List of Coal Processing Projects in NSW


COAL & ALLIED OPERATIONS - HUNTER VALLEY/MOUNT THORLEY/WARKWORTH/BENGALLA
Renovations, Refurbishments etc. project of Mining - Primary And Secondary Processing (Coal Processing) project at Via, Singleton, NSW 2330. Includes professional services for the maintenance of the many screenbowl centrifuges at the above location. All work will comply to stringent Coal & Allied safety standards. Involves overhaul of rotating assemblies and gearboxes;removal, installation and commissioning of all components, maintenance and general servicing of components; design and process expertise. Click for more details...

HUNTER VALLEY COAL OPERATIONS - HUNTER VALLEY/HOWICK/LEMINGTON
Mining - Primary And Secondary Processing (Coal Processing) project at Via, Singleton, NSW 2330 of Reject Bin - Fabrication type of Supply & Install development. A second reject bin to accommodate larger trucks. Adjacent to existing 500 tonne bin. Click for more details...

BULGA COAL OPERATIONS - REDBANK II COAL TAILINGS PREPARATION & WASTE MANAGEMENT
Coal Tailings Dewatering Plant & Associated Infrastructure New project In The Singleton Council Area. The proposal included construction & operation of a tailings dewatering plant (DBT) and associated infrastructure and facilities. Supply of BDT fuel to the Redbank 2 power plant and receipt and disposal of fly ash, water treatment plant sludge, and wastewater from the Redbank 2 power plant. Click for more details...

HUNTER VALLEY COAL OPERATIONS
Product Coal Feed Bin project at Lemington Rd, Lemington, NSW 2330 In The Council Area Of Singleton of Private. Coal and Allied Operations Pty Ltd operates open cut coal mines and coal preparation plants in the Hunter Valley at Mount Thorley, Hunter Valley Operations (Howick, Hunter Valley and Lemington), Warkworth, Ravensworth and Bengalla Mines. Coal and Allied is interested in receiving Expressions of Interest from companies that can provide professional services for the staged design and construction of a product coal feed bin at the Hunter Valley Operations Load Point. Stage 1 will include site investigation, conceptual design and budget preparation. Stage 2 will encompass design and construction for the completion of the works. all works will comply to stringent Coal & Allied safety standards. It is envisaged that the design process will be highly consultative iwth existing operations, with a key element of the work being the minimisation of disruptions to current train loading facilities during construction. It is envisaged that conceptual works and budget preparation be completed by 1 December 2001 with final works completed (pending internal finanical approval) by the third quarter of 2002. Click for more details...

LIDDELL COAL COLLIERY - RESOURCE
Mine - Coal New project In The Singleton Council Area. Existing operation produces 4.5 Mtpa of Rom coal and the CHPP processes 700 tonnes per hour. A proposal has been approved to increase ROM coal production to 8 Mtpa. Associated development will comprise the construction of a new Coal Handling Plant, establishment of a new supplementary stockpile with capacity of 450,000 tonnes, alter the planned 1500 ML Dam 13B footprint, construct a bridge over the main Northern Railway to improve transport between existing coal pits, alter an access road to the CHPP, relocation of offices, workshop and storage area and an associated access road, and the construction of a desalination unit within the CHPP area for the treatment of mine water. Capital expenditure on the Washplant upgrade alone was approx $100 million. Click for more details...

TAHMOOR COLLIERY - TAHMOOR NORTH EXPANSION STAGE THREE/COAL PREPARATION PLANT
Tahmoor Colliery - Tahmoor North Expansion Stage Three/Coal Preparation Plant is currently at the Tenders & Building stage, valued at about $ 5000000 it is Part of proposed Tahmoor North expansion from 1.9 million tonnes ROM in 2002 rising to 3.2 million tonnes ROM by end 2004 of high quality coking coal. The project is currently scheduled for completion by early 2004 and will proceed in three stages. Expressions of interest are invited for supply of equipment for each stage of the project. Click for more details...

CUMNOCK NO 1 COLLIERY
Mining - Primary And Secondary Processing (Coal Processing) project In The Singleton Council Area of Mine - Coal type. The mine produces soft coking coal used in Asian steel mills. Coal is loaded at adjacent Ravensworth coal terminal and railed to Newcastle for export. Production for 2006 was 1,416,666 tonnes of raw coal. Click for more details...

DARTBROOK COAL OPERATIONS - KAYUGA
Mining - Primary And Secondary Processing (Coal Processing) project In The Muswellbrook Council Area of Reject Emplacement Works type. Tailings dewatering. Click for more details...

RAVENSWORTH EAST COAL OPERATIONS
Mining - Primary And Secondary Processing (Coal Processing) project for New development. The contract involves mining, coal beneficiation, stockpiling and loading of coal for both domestic and export markets.Planed production is 1.2 million tonnes per annum, with 600,000 tonnes per annum contracted to Macquarie Generation and the remainder to be sold to the export market. Click for more details...

MOUNT OWEN COAL OPERATIONS - CHPP UPGRADE
Mining - Primary And Secondary Processing (Coal Processing) project In The Singleton Council Area of Private ownership. An upgrade of the Mount Owen CHPP to allow for increased throughput up to 14 Mtpa (likely to include coal from Ravensworth East and Glendell), and increase the approved capacity of the rail loading facility. Click for more details...

DRAYTON COAL OPERATIONS
Coal Treatment Unit - Design project at Lot 6 DP 701496, Thomas Mitchell Dr, Muswellbrook, NSW 2333 in the Mining - Primary And Secondary Processing (Coal Processing). The coal treatment unit (CTU) will be a closed working circuit with coal being fed through the existing coal handling plant. The current operation of Drayton requires the CTU in order to produce saleable export quality product for an excess of unsaleable domestic quality production. Click for more details...

TARAWONGA COAL PROJECT - RESOURCE
Resource - Coal project at Maules Creek & Goonbri Rds, 15 km north east of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. The expected mine life between 8 to 10 years, will yield close to 12 million tonnes of export quality low sulphur, low ash, high-energy semi-soft coking coal from the Forest View, Thuin and Nagero properties east of Boggabri (formerley named East Boggabri Coal Project). Click for more details...

TAHMOOR COLLIERY
New project of Mining - Primary And Secondary Processing (Coal Processing) project at At, Tahmoor, NSW 2573. Bolt-up in progress. The clean coal stockpile level has been built up to 284,000 tonnes to ensure that coal shipment could be met during the planned shutdown. The shutdown is required to enable completion of necessary capital works during the Tahmoor North Expansion. The longwall changeover is part of normal mining operations. Click for more details...

BENGALLA COAL OPERATIONS EXPANSION PHASE 1
Mining - Primary And Secondary Processing (Coal Processing) New project at 4 km west of, Muswellbrook, NSW 2333. This type is Operating Mine - Expansion - Phase 1 with Private ownership. Expansion of open cut operations with Phase 1 to increase Run-of-Mine (RoM) coal to 9.3Mtpa for 7.5Mtpa approx product coal. To include upgrade of the existing 8.7million tonnes per annum (Mtpa) capacity coal washery to 2 stage washing. Purchase of additional mining equipment. Upgrades of associated mine infrastructure including a heavy vehicle workshop, bathhouse & wash bay. Click for more details...

CHARBON COAL OPERATIONS - OPERATING MINE
Charbon Coal Operations - Operating Mine is currently at the Construction stage, valued at about $ 20000000 it is Developer is proposing to expand the open cut operations into stage 2 area of the mine. It will involve the production of 600,000 tonnes of coal per annum. The existing infrastructure at the mine will not be altered. Existing infrastructure includes a Coal Preperation Plant, stockpiles and transport infrastructure. Resource estimate is 7.1 Mt measured in-situ, 18.7 Mt indicated, 25.8 Mt recoverable, 5.8 Mt marketable. Click for more details...

POWERCOAL COLLIERIES
Lifting Products - Supply project at Various sites lake Macquarie, Central Coast & Lithgow Regions, Lithgow, NSW 2790 In The Council Area Of Lithgow of Private. Supply and delivery of lifting and materials handling products (including winches, hoists, blocks, wire and fibre ropes, chains, shackles, tumbuckles etc) for an initial two year period with "optional" extension period. Click for more details...

BENGALLA COAL OPERATIONS
Mine site, Bengalla, NSW 2333 Has Bengalla Coal Operations currently at Construction stage. The expansion involves additions of a second module. This will replicate module 1, which was designed to allow addition of a second module. The addition will expand production capacity to 3,000 tonnes per annum export capacity. Click for more details...

WEST CLIFF COLLIERY
Upgrade Conveyor Belts & Drive Units project at Wedderburn Rd, Appin, NSW 2560 In The Council Area Of Wollondilly of Private. The drive units involved are numbers 1.11, 1.5 & 1.9. Click for more details...

MANGOOLA COAL PROJECT - COAL HANDLING & PREPARATION PLANT
Mining - Primary And Secondary Processing (Coal Processing) project for New development. For the installation of a 10.5 Mtpa coal handling & preparation plant, including site-wide electrical, instrumentation, & control, 500 kV line relocation (subject to relevant regulatory approval), & 66kV supply to mine substation. Click for more details...

MANDALONG COAL OPERATIONS - METHANE GAS DRAINAGE PLANT
Methane Gas Drainage Plant - Construct/Operate project at 3 km south west of, Morisset, NSW 2264 In The Council Area Of Lake Macquarie of Private. The coal haulage is 1,000 tonnes by road to Eraring and/or Vales Point power stations contract is likely to be added to existing contractor. The likely method to be used for the Methane Gas Drainage Plant at the first stage is to purge the gas to atmosphere using one of two options. A decision will be made by mid February 2005 on which option is to be used. Click for more details...

CAMBERWELL COAL OPERATIONS - CHPP STAGE 2 UPGRADE
Camberwell Coal Operations - Chpp Stage 2 Upgrade is currently at the Construction stage, valued at about $ 5000000 it is The upgrade will facilitate the removal of all particles greater than 0.5mm from tailings. As a result, the proportion of the smallest size fraction in the tailings reject material will increase after Stage 1B. The addition of the floatation process in Stage 2 will enable the removal of a proportion of the fine coal from tailings, the proportion of smaller to larger size particles will return to the current level. Click for more details...

ULAN COAL OPERATIONS - EXPANSION
Coal Mine Expansion/Associated Facilities New project In The Upper Hunter Council Area. The proposed expansion will include extending the existing open cut coal mine about 180 metres to the west of the approved limits, relocating the approved Ulan West surface infrastructure, upgrading the coal handling, storage and train loading facilities, constructing the Ulan West services corridor and extending the hub stockpile. Click for more details...

KOORAGANG COAL TERMINAL STAGE 3 EXPANSION WORKS
Mining - Primary And Secondary Processing (Coal Processing) New project at ., Kooragang, NSW 2304. This type is Coal Terminal Expansion with Private ownership. Expansion of terminal capacity from 89 mtpa to 102 mtpa. Development will involve a fourth stacking stream, a new stockpile pad, associated stacking conveyors and a new coal stacker. Click for more details...

ASHTON COAL PREPERATION PLANT EXPANSION
Ashton Coal Preperation Plant Expansion is currently at the Construction stage, valued at about $ 50000000 it is Coal Preparation Plant Expansion from 400 tph to 1000 tph. Click for more details...

PORT WARATAH COAL SERVICES - PAINTING SERVICES CONTRACT
Private ownership Mining - Primary And Secondary Processing (Coal Processing) project In The Newcastle Council Area for New development. A two year contract with option for 5 years. Click for more details...

CAMBERWELL COAL OPERATIONS - FLOATATION CIRCUIT
Mining - Primary And Secondary Processing (Coal Processing) New project at Bridgeman Rd, Singleton, NSW 2330. This type is Floatation Circuit - Design/Supply/Commission with Private ownership. Long lead items have been ordered. Click for more details...

MANGOOLA COAL PROJECT - STRUCTURAL STEEL & MECHANICAL FOR RAIL LOADING INFRASTRUCTURE
Rail Loading Infrastructure - Structural Steel/Mechanical New project In The Muswellbrook Council Area. For the provision of structural steel & mechanical works. Click for more details...

DRAYTON COAL OPERATIONS - CRANAGE - FOR COAL TREATMENT UNIT
Mining - Primary And Secondary Processing (Coal Processing) project at Thomas Mitchell Dr, Muswellbrook, NSW 2333 for New. This will be a 3 year contact with a further option of 12 months. Click for more details...

LIDDELL COAL OPERATIONS - COAL HANDLING PREPARATION PLANT
Coal Handling Preparation Plant project at 20 Km North West of, Singleton, NSW 2330 In The Council Area Of Singleton of Private. Construction of a new Coal Handling Preparation Plant. This will involve the construction of a new preparation section, upgrades to the ROM receival and product coal facilities. The new preparation area will be located next to the old CHPP and its capacity will be 1200 tonnes per hour. This will include new screening, cyclone and spiral components for the plant. Upgrades to the ROM receival equipment include shortening of the apron feeder, a new rotating star wheel, new sizers and an increase in the drive power and length of the ROM conveyor. Modifications to the product handling equipment will include a short product conveyor to collect coal from the new CHPP to be deposited at a new transfer station onto the existing product stockpile rising conveyor. The existing road truck type coarse rejects bin will be replaced by a larger bin capable of loading mining sized trucks. The exisiting CHPP will be dismantled and recycled or disposed of over a one year period. Click for more details...

LIDDELL POWER STATION - COAL UNLOADER MAINTENANCE
Liddell Power Station - Coal Unloader Maintenance is currently at the Construction stage, valued at about $ 4000000 it is Work comprises the sampling and analysis of coal supplied to Bayswater and Liddell Power Stations. This will include operation, routine inspection and maintenance of the two automatic coal samplers at Ravensworth Operations Narama/Ravensworth West Mine. Routine inspection and maintenance of three automatic coal samplers located on conveyors supplying coal from Howick Coal, Drayton Coal and the Macquarie Generation Ravensworth Coal Unloader. Collection and analysis of samples from Howick Coal, Drayton Coal, Mount Arthur North, Macquarie Generation Ravensworth Coal Unloader, Macquarie Generation Antiene Coal Unloader, Ravensworth Operations Narama/Ravensworth West Mine and Ravensworth Operations Ravensworth East Mine. Quarterly inspections of the automatic coal samplers located on the conveyors supplying coal from Mount Arthur North Mine, Ravensworth East Mine and the Macquarie Generation Antiene Coal Unloader. manual sample collection from trucks at Bayswater Power Station and analysis. Click for more details...

BENGALLA COAL OPERATIONS - CIVIL WORKS FOR ROM HOPPER CONSTRUCTION
Mining - Primary And Secondary Processing (Coal Processing) project In The Muswellbrook Council Area of Private ownership. For the provision of civil works for the rom hopper construction. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION
Mining - Primary And Secondary Processing (Coal Processing) project at 17km northeast of, Boggabri, NSW 2382 of Operating Mine - Expansion - Stage 2 type of New development. Expansion of existing Boggarbri open cut coal operations. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 1.5 million tonnes per annum (Mtpa) to 2.5Mtpa in 2011 & 4.3Mtpa in 2013. Installation of a new 132kV switchyard/sub-station/overhead power lines. Installation of modular buildings for offices & bathhouse extension. Construction of a light vehicle workshop, a heavy vehicle workshop with warehouse & a car park. 150 construciton jobs expected as well as 500 operational jobs. Click for more details...

ROCGLEN COAL PROJECT - CRUSHING PLANT
Mining - Primary And Secondary Processing (Coal Processing) project at 25 km north of, Gunnedah, NSW 2380 for New. For the provision of a crushing plant. Click for more details...

ROCGLEN COAL PROJECT - SCREENING PLANT
Screening Plant project at 25 km north of, Gunnedah, NSW 2380 In The Council Area Of Gunnedah of Private. For the provision of a screening plant. Click for more details...

SUNNYSIDE OPEN CUT COAL PROJECT - CRUSHING & SCREENING PLANT
Mining - Primary And Secondary Processing (Coal Processing) project In The Gunnedah Council Area of Crushing/Screening Plant type. Crushing and screening plant for 5 year operation of mine at around 1 million/annum. coal will then be trucked to Whitehaven's Gunnedah coal preparation plant. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Primary And Secondary Processing (Coal Processing) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

WEST CLIFF COLLIERY WASHERY UPGRADE
New project of Mining - Primary And Secondary Processing (Coal Processing) project at 4km southeast of, Appin, NSW 2560. Upgrade of the West Cliff Washery over the life of the Bulli Seam Operations Project to handle up to 105Mtpa throughput. To include installation of new components such as rotary breaker & screen house, coarse & fine coal storage bins, triple roll crusher, small coal circuit modules (eg desliming screens, primary & secondary cyclones, centrifuges), flotation cells & a teetered bed separator, coal & tailings thickeners, belt filters & tailings presses. Replacement of the existing Baum jig with a dense medium drum. Upgrades of existing conveyor systems, piping, pumps, sumps, safety & auxiliary systems. Upgrades of power supply systems to provide additional capacity & back up supply. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION
A project in the NSW Within Mid Western Regional. A project at the existing open-cut mine to expand Run-of-Mine (RoM) coal production from 13million tonnes per annum (Mtpa) to 15Mtpa for 12Mtpa per annum of washed & unwashed product coal to be railed to domestic power customers & a port for export. To involve a 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Associated upgrading of the coal handling & stockpiling system to include an additional ROM hopper with associated sizing station & raw coal conveyor & stacker plus an additional product coal stockpile with associated stacking conveyor & reclaim conveyor. Other work to include minor earthworks, conveyors, transfer stations & relocation of site roads. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION - CHPP UPGRADE
Mining - Primary And Secondary Processing (Coal Processing) project at 386 Leard Forest Rd 17km northeast of, Boggabri, NSW 2382 for Renovations, Refurbishments etc.. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 3 million tonnes per annum (Mtpa) to 6.9 Mtpa. Construction also of a new rail loop & load out facility & upgrade of the present one. Click for more details...

STRATFORD COAL OPERATIONS - CHPP UPGRADE
Coal Handling & Preparation Plant ? Upgrade project at 3364 Bucketts Way, Stratford, NSW 2422 In The Council Area Of Gloucester of Private. Upgrade of the Stratford coal handling & preparation plant (CHPP) to 5million tonnes per annum (Mtpa) to accommodate planned increased mining production of 3.5Mtpa approx. To include an increase to the flotation & filtration capacity. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION - CHPP UPGRADE
Private ownership Mining - Primary And Secondary Processing (Coal Processing) project In The Mid Western Regional Council Area for New development. A 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Click for more details...

MAULES CREEK COAL PROJECT - PROCESSING PLANT
Coal Handling & Processing Plant project at 20km northeast of, Boggabri, NSW 2382 in the Mining - Primary And Secondary Processing (Coal Processing). Design & construction of a coal handling & preparation plant (CHPP). Wash plant system & bypass system each with a capacity of 1600tph (11.8 million tonnes per annum). Includes a secondary sizing station, Run-of-Mine (ROM) hoppers, thickener facility & train load out. Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - RAVENSWORTH NORTH PROJECT - CHPP STRUCTURAL STEEL SUPPLY
Mining - Primary And Secondary Processing (Coal Processing) project In The Singleton Council Area of Structural Steel - For Coal Handling & Preparation Plant type. Upgrade of an existing coal handling & preparation (CHPP) plant & construction of 2 new ones (Modules 2 & 3). Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - CHPP ELECTRICAL
Mining - Primary And Secondary Processing (Coal Processing) New project at Lemington Rd, Singleton, NSW 2330. This type is Electrical - For Coal Handling & Processing Plant with Private ownership. Low voltage power supply & reticulation as well as high voltage transmission supply & relocation. Click for more details...

CENTENNIAL WESTERN COAL SERVICES - SPRINGVALE SERVICES SITE UPGRADE
A project in the NSW Within Lithgow. A project to support western operations (Springvale, Angus Collieries) by upgrading the coal handling & distribution capacity at the central Springvale Coal Services site to 9.5 million tonnes per annum (Mtpa) of run-of-mine (ROM) coal. To include expansion of the coal washery involving installation of new plant adjacent the existing plant for an overall capacity of 7 Mtpa along with additional conveyors & transfer points. Increase of reject disposal capacity. Construction of a private haul road linking the site to the existing Angus Place-Mount Piper power station haul road. Continued integrated rehabilitation of the former Lambert Gully Mine also located on the coal services site. Click for more details...

PINE DALE COAL OPERATIONS STAGE 2 EXTENSION
Mining - Primary And Secondary Processing (Coal Processing) project In The Lithgow Council Area of Operating Mine - Extension type. A project to extend operations 10-15 years by incorporating 201ha in the Blackmans Flat area adjoining the now exhausted original Pine Dale mine & the recently approved 27ha Stage 1 Yarraboldy extension. Continued open cut operations accessing 14.2 million tonnes (Mt) at a rate of 2Mt product coal annually. Construction of a new mine industrial area to include a 600tph crushing & screening plant, 100,000t run-of-mine (ROM) stockpile, 200,000t product stockpiles & maintenance facilities. Construction or relocation of offices, amenities, workshop, water management infrastructure, electric power supply, explosives magazine & fuel storage area. Dewatering of existing pit prior to use for overburden & interburden emplacement. Reinstatement of the now derelict Wallerawang spur rail line & rail siding & construction of a rail load out facility. Internal access roads & private haul road crossing. An additional 60 employees expected at maximum production. Click for more details...

ASHTON COAL OPERATIONS GAS DRAINAGE PROJECT
Mining - Primary And Secondary Processing (Coal Processing) project at New England Hwy south of, Camberwell, NSW 2330 for New. A project to drain goaf methane gas from 8 longwall blocks over the remaining 10-12 years of underground mining. To include up to 80 boreholes on pads typically 5m x 5m & linked by a 16km long, 300-700m diameter high density polyethylene (HDPE) pipeline network to a central plant & enclosed gas flaring facility constructed in a 25m x 75m area. The plant to comprise up to 4 x 1500L/s electrically driven liquid ring vacuum pumps, a gas-water separator, flow control reticulation, control panel/room & gas analyser along with associated electrical transformer or on site generator & cooling water tank. Up to 15 construction jobs expected. Click for more details...

CENTENNIAL WESTERN COAL SERVICES - COAL WASHERY UPGRADE DESIGN CONTRACT
Design Contract - Coal Washery project at Castlereagh Hwy BLACKMANS FLAT 5km north of, Wallerawang, NSW 2845 In The Council Area Of Lithgow of Private. Design for expansion of the coal washery involving installation of new plant adjacent the existing plant for an overall capacity of 7 million tonnes per annum (Mtpa) along with additional conveyors & transfer points. Associated increase of reject disposal capacity. Click for more details...