WEIPA BAUXITE OPERATIONS - ANDOOM/NEWEIPA
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at At, Weipa, QLD 4874. Detailed earthworks, civil works and concrete. Click for more details...

LADY ANNIE/MOUNT KELLY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Adjacent to Lady Loreta Mine 140 Km North West of, Mount Isa, QLD 4825. To construct a 1900 tpa copper SXEW plant and heap leach. Total copper recovery is expected to be 89% of the ore processed. Click for more details...

ROSEBY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at North west of, Cloncurry, QLD 4824. The process plant is to be located immediately adjacent the Blackard Pit. The basic processes include: primary crushing, comprising feed bin, apron feeder, crusher and dust suppression, grinding in a single stage SAG mill and classification in cyclones, optional stockpiling of primary crushed or to de-couple the grinding and flotation processes for the crushing operations, rougher and scavenger flotations, rougher concentrate regrinding to improve final concentrate grade, two stages of cleaner flotation, concentrate thickening and filtration and filter cake storage before transportation, tailings thickening and disposal storage facility and reagents preparation and services. The process plant has been designed to treat approximately 3 Mtpa of sulphide feed, as this will be the case for the initial 4 years of production. Following this, the processing plant may require adaptation to process oxide ores, as the style of ore mineralisation vary. These throughputs are based on a 24 hour per day, 7 days per week operations. The flotation concentrate would be saleable for smelter feed. The proposed process plant comprises the following: Run of Mine (ROM) ore bin fed by either a front end loader or by trucks direct tipping ore, grizzly feeder to remove fines less than 150mm, conveyor feeding combined grizzly and crusher products to the mill, a SAG mill with single 3 MW drives, a ball miss with single 3MW drive, two sets of rougher/scavenger flotation cells (2x7x160 cubic metres), concentrate regrind mill with 550kW drive, cleaner flotation cells (6x50 cubic metres cells), recleaner flotation (4x20 cubic metres cells), concentrate thickening and filtration, reagents, air and water services and pumps, service cranes and hoists. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Via, Blackwater, QLD 4717 Has Blackwater/Comet Chpp Project currently at Planning stage. The project manager's role will include design work for earthworks and related services (ensuring no mismatches between earthworks construction and CHPP construction), construction and related managment and contract administration for CHPP design construct package, once awarded (contract superintendent). Click for more details...

GLADSTONE INTERNATIONAL NICKEL PROJECT - MARLBOROUGH
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Gladstone Regional Council Area of Processing Plant type. Processing of laterite ore. Ore likely to be sourced from New Caledonia via Cape size shipping through Gladstone's deepwater port, supplemented by ore from the deposits at Marlborough. This is likely to be a two stage development. Stage one to 65,000 tpa producing nickel cobalt suplhide will involve a 4 autoclave plant. Stage two would be likely to involve doubling of capacity. Click for more details...

KOGAN CREEK POWER STATION PROJECT - CONCRETE & FINISHING WORKS
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at 9 km south of, Brigalow, QLD 4412. Procurement, (fabrication) and erection of: 36,500 m³ concrete for foundations, walls, columns, ceilings and turbine foundation. 3,500 to reinforcement, 49,000 m² formwork for foundations, walls, columns, ceilings and turbine foundation. 1,570 m³ Brickwork 17,5 cm to 36,5 cm thickness, 600 m² Brickwork 12 cm thickness, 8,770 m² Plastering of walls, columns, ceilings, 24,300 m² Painting of walls, columns, ceilings, 2,150 m² Ceramic tiles for walls and floors, 2,200 m² Carpet tiles / linoleum flexible sheets, 2,000 m² Suspended ceilings, 350 m² Raised floors, 210 No Toilets, washbasins, showers, urinal. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS
Surface Infrastructure project at via, Texas, QLD 4385 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Likely to be small scale infrastructure requirements, including demountables. Some demountables are already in place for administration of exploration project. Only 1-2 additional demountables likely to be required. Likely to be sourced locally. NO accommodation requirements, as the project is located only 7 km from Texas. Heap leach operation will require earthworks to prepare leach pads. Likely to be part of mining operation. Click for more details...

BARALABA COAL PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at 155 km west of Gladstone at, Baralaba, QLD 4702 of Rail Loadout type of New development. The loadout facility will consist of an earth pad and front end loaders. Click for more details...

YABULU NICKEL REFINERY EXTENSION - INITIAL SITE INFRASTRUCTURE CONTRACT
Refinery site at, Yabulu, QLD 4818 Has Yabulu Nickel Refinery Extension - Initial Site Infrastructure Contract currently at Construction stage. Scope of the work involves mainly roads and some early site concrete. Click for more details...

YABULU NICKEL REFINERY EXTENSION - SITE WIDE CONCRETE CONTRACT
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Refinery site at, Yabulu, QLD 4818. Scope of work involves concrete work to the entire refinery site. Click for more details...

MOUNT NORMA LEACH VAT NUMBER FIVE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Cloncurry Shire Council Area of Private ownership. Construction will comprise earthworks, lining of the vats, filters, electrical installation, crushing and loading of the vats. The vat is to contain 30,000 tonnes of high leach copper oxide. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

DAANDINE GAS PROJECT - POWER STATION CIVIL WORKS CONTRACT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Western Downs Regional Council Area of Civil Works Contract type. Civil works for a new power station. Click for more details...

QUEENSLAND ALUMINA RED MUD DAM REDEVELOPMENT
Dam/Pipeline/Roadworks/Processing Plant project at ., Boyne Island, QLD 4680 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Containment walls, processing plant, roads & pipes. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - LAND RECLAIMATION
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Mackay Regional Council Area for New development. Reclaim land for a surge bin. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - ONSHORE OUTLOADING CONVEYOR SYSTEM
Dalrymple Bay Coal Terminal Expansion - Onshore Outloading Conveyor System is currently at the Construction stage, valued at about $ 60000000 it is To fabricate and erect an Onshore Outloading Conveyor System. The conveyor will be one kilometre in length and will be constructed of fabricated steel. There will be a minor civil work component to the project involving concreting. All the mechanics have been supplied. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - MINOR CIVIL/MECHANICAL/STRUCTURAL WORKS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Mackay Regional Council Area for New development. Work comprises the contractor to do minor civil, mechanical and structural works on site when needed. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - BUND 4A CIVIL WORKS
Bund 4a Civil Works New project In The Mackay Regional Council Area. To construct Bund 4A. Click for more details...

LAKE VERMONT COAL PROJECT - EARTHWORKS FOR COAL PREPARATION PLANT
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 1200000. This project For a 4 Mtpa facility. Click for more details...

LAKE VERMONT COAL PROJECT - CONCRETE WORKS FOR COAL PREPARATION PLANT
A project in the QLD Within Isaac Regional. For a 4 Mtpa plant. Click for more details...

LAKE LINDSAY COAL PROJECT - CIVIL WORKS FOR MINE SITE
Civil Works - For Mine Site project at Approx 25 km from, Middlemount, QLD 4746 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Various civil & concrete works for the mine site. Click for more details...

TALINGA DEVELOPMENT PROJECT STAGE 1 - CIVIL WORKS
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Western Downs Regional Council Area of Private ownership. Stage 1 - Civil Works involves earthmoving, hydraulic & civil works up to the completion of the slab & sub-structure. The pipe-laying & superstructure of the facility will be further stages with the pipework to be completed by a specialist company. Click for more details...

GROSVENOR COAL PROJECT - ROM STOCKPILE CIVIL WORKS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 10000000. This project Civil works for the run-of-mine (ROM) stockpile & crushing area. Click for more details...

GROSVENOR COAL PROJECT - BULK EARTHWORKS PACKAGE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at via, Moranbah, QLD 4744 of Bulk Earthworks type of New development. Bulk earthworks for coal operations areas to include drift cut & cover and shotcrete soil stabilisation. Click for more details...

ROCKLANDS GROUP JOINT VENTURE COPPER PROJECT - PROCESSING PLANT INSTALLATION
Structural/Mechanical/Piping Installation New project In The Cloncurry Shire Council Area. Installation of a fully computerised & automated 3 million tonne per annum (Mtpa) processing plant for copper/gold, cobaltic-pyrite, native copper & magnetite concentrate production. Click for more details...

DUGALD RIVER BASE METAL PROJECT - CONCENTRATOR
Concentrator Plant/Associated Plant New project In The Mt Isa City Council Area. The concentrator will have an annual production of approximately 160,000 tonnes of zinc in zinc concentrate, plus by-products, over an estimated 28 year mine life. Click for more details...