State

Categories

Sub Categories

Click Here to Find Current Projects

List of Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks Projects in SA


AUSTRALIAN SCIENCE & MATHEMATICS SCHOOL
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) Subcontract project at University Campus, Sturt Rd, Bedford Park, SA 5042. This type is Trade Package For Precast Concrete - University - Addns - Multi Level with State ownership. Precast concrete for new Australian Science & Mathematics school. Click for more details...

SAHT - NORTHERN METROPOLITAN ADELAIDE
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Various Council Area for New development. Demolition of varios properties in Northern Metropolitan Adelaide (period contract). Click for more details...

VARIOUS SOUTH AUSTRALIAN WIND FARMS
Private ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Various Council Area for New development. Develop numerous wind farms within South Australia. Click for more details...


Plumbing Package For Council Works Depot Subcontract project In The Mitcham Council Area. Steel framed construction, concrete floor, colourbond cladding & roofing, aluminium framed windows, ducted reverse cycle refrigerated airconditioning for office area & evaporative airconditioning for elsewhere. 120 carparks & 34 truck parks & associated landscaping. Click for more details...

PORT LINCOLN HOSPITAL
Trade Package For Siteworks - Hospital - Stage 2 Subcontract project In The Port Lincoln Council Area. For construction of casualty, medical imaging & maternity wards, single storey. Click for more details...

LUTHERAN HOMES - HOPE VALLEY HOSTEL
Civil Works For Nursing Home New project In The Tea Tree Gully Council Area. Construction of roads, diversion of sewer & stormwater, construction of new sewer & stormwater services, carpark & all associated site works. Click for more details...

AUSTRALIAN NATIONAL
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Islington Siding Kilburn & Stirling North Siding Port Augusta, Kilburn, SA 5700 of Ballast type of New development. 17,000 tonnes of ballast for Islington Siding & 14,000 tonnes of ballast for Stirling North Stirling. Click for more details...

SA WATER CORPORATION
Currently at the Construction stage In Willunga is a project estimated to be $ 500000. This project Construct treatment plant, associated equipment & water storage lagoons to use recycled water from plant. Scheme will initially serve population of up to 5,000 people. Works include: 1 x holding lagoon, 3 x evaporation lagoons, pump station, oxidation ditch, clarifier, filtration units & associated equipment. Click for more details...

TARGET AUSTRALIA
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The West Torrens Council Area of Earthworks For Reserve Storage Building type. Earthworks for steel framed construction, concrete floor, precast concrete cladding, colourbond roofing, aluminium framed windows, electrical work, fire hydrants & hoses & reverse cycle refrigerated ducted airconditioning (for office only). Warehouse floor area: 5,000 sq m approx. Office floor area: 120 sq m approx. 5,000 sq m approx x hotmix bituminous surfacing & extensive landscaping. Click for more details...

ADELAIDE FESTIVAL CENTRE
Currently at the Construction stage In Adelaide is a project estimated to be $ 250000. This project PACKAGE 605 - hydraulic services for centre upgrade stage 2/phase 3. Click for more details...

THE DOMAIN MARION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Bnd by Milham St North to Morphett & Diagonal Rds, Oaklands Park, SA 5046 for New. To include roads, kerbing, storm water, services trenching for power, sewer, water & cabling. Click for more details...

SIR SAMUEL WAY COURT NO 3
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for Subcontract development. Demolition associated with High Technology Court upgrade. Click for more details...

SEAFORD SUBSTATION
Alt 1015 Commercial Rd, Seaford Rise, SA 5169 Has Seaford Substation currently at Construction stage. Civil works for new substation. Click for more details...

REPATRIATION GENERAL HOSPITAL
Preliminary Works For Hospital - Redevelopment project at Daws Rd, Daw Park, SA 5041 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Staged refurbishment of existing buildings including workshops, warehouses & offices, includes new building works for Linen Stores, Gardeners' Amenities & Tow Motor Store. Siteworks includes relocation & demolition of buildings, new road ways & car park areas, landscaping & site services. Approximate area of new & refurbished buildings - 1,750 sq m. Click for more details...

MORPHETTVILLE RACECOURSE WETLANDS
A project in the SA Within Marion. Inlet/Outlet diversions for wetland & crossing of Morphett Rd & Bray Sts. Works include: civil works associated with connections into wetlands, laying stormwater pipes under Morphett Rd & tram tracks, connections into existing stormwater system along Bray St & cut in into Sturt River. Click for more details...

SA CO-OP BULK HANDLING
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project, Pinnaroo, SA 5304. This type is Earthworks For Bunker Storages (2) with Private ownership. 20,000 total tonnes storage, 2 x 10,000 configuration, 120 m long x 100 m wide x 150 mm depth pads. Click for more details...

SNI (RIVERLINK) TRANSMISSION LINE
New project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Btwn Buronga Substation (north of Mildura) New South Wales & Robertstown Substation, Robertstown, SA 5381. 235 km approx long above-ground transmission line including 50 m approx high pylons & staggered 500 m apart to support lines. Major works required for Monash Substation & minor works for Robertstown Substation. Click for more details...

GENERAL MOTORS HOLDEN LTD
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at Philip Hwy, Elizabeth South, SA 5112. This type is Footings/Bored Pilings For Paint Shop with Private ownership. Footings/Bored Pilings for steel frame construction, metal cladding, zincalume roof, concrete floor, associated siteworks. Click for more details...

BTR ENGINEERING AUSTRALIA LTD FERRIS PRODUCTS ADELAIDE
Concrete Floors & Pits For Foundry/Office Subcontract project In The Port Adelaide Enfield Council Area. Concrete floors & pits for Foundry: Steel portal frame, concrete floor, colourbond cladding & (Likely to be) colourbond roofing. Office: masonry construction, concrete floor, (likely to be) colourbond roofing, aluminium framed windows & airconditioning (type not determined). Associated carparking & landscaping. Click for more details...

DOMAIN MARION THE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Marion Council Area of Local Govt ownership. Comprising approx 80 linear m roadway with kerbs, common services trench, stormwater drain & block paved footpath. Click for more details...

FLINDERS PORTS - OUTER HARBOR
Civil Works (Earthworks) For Deep Sea Port Facilities project at Flinders Ports Port Adelaide port facilities, Outer Harbor, SA 5018 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Civil works (earthworks) for port facilities upgrade. Click for more details...

KIRRIBILLY WINERY
Kirribilly Winery is currently at the Construction stage, valued at about $ 500000 it is Concrete work for winery & crushing plant. Click for more details...

ANGASTON CREEK WATERCOURSE MANAGEMENT & LINEAR PARK PROJECT
Currently at the Construction stage In Barossa is a project estimated to be $ 200000. This project Murray St to Hill St flood mitigation work including gross pollutant trap. To incorporate linear park. Click for more details...

NORWOOD PAYNEHAM & ST PETERS COUNCIL
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Various sites within Council area of Norwood Payneham &, St Peters, SA 5069 for New. Underground all power lines within council area. Click for more details...

ADELAIDE FESTIVAL CENTRE
Adelaide Festival Centre is currently at the Construction stage, valued at about $ 250000 it is Concretor/reinforcing/formwork for enabling works for Festival Centre. Click for more details...

ROYAL ADELAIDE HOSPITAL
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) Subcontract project at North Tce, Adelaide, SA 5000. This type is T/Package For Piling - Hospital-Redev-Stage 2/3a Phase A-Package 3-Multi Storey with State ownership. Piling for hospital redevelopment. Click for more details...

ALMA HOTEL & RETAIL SHOWROOM/OFFICE
Demolition For Hotel & Showroom/Office - Stage 1 project at 66 - 74 Magill Rd Cnr 4 Sydneham Rd, Norwood, SA 5067 In The Council Area Of Norwood & Payneham & St Peters of Private. Demolition of existing structure. Click for more details...

UNIVERSITY OF SA - CITY EAST - CAMPUS - REID BUILDING
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for New development. Partial demolition of Reid Building. Click for more details...

ANZAC HIGHWAY REMEDIATION WORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 605 - 609 Anzac Hwy (Vol 5788, 5871 Fol 996, 191+), Glenelg North, SA 5045 of Remediation Works type of New development. Remediation of former service station site including excavation of land. Click for more details...

DTEI - ISLINGTON WORKSHOPS GROUNDWATER REMEDIATION
Groundwater Remediation project at Lot 44 Churchill Rd, Kilburn, SA 5084 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Groundwater remediation within workshops complex site. Click for more details...

EDINBURGH PARKS LEISURE PRECINCT - ENVIRONMENTAL MANAGEMENT PLAN CONSULTANT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Lot 50 Womma Rd cnr Andrews Rd (DP 7935), Edinburgh, SA 5111 for New. Consultancy to include assessment of adequacy of rehabilitation works (& management of such works) proposed for rehabilitation of land previously used for landfilling to facilitate redevelopment of land for golf course. Click for more details...

SAHT - MARION REGION DWELLINGS - DEMOLITION WORKS
New project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Within Marion Region of, South Australia, SA 5999. Demolition of 22 cottage flats in Marion Region. Click for more details...

SAHT - WHYALLA DEMOLITION
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Whyalla Council Area for New development. Demolition of 4 properties in Whyalla. Click for more details...

PORT ADELAIDE BULK STORAGE & TRANSFER FACILITY
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Minnipa Rd & Grand Trunkway, Port Adelaide, SA 5015 for New. Proposed construction of two mineral sands storage sheds, two concentrate storage sheds with inloading and outloading conveyor systems and associated earthworks, roadways & stormwater infrastructure also includes the development of a rail spur running into the site from the Port Flat Rail Yards. Click for more details...

NORTHERN EXPRESSWAY ROADWORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at Btwn Port Wakefield Rd at Salisbury Hwy-South Road Connector Bridge & Gawler, ., SA 5999. This type is Demolition with State ownership. For the provision of demolition services. Click for more details...

ADELAIDE SQUARE PLAYGROUND AMENITIES BLOCK
Amenities Block/Demolition New project In The Crystal Brook Council Area. T10/08 - Demolish and clear the existing toilet block. T09/08 - Construction of a new toilet block facility. Click for more details...

BOWDEN URBAN VILLAGE ENVIRONMENTAL WORKS (CLIPSAL SITE) CONSULTANCY
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Charles Sturt Council Area for New development. Consultancy includes reporting on groundwater monitoring, remediation of contaminated soil, geotechnical issues & underground storage tanks. Click for more details...

ADELAIDE SHORES GOLF WATERCOURSE REALIGNMENT
Watercourse Realignment New project In The West Torrens Council Area. Realign a section of the watercourse to the south of the Golf Pro Shop in order to provide a wider practice range. Total length of realigned section is approx 130 m with volume of excavation of approx 5000 cu m. The realigned watercourse is proposed to be lined with a biodegradable erosion control blanket (tender to identify the proposed material), to allow banks to be planted with suitable indigenous vegetation to aid bank stabilisation (revegetation to be carried out by Adelaide Shores). Scope of works includes all tasks associated with the realignment including gaining of approvals for the realignment from the Adelaide & Mt Lofty Natural Resource Management Board (to be costed separately), removal of existing vegetation, earthworks & preparation of banks. Click for more details...

MINDA HOME INCORPORATED RESIDENTIAL ACCOMMODATION STAGE 1B
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for New development. To include 8 single storey group dwellings, 2 single storey residential flat dwellings & 1 x 3 storey residential flat building comprising 17 apartments. Infrastructure services, stormwater & roadworks. Click for more details...

CITY OF CHARLES STURT ROAD & STORMWATER DRAINAGE CONSTRUCTION
Civil Works - Roadworks/Drainage project at Various locations within Council, Charles Sturt, SA 5999 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). The works are located within the City of Charles Sturt. These are: Kingston Avenue, Royal Park; Forest Avenue, Royal Park; Owen Street, Seaton; Suffolk Avenue and Exeter Crescent, Fulham Gardens; Esk Street & Findon Road, Findon; Wodonga Street, Beverley; Denton Street, Hendon. The scope of works comprise the reconstruction of road pavement and construction of stormwater drains including pedestrian and traffic management that include but are not limited to the following: removal of existing pavement material including asphalt; construction of earthworks as base preparation; construction of sub-base and base pavement; construction of asphaltic concrete sealed pavements; kerb and/or channel (gutter), which ncludes all forms ofconcrete channels(gutters), spoon drains, grated drains and mountable median and barrier kerbing; median kerbs and edging strips; junction pits with gatic cover frame; side entry pits (SEP); kerb ramps, crossovers and concrete driveways; concrete footpaths sections, access ramps/kerb ramps; brick paved footpath sections; paved commercial crossovers; residential and industrial vehicular crossings; infill concrete pavement for residential and commercial applications; concrete traffic island construction; supply and installation of segmental paving; construction of asphaltic concrete footpaths; pipework for drainage systems; provision of pre-cast box culverts units including construction of base slabs; drainage structures including headwalls, wingwalls, gully pits and outlet structures; miscellaneous concrete works required for open drains and drainage pits, lining and gully pits & cast in-situ or sprayed concrete; provision of galvanised steel box drains; provision for control, protection and safety of traffic during construction, including notifications to and approvals from authorities; notification to all appropriate property occupiers adjoining the works. Click for more details...

THE PARAFIELD & BROADMEADOWS RAILWAY STATIONS UPGRADE
Kings Rd, Parafield & Tisbury St, Davoren Park, Gawler, SA 5118 Has The Parafield & Broadmeadows Railway Stations Upgrade currently at Construction stage. As part of Public Transport Services (PTS) commitment to providing accessible public transport, two stations have been identified for upgrades to meet access requirements under the Disability Discrimination Act. The sites where upgrade works are to be undertaken are Parafield Station and Broadmeadows Station. Both stations are located on the Gawler line. Parafield station consists of two side platforms. The western (down) platform is an earth filled island platform with bituminous surfacing, located between ARTC and PTS (AMPRN) tracks. Access is via a ramp and automated pedestrian crossing on the northern end. The eastern (up) platform has been partly upgraded previously and consists of a side platform with concrete surfacing. Access is via a northern and a central ramp with the northern ramp connecting to the automated pedestrian crossing. Broadmeadows station is an earth filled island platform with concrete edges and capped with bituminous surfacing, currently with ramps and pedestrian crossings at each end. The railway right of way is a nominated specialised work location and safety of railway operations is of paramount importance. The contractor shall undertake the works in such a manner so as to not impede, obstruct or interfere in any manner whatsoever with Railway Infrastructure. The contractor shall perform all work outlined below in accordance with the contract and any other works outlined in the specifications and on the drawings which includes: demolition and earthworks required for platform modification works, including: removal and disposal of fill material including contaminated materials, removal and disposal of bitumen surfacing, footings and crossings as required, removal and disposal of shelters, lighting, platform furniture, signage and all other redundant infrastructure as required to complete the works, removal and disposal of fencing, disconnection of electrical and communications infrastructure, return of any infrastructure listed for salvage to PTS depot & all other work specified in the specifications and on the drawings; Reconstruction of the platform including: concrete works including edging, footings, pedestrian crossings and platform topping slabs, supply and install TGSIs, pit & conduit installation and modification, including spare conduits (as outlined in the drawings), drainage, including under track, pipe work connections, pits, grates, gutters & downpipes, off platform works and all other associated works, footings for platform furniture, light poles, illuminated signage, timetables mirrors and shelters, raise existing pits and install new pits to meet new finished platform level flush with platform surface & earthing and bonding of platform infrastructure and concrete reinforcement and associated work in preparation for the future electrification of the Gawler Railway Line; manufacture and installation of new shelters; plumbing connection and installation of water points; supply and install all new station furniture, including on walkways, outside of the shelter (seating, lean rails and bins) including footings; reconstruct ramps, access paths and pedestrian crossings in accordance with the drawings including concrete maze slabs, TGSIs, fencing, handrails and kerbs (or kerb rails) as required, walkways across tracks, access paths between ramps and pedestrian crossings & smooth transition to adjoining surfaces; supply and install all new signage & supply and install Alpolic (Di Bond) shelter signage including back lighting; install all pits and conduits required to complete all electrical & comms works including future works and additional spare conduits in accordance with the drawings, install all conduits including spares to the shelter, light poles, signs and pits & raise existing pits flush with surrounding surface; supply Click for more details...

MARDEN SHOPPING CENTRE CIVIL WORKS INCORPORATED INTO ID 1977568
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 5-7 Lower Portrush Rd, Marden, SA 5070 for New. Civil works, alteration to road, fencing & parking. Click for more details...

TECHPORT CUF & ASC MAINTENANCE DREDGING WORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Port Adelaide Enfield Council Area of State ownership. The Common User Facility (CUF) and ASC Pty Ltd., are located within South Australia's maritime precinct known as Techport Australia. The CUF is a State owned facility & consists of a ship-lift, wharf, ship transfer system & dry berth for ship building & ship maintenance activities. The primary purpose of the CUF is to support the Commonwealth & ASC in the construction of the Air Warfare Destroyers for the Royal Australian Navy. In addition to this Project , other maritime shipbuilding, repair & maintenance activities are supported at CUF. Located to the north of the CUF, ASC conducts the long term maintenance of the Submarines for the Royal Australian Navy. The facility consists of a shiplift, wharf, transfer system, hardstand & maintenance support buildings. Both ASC & the CUF operate shiplifts for the docking & un-docking of ships, submarines & other vessels. The specification supplied details the minimum requirements for maintenance dredging of the CUF Shiplift pocket & the ASC Shiplift pocket & wharf areas. Interested parties are invited to submit an Expression of Interest for the provision of services, relating to maintenance dredging of both the Techport Common User Facility & ASC Pty Ltd. Shiplift pockets. 1) CUF Shiplift - The CUF Shiplift is a 160 metre long structure & consists of combiwall, sheet piling, circular piling with reinforced concrete headstocks, decks & capping beams & a ship lift platform. The shiplift pocket was originally dredged in 2009 to a depth of 17.55m LAT with a gutter under the centre of shiplift to 19.2m LAT. 2) ASC Shiplift - The ASC Shiplift has a platform length of 80m & a platform width of 20m. The Shiplift is a Syncrolift system & is raised & lowered by 13 pairs of hoists. The structure has circular pilings with concrete headstock. The platform is made of numerous major & interconnecting beams that are covered by a timber deck. The Shiplift pocket was originally dredged in 1988 to depth of 19.5m LAT. The last dredging work was completed in November 2011 with the last hydrographic survey completed in July 2014. 3) ASC Wharf - The ASC Wharf is a sheet piled structure that is 160m long & 16.5m wide. The area requiring dredging is bound by the northern & southern corners of the wharf structure out to a distance of 100m. The wharf area was originally dredged to a depth of 9.1m LAT. The last dredging work was completed in November 2011 with the last hydrographic survey completed in July 2014. Scope of Specification - The specification provides technical requirements for maintenance dredging of the shiplift pockets, the ASC wharf area & the disposal of dredged material on Techport property where shown on the drawings. The scope of work includes the construction & removal of a temporary pipeline for the transport of the dredged material from the dredge site to the disposal site. Click for more details...

WIRRABARA COMMUNITY WASTEWATER MANAGEMENT SYSTEM
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at Wilds Rd, Wirrabara, SA 5481. This type is Civil Works For Wastewater Management System with Local Govt ownership. Tenders are invited for the construction of the collection network for the Wirrabara Community Wastewater Management System (the Works). The allotments within the township of Wirrabara are currently serviced by individual septic tanks, whereby wastewater is disposed of on site. A Community Wastewater Management System is to be installed in the town. Full sewage will be collected from allotments & transferred to a new Wastewater Treatment Plant (WWTP) on Wilds Rd at the old dump site. (Note that the design & construction of the WWTP is a separate contract.) The WWTP will collect sewage from approximately 200 connections within the town & treat it to produce Class B quality recycled water. The plant is estimated to have an average daily flow (ADF) of 80 kL/day. The following list indicates the main elements of the Works sufficient to ensure that the Tenderer is aware of the scope of the Tender. It does not detail duties, actions or items of supply on minor works which are self-evident or inherent to the satisfactory completion of the scheme as described in the tender documents. Preliminaries: This includes: 1) Site establishment (including the transportation of all personnel, plant & materials to & from the site & the provision of temporary site accommodation); 2) Quality control & quality assurance; 3) Obtaining all licenses & payment of fees where required for conduct of the Works & compliance with all regulations relating to the Works; 4) Environmental controls management; 5) Traffic management; 6) All setting out of works & survey for identifying boundary locations, connection points, temporary bench marks, etc; 7) Survey for property boundaries in all easements; 8) Service locating & depthing; 9) Consultation with all authorities regarding work around existing services; 10) Site security; 11) Site office (including the provision of all personnel, facilities & amenities for the administration of the works of the scheme including temporary connections to Telstra/NBN, SA Power Networks & SA Water); 12) Pegging of connection points; 13) As constructed drawings; 14) Dilapidation reports; 15) Line flushing; 16) Hydraulic testing; 17) Air Testing; 18) Compaction testing of trench backfill; 19) PC inspections & end of defects inspections; 20) Operations Manuals; 21) Site Meetings. Property Connections: Supply & Install 100mm diameter uPVC DWV Class SN6 pipe to form approximately 200 property connections, including inspection points & all other associated fittings, laid at the locations & levels shown on the supplied Drawings. The Tenderer shall place timber marking pickets for each new property connection as per the design drawings prior to any construction. All requests for connection relocations are to be approved by the Superintendent. The Tenderer is to locate & relocate any water connections that clash with the network design. Gravity Drains - Supply & Install approximately 6620 metres of 150mm diameter uPVC DWV Class SN4 pipe, including all maintenance shafts & maintenance holes plus other standard &/or special fittings including direction boring, laid at the locations & grade shown on the drawings. Pump Stations - Construct one new pump station. Rising Mains - Supply & Install 80mm diameter rising main, including air bleed valves, scour valves, thrust blocks & other fittings, along with marker posts, laid at the locations & depth shown on the drawings. The Tenderer shall also supply & install all valves & pipework from the interface with the WWTP civil contractor as shown on the drawings. Gate valves shall be installed on all rising mains at the termination points with the WWPT Tender. Football Oval Irrigation System - Design, supply & installation of all Click for more details...

BIRKENHEAD REMEDIATION SITEWORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for New development. Demolition of site buildings & petroleum storage infrastructure & remediation of site prior to termination of current lease with RenewalSA to 30 June 2016. Click for more details...

PUKATJA (ERNABELLA) WASTE MANAGEMENT FACILTIES
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Far North Council Area for New development. This tenders is for the establishment of waste management facilities at a new location & closure of the old waste disposal site at Pukatja (Ernabella) in the Anangu, Pitjantjatjara Yankunytjatjara (APY) Lands. The work includes the establishment of waste management facilities at a new site, including the construction of: 1) a compound for disposal of domestic waste in trenches, 2) drying beds for bio-solids, 3) an area with individual bays & an adjacent apron for the sorting and storage of materials recovered from the waste stream, 4) an area for storage of large items such as abandoned vehicles, water tanks & concrete items, & 5) a cleared area, prepared for the installation of a hazardous waste material storage facility. Work also includes the construction of an earth mound between the new waste site the NT Border - Umuwa Rd to screen the site from the road & an access track to the waste site & the NT Border - Umuwa Rd. The existing Pukatja waste disposal site, which consists of more than one area, is to be closed. Waste shall be buried in either existing or to be constructed excavation(s) within the identified areas or compacted in mounds at ground level. All compacted waste material shall be capped with cover material. Mounding, compacting & capping waste shall only be allowed if there is insufficient space to bury waste in excavations. Large objects within the site, including abandoned vehicles, water tanks & large concrete items shall be removed from the areas to be closed & stored at designated locations with other like materials. Items such as tyres & wheels with tyres shall also be removed from the areas to be closed & stockpiled in separate locations with like materials. The storage areas for materials recovered from the existing waste disposal site shall be on or adjacent to the closed waste site. The work under the Tender consists of: a) New site identification & establishment; b) Closure of existing Waste Management Site; c) Establishment of new Waste Management facilities on the new site; d) Fencing & erection of signs; & Waste Management Site Access Track & junction & Screening Mound. Supply of Materials: The Principal shall supply all signs, posts & materials for the installation of signs at the new waste management site & the old waste disposal site. All other materials shall be supplied by the Contractor. Click for more details...

PORT STANVAC WHARF DEMOLITION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Onkaparinga Council Area of Wharf - Demolition type. Demolition of Port Stanvac Wharf. Click for more details...

MOUNT GAMBIER PRISON ACCOMMODATION INFRASTRUCTURE EARLY WORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Carpenter Rocks Road, Moorak, SA 5291 for New. Early works infrastructure for fences, perimeter road, civil platform, carpark for the proposed construction of 112 bed accommodation building. Click for more details...

WATERPROOFING EASTERN ADELAIDE
Local Govt ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Port Adelaide Enfield Council Area for New development. Works required include the construction of wetlands, biofilters, pipework, drainage & associated works. Access to the site shall be: 1) Felixstow - from Langman Gr; & 2) Hamilton Reserve - from O G Rd. Click for more details...

ELLISTON DISTRICT COUNCIL DEPOT SITE REMEDIATION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for New development. The Principal invites tenders for the following: Elliston District Council has determined to remove all of the fuel storage, including an underground fuel tank, and above ground tank, a mobile tank & associated infrastructure & remediate the site. The site is to be repurposed for use as a car park. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect