, groundwater extraction & on-site treatment & oxygen injection to the groundwater. Click for more details...

SHIRE OF COOLGARDIE - KAMBALDA WEST HALL
A project in the WA Within Coolgardie. Works include demolition & removal of Kambalda West Hall. Click for more details...

KERANG DISUSED GRAIN HANDLING FACILITY
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Gannawarra Council Area for New development. Demolition of disused grain handling facility. Corrugated iron over steel structure. Click for more details...

HAMILTON ROAD DEMOLITION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Fairfield Council Area of Private ownership. Demolition of existing structures, site establishment, earthworks, bulk excavations & retaining wall Click for more details...

MORPETH HERITAGE VILLAGE ST JOHN'S CENTRE OF MINISTRY
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Maitland Council Area of Private ownership. Stage 1 of retirement village development, which will comprise demolition & mainly civil works associated with the entry road & upgrading works on Morpeth Rd. This stage will also include provision of sewer, water & electricity & landscaping. Click for more details...

BIOSECURITY QUEENSLAND CONTROL CENTRE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for New development. Replacement Fire Main. Click for more details...

HORROCKS FORESHORE REDEVELOPMENT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for Renovations, Refurbishments etc. development. Redevelopment of the foreshore, which will include construction of a sea wall made up of sand bags, each weighing 3 tonne, on an alignment from the boat launching access area through to the southern side of the playground. South of the recreation jetty would be flattened to create a slight slope from the car park to the foreshore, which will eliminate the existing large bankment. Click for more details...

SAND PIT ROAD SAND QUARRY
Lots 5 & 6 Sand Pit Rd, Dardanup, WA 6236 Has Sand Pit Road Sand Quarry currently at Planning stage. Works to include the construction of a sand quarry. Click for more details...

CANBERRA HOSPITAL - NEW MENTAL HEALTH FACILITY
Bulk Earthworks project at Blks 9 & 10 Secn 53 Palmer St, Garran, ACT 2605 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Bulk earthworks for the Adult Acute Mental inpatient unit Click for more details...

PERTH CITY LINK RAIL
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Perth Council Area of Forward Works type. Forward Works package FW6 includes installation, termination & testing of optical fibre & copper cables & recovery of optical fibre & copper cables. Click for more details...

WALLAN WETLAND
Wetland project at Hadfield East Community Park, Whittlesea Rd, Wallan, VIC 3756 In The Council Area Of Mitchell of Local Govt. The Wallan Wetland will be made up of a deeper sediment pond, two shallow vegetated wetland pools and a rock weir within Wallan Creek. The rock weir within Wallan Creek will divert a portion of water into the sediment pond. The sediment pond is designed to slow the flow of the diverted water causing dissolved sediments such as silt and organic matter to fall to the bottom. Click for more details...

SCENIC RAILWAY
Scenic Railway - Upgrade project at Cnr Violet St & CLiff Dr, Katoomba, NSW 2780 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Upgrade of the top & bottom platforms of the Scenic World Science railway. Undertake upgrade works at the top & bottom platforms. The top platform is to be extended in width; the upgrade will include a new roof & profile. A new platform & roof are to be added to the western side of the bottom station. A new section of boardwalk will allow visitors to alight from one side of the train carriages & enter from the others. New carriages are to be installed & the mechanisms for driving the railway will be replaced; this includes a new winch mechanism to be installed in the current workshop; to accommodate this the workshop will be extended. Top station - new platform & viewing area; installation of an elevated ramp along an existing access track. The formalisation of the track will involve constructing new footings for the ramp. Tunnel works will include minor excavation of the tunnel walls, rock bolting, mesh installation & shotcreting. Bottom platform will inlcude new stairs from the existing platform to the boardwalk above. A new boardwalk will be constructed to connect the western platform to the existing boardwalk. Existing bottom platform & roof will be retained & refurbished Click for more details...

FALLS CREEK ALPINE RESORT
Falls Creek Alpine Resort is currently at the Construction stage, valued at about $ 200000 it is Design and construction an elevated pedestrian stairway between Silverski and Frueauf Village, Falls Creek Alpine Resort. The solar lit stairway will be approximately 70m in length with a vertical rise of approximately 18m. Click for more details...

BIGGE PARK
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 124 (Lots 701 & 702) Bigge St (DP1056246), Liverpool, NSW 2170 of Park - Redevelopment type of New development. Revitalisation to Bigge Park. Scope of work includes: replacement & realignment of internal pathways, replacement & realignment of park lighting, removal of trees. Replacement of existing retaining wall. Renovation of rotary clock. Install new fitness stations. New children's play area. Construct a circular contemplation walk. Installation of water play area. Planting of new trees & landscaping, irrigation works. Installation of park furniture. Install a heritage forecourt to reconnect the park with its history including the 1820s colonial Georgian building commissioned by Governor Macquarie. Earthworks & demolition of bowling greens Click for more details...

GEORGE HOTEL EXTENSION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Ballarat Council Area of Private ownership. Alterations & part demolition to existing building including a three storey extension to existing hotel, associated public throughfare, dispensation of car and bicycle parking. The development will extend the George Hotel which is at the adjoining site at 25-27 Lydiard St North, by incorporating the subject site through the conversion and extension of the vacant commerial building (former newsagency) located at this site. The front facade of the existing will be retained with the remainder of the building to be demolished. A new three storey building will be constructed behind the retained facade. The remaining 3 metres width will become a private public laneway which will connect Lydiard Street North to an existing laneway off Armstrong Street North. The laneway will have lockable gates at both the Lydiard Street and the rear of the property for security. At ground level the proposed extension will have a deli to the front, a retail area and a cafe/bistro at the rear. Outdoor seating and dining will be available. The first floor will consist of a gym and swimming pool as well as four hotel rooms with ensuites. The second floor will consist of six hotel rooms with ensuites. Access to the upper floors will be via internal corridors connecting to the George Hotel. Key features will include articulated north glass facade using jagged edge forms to help intergration with adjacent site and stepped Regent Theatre complex, glass facade to maximise solar access and views, contemporary style and materials. Click for more details...

MODE APARTMENTS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Brisbane City Council Area of Units (157) - 12 Storey type. Demolition of existing commercial buildings. Construction of 12 storey residential building with 68 x 1 bedroom & 69 x 2 bedroom units. Pre-cast concrete panels, tinted glazing. 3 levels secure basement parking & ground level parking for 181 cars. 2 lifts. Roof deck with barbecue facilities & casual seating areas. Associated landscaping. Click for more details...

7 MILE LANDFILL FACILITY REDEVELOPMENT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 7 Mile Waste Facility, Crown Reserves 32987 & 33135 Seven Mile Rd, 10 km from Karratha towards Dampier, off Dampier Hwy, Gap Ridge, WA 6714 for New. Works to include concrete & steel structural works & associated earthworks related to the 7 Mile Waste Facility Redevelopment in Karratha. Click for more details...

MELBOURNE COUNCIL BANNER POLE REPLACEMENT PROGRAM 2013/14
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Melbourne Council Area of Banner Pole Replacement type. Supply and installation of 288 upper sections for retrofitting to banner poles. The goods to be supplied are 288 upper section high tensile aluminium tubes 100 x 4 x 6000, alloy 6351 T-6 or equivalent to existing banner poles throughout the City of Melbourne. Click for more details...

MURRINDINDI SHIRE COUNCIL TENDER PANELS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Murrindindi Council Area of Local Govt ownership. Murrindindi Shire Council is establishing a panel of pre-qualified consultants and contractors to supply building design/architectural services including landscape architecture, tender 13/3. Council is also establishing a panel of providers of major, medium and minor civil works projects, tender 13/6. Click for more details...

KIRRAWEE VILLAGE - SOUTH VILLAGE
Private ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Sutherland Council Area for New development. Proposed early works to prepare site for redevelopment. Scope of work includes: excavation & filling & dewatering. Creation of a water body & clearing of the vegetation. Click for more details...

PUBLIC TRANSPORT CENTRE - ASBESTOS REMEDIATION WORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 116 West Pde, Perth, WA 6000 of Asbestos Remediation Works type of Renovations, Refurbishments etc. development. Works to include asbestos remediation works comprising of asbestos decontamination or removal at the Public Transport Centre. Click for more details...

POINT COOK ROAD ROAD CONSTRUCTION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at 359 Point Cook Rd, Point Cook, VIC 3030. This type is Road Construction with Local Govt ownership. Creation of a road at 359 Point Cook Road, Point Cook. Click for more details...

7 ELEVEN SUTHERLAND
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at 693 Old Princes Hwy, Sutherland, NSW 2232. This type is Tank - Replacement with Private ownership. Removal of 4 underground storage tanks, associated fuel lines & fuel dispensers & necessary remediation. Installation of 2 x 90KL underground fuel tanks. Install 2 x new grated pits, electrical pit, vent stack with bollards, spill safe fill box, new pulse dispensers & associated infrastructure. New concrete bunding & re-establishment of surfaces Click for more details...

WILLOWMAVIN ROAD BRIDGE 1443 WORKS
Demolition & Reconstruction Bridge Works New project In The Mitchell Council Area. Bridge 1443 - Demolition & construction of a new single span bridge on Willowmavin Road, Kilmore. The scope of works include removal of the existing steel & concrete structure, construction of a new precast concrete structure, guard rail & an asphalt wearing course. Click for more details...

NORTHERN GOLF CLUB LAKE EXTENSION
Lake - Extension project at 47-97 Glenroy Rd, Glenroy, VIC 3046 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Extension of the existing water retention basin (lake). Click for more details...

WANATTA LANE CENTRAL WASTE FACILITY
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Bega Valley Council Area of Local Govt ownership. Construction of the second landfill cell. Scope of work includes: establish & maintain erosion & sediment control for the works area. Excavate, fill, compact and grade as necessary to develop the finished surfaces. Supply & install groundwater drainage system. Supply & install the leachate barrier system. Conduct field trial for the placement of leachate drainage aggregate. Supply & install leachate collection and conveyance system. Supply & install surface water management system Click for more details...

EMERALD HILLS ESTATE - STAGES 1, 2, 4, 5 & 6
A project in the NSW Within Camden. Staged civil works over stages 1, 2, 3, 4, 5 & 6 comprising clearing of vegetation, demolition of existing structures, site regarding, 5 sediment basins. Construction of roads Click for more details...

GOULBURN MURRAY WATER METERS CONSTRUCTION PANEL
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Greater Shepparton Council Area of Meters Construction type. The installation of modernised outlets as part of the Goulburn Murray Water Connections Project. Click for more details...

BAPTCARE NORLANE AGED CARE FACILITY AND AFFORDABLE HOUSING - STAGE 1
14 Thrush St, Norlane, VIC 3214 Has Baptcare Norlane Aged Care Facility And Affordable Housing - Stage 1 currently at Construction stage. Early works infrastructure for a housing and aged care facility including roads and all services. Click for more details...

WASTEWATER MANAGEMENT INLET SCREENS
Inlet Screens project at ., Shepparton, VIC 3630 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Wastewater management inlet screens & associated civil works. Click for more details...

LYONS STREET RECONSTRUCTION
Lyons St, Carnegie, VIC 3163 Has Lyons Street Reconstruction currently at Construction stage. Lyons Street Reconstruction. Requirement: Removal of 600 sqm of 75-150 mm thick concrete paving & 2300 sqm of 200 mm thick concrete road pavement & supply & lay 2300 sqm of new 42 Mpa 200 mm thick reinforced concrete pavement, 820 lin m of dowelled concrete kerb & channel, 20 lin m of concrete kerb & channel, 595 sqm of concrete paving, 57 tonnes of new asphalt, 18 in No new drainage pits, 51 lin m of 300 mm DIA RCP, 105 lin m of 450 mm DIA RCP, 149 lin m of 525 mm DIA RCP, 134.50 lin m of 600 mm DIA RCP, inclusive of drainage excavation & associated works including the removal & replacement of 1 in No. concrete raised pavement & splitter island. Click for more details...

GLEBE ISLAND SITE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Leichhardt Council Area of Demolition/Removal type. The works will be conducted in two phases to facilitate the removal of the temporary structures. Phase 1 - removal of two 10 metre wide zone on either side of Hall 3 once the structure of Hall 2 & Hall 4 have been lowered & dismantled along the 10 metre zone. Phase 2: removal of all the remaining concrete structure and items and make good the site to its original condition. Phase 1 works include: demolition, removal & disposal of the following: all reinforced bond deck slab (approximately26,000sqm), all reinforced concrete bond deck slab supporting walls (block work and concrete), piers and footings; all sullage tanks & associated pipework (under slabs); all concrete slabs on ground and any remaining concrete plinths; any remaining services and fittings that are around or under the slab; fire service tanks and all remaining pipework; any loose concrete blocks (excluding jersey kerb); planter boxes & contents; any other loose items site that will be required to be removed to make good the site. Phase 2 works to include: asphalt/concrete repairs and profiling upon removal of concrete slabs and ramps, to take site back to its original condition. Click for more details...

MORT STREET STORMWATER DRAINAGE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for New development. Installation of stormwater drainage systems for the Mort St Upgrade Project, from Jellico St to Black Gully, and from Black Gully to the intersection of Griffiths St and Hogg St. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect