State

Categories

Sub Categories

Click Here to Find Current Projects

List of Civil works at processing facilities Projects


WEIPA BAUXITE OPERATIONS - ANDOOM/NEWEIPA
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at At, Weipa, QLD 4874. Detailed earthworks, civil works and concrete. Click for more details...

AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

FOSTERVILLE GOLD OPERATIONS
Processing Facility project at Near Fosterville 20 km northeast of, Bendigo, VIC 3550 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Gold Fields Ltd's BIOX process has been selected as the preferred technology for the treatment of Fosterville mineralisation. BIOX is a patented bacterial process designed to break down the suphide lattcie that contains the gold in the Fosterville mineralisation, enabling subsequent extraction by conventional cyanidation. Click for more details...

WHIM CREEK COPPER PROJECT
Infrastructure project at Via, Whim Creek, WA 6718 In The Council Area Of City Of Karratha of Private. Crushing & stacking facilities, site layout, crusher area works. Surplus plant from Girilambone to be utilised. A conventional SX-EW operation. Click for more details...

BLACK SWAN DISSEMINATED TWO PROJECT - PLANT UPGRADE
53 km north east of, Kalgoorlie, WA 6430 Has Black Swan Disseminated Two Project - Plant Upgrade currently at Construction stage. Expansion in production capacity of the processing plant from 600,000 tpa to 2,150,000 tpa. Production of 13,000 tonnes of payable nickel per annum is to be produced. This will require two new grinding mills, which have already been sourced second hand. Project to include upgrade of grinding circuit, new tank cells, relocation of control room. Click for more details...

HISMELT EXPANSION PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Kwinana Council Area of Earthworks - Preliminary Works type. Concrete works and pipebridges. A vertical package comprising both civil and mechanical works. Includes earthworks, stone column foundations, 10,000 cu m of reinforced concrete foundations and 1,000 tonnes of structural steel pipe racks, associated pipes, ducting and accessories. Click for more details...

ROSEBY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at North west of, Cloncurry, QLD 4824. The process plant is to be located immediately adjacent the Blackard Pit. The basic processes include: primary crushing, comprising feed bin, apron feeder, crusher and dust suppression, grinding in a single stage SAG mill and classification in cyclones, optional stockpiling of primary crushed or to de-couple the grinding and flotation processes for the crushing operations, rougher and scavenger flotations, rougher concentrate regrinding to improve final concentrate grade, two stages of cleaner flotation, concentrate thickening and filtration and filter cake storage before transportation, tailings thickening and disposal storage facility and reagents preparation and services. The process plant has been designed to treat approximately 3 Mtpa of sulphide feed, as this will be the case for the initial 4 years of production. Following this, the processing plant may require adaptation to process oxide ores, as the style of ore mineralisation vary. These throughputs are based on a 24 hour per day, 7 days per week operations. The flotation concentrate would be saleable for smelter feed. The proposed process plant comprises the following: Run of Mine (ROM) ore bin fed by either a front end loader or by trucks direct tipping ore, grizzly feeder to remove fines less than 150mm, conveyor feeding combined grizzly and crusher products to the mill, a SAG mill with single 3 MW drives, a ball miss with single 3MW drive, two sets of rougher/scavenger flotation cells (2x7x160 cubic metres), concentrate regrind mill with 550kW drive, cleaner flotation cells (6x50 cubic metres cells), recleaner flotation (4x20 cubic metres cells), concentrate thickening and filtration, reagents, air and water services and pumps, service cranes and hoists. Click for more details...

TRITTON COPPER PROJECT - MURRAWOMBIE - MINING/EARTHWORKS CONTRACTS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bogan Council Area for New development. The construction of the box cut and the ROM development contract has been awarded to a local contractor ahead of full mobilisation to site later in February 2004 by the principal mining contractor. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF
Mine Infrastructure New project In The Newcastle Council Area. Includes mine portal, conveyor, coal stockpile and truckloading area. Click for more details...

RAVENSTHORPE NICKEL PROJECT - MISCELLANEOUS CIVIL WORKS
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Ravensthorpe Council Area of Miscellaneous Civil Works type. Miscellaneous Civil Works Click for more details...

HISMELT EXPANSION PROJECT
Earthworks/Civil Works New project In The Kwinana Council Area. Roadworks, drainage. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Via, Blackwater, QLD 4717 Has Blackwater/Comet Chpp Project currently at Planning stage. The project manager's role will include design work for earthworks and related services (ensuring no mismatches between earthworks construction and CHPP construction), construction and related managment and contract administration for CHPP design construct package, once awarded (contract superintendent). Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO
Pooncarie Mineral Sands Project - Ginkgo is currently at the Construction stage, valued at about $ 5000000 it is Includes construction of mine pit, tailings/water storage dam and overburden storage areas. Click for more details...

JAGUAR BASE METALS PROJECT - RESOURCE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Leonora Council Area of Private ownership. RC/DC drilling program will undertaken with the intention of doubling the announced resource estimate. Resource estimate of 1,600,000 Mt @ 3.07% Cu, 11.73% Zn, 0.72% Pb, 120 g/t Ag. A proposed underground mining development employing long-hole open stoping techniques. The resource is high-grade copper, zinc and silver. The current mine plan sees the initial development phase of the mine being conducted over an 18 month period. During this time the box cut, decline, main ventilation rise and associated infrastructure will be installed and commissioned. Mine life on the current mine reserves is 6 years, at a design throughput of 350000 tpa of ore. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Primary And Secondary Processing (Civil works at processing facilities) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

TRITTON COPPER PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bogan Council Area of Private ownership. Includes a 660,000 tpa copper concentrator (expandable to 900,000 tpa), a tailings dam and surface infrastructure such as roads and bridges. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS
Surface Infrastructure project at via, Texas, QLD 4385 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Likely to be small scale infrastructure requirements, including demountables. Some demountables are already in place for administration of exploration project. Only 1-2 additional demountables likely to be required. Likely to be sourced locally. NO accommodation requirements, as the project is located only 7 km from Texas. Heap leach operation will require earthworks to prepare leach pads. Likely to be part of mining operation. Click for more details...

BARALABA COAL PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at 155 km west of Gladstone at, Baralaba, QLD 4702 of Rail Loadout type of New development. The loadout facility will consist of an earth pad and front end loaders. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

HISMELT - FREMANTLE PORT STOCKPILE
A project in the WA Within Kwinana. A concrete stockpile pad and associated loadout facilities to export bulk products from the existing Hismelt plant. Includes a 270 metre reclaim conveyor, concrete pad, fixed hopper with apron feeder and new access road and bridge over reclaim conveyor. Click for more details...

JAGUAR BASE METALS PROJECT - SITE PREPARATION WORKS/BOX CUT MINING CONTRACT
A project in the WA Within Leonora. Development comprises the movement of 1 million cubic metres of material over five months. Work will involve site clearing, mining the box cut, construction of haul roads, initial processing plant earthworks, and tailings dams construction. Click for more details...

COWAL GOLD PROJECT - CIVIL WORKS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bland Council Area for New development. Concrete foundations, sub-structure and structures. Includes concrete reclaim tunnels. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - SITE PREPARATION/TEMPORARY FACILITIES
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Burrup Peninsula north of, Dampier, WA 6713 of Site Preperation/Temporary Facilities Services Contract - Erect type of New development. The contract involves the re-routing of existing roads near the site, the construction of new roads, rundown and drainage culverts. The provision of bulk earthworks. Removal of redundant process plant and structures on the site, the relocation of plant services and utilities. Installation of temporary facilities including security and safety infrastructure, offices, crib rooms and ablution areas. Click for more details...

YABULU NICKEL REFINERY EXTENSION - SITE WIDE CONCRETE CONTRACT
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Refinery site at, Yabulu, QLD 4818. Scope of work involves concrete work to the entire refinery site. Click for more details...

MID WEST IRON & STEEL PROJECT - KOOLANOOKA - CIVIL WORKS CONTRACT
Mid West Iron & Steel Project - Koolanooka - Civil Works Contract is currently at the Construction stage, valued at about $ 500000 it is Civil works for storage shed and associated facilities. Click for more details...

LIDDELL POWER STATION - SOLAR FARM/EARTH WORKS STAGE 1
Mining - Primary And Secondary Processing (Civil works at processing facilities) New project at At, Liddell, NSW 2333. This type is Solar Farm/Earth Works Stage 1 with Private ownership. Work involves the preparation of an area south of Liddell Power Station for the installation of a solar farm. Click for more details...

MOUNT NORMA LEACH VAT NUMBER FIVE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Cloncurry Shire Council Area of Private ownership. Construction will comprise earthworks, lining of the vats, filters, electrical installation, crushing and loading of the vats. The vat is to contain 30,000 tonnes of high leach copper oxide. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

AUGUSTA GOLD PROJECT - EARTH WORKS/BOX CUT CONTRACT
Heathcote Nagambie Road, Bendigo, VIC 3550 Has Augusta Gold Project - Earth Works/Box Cut Contract currently at Construction stage. Development option is to construct an underground portal on C Lode where approximately 5000 tonnes of ore can be extracted. As part of the earthworks component the contractor will will construct an evaporation pond and do the creek diversion work. Click for more details...

DAANDINE GAS PROJECT - POWER STATION CIVIL WORKS CONTRACT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Western Downs Regional Council Area of Civil Works Contract type. Civil works for a new power station. Click for more details...

QUEENSLAND ALUMINA RED MUD DAM REDEVELOPMENT
Dam/Pipeline/Roadworks/Processing Plant project at ., Boyne Island, QLD 4680 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Containment walls, processing plant, roads & pipes. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - LAND RECLAIMATION
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Mackay Regional Council Area for New development. Reclaim land for a surge bin. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MECHANICAL/CIVIL/STRUCTURAL & ELECTRICAL
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The City Of Greater Geraldton Council Area for New development. Provision & Management of Minor Mechanical/Civil/Structural & Electrical works to Brownfield & Greenfield. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - BRIDGES
Bridges New project In The East Pilbara Council Area. To design and construct bridges for a 255 Km rail line. Click for more details...

TAHMOOR COLLIERY - DRIFT CONVEYOR STAGE 3 UPGRADE - CIVIL WORKS - CONCRETE PIERS/COLUMNS
Civil Works - Concrete For Piers/Columns project at Hume Highway, Tahmoor, NSW 2573 In The Council Area Of Wollondilly of Private. Work is to coincide with the next dry season longwall changeover in 2008. Click for more details...

TAHMOOR COLLIERY - DRIFT CONVEYOR STAGE 3 UPGRADE - CIVIL WORKS - CONCRRETE FOR FOOTINGS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Wollondilly Council Area for New development. Work is to coincide with the next dry season longwall changeover in 2008. Click for more details...

WHITE DAM PROJECT - GOLD PROCESSING PLANT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project for New development. Refurbishment, dismantling, transporting and reassembling of a 2 Mtpa heap leach process plant. Click for more details...

BENGALLA COAL OPERATIONS - CIVIL WORKS FOR ROM HOPPER CONSTRUCTION
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Muswellbrook Council Area of Private ownership. For the provision of civil works for the rom hopper construction. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - MINOR CIVIL/MECHANICAL/STRUCTURAL WORKS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Mackay Regional Council Area for New development. Work comprises the contractor to do minor civil, mechanical and structural works on site when needed. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - BUND 4A CIVIL WORKS
Bund 4a Civil Works New project In The Mackay Regional Council Area. To construct Bund 4A. Click for more details...

SUNNYSIDE OPEN CUT COAL PROJECT - CRUSHING & SCREENING PLANT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Gunnedah Council Area of Crushing/Screening Plant type. Crushing and screening plant for 5 year operation of mine at around 1 million/annum. coal will then be trucked to Whitehaven's Gunnedah coal preparation plant. Click for more details...

LAKE VERMONT COAL PROJECT - EARTHWORKS FOR COAL PREPARATION PLANT
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 1200000. This project For a 4 Mtpa facility. Click for more details...

LAKE VERMONT COAL PROJECT - CONCRETE WORKS FOR COAL PREPARATION PLANT
A project in the QLD Within Isaac Regional. For a 4 Mtpa plant. Click for more details...

MURRAY BASIN STAGE 2 MINERAL SANDS PROJECT - CIVIL WORKS & BULK EARTHWORKS
Murray Basin Stage 2 Mineral Sands Project - Civil Works & Bulk Earthworks is currently at the Construction stage, valued at about $ 5000000 it is For the provision of site-wide civil works & bulk earthworks. Click for more details...

MOOLARBEN JOINT VENTURE COAL OPERATIONS - STAGE 1 ROM STOCKPILE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at 40km northeast of, Mudgee, NSW 2850 for New. Construction of a 100,000tonne Run-of-Mine (ROM) stockpile for Stage 1 operations. Click for more details...

GROSVENOR COAL PROJECT - ROM STOCKPILE CIVIL WORKS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 10000000. This project Civil works for the run-of-mine (ROM) stockpile & crushing area. Click for more details...

GROSVENOR COAL PROJECT - BULK EARTHWORKS PACKAGE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at via, Moranbah, QLD 4744 of Bulk Earthworks type of New development. Bulk earthworks for coal operations areas to include drift cut & cover and shotcrete soil stabilisation. Click for more details...

ROCKLANDS GROUP JOINT VENTURE COPPER PROJECT - PROCESSING PLANT INSTALLATION
Structural/Mechanical/Piping Installation New project In The Cloncurry Shire Council Area. Installation of a fully computerised & automated 3 million tonne per annum (Mtpa) processing plant for copper/gold, cobaltic-pyrite, native copper & magnetite concentrate production. Click for more details...

NIMBUS VHMS PROJECT - LEACH TANK CIRCUIT WORKS CONTRACT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project for New development. For the provision of contract works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect