AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

FOSTERVILLE GOLD OPERATIONS
Processing Facility project at Near Fosterville 20 km northeast of, Bendigo, VIC 3550 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Gold Fields Ltd's BIOX process has been selected as the preferred technology for the treatment of Fosterville mineralisation. BIOX is a patented bacterial process designed to break down the suphide lattcie that contains the gold in the Fosterville mineralisation, enabling subsequent extraction by conventional cyanidation. Click for more details...

WHIM CREEK COPPER PROJECT
Infrastructure project at Via, Whim Creek, WA 6718 In The Council Area Of City Of Karratha of Private. Crushing & stacking facilities, site layout, crusher area works. Surplus plant from Girilambone to be utilised. A conventional SX-EW operation. Click for more details...

LADY ANNIE/MOUNT KELLY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Adjacent to Lady Loreta Mine 140 Km North West of, Mount Isa, QLD 4825. To construct a 1900 tpa copper SXEW plant and heap leach. Total copper recovery is expected to be 89% of the ore processed. Click for more details...

HISMELT EXPANSION PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Kwinana Council Area of Earthworks - Preliminary Works type. Concrete works and pipebridges. A vertical package comprising both civil and mechanical works. Includes earthworks, stone column foundations, 10,000 cu m of reinforced concrete foundations and 1,000 tonnes of structural steel pipe racks, associated pipes, ducting and accessories. Click for more details...

ROSEBY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at North west of, Cloncurry, QLD 4824. The process plant is to be located immediately adjacent the Blackard Pit. The basic processes include: primary crushing, comprising feed bin, apron feeder, crusher and dust suppression, grinding in a single stage SAG mill and classification in cyclones, optional stockpiling of primary crushed or to de-couple the grinding and flotation processes for the crushing operations, rougher and scavenger flotations, rougher concentrate regrinding to improve final concentrate grade, two stages of cleaner flotation, concentrate thickening and filtration and filter cake storage before transportation, tailings thickening and disposal storage facility and reagents preparation and services. The process plant has been designed to treat approximately 3 Mtpa of sulphide feed, as this will be the case for the initial 4 years of production. Following this, the processing plant may require adaptation to process oxide ores, as the style of ore mineralisation vary. These throughputs are based on a 24 hour per day, 7 days per week operations. The flotation concentrate would be saleable for smelter feed. The proposed process plant comprises the following: Run of Mine (ROM) ore bin fed by either a front end loader or by trucks direct tipping ore, grizzly feeder to remove fines less than 150mm, conveyor feeding combined grizzly and crusher products to the mill, a SAG mill with single 3 MW drives, a ball miss with single 3MW drive, two sets of rougher/scavenger flotation cells (2x7x160 cubic metres), concentrate regrind mill with 550kW drive, cleaner flotation cells (6x50 cubic metres cells), recleaner flotation (4x20 cubic metres cells), concentrate thickening and filtration, reagents, air and water services and pumps, service cranes and hoists. Click for more details...

TRITTON COPPER PROJECT - MURRAWOMBIE - MINING/EARTHWORKS CONTRACTS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bogan Council Area for New development. The construction of the box cut and the ROM development contract has been awarded to a local contractor ahead of full mobilisation to site later in February 2004 by the principal mining contractor. Click for more details...

RAVENSTHORPE NICKEL PROJECT - MISCELLANEOUS CIVIL WORKS
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Ravensthorpe Council Area of Miscellaneous Civil Works type. Miscellaneous Civil Works Click for more details...

HISMELT EXPANSION PROJECT
Earthworks/Civil Works New project In The Kwinana Council Area. Roadworks, drainage. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Via, Blackwater, QLD 4717 Has Blackwater/Comet Chpp Project currently at Planning stage. The project manager's role will include design work for earthworks and related services (ensuring no mismatches between earthworks construction and CHPP construction), construction and related managment and contract administration for CHPP design construct package, once awarded (contract superintendent). Click for more details...

JAGUAR BASE METALS PROJECT - RESOURCE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Leonora Council Area of Private ownership. RC/DC drilling program will undertaken with the intention of doubling the announced resource estimate. Resource estimate of 1,600,000 Mt @ 3.07% Cu, 11.73% Zn, 0.72% Pb, 120 g/t Ag. A proposed underground mining development employing long-hole open stoping techniques. The resource is high-grade copper, zinc and silver. The current mine plan sees the initial development phase of the mine being conducted over an 18 month period. During this time the box cut, decline, main ventilation rise and associated infrastructure will be installed and commissioned. Mine life on the current mine reserves is 6 years, at a design throughput of 350000 tpa of ore. Click for more details...

PENRICE SODA OPERATIONS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Port Adelaide Enfield Council Area for New development. Involves a series of thirteen drying basins, a stockpile area, internal roadways linking site the the existing Penrice Soda products operations. Initial work will involve bulldozing stockpile area. The ponds will not be constructed in the short term Click for more details...

TRITTON COPPER PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bogan Council Area of Private ownership. Includes a 660,000 tpa copper concentrator (expandable to 900,000 tpa), a tailings dam and surface infrastructure such as roads and bridges. Click for more details...

BARALABA COAL PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at 155 km west of Gladstone at, Baralaba, QLD 4702 of Rail Loadout type of New development. The loadout facility will consist of an earth pad and front end loaders. Click for more details...

CSA COPPER OPERATIONS - CONCRETE REMOVAL
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Cobar Council Area of Concrete Removal type. This package may be combined with Steel Work contract ID: 2155418. Decision is yet to be made whether concrete may be replaced with steel flooring. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARY WORKS
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The East Arnhem Shire Council Area of Civil Works type. Preliminary works to include roads, laydown areas. Click for more details...

HISMELT - FREMANTLE PORT STOCKPILE
A project in the WA Within Kwinana. A concrete stockpile pad and associated loadout facilities to export bulk products from the existing Hismelt plant. Includes a 270 metre reclaim conveyor, concrete pad, fixed hopper with apron feeder and new access road and bridge over reclaim conveyor. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARYWORKS
Civil Works Packages project at At, Gove, NT 0880 In The Council Area Of East Arnhem Shire of Private. Various. Civil works likely to include a wharf. Click for more details...

DARWIN EAST ARM WHARF - BULK MATERIALS HANDLING INFRASTRUCTURE PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Darwin City Council Area of Private ownership. Expressions of interest are sought to design, procure and construct common user bulk materials handling facilities for the export of bulk ore. The package includes rail and road bottom dump facilities, including an associated conveyor system to a stockpile area and headworks and a ship loader and associated headworks. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - SITE PREPARATION/TEMPORARY FACILITIES
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Burrup Peninsula north of, Dampier, WA 6713 of Site Preperation/Temporary Facilities Services Contract - Erect type of New development. The contract involves the re-routing of existing roads near the site, the construction of new roads, rundown and drainage culverts. The provision of bulk earthworks. Removal of redundant process plant and structures on the site, the relocation of plant services and utilities. Installation of temporary facilities including security and safety infrastructure, offices, crib rooms and ablution areas. Click for more details...

YABULU NICKEL REFINERY EXTENSION - INITIAL SITE INFRASTRUCTURE CONTRACT
Refinery site at, Yabulu, QLD 4818 Has Yabulu Nickel Refinery Extension - Initial Site Infrastructure Contract currently at Construction stage. Scope of the work involves mainly roads and some early site concrete. Click for more details...

YABULU NICKEL REFINERY EXTENSION - SITE WIDE CONCRETE CONTRACT
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Refinery site at, Yabulu, QLD 4818. Scope of work involves concrete work to the entire refinery site. Click for more details...

MID WEST IRON & STEEL PROJECT - KOOLANOOKA - CIVIL WORKS CONTRACT
Mid West Iron & Steel Project - Koolanooka - Civil Works Contract is currently at the Construction stage, valued at about $ 500000 it is Civil works for storage shed and associated facilities. Click for more details...

LIDDELL POWER STATION - SOLAR FARM/EARTH WORKS STAGE 1
Mining - Primary And Secondary Processing (Civil works at processing facilities) New project at At, Liddell, NSW 2333. This type is Solar Farm/Earth Works Stage 1 with Private ownership. Work involves the preparation of an area south of Liddell Power Station for the installation of a solar farm. Click for more details...

MOUNT NORMA LEACH VAT NUMBER FIVE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Cloncurry Shire Council Area of Private ownership. Construction will comprise earthworks, lining of the vats, filters, electrical installation, crushing and loading of the vats. The vat is to contain 30,000 tonnes of high leach copper oxide. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

AUGUSTA GOLD PROJECT - EARTH WORKS/BOX CUT CONTRACT
Heathcote Nagambie Road, Bendigo, VIC 3550 Has Augusta Gold Project - Earth Works/Box Cut Contract currently at Construction stage. Development option is to construct an underground portal on C Lode where approximately 5000 tonnes of ore can be extracted. As part of the earthworks component the contractor will will construct an evaporation pond and do the creek diversion work. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - BULK EARTHWORKS
Bulk Earthworks project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Civil and Concrete Work comprises moving about 1 million cubic metres of dirt. More specifically the construction of the E deposit primary crushing area and mechanically stabilised earth wall (MSE). To construct a 7.5 km long overland conveyor from the E deposit primary crusher to a new Ore Handling Plant 2 (OHP 2), Stockyard 2 located within the rail loop, associated earthworks and heavy vehicle park-up and upgrade of the infrastructure for the operation. This will include office, amenities and waste water services. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - EARTHWORKS/DRAINAGE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The East Pilbara Council Area of Private ownership. Formation Earthworks and Drainage at Weeli, Poonda, Yeerabiddy and Area C . Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - BULK EARTHWORKS
Bulk Earthworks - Phase 2 project at On, Finucane Island, WA 6721 In The Council Area Of Port Hedland of Private. Finucane Island Bulk Earthworks Phase 2. Click for more details...

DAANDINE GAS PROJECT - POWER STATION CIVIL WORKS CONTRACT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Western Downs Regional Council Area of Civil Works Contract type. Civil works for a new power station. Click for more details...

TOM PRICE IRON ORE OPERATION - CIVIL WORKS CONTRACT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project for New development. Work comprises civil and concrete works for the Vault, Rail Stacker and miscellaneous concrete works at the Tom Price mine. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - LAND RECLAIMATION
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Mackay Regional Council Area for New development. Reclaim land for a surge bin. Click for more details...

DAVYHURST GOLD PROJECT - GOLD MILL REFURBISHMENT
Mining - Primary And Secondary Processing (Civil works at processing facilities) New project at 80 Km North west of, Kalgoorlie, WA 6430. This type is Gold Mill Refurbishment with Private ownership. The 1.2 Mtpa mill was purchased from Croseus mining and remains in good condition. Work on the tanks and concrete pillars will be the focus of the work. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MECHANICAL/CIVIL/STRUCTURAL & ELECTRICAL
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The City Of Greater Geraldton Council Area for New development. Provision & Management of Minor Mechanical/Civil/Structural & Electrical works to Brownfield & Greenfield. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - ONSHORE OUTLOADING CONVEYOR SYSTEM
Dalrymple Bay Coal Terminal Expansion - Onshore Outloading Conveyor System is currently at the Construction stage, valued at about $ 60000000 it is To fabricate and erect an Onshore Outloading Conveyor System. The conveyor will be one kilometre in length and will be constructed of fabricated steel. There will be a minor civil work component to the project involving concreting. All the mechanics have been supplied. Click for more details...

LIDDELL COAL OPERATIONS - COAL HANDLING PREPARATION PLANT
Coal Handling Preparation Plant project at 20 Km North West of, Singleton, NSW 2330 In The Council Area Of Singleton of Private. Construction of a new Coal Handling Preparation Plant. This will involve the construction of a new preparation section, upgrades to the ROM receival and product coal facilities. The new preparation area will be located next to the old CHPP and its capacity will be 1200 tonnes per hour. This will include new screening, cyclone and spiral components for the plant. Upgrades to the ROM receival equipment include shortening of the apron feeder, a new rotating star wheel, new sizers and an increase in the drive power and length of the ROM conveyor. Modifications to the product handling equipment will include a short product conveyor to collect coal from the new CHPP to be deposited at a new transfer station onto the existing product stockpile rising conveyor. The existing road truck type coarse rejects bin will be replaced by a larger bin capable of loading mining sized trucks. The exisiting CHPP will be dismantled and recycled or disposed of over a one year period. Click for more details...

TAHMOOR COLLIERY - DRIFT CONVEYOR STAGE 3 UPGRADE - CIVIL WORKS - CONCRETE PIERS/COLUMNS
Civil Works - Concrete For Piers/Columns project at Hume Highway, Tahmoor, NSW 2573 In The Council Area Of Wollondilly of Private. Work is to coincide with the next dry season longwall changeover in 2008. Click for more details...

WHITE DAM PROJECT - GOLD PROCESSING PLANT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project for New development. Refurbishment, dismantling, transporting and reassembling of a 2 Mtpa heap leach process plant. Click for more details...

PROMINENT HILL GOLD COPPER PROJECT - BULK EARTHWORKS
A project in the SA Within Coober Pedy. Bulk Earthworks for Process Plant Earth works and Plant Roads. Click for more details...

BENGALLA COAL OPERATIONS - CIVIL WORKS FOR ROM HOPPER CONSTRUCTION
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Muswellbrook Council Area of Private ownership. For the provision of civil works for the rom hopper construction. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRAIN LOAD OUT
Iron Ore Rapid Growth 4 Project - Train Load Out is currently at the Planning stage, valued at about $ 100000000 it is The new TLO facility will match the existing train load-out plant for through train capacity at 58Mtpa. The new TLO will comprise a new section of rail passing through a single tunnel that has two loading vaults. Each vault is located under a discrete stockpile, each with a minimum 25,000 live capacity. These stockpiles will be product specific, one for lump and one for fines, to eliminate product cross-contamination. Each stockpile will be built and maintained by a fixed stacker conveyor, fed from the diverter transfer station at the head of the stockyard reclaim conveyor (the transfer station and stacker conveyors are part of work pack 4N0). The conveyors will discharge from fixed cantilever booms. Dust suppression sprays will be mounted at the head of each conveyor discharge. The spray system will be complete with break tank and pumps for the high pressure for the spray canon. The TLO will have dedicated dust extraction/collection and ventilation systems for each of the vaults. Each of the dust systems will comprise dust hoods, ducting, wet scrubbers, extraction fans, seal tank, circulation pumps, sump tanks, pumps and associated pipe work. The complete tunnel with the vaults will have a vault ventilation system complete with fans, ducting, discharge registers and intake silencers. The stockpiles and stacker conveyors will have dust suppression sprays. Process water will be supplied for dust suppression and dust extraction scrubbers. The dust suppression spray system comprises piping, water cannon and controls. Click for more details...

SUNNYSIDE OPEN CUT COAL PROJECT - CRUSHING & SCREENING PLANT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Gunnedah Council Area of Crushing/Screening Plant type. Crushing and screening plant for 5 year operation of mine at around 1 million/annum. coal will then be trucked to Whitehaven's Gunnedah coal preparation plant. Click for more details...

LAKE VERMONT COAL PROJECT - EARTHWORKS FOR COAL PREPARATION PLANT
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 1200000. This project For a 4 Mtpa facility. Click for more details...

LAKE LINDSAY COAL PROJECT - CIVIL WORKS FOR MINE SITE
Civil Works - For Mine Site project at Approx 25 km from, Middlemount, QLD 4746 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Various civil & concrete works for the mine site. Click for more details...

MURRAY BASIN STAGE 2 MINERAL SANDS PROJECT - CIVIL WORKS & BULK EARTHWORKS
Murray Basin Stage 2 Mineral Sands Project - Civil Works & Bulk Earthworks is currently at the Construction stage, valued at about $ 5000000 it is For the provision of site-wide civil works & bulk earthworks. Click for more details...

MOOLARBEN JOINT VENTURE COAL OPERATIONS - STAGE 1 ROM STOCKPILE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at 40km northeast of, Mudgee, NSW 2850 for New. Construction of a 100,000tonne Run-of-Mine (ROM) stockpile for Stage 1 operations. Click for more details...

GROSVENOR COAL PROJECT - ROM STOCKPILE CIVIL WORKS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 10000000. This project Civil works for the run-of-mine (ROM) stockpile & crushing area. Click for more details...

ROCKLANDS GROUP JOINT VENTURE COPPER PROJECT - PROCESSING PLANT INSTALLATION
Structural/Mechanical/Piping Installation New project In The Cloncurry Shire Council Area. Installation of a fully computerised & automated 3 million tonne per annum (Mtpa) processing plant for copper/gold, cobaltic-pyrite, native copper & magnetite concentrate production. Click for more details...

ICHTHYS GAS PROJECT - MAIN CIVIL WORK (CVL3) - TEMPORARY WORKS DESIGN REV1 CONSULTANCIES
Ichthys Gas Project - Main Civil Work (Cvl3) - Temporary Works Design Rev1 Consultancies is currently at the Construction stage, valued at about $ 250000 it is For the provision of Temporary Works Design along with Construction Methodologies associated with CVL3 Main Civil Works project on the Ichthys Project Onshore LNG facilities. Click for more details...