List of Coal Processing Projects in QLD


BLACKWATER COMET PROJECT
Structural Steelwork project at Via, Blackwater, QLD 4717 in the Mining - Primary And Secondary Processing (Coal Processing). More than one package. Click for more details...

COPPABELLA COAL OPERATIONS
Addition project of Mining - Primary And Secondary Processing (Coal Processing) project at Approx 130 km west of, Mackay, QLD 4740. The Coal Preparation Plant will become the largest single module plant in the world. Click for more details...

BLACKWATER COMET PROJECT
New project of Mining - Primary And Secondary Processing (Coal Processing) project at Via, Blackwater, QLD 4717. Part of Comet CPP project. Coal Handling. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Coal Handling & Preparation Plant project at Via, Blackwater, QLD 4717 In The Council Area Of Central Highlands Regional of Private. Comet CPP project. Raw coal and product coal areas included. The new facility will be located adjacent to the current Blackwater North preparation plant and will replace the high cost North, South and Thermal Coal Plants. Click for more details...

BLACKWATER COMET CHPP PROJECT
Mining - Primary And Secondary Processing (Coal Processing) project In The Central Highlands Regional Council Area of Prep Plant/Raw Coal Area/Loadout/High Voltage - Design/Const Package (Combined) type. Now includes the Comet CPP Project (Preparation Plant), and all coal handling facilities, as well a high voltage electrical package. Click for more details...

LAKE VERMONT COAL PROJECT - COAL PREPARATION PLANT
New project of Mining - Primary And Secondary Processing (Coal Processing) project at Approx 15 km northeast of, Dysart, QLD 4745. For a 4 Mtpa plant. Click for more details...

ROLLESTON COAL PROJECT - COAL HANDLING/INFRASTRUCTURE
Mining - Primary And Secondary Processing (Coal Processing) New project at 16km west of, Rolleston, QLD 4702. This type is Crushing & Mine Site Infrastructure with Private ownership. Initial development will be for 6mtpa. Expansion to 8 mtpa allowed for. Click for more details...

ROLLESTON COAL PROJECT - STAGE TWO/STAGE THREE
Mining - Primary And Secondary Processing (Coal Processing) project for New development. First production will of one million tonnes approx is expected in late 2005. Stage two to 8 mtpa will require only the purchase of an additional second hand dragline and some minor mobile plant. The crushing and mine site infrastructure for stage one will be sized to handle 8 mtpa.Stage two production levels are expected in 2008. The mine is expected to have a 20 year plus life and has further expansion potential to 12mtpa with additional minor capital. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Via, Blackwater, QLD 4717 Has Blackwater/Comet Chpp Project currently at Planning stage. The project manager's role will include design work for earthworks and related services (ensuring no mismatches between earthworks construction and CHPP construction), construction and related managment and contract administration for CHPP design construct package, once awarded (contract superintendent). Click for more details...

KESTREL COAL OPERATIONS
New project of Mining - Primary And Secondary Processing (Coal Processing) project at 49 km north east of, Emerald, QLD 4720. The mine is capable of annual production of up to five million tonnes of high quality metallurgical coal and high energy thermal coal for export markets in Asia and Europe. The lease contains 190 million tonnes of recoverable reserves, part of total coal resources of 289 million tonnes. The purchase includes the nearby Gordonstone West property, which has additional recoverable resources of 126 million tonnes. Click for more details...

KOGAN CREEK COAL/POWER STATION PROJECT
Mining - Primary And Secondary Processing (Coal Processing) project In The Western Downs Regional Council Area of Private ownership. Proposed open cut coal mine and associated power station Click for more details...

WILKIE CREEK COAL OPERATIONS
A project in the QLD Within Western Downs Regional. To upgrade the wash plant from 2 to 2.5 mtpa. Click for more details...

CLERMONT COAL PROJECT - ROM DUMP STATION
Mining - Primary And Secondary Processing (Coal Processing) New project at 10 km north of, Clermont, QLD 4721. This type is Rom Dump Station - For Coal Handling Preparation Plant with Private ownership. For the provision of a steel ROM dump station. Click for more details...

NEWLANDS COAL OPERATIONS - STRUCTURAL STEEL ERECTION
New project of Mining - Primary And Secondary Processing (Coal Processing) project at 13 km west of, Glenden, QLD 4743. Two Ultra Fine Coal buildings and one Portal building. Click for more details...

FOXLEIGH COAL OPERATIONS - PIPING FOR TRAIN LOADOUT
Mining - Primary And Secondary Processing (Coal Processing) New project at 10 km south of, Middlemount, QLD 4746. This type is Piping - For Train Loadout with Private ownership. Poly piping & steel piping will be required. Click for more details...

ABBOT POINT COAL TERMINAL EXPANSION STAGE 3
Mining - Primary And Secondary Processing (Coal Processing) project at Abbot Point 25 km north west of, Bowen, QLD 4805 of Coal Terminal Expansion - Stage 3 type of New development. Expansion of terminal capacity from 15 mtpa to 50 mtpa. Key components of the stage 3 expansion will involve the construction of a second berth, a second rail loop and train dump facilities and associated second in loading conveyor. Installation of a new stockyard bund and two new stockpile rows. Up to three new stacker reclaimers and a new yard conveyor and transfer towers will be installed. A second outloading conveyor to the offshore berth, using the existing jetty structure will be installed. Installation of a second offshore berth and a second shiploader on the new berth. Lastly there will dredging work associated with the second berth and the dredge material will be disposed of on either land or sea. Click for more details...

NEW ACLAND COAL STAGE 2 EXPANSION PROJECT - WASHPLANT
New Acland Coal Stage 2 Expansion Project - Washplant is currently at the Construction stage, valued at about $ 10000000 it is This package is for a new washplant. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION
A project in the QLD Within Isaac Regional. The project involves an expansion of the existing Goonyella Riverside open cut and the underground operations at Broadmeadow to increase the capacity from 16 Mt/a to 24 Mt/a. Mining and processing will yield a Hard Coking Coal product for the export market. The open cut expansion and underground expansions will result in an additional 5Mt/a and 3Mt/a of product coal respectively. The surface expansion will use the current open cut mining methods, which involve truck and shovel fleets and draglines exposing coal. Most of the open cut spoil from the expanded operations will be disposed of within mined out pits as is the current practice. However, it is expected that some of the spoil will need to be disposed of in out-of-pit spoil dumps. The existing Broadmeadow Mine, which extracts the Goonyella Middle Seam (GMS), will be expanded eastwards using either the conventional longwall mining practices currently being used for its operations or see the introduction of Longwall Top Coal Caving (LTCC) technology once its feasibility is proven as a means to improve the levels of resource recovery compared to conventional longwall mining methods. A second longwall mine is currently under investigation using either conventional longwall methods or LTCC method. The existing mine has much of the necessary infrastructure in place, however, there are infrastructure upgrades required for the expansion of the mine including: a new CHPP and upgrade to the existing CHPP; construction of an additional 66kV feeder adjacent to the present Goonyella 66kV line; expansion of the existing tailings storage facilities to accommodate increased tailings volumes; improvements to the existing mine water management system, including clean water diversion, disturbed area runoff collection and treatment, pit water management, water reuse and water disposal if there is surplus water at any time that cannot be reused on site. The expansion element of the project requires an additional coal preparation capacity of approximately 2 370 tonnes per hour (t/h) to achieve a production rate of 24 Mt/a. The options to achieve this throughput are to expand the existing CHPP's and/or build a new plant to supplement one or both existing plants. The new CHPP is likely to be tied into the existing product handling system. Alternatively a separate train load-out will be constructed on one of the existing rail loops. The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

DAWSON SOUTH STAGE TWO PROJECT - COAL HANDLING PREPARATION PLANT
Dawson South Stage Two Project - Coal Handling Preparation Plant is currently at the Construction stage, valued at about $ 400000000 it is Development comprises the development of a Coal handling Preparation Plant (CHPP) to process 5 Mtpa. Coal will be delivered by an overland conveyor with the CHPP processing at 2000 tonnes per hour in two stage mode and 3400 tonnes per hour in single stage mode. The plant will comprise six fully automated stacker and reclaimer machines, dense medium cyclones, spirals and flotation circuits. Coal will then be loaded by a high capacity automated reclaimers to a new rail load out facility. Click for more details...

SONOMA COAL PROJECT - COAL HANDLING PREPERATION PLANT - STAGE 1
Mining - Primary And Secondary Processing (Coal Processing) New project at 7 Km South of, Collinsville, QLD 4804. This type is Coal Handling Preperation Plant - Stage 1 with Private ownership. Subcontract packages include: Train Loadout Bin - fab/install; ROM Hopper - fab/install; conveyor - fab/install; Motor Control Centre; Concrete Works; and, High Voltage Reticulation. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 1 - STRUCTURAL STEEL FOR DEMONSTRATION PLANT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 6000000. This project For a 1-5 barrels per day Gas to Liquids demonstration plant. Click for more details...

ENSHAM CENTRAL UNDERGROUND COAL PROJECT
New project of Mining - Primary And Secondary Processing (Coal Processing) project at 40 km north east of, Emerald, QLD 4720. A project to extend Ensham's Life-Of-Mine by 20-30 years by expanding into underground mining. Operations at around 7.6 million tonnes per annum (Mt/y) expected initially to be bord & pillar. New surface facilities likely to include access roads, workshop & vehicle servicing facilities, administration building, accommodation camp, washplant, tailings dams, conveyors, coal stockpile areas, coal handling & preparation facilities, ventilation shafts & access boreholes. A new conveyor to connect the underground product coal stockpile to the existing conveyor serving the train loading bin. Click for more details...

KESTREL COAL UNDERGROUND EXTENSION PROJECT - COAL HANDLING & PREPARATION PLANT UPGRADE
Mining - Primary And Secondary Processing (Coal Processing) project for Addition development. Upgrade to existing coal wash plant to increase production from 1000t/h to 1400t/h. Click for more details...

MIDDLEMOUNT COAL PROJECT - CONSTRUCT & OPERATE COAL HANDLING & PREPARATION PLANT
Mining - Primary And Secondary Processing (Coal Processing) project In The Isaac Regional Council Area of Private ownership. Includes 10 year operations contract operating the coal handling & preparation plant at 400 tonnes per hour. Click for more details...

LAKE VERMONT COAL PROJECT - EARTHWORKS FOR COAL PREPARATION PLANT
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 1200000. This project For a 4 Mtpa facility. Click for more details...

LAKE VERMONT COAL PROJECT - CONCRETE WORKS FOR COAL PREPARATION PLANT
A project in the QLD Within Isaac Regional. For a 4 Mtpa plant. Click for more details...

LAKE VERMONT COAL PROJECT - MECHANICAL FOR COAL PREPARATION PLANT
Mechanical - For Coal Preparation Plant project at Approx 15 km north east of, Dysart, QLD 4745 In The Council Area Of Isaac Regional of Private. For a 4 Mtpa plant. Click for more details...

LAKE VERMONT COAL PROJECT - STRUCTURAL STEEL FOR COAL PREPARATION PLANT
Mining - Primary And Secondary Processing (Coal Processing) New project at Approx 15 km north east of, Dysart, QLD 4745. This type is Structural Steel - For Coal Preparation Plant with Private ownership. For a 4 Mtpa plant. Click for more details...

LAKE VERMONT COAL PROJECT - ELECTRICAL FOR COAL PREPARATION PLANT
Approx 15 km north east of, Dysart, QLD 4745 Has Lake Vermont Coal Project - Electrical For Coal Preparation Plant currently at Construction stage. For a 4 Mpta plant. Click for more details...

LAKE VERMONT COAL PROJECT - PIPING FOR COAL PREPARATION PLANT
Piping - For Coal Preparation Plant project at Approx 15 km north east of, Dysart, QLD 4745 In The Council Area Of Isaac Regional of Private. For a 4 Mtpa plant. Click for more details...

CLERMONT COAL PROJECT - COAL HANDLING PREPARATION PLANT
Private ownership Mining - Primary And Secondary Processing (Coal Processing) project In The Isaac Regional Council Area for New development. Off site fabrication & installation of 2 major (2500tph) & 3 minor (300tph) conveyors, a dump hopper, a wash plant (300tph). Associated process piping. Click for more details...

BLOODWOOD CREEK UCG POWER PROJECT
Mining - Primary And Secondary Processing (Coal Processing) project In The Western Downs Regional Council Area of Private ownership. A power plant project based on underground coal gas (UCG) with late 2009 certified syngas reserves of 11PJ at 1P (proven) level of certainty, 743.9PJ at 2P (proven + probable) & 1042.8PJ at 3P (proven + probable + possible). The 5MW proof-of-concept power station powered by 4 GEC Alsthom Ruston low emission engines to be connected via a 12.6km overhead line to the power grid in October 2011. Development of a commercial scale 20-25MW power station to follow. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - ELECTRICAL INSTRUMENTATION FOR CHPP
15 km east of, Moranbah, QLD 4744 Has Carborough Downs Coal Mine Expansion Project - Electrical Instrumentation For Chpp currently at Tenders & Building stage. For the provision of electrical instrumentation for the new 5Mpta CHPP. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - VALVES FOR MECHANICAL EQUIPMENT
New project of Mining - Primary And Secondary Processing (Coal Processing) project at 15 km east of, Moranbah, QLD 4744. For the provision of valves for the mechanical equipment for the new 5Mpta CHPP. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - PIPING FOR MECHANICAL EQUIPMENT
Mining - Primary And Secondary Processing (Coal Processing) project In The Isaac Regional Council Area of Private ownership. For the provision of piping for mechanical equipment for the new 5Mpta CHPP. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - SPIRALS FOR CHPP
Mining - Primary And Secondary Processing (Coal Processing) project at 15 km east of, Moranbah, QLD 4744 for New. For the provision of spirals for the new 5Mpta CHPP. Click for more details...

DAUNIA COAL PROJECT - COAL HANDLING PREPARATION PLANT
Approximately 25km Southeast of, Moranbah, QLD 4744 Has Daunia Coal Project - Coal Handling Preparation Plant currently at Construction stage. The contract involves detailed design and procurement of a CHPP, with all key components scheduled for delivery during calendar 2009. Click for more details...

MILLENNIUM COAL OPERATIONS EXPANSION
via Peak Downs Hwy 16km southwest of, Coppabella, QLD 4741 Has Millennium Coal Operations Expansion currently at Construction stage. A project to expand the 2million tonnes per annum (Mtpa) operations to 5.5Mtpa Run-of-Mine (ROM) coal for 3.6Mtpa product coal for up to 16 years. Development of the new Mavis Pit by contract mining comprising conventional open-cut truck & excavator terrace mining. Possibility of minor upgrade & a new ROM stockpile at the existing coal handling & preparation plant (CHPP). Temporary waste rock emplacements prior to likely ultimate disposal in the Millennium Pit void. Construction of haul roads across New Chum Creek & possible alteration of the Millennium/Poitrel access road. Establishment of a 2km long drainage system along the northern boundary of the new pit as well as 15 new sediment dams. The expansion project to involve 160 employees & contractors in addition to the existing 220 person workforce. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - SOCIAL IMPACT CONSULTANTS PANEL
Mining - Primary And Secondary Processing (Coal Processing) New project at Between Bowen Basin &, Curtis Island, QLD 4680. This type is Consultants Panel - Social Impact Management Plan with Private ownership. QCLNG is a project to develop coal seam gas wells in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product LNG by ship. A panel of providers is being sought to undertake contracted social performance services in the course of compiling a Social Impact Management Plan for the project. Click for more details...

LAKE VERMONT COAL OPERATIONS - CHPP EXPANSION
Mining - Primary And Secondary Processing (Coal Processing) project In The Isaac Regional Council Area of Coal Handling & Preparation Plant - Expansion type. A contract to design, procure, construct & commission an extension to the existing coal handling & preparation plant (CHPP). To provide an additional 4million tonnes per annum (Mtpa) capacity to the 2009 commissioned plant. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - UNDERGROUND
Goonyella Riverside Broadmeadow Coal Operations Expansion - Underground is currently at the Construction stage, valued at about $ 900000000 it is The existing underground Broadmeadow Mine to be expanded eastwards using either conventional longwall mining as used currently or alternatively Longwall Top Coal Caving (LTCC). Additional coal handling & preparation plant (CHPP) capacity of 2370 tonnes per hour (t/h) approx required to achieve a production rate of 24 Mt/a which may include an upgrade of the existing plant as well as a new CHPP. Associated infrastructure upgrades expected to include a second 66kV feeder adjacent to the present line; expanded tailings storage facilities & improvements to the existing mine water management system (clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if required). The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

OAKY CREEK COAL OPERATIONS - LONGWALL PROJECT STAGE 4
Mining - Primary And Secondary Processing (Coal Processing) project for New development. A project to increase production over 5 years by expanding into additional sections of the mine tenement. To include a new longwall mining system & associated development suite. Expansion of the existing coal handling & preparation plant (CHPP). Upgrade of the electrical system. Click for more details...

CAVAL RIDGE COAL PROJECT - SUMP PUMPS
Sump Pumps - For Coal Processing Plant project at 16km south of, Moranbah, QLD 4744 In The Council Area Of Isaac Regional of Private. Electric water pumps. To include both end suction & split case types. Click for more details...

CAVAL RIDGE COAL PROJECT - COAL PREPARATION PLANT & RAIL FACILITIES
Mining - Primary And Secondary Processing (Coal Processing) project at 16km south of, Moranbah, QLD 4744 of Coal Preparation Plant/Rail Loadout/Conveyor/Roads type of New development. The proposed Caval Ridge CHPP will have a nominal feed capacity of 2 000 t/h and is capable of processing 14-16 Mt/a to produce a nominal 8 Mt/a of hard coking coal, 5.5 Mt/a of which will be sourced from the Caval Ridge Mine & the balance to come by conveyor from the expanded Peak Downs mine. The facility shall operate seven days per week on a continuous basis. The CHPP will consist of: ROM dump hopper for primary sizing; secondary and tertiary sizers with intermediate screening; raw coal stockpiles with mechanised stacking and reclaim facilities; 2 module coal preparation plant, nominally 1000 tph, per module; product coal stockpiles with mechanised stacking and reclaim facilities; train loadout to the north of the Peak Downs Highway, a conveyor will transport material crossing the highway; reject bin and handling system and ultrafine tailings dewatering system. Water supply to be a combination of site water reuse & a raw water supply via a new off take pipeline from existing bulk pipelines. Process plant water will be recycled to minimise raw water make-up requirements for the site. The product coal will be railed approximately 185km to the Hay Point and/or Dalrymple Bay coal terminals for shipment. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS ECI CONTRACT
Mining - Primary And Secondary Processing (Coal Processing) project In The Western Downs Regional Council Area of Compression Stations - Early Contractor Involvement type. Contract for the early civil site works (bulk earthworks, piling & concrete foundations) & front end planning work for 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS & CENTRAL PROCESSING PLANTS
Compression Stations/Central Processing Plants New project In The Western Downs Regional Council Area. Construction & fabrication of 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

ISAAC PLAINS CHPP OPERATIONS & MAINTENANCE CONTRACT
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 66000000. This project Renewal of the contract to operate & maintain the 3.6 million tonnes per annum (Mtpa) coal handling & preparation plant. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - PROCESSING FACILITIES
Mining - Primary And Secondary Processing (Coal Processing) project for New development. Construction of the balance of 12 field compressor stations (FCS) & 3 central processing plants (CPP). Each FCS will need up to 7ha & will include a flare, up to 8 screw compressors, a water management system including a pond as well as a substation/switchyard if connected to the grid instead of being powered by decentralised gas fired turbines. Associated infrastructure to include access tracks, warehouses, construction camps, operations camps, offices & telecommunication services. Each CPP to need up to 19ha & will include a flare, a tri-ethylene glycol (TEG) unit per compressor, plant gas inlet & export systems, drainage, gas or grid power supply, storage for air, nitrogen, water, chemical & lube oil, office & workshop buildings, switch gear & instrument rooms & access roads. Water separated at the well heads will be gathered separately into ponds/tanks prior to treatment & reuse. Click for more details...

EAGLE DOWNS JOINT VENTURE COAL PROJECT - CHPP
20km Southeast of, Moranbah, QLD 4744 Has Eagle Downs Joint Venture Coal Project - Chpp currently at Construction stage. For the provision of coal handling & preparation plant for the Eagle Downs Joint Venture Coal Project. Click for more details...

CARMICHAEL COAL MINE RAIL & PORT PROJECT - COAL HANDLING & PREPARATION PLANT PLANT EPC
New project of Mining - Primary And Secondary Processing (Coal Processing) project at via the Gregory Developmental Road 140km northwest of, Clermont, QLD 4721. Entire design & engineering including preparation of shop fabrication drawings. Supply & installation of mechanical, electrical, control, instrumentation & automation. Equipment/component & systems. All civil, structural & construction work including supply of bulk materials with steel work. Entire erection & installation works. No load commissioning, commissioning, performance guarantee testing & load commissioning works. Supply of all commissioning spares. Supply of critical insurance spares & recommended spares. Operation & maintenance of the plant .Supply of manpower, plant & equipment, spares, & consumables. Click for more details...