State

Categories

Sub Categories

Click Here to Find Current Projects

List of Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks Projects in WA


MERSEY POINT SEAWALL & ACCESS STAIRS
Currently at the Construction stage In Rockingham is a project estimated to be $ 270000. This project Construction of Mersey Point seawall & access stairs. Click for more details...

CWA BUILDING
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 3 (lot 368) Brooking St, Williams, WA 6391 for New. Works comprise demolition/relocation of CWA Building. Building comprises weatherboard, iron roof & timber floor. Click for more details...

BIOWISE COMPOSTING FACILITY
A project in the WA Within Kwinana. It is proposed to construct two underground storage tanks for storage of grease trap waste for incorporation into existing BioWise waste composting process. Tanks to have capacity of 16,000 l. Click for more details...

BRIDGETOWN INDOOR SPORT & RECREATION CENTRE
Site Preparation For Indoor Sport & Recreation Centre (Stage 1) project at Northwest corner of intersection of Gifford Rd & Steere St, Bridgetown, WA 6255 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Removal of debris & asphalt paving, earthworks for the removal of unsuitable foundation materials, installation of sub-soil drainage & earthworks to re-build & prepare site for construction of Stage 1 of proposed Bridgetown Recreation Centre. Click for more details...

BAYSWATER WETLANDS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) Renovations, Refurbishments etc. project at West of Tonkin Hwy, Bayswater, WA 6053. This type is Wetlands - Rehabilitation with Local Govt ownership. It is proposed to rehabilitate wetlands to west of Tonkin Hwy in Bayswater. Click for more details...

ELIZABETH QUAY - PERTH WATERFRONT (PERTH CITY FORESHORE) - PUBLIC REALM & INLET
Waterfront - Redevelopment - Design & Construct project at Foreshore btwn Barrack & William Sts, Perth, WA 6000 In The Council Area Of Perth of State. Construction of a 2.8 ha inlet that will bring the river back to near its original shore line. The inlet will be surrounded by landscaped terraces, boardwalks & promenades. It is proposed to remove a section of Riverside Dr & some changes may be made to existing roads to create more pedestrian-friendly routes. Significant work may be done on road re-alignment, drainage & dredging. The inlet, designed to reflect the historical characteristics of Perth Port, will have room for public boat mooring facilities. At the centre of the new inlet will be an island. Potential land use mix may include 15,000 sqm of office space, 36,000 sqm of retail, 1700 apartments, 220 hotel & short stay accommodation rooms & land at the foot of William St has been set aside for a significant public building to be 9,000 sqm in area likely to be a National Centre for Indigenous Art & Culture. Event spaces may include a public square next to the Esplanade train station, the promenade, the island & a new road which can be closed to accommodate events. Works may also include a swimming pool. Click for more details...

TAMALA PARK WASTE DISPOSAL FACILITY
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for Addition development. Works comprise removal of up to 1.4 million t of limestone from Tamala Park for four-year period, with option to extend for further four years. Removal may include pre-processing on site before removal. Details of any pre-processing will need to be given on appropriate schedule. Click for more details...


Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Various Council Area of Siteworks For Pre-Primary Transportables type. The following schools have been provisionally listed to have siteworks for transportable classroom units carried out: South Lake, Jandakot, Kardinya, Mandurah, Cooloongup, Koorawa, Hillman, Safety Bay, Parkwood. The work at each site is anticipated to require: Preliminary preparation (levelling) of the area for the transportable building/s, including clearing, etc.; Preparation of the access route from the existing road surface (selected sites); Provision of fencing/adjustment of any existing fencing, including personnel gate & vehicle access gate (selected sites); Provision of concrete paving slab paths both inside & outside fenced area (selected sites); Provision of concrete slab floor to verandah and storage shed; Connection of the pre-primary centre transportable to the existing electrical services of the site including adjustment of the site switchboard, etc.; Connection to the existing water supply, sewerage system (or provision of a septic tank system complete with leach drains, etc.); Incidental site preparation, landscaping, reticulation system adjustments, as may be specifically required. Click for more details...

GOLDFIELDS GAS TRANSMISSION LINE
Drilling Contract project at Pilbara to Kalgoorlie-Boulder, WA 6430 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). This 5 month contract to involve drilling & blasting requirements for the new gas pipeline to extend from the Pilbara to the Eastern Goldfields. Click for more details...

NEW METRORAIL PROJECT - SOUTH WEST METROPOLITAN RAILWAY
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Median of Kwinana Fwy btwn The Narrows & Glen Iris, ., WA 6999 of Rail Corridor - Design & Construction For Package E type of New development. South West Metropolitan Railway - Package E involves design & construction of civil, structural & drainage works to provide rail corridor within median of Kwinana Fwy between The Narrows & Glen Iris, including The Narrows & Mount Henry bridge sites. Works will include strengthening existing Narrows Bridge & construction of new southbound rail bridge, realignment of carriageways & building railway formation, widening & strengthening Mount Henry Bridge, construction of railway station earthworks at Leach Hwy & South St & realignment & reconstruction of ramps & intersections at Leach Hwy & South St. Click for more details...

CITY OF ROCKINGHAM - PIPELINES, DRAINAGE PRODUCTS & ASSOCIATED WORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Within council area of City of, Rockingham, WA 6168 for New. Works comprise period installation of pipelines, drainage products & associated works. Click for more details...

MENZIES & LEONORA BOREFIELDS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Menzies & Leonora Borefields, ., WA 6999 for Addition. Works comprise bunding of diesel fuel tanks & decantation areas at Menzies & Leonora Borefields. Click for more details...

NEW METRORAIL PROJECT - SOUTH WEST METROPOLITAN RAILWAY
Median of Kwinana Fwy btwn The Narrows & Glen Iris, ., WA 6999 Has New Metrorail Project - South West Metropolitan Railway currently at Early Planning stage. Provision of specialist technical support for South West Metropolitan Railway Package E Kwinana Fwy Rail Corridor (Narrows to Glen Iris). Click for more details...

MOUNT WELCOME SITE REMEDIATION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Crown land nr Mount Welcome via, Roebourne, WA 6718 for Renovations, Refurbishments etc.. Works comprise removal & disposal of raw asbestos fibres & asbestos cement products from, & site remediation work to, vacant Crown land near Mount Welcome. Click for more details...

QUINNS BEACH
New project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Fred Stubbs Memorial Grove, Reserve 22915 67 Ocean Dr, Quinns Rocks, WA 6030. Works comprise construction of one groyne & 86,000 t of sand renourishment for coastal protection works at Quinns Beach. Click for more details...

WAROONA DAM
Drakes Brook (access via Inverall Rd off South Western Hwy) 5.5 km approx east of townsite of, Waroona, WA 6215 Has Waroona Dam currently at Construction stage. Raising & stabilisation of Waroona Dam from RL 212.6 m to 215 m, construction of downstream seepage control works in conjunction with upstream clay blanket, submerged remotely-operated valve for control of outlet pipeworks to replace existing intake tower which is to be demolished, demolition of existing spillway & downstream access bridge. Demolition will include removal of side channel & ogee crest, warped transition, bridge abutment walls, pre-cast bridge sections, chute side walls & floor slab, downstream access bridge, energy dissipater & stilling basin & fencing. Following demolition, existing spillway to be backfilled & rehabilitated. Construction of new spillway along with approach channel & 16 m wide straight ogee crest with 235 m long concrete-lined chute which tapers from crest to chute width of 10 m. New spillway to include 6 m high curved approach walls, 9 m high bridge abutment walls, new 6.2 m wide x 18 m long skewed spillway bridge for vehicular access to dam crest road. Bridge to comprise pre-cast beams, top slab substructure, footpath, guardrailing, handrailing & road pavement. Upgrading works to existing instrumentation (this may be undertaken as separate contract), realignment of Inverall Rd & access road & site restoration. Dam instrumentation will involve relocation of existing rain gauge, installation of automated water level indicator, automation of existing hydraulic piezometers & replacement of some standpipe piezometers with electric piezometers, provision of new seepage weirs, automation of piezometer, water level & rain gauge readings & seepage weir & connection to SCADA. Click for more details...

LE GRAND ESTATE - SEWERAGE PUMPING STATION & PRESSURE MAIN
A project in the WA Within Esperance. Work comprises construction of Type 10 sewerage pumping station some 8 m deep & approximately 180 m of 100 mm diameter pressure main. Click for more details...

TANKERTON WAY - DN500 MSCL WATER DISTRIBUTION MAIN WORKS
Water Main - Construction project at Tankerton Wy, Mandurah, WA 6210 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Works to comprise of construction of 630 m of DN5000 MSCL Water Distribution Main in Tankerton Wy, Mandurah. Click for more details...

CITY OF COCKBURN - OPTICAL FIBRE CABLE LINK WORKS
Supply & Install project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at From Spearwood to Bibra Lake,, Cockburn, WA 6166. Works to comprise of supply & installation of optical fibre cable link services from Spearwood to Bibra Lake in City of Cockburn. Click for more details...

SHIRE OF MURCHISON - CONCRETE WORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Murchison Council Area of Local Govt ownership. Works to comprise of supply & lay of concrete for depot shed. Click for more details...

PERTH ZOO - ORANGOUTANG/ORANGUTAN EXHIBIT - STAGE 3
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) Supply & Install project at 20 Labouchere Rd, South Perth, WA 6151. This type is Exhibit Apparatus - Stage 3 - Fabricate, Supply & Install with Private ownership. Works to comprise of construction & erection of Stage 3 Apparatus for new Orangutan enclosures 101, 102, 103, 105, 107 & 108. Contractor to fabricate, supplay & install: Nesting platforms, water sprays, drinkers, shades, ropes, & rigging to 8 pre-cast concrete poles (M, N, P, Q, R, S, T & U); Install concrete ring collar to base of all poles as indicated, with cast anti-tamper service pits to poles M, N, R, U & T; Supply new puzzle boxes; Supply & install 1 tall & 3 short masts with concrete footings; Install overhead ropes; Demolish & dispose of existing apparatus; perform all site works as required to install new poles; All external timber work & required finishings outlined in tender documents. Click for more details...

MOUNT BARKER HIGH SCHOOL - STAGE 1
Forward Earthworks - Stage 1 project at Albany Hwy, adjacent to existing Mount Barker High School site, Mount Barker, WA 6324 In The Council Area Of Plantagenet of State. Works comprise of diversion of existing services & completion of bulk earthworks in preparation for construction of new school buildings & such other works as shown in drawings or included in specification. Premises will be occupied during currency of contract. Site to be accessed from Albany Hwy. Click for more details...

CHALLENGER TAFE AUTOMOTIVE TECHNOLOGY CENTRE
A project in the WA Within Kwinana. Works comprise elemental removal & disposal of parts of existing Kwinana High School to form cleared site free of building material & existing below ground services including: removal & disposal of asbestos cement including, but not limited to, roof & ceiling sheeting; removal & disposal of existing leach drain & associated contaminated soil; removal & disposal of structures & below ground services; removal & disposal of all pipework/services & electrical cables; removal & disposal of pesticide contaminated soil; removal of designated existing trees; retention & protection of all adjacent school buildings; cleaning & making safe on completion of works all as documented; & installation of new power supply to existing switchboard. Click for more details...

MIDLAND RAILWAY WORKSHOPS PRECINCT - HERITAGE RESTORATION PROJECT
Midland Railway Workshops Precinct, Montreal St, Midland, WA 6056 Has Midland Railway Workshops Precinct - Heritage Restoration Project currently at Construction stage. Works to include various demolition works to number of buildings located in Midland Railway Workshops Precinct. Click for more details...

MURRAY STREET MALL UPGRADE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for Renovations, Refurbishments etc. development. Works to comprise concrete cutting & associated works in Murray Street Mall to facilitate installation of footings for light poles, fire hydrants, etc. Click for more details...

OCEAN OUTLET/OUTFALL - ALKIMOS WASTEWATER TREATMENT SCHEME
New project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Connected to Alkimos WWTP, extends 1 km onshore & 3.7 km offshore into Indian Ocean, Alkimos, WA 6033. Works comprise: Construction of 3.7 km ocean outfall with diameter of 1,200 mm & diffuser; construction of temporary pipe fabrication area & launch site; construction of temporary site access track; construction of connection pip to Alkimos Wastewater Treatment Plant (WWTP) approx 1,027 m in length with internal diameter of 2,000 mm to be constructed by tunnelling. Click for more details...

HAKEA PRISON - COOL STORE/FREEZER
Cool Store/Freezer - Refurbishment Renovations, Refurbishments etc. project In The Canning Council Area. Refurbishment works for cool store/freezer room at Hakea Prison include but are not limited to: demolition works; construction of new cool store & new freezer room with all mechanical works required; & electrical works. Click for more details...

CITY OF SWAN - EXCAVATION, CRUSHING, MIXING & STOCKPILING GRAVEL
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Council's gravel pit at lot 120 Lilydale Rd, Gidgegannup, WA 6083 of Gravel - Excavation, Crushing, Mixing & Stockpiling type of New development. Excavation, crushing, mixing & stockpiling of gravel at Council's gravel pit. Contractors to produce approx 40,000 cu m of non conforming basecourse material. Contract to commence within 3 weeks of contract award & be completed by end of December 2007. Click for more details...

WATTLE STREET SHELL ESPERANCE FUEL DEPOT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Lot 290 Wattle St, Chadwick, WA 6450 of Land Remediation - Environmental Consultancy Services type of New development. Works to comprise of Environmental Consultancy Services for Land Remediation Works. Click for more details...

KOSTERA OVAL RESERVE REDEVELOPMENT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at McRae Rd (Cnr Recreation Rd), Kalamunda, WA 6076 of Oval - Redevelopment type of New development. Re-development of Kostera Oval. To include civil, earthworks & associated works. Click for more details...

ST PATRICK'S CATHOLIC CATHEDRAL REDEVELOPMENT
Lots 5 & 6 Money St, Lots 1 to 4 & 27 Parkfield St & Lots 2, 15 & 16 Brend Tor St, Bunbury, WA 6230 Has St Patrick's Catholic Cathedral Redevelopment currently at Construction stage. Forward works to include earthworks, clearing of site & removing existing buildings, old bitumen car park, retaining walls & levelling of site. Click for more details...

WEST KIMBERLEY REGIONAL PRISON (WKRP DERBY)
West Kimberley Regional Prison (Wkrp Derby) is currently at the Construction stage, valued at about $ 10768000 it is Works to comprise of forward works & site access for West Kimberley Regional Prison & Prisoner Work Camp (WKRP DERBY). Click for more details...

RED HILL WASTE MANAGEMENT FACILITY LEACHATE POND
Renovations, Refurbishments etc. project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 1094 Toodyay Rd, Gidgegannup, WA 6083. Works to comprise of remedial works for Class III & Class IV Leachate Pond at Red Hill Waste Management Facility. Click for more details...

BURSWOOD INTERNATIONAL RESORT CASINO
Private ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Victoria Park Council Area for New development. To include sub-slab works for VVIP Villas on Tennis Courts Site. Click for more details...

WESTERN AUSTRALIAN MUSEUM - BUILDING DEMOLITION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Perth Council Area of State ownership. Works to comprise demolition of buildings at Western Australian Museum, Francis St, Perth. The WA Museum Francis St building is to be demolished to make sufficient land available on the Perth Cultural Centre site for a proposed new building. The Francis St building contains hazardous materials as identified in a hazardous materials database. These will need to be removed before the dismantling process can begin. The highest priority of these contaminants is asbestos. Anticipated contract practical completion date 11 November 2011. Click for more details...

HANGOVER BAY - VISITOR FACILITIES & LANDSCAPE WORKS
A project in the WA Within Dandaragan. Works to include construction of a new visitor facilities & landscape works at Hangover Bay comprising of 3 new picnic areas with shade shelters, a 4 cubicle toilet block, 2 lookout areas, paths, trails, stairs, furniture, bollards & wheelstops & associated earthworks, site preparation, clearing, remediation works & drainage. Click for more details...

SHIRE OF MENZIES - LIQUID WASTE EVAPORATION BASINS
New project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Within the Shire of, Menzies, WA 6436. Works to include design & construction of 2 Liquid Waste Evaporation Basins within the Shire of Menzies. Click for more details...

CITY OF GREATER GERALDTON EASTERN BREAKWATER PROJECT PORTION NO 1
New project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Off Marine Tce, Geraldton, WA 6530. Construction of the Eastern Breakwater. To include civil & reventment works. Click for more details...

BUSSELTON HEALTH CAMPUS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Mill St, Busselton, WA 6280 for New. Works to include clearing of surveyed trees and the supply and installation of temporary site fencing. Click for more details...

VERNA STREET 20 LOT RESIDENTIAL SUBDIVISION
A project in the WA Within Gosnells. To include bulk earthworks, retaining walls, roadworks, main & stormwater drainage, sewerage, water reticulation & underground power for a residential subdivision of 20 lots. Click for more details...

JOHN WOLLASTON ANGLICAN COMMUNITY SCHOOL
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) Addition project at Lot 6 Centre Rd, Westfield, WA 6111. This type is School - Altns & Addns - Single & 2 Storey with Private ownership. Works to include construction of a single & 2 storey arts & technology building, associated external & demolition works. Click for more details...

PAWSEY HIGH PERFORMANCE COMPUTING CENTRE FOR SKA
Federal ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The South Perth Council Area for New development. Works to include design, supply & installation of the ground water cooling project borefield to provide a fully functioning & commissioned bore water supply & reinjection system & includes a 4 well production system comprising of 2 production bores & 2 injection bores with the option of additional injection bores, works also includes supply & connection of the electrical infrastructure required to connect future photovoltaic (PV) cells & the connection of controls equipment on monitoring bores & supply & installation of all pipe works. Click for more details...

SUNBURY ROAD GROUPED DWELLINGS
Currently at the Construction stage In Victoria Park is a project estimated to be $ 700000. This project Works to include demolition & construction of 4 grouped dwellings. Click for more details...

AUGUSTA BOAT HARBOUR - FLAT ROCK BOATING FACILITY - CIVIL WORKS
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Augusta-Margaret River Council Area for New development. To include civil works construction at the Augusta Boat Harbour to comprise of: roads & carparks, retaining walls & fences, stormwater drainage, electrical distribution & lighting, water reticulation, sewer treatment, telecommunications & CCTV. Click for more details...

LEDGAR ROAD FORWARD WORKS FOR STORAGE FACILITY - STAGE 1
New project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 46 (Lot 63) Ledgar Rd, Balcatta, WA 6021. Demolition of an existing warehouse onsite & forward work for a new storage facility. Click for more details...

CAMP SIMONS DEMOLITION WORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for New development. Works to include demolition of Camp Simons which comprises of: dormitory rooms, caretakers' house, sheds, function hall, male & female toilets, activity rooms, water tanks, tennis & basketball courts, playground, BBQ area & swimming pool. Works to also include: removal & disposal of the house, all structures, footpaths, paving, septic tanks & associated works. The premises will likely not be occupied but contractor must ensure minimal inconvenience & disturbance to the surrounding properties. Click for more details...

DEPARTMENT OF PARKS & WILDLIFE - BIBBULMUN TRACK CAMP SITES
Camp Site Shelters(2)/Amenities(2)/Earthworks - Supply/Install New project In The Various Council Area. Works to include the supply & installation of two campsites shelters & two amenities buildings comprising of rammed earth & steel roofs located along the Bibbulmun Track. Works to also include supply & installation of sewerage tank, supply & install a retaining wall at Possum Springs site only, site preparation - construction pad levelling at both sites (height adjustment at Possum Springs), batter rock pitching, footing excavation, building & site drainage, supply & install water tanks & rainwater plumbing, stabilising floor & surrounds of building, install picnic tables & BBQ's, clean up & rehabilitate site. Click for more details...

BURSWOOD ROAD OFFICE BUILDING DEMOLITION WORKS
Demolition Works project at 43-47 Burswood Rd, Burswood, WA 6100 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). To include partial demolition of office building. Click for more details...

PUBLIC TRANSPORT AUTHORITY - LONG LINE PUBLIC ADDRESS PROJECT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) Renovations, Refurbishments etc. project at Various locations within, ., WA 6999. This type is Long Line Public Address - Replacement with State ownership. Works to include the replacement of the long line public address network to include installation of the survey; migration, implementation, project management, safety management & environmental management plans; supply of products; hauling of cables & conduits for the ambient noise system; junction boxes; weather proof brackets; testing, commissioning & training. Click for more details...

BINDA PLACE REDEVELOPMENT
Binda Place Redevelopment is currently at the Construction stage, valued at about $ 1720000 it is Works to include civil works for the redevelopment of Binda Place. To include roadworks, footpaths, car parking & kerbing. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect