List of Civil works at processing facilities Projects


WEIPA BAUXITE OPERATIONS - ANDOOM/NEWEIPA
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at At, Weipa, QLD 4874. Detailed earthworks, civil works and concrete. Click for more details...

AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

FOSTERVILLE GOLD OPERATIONS
Processing Facility project at Near Fosterville 20 km northeast of, Bendigo, VIC 3550 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Gold Fields Ltd's BIOX process has been selected as the preferred technology for the treatment of Fosterville mineralisation. BIOX is a patented bacterial process designed to break down the suphide lattcie that contains the gold in the Fosterville mineralisation, enabling subsequent extraction by conventional cyanidation. Click for more details...

LADY ANNIE/MOUNT KELLY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Adjacent to Lady Loreta Mine 140 Km North West of, Mount Isa, QLD 4825. To construct a 1900 tpa copper SXEW plant and heap leach. Total copper recovery is expected to be 89% of the ore processed. Click for more details...

BLACK SWAN DISSEMINATED TWO PROJECT - PLANT UPGRADE
53 km north east of, Kalgoorlie, WA 6430 Has Black Swan Disseminated Two Project - Plant Upgrade currently at Construction stage. Expansion in production capacity of the processing plant from 600,000 tpa to 2,150,000 tpa. Production of 13,000 tonnes of payable nickel per annum is to be produced. This will require two new grinding mills, which have already been sourced second hand. Project to include upgrade of grinding circuit, new tank cells, relocation of control room. Click for more details...

HISMELT EXPANSION PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Kwinana Council Area of Earthworks - Preliminary Works type. Concrete works and pipebridges. A vertical package comprising both civil and mechanical works. Includes earthworks, stone column foundations, 10,000 cu m of reinforced concrete foundations and 1,000 tonnes of structural steel pipe racks, associated pipes, ducting and accessories. Click for more details...

ROSEBY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at North west of, Cloncurry, QLD 4824. The process plant is to be located immediately adjacent the Blackard Pit. The basic processes include: primary crushing, comprising feed bin, apron feeder, crusher and dust suppression, grinding in a single stage SAG mill and classification in cyclones, optional stockpiling of primary crushed or to de-couple the grinding and flotation processes for the crushing operations, rougher and scavenger flotations, rougher concentrate regrinding to improve final concentrate grade, two stages of cleaner flotation, concentrate thickening and filtration and filter cake storage before transportation, tailings thickening and disposal storage facility and reagents preparation and services. The process plant has been designed to treat approximately 3 Mtpa of sulphide feed, as this will be the case for the initial 4 years of production. Following this, the processing plant may require adaptation to process oxide ores, as the style of ore mineralisation vary. These throughputs are based on a 24 hour per day, 7 days per week operations. The flotation concentrate would be saleable for smelter feed. The proposed process plant comprises the following: Run of Mine (ROM) ore bin fed by either a front end loader or by trucks direct tipping ore, grizzly feeder to remove fines less than 150mm, conveyor feeding combined grizzly and crusher products to the mill, a SAG mill with single 3 MW drives, a ball miss with single 3MW drive, two sets of rougher/scavenger flotation cells (2x7x160 cubic metres), concentrate regrind mill with 550kW drive, cleaner flotation cells (6x50 cubic metres cells), recleaner flotation (4x20 cubic metres cells), concentrate thickening and filtration, reagents, air and water services and pumps, service cranes and hoists. Click for more details...

TRITTON COPPER PROJECT - MURRAWOMBIE - MINING/EARTHWORKS CONTRACTS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bogan Council Area for New development. The construction of the box cut and the ROM development contract has been awarded to a local contractor ahead of full mobilisation to site later in February 2004 by the principal mining contractor. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF
Mine Infrastructure New project In The Newcastle Council Area. Includes mine portal, conveyor, coal stockpile and truckloading area. Click for more details...

RAVENSTHORPE NICKEL PROJECT - MISCELLANEOUS CIVIL WORKS
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Ravensthorpe Council Area of Miscellaneous Civil Works type. Miscellaneous Civil Works Click for more details...

HISMELT EXPANSION PROJECT
Earthworks/Civil Works New project In The Kwinana Council Area. Roadworks, drainage. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Via, Blackwater, QLD 4717 Has Blackwater/Comet Chpp Project currently at Planning stage. The project manager's role will include design work for earthworks and related services (ensuring no mismatches between earthworks construction and CHPP construction), construction and related managment and contract administration for CHPP design construct package, once awarded (contract superintendent). Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO
Pooncarie Mineral Sands Project - Ginkgo is currently at the Construction stage, valued at about $ 5000000 it is Includes construction of mine pit, tailings/water storage dam and overburden storage areas. Click for more details...

JAGUAR BASE METALS PROJECT - RESOURCE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Leonora Council Area of Private ownership. RC/DC drilling program will undertaken with the intention of doubling the announced resource estimate. Resource estimate of 1,600,000 Mt @ 3.07% Cu, 11.73% Zn, 0.72% Pb, 120 g/t Ag. A proposed underground mining development employing long-hole open stoping techniques. The resource is high-grade copper, zinc and silver. The current mine plan sees the initial development phase of the mine being conducted over an 18 month period. During this time the box cut, decline, main ventilation rise and associated infrastructure will be installed and commissioned. Mine life on the current mine reserves is 6 years, at a design throughput of 350000 tpa of ore. Click for more details...

PENRICE SODA OPERATIONS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Port Adelaide Enfield Council Area for New development. Involves a series of thirteen drying basins, a stockpile area, internal roadways linking site the the existing Penrice Soda products operations. Initial work will involve bulldozing stockpile area. The ponds will not be constructed in the short term Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Primary And Secondary Processing (Civil works at processing facilities) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

GLADSTONE INTERNATIONAL NICKEL PROJECT - MARLBOROUGH
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Gladstone Regional Council Area of Processing Plant type. Processing of laterite ore. Ore likely to be sourced from New Caledonia via Cape size shipping through Gladstone's deepwater port, supplemented by ore from the deposits at Marlborough. This is likely to be a two stage development. Stage one to 65,000 tpa producing nickel cobalt suplhide will involve a 4 autoclave plant. Stage two would be likely to involve doubling of capacity. Click for more details...

KOGAN CREEK POWER STATION PROJECT - CONCRETE & FINISHING WORKS
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at 9 km south of, Brigalow, QLD 4412. Procurement, (fabrication) and erection of: 36,500 m³ concrete for foundations, walls, columns, ceilings and turbine foundation. 3,500 to reinforcement, 49,000 m² formwork for foundations, walls, columns, ceilings and turbine foundation. 1,570 m³ Brickwork 17,5 cm to 36,5 cm thickness, 600 m² Brickwork 12 cm thickness, 8,770 m² Plastering of walls, columns, ceilings, 24,300 m² Painting of walls, columns, ceilings, 2,150 m² Ceramic tiles for walls and floors, 2,200 m² Carpet tiles / linoleum flexible sheets, 2,000 m² Suspended ceilings, 350 m² Raised floors, 210 No Toilets, washbasins, showers, urinal. Click for more details...

TRITTON COPPER PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bogan Council Area of Private ownership. Includes a 660,000 tpa copper concentrator (expandable to 900,000 tpa), a tailings dam and surface infrastructure such as roads and bridges. Click for more details...

CSA COPPER OPERATIONS - CONCRETE REMOVAL
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Cobar Council Area of Concrete Removal type. This package may be combined with Steel Work contract ID: 2155418. Decision is yet to be made whether concrete may be replaced with steel flooring. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARYWORKS
Civil Works Packages project at At, Gove, NT 0880 In The Council Area Of East Arnhem Shire of Private. Various. Civil works likely to include a wharf. Click for more details...

COWAL GOLD PROJECT - CIVIL WORKS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bland Council Area for New development. Concrete foundations, sub-structure and structures. Includes concrete reclaim tunnels. Click for more details...

DARWIN EAST ARM WHARF - BULK MATERIALS HANDLING INFRASTRUCTURE PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Darwin City Council Area of Private ownership. Expressions of interest are sought to design, procure and construct common user bulk materials handling facilities for the export of bulk ore. The package includes rail and road bottom dump facilities, including an associated conveyor system to a stockpile area and headworks and a ship loader and associated headworks. Click for more details...

MID WEST IRON & STEEL PROJECT - KOOLANOOKA - CIVIL WORKS CONTRACT
Mid West Iron & Steel Project - Koolanooka - Civil Works Contract is currently at the Construction stage, valued at about $ 500000 it is Civil works for storage shed and associated facilities. Click for more details...

LIDDELL POWER STATION - SOLAR FARM/EARTH WORKS STAGE 1
Mining - Primary And Secondary Processing (Civil works at processing facilities) New project at At, Liddell, NSW 2333. This type is Solar Farm/Earth Works Stage 1 with Private ownership. Work involves the preparation of an area south of Liddell Power Station for the installation of a solar farm. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

AUGUSTA GOLD PROJECT - EARTH WORKS/BOX CUT CONTRACT
Heathcote Nagambie Road, Bendigo, VIC 3550 Has Augusta Gold Project - Earth Works/Box Cut Contract currently at Construction stage. Development option is to construct an underground portal on C Lode where approximately 5000 tonnes of ore can be extracted. As part of the earthworks component the contractor will will construct an evaporation pond and do the creek diversion work. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - EARTHWORKS/DRAINAGE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The East Pilbara Council Area of Private ownership. Formation Earthworks and Drainage at Weeli, Poonda, Yeerabiddy and Area C . Click for more details...

DAANDINE GAS PROJECT - POWER STATION CIVIL WORKS CONTRACT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Western Downs Regional Council Area of Civil Works Contract type. Civil works for a new power station. Click for more details...

TOM PRICE IRON ORE OPERATION - CIVIL WORKS CONTRACT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project for New development. Work comprises civil and concrete works for the Vault, Rail Stacker and miscellaneous concrete works at the Tom Price mine. Click for more details...

DAVYHURST GOLD PROJECT - GOLD MILL REFURBISHMENT
Mining - Primary And Secondary Processing (Civil works at processing facilities) New project at 80 Km North west of, Kalgoorlie, WA 6430. This type is Gold Mill Refurbishment with Private ownership. The 1.2 Mtpa mill was purchased from Croseus mining and remains in good condition. Work on the tanks and concrete pillars will be the focus of the work. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - ONSHORE OUTLOADING CONVEYOR SYSTEM
Dalrymple Bay Coal Terminal Expansion - Onshore Outloading Conveyor System is currently at the Construction stage, valued at about $ 60000000 it is To fabricate and erect an Onshore Outloading Conveyor System. The conveyor will be one kilometre in length and will be constructed of fabricated steel. There will be a minor civil work component to the project involving concreting. All the mechanics have been supplied. Click for more details...

BATCHELOR SUBSTATION - CIVIL/EARTHING WORKS
A project in the NT Within Darwin City. Work comprises civil and drainage works, earth grid and connection tails, fencing, installed certified and fully serviced crib room, new poles, nominated structures, and foundations for HV structures. All structures to include hold down bolts measured to ensure they will accommodate the future installation of electrical equipment that will be relocated from the Edith River substation. Click for more details...

TAHMOOR COLLIERY - DRIFT CONVEYOR STAGE 3 UPGRADE - CIVIL WORKS - CONCRRETE FOR BUILDING & MEZZANINE FLOOR
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Wollondilly Council Area of Civil Works - Concrete For Builing/Mezzanine Floor type. Work is to coincide with the next dry season longwall changeover in 2008. Click for more details...

TAHMOOR COLLIERY - DRIFT CONVEYOR STAGE 3 UPGRADE - CIVIL WORKS - CONCRETE PIERS/COLUMNS
Civil Works - Concrete For Piers/Columns project at Hume Highway, Tahmoor, NSW 2573 In The Council Area Of Wollondilly of Private. Work is to coincide with the next dry season longwall changeover in 2008. Click for more details...

TAHMOOR COLLIERY - DRIFT CONVEYOR STAGE 3 UPGRADE - CIVIL WORKS - CONCRRETE FOR FOOTINGS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Wollondilly Council Area for New development. Work is to coincide with the next dry season longwall changeover in 2008. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - MINOR CIVIL/MECHANICAL/STRUCTURAL WORKS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Mackay Regional Council Area for New development. Work comprises the contractor to do minor civil, mechanical and structural works on site when needed. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRAIN LOAD OUT
Iron Ore Rapid Growth 4 Project - Train Load Out is currently at the Planning stage, valued at about $ 100000000 it is The new TLO facility will match the existing train load-out plant for through train capacity at 58Mtpa. The new TLO will comprise a new section of rail passing through a single tunnel that has two loading vaults. Each vault is located under a discrete stockpile, each with a minimum 25,000 live capacity. These stockpiles will be product specific, one for lump and one for fines, to eliminate product cross-contamination. Each stockpile will be built and maintained by a fixed stacker conveyor, fed from the diverter transfer station at the head of the stockyard reclaim conveyor (the transfer station and stacker conveyors are part of work pack 4N0). The conveyors will discharge from fixed cantilever booms. Dust suppression sprays will be mounted at the head of each conveyor discharge. The spray system will be complete with break tank and pumps for the high pressure for the spray canon. The TLO will have dedicated dust extraction/collection and ventilation systems for each of the vaults. Each of the dust systems will comprise dust hoods, ducting, wet scrubbers, extraction fans, seal tank, circulation pumps, sump tanks, pumps and associated pipe work. The complete tunnel with the vaults will have a vault ventilation system complete with fans, ducting, discharge registers and intake silencers. The stockpiles and stacker conveyors will have dust suppression sprays. Process water will be supplied for dust suppression and dust extraction scrubbers. The dust suppression spray system comprises piping, water cannon and controls. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - BUND 4A CIVIL WORKS
Bund 4a Civil Works New project In The Mackay Regional Council Area. To construct Bund 4A. Click for more details...

KING ISLAND SCHEELITE PROJECT - CIVIL WORKS FOR PROCESSING PLANT BUILDING
A project in the TAS Within King Island. For the provision of civil works for the processing plant building. Click for more details...

LAKE VERMONT COAL PROJECT - EARTHWORKS FOR COAL PREPARATION PLANT
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 1200000. This project For a 4 Mtpa facility. Click for more details...

LAKE LINDSAY COAL PROJECT - CIVIL WORKS FOR MINE SITE
Civil Works - For Mine Site project at Approx 25 km from, Middlemount, QLD 4746 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Various civil & concrete works for the mine site. Click for more details...

MURRAY BASIN STAGE 2 MINERAL SANDS PROJECT - CIVIL WORKS & BULK EARTHWORKS
Murray Basin Stage 2 Mineral Sands Project - Civil Works & Bulk Earthworks is currently at the Construction stage, valued at about $ 5000000 it is For the provision of site-wide civil works & bulk earthworks. Click for more details...

TALINGA DEVELOPMENT PROJECT STAGE 1 - CIVIL WORKS
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Western Downs Regional Council Area of Private ownership. Stage 1 - Civil Works involves earthmoving, hydraulic & civil works up to the completion of the slab & sub-structure. The pipe-laying & superstructure of the facility will be further stages with the pipework to be completed by a specialist company. Click for more details...

MOOLARBEN JOINT VENTURE COAL OPERATIONS - STAGE 1 ROM STOCKPILE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at 40km northeast of, Mudgee, NSW 2850 for New. Construction of a 100,000tonne Run-of-Mine (ROM) stockpile for Stage 1 operations. Click for more details...

GROSVENOR COAL PROJECT - ROM STOCKPILE CIVIL WORKS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 10000000. This project Civil works for the run-of-mine (ROM) stockpile & crushing area. Click for more details...

GROSVENOR COAL PROJECT - BULK EARTHWORKS PACKAGE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at via, Moranbah, QLD 4744 of Bulk Earthworks type of New development. Bulk earthworks for coal operations areas to include drift cut & cover and shotcrete soil stabilisation. Click for more details...

DUGALD RIVER BASE METAL PROJECT - CONCENTRATOR
Concentrator Plant/Associated Plant New project In The Mt Isa City Council Area. The concentrator will have an annual production of approximately 160,000 tonnes of zinc in zinc concentrate, plus by-products, over an estimated 28 year mine life. Click for more details...

NIMBUS VHMS PROJECT - LEACH TANK CIRCUIT WORKS CONTRACT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project for New development. For the provision of contract works. Click for more details...