List of Computer centres Projects in NSW


TELSTRA CALL CENTRE
Commercial Premises (Computer centres) project at 149-161 Bentinck St, Bathurst, NSW 2795 of Call Centre type of New development. Demolition & construction of a Telstra call centre. A single storey building with landscaping & carparking. Click for more details...

WESTERN SYDNEY ORBITAL - WESTLINK M7
A project in the NSW Within Blacktown. Construction of motorway maintenance depot. Construction of control centre to contain computer control equipment, associated administrative area. Click for more details...

33 ALFRED ST COMPUTER ROOM
Commercial Premises (Computer centres) Renovations, Refurbishments etc. project at 33 Alfred St (level 19), Sydney, NSW 2000. This type is Computer Room - Fitout with Private ownership. Partitions & fitout of level 19 for use as a computer room. Click for more details...

ENERGY AUSTRALIA
A project in the NSW Within Various. Fitout of new centre at 570 George St Sydney. Click for more details...

INFRINGEMENT PROCESSING BUREAU
Commercial Premises (Computer centres) New project at 525 High St, Maitland, NSW 2320. This type is Processing Facility with State ownership. Construction of a new infringement processing bureau. Concrete slab, tilt up panels, aluminium windows, metal roof, associated carparking & landscaping. Click for more details...

TALAVERA RD DATA CENTRE - INTELLICENTRE 2
Data Centre - 2 Storey New project In The Ryde Council Area. Alterations & additions to existing building & change use & fitout of the premises for a data centre & research & development facility. Proposed works comprise 2 storey addition to the western elevation to accommodate new security entry, new security entry, meeting rooms, storerooms, operations facilities, staff facilities & loading dock; southern elevation to accommodate internal pedestrian access corridor, electricity substations, switch rooms & an uninterrupted power suply system; eastern elevation to accommodate communications equipment, generator rooms, high voltage control room, chiller rooms & storeroom. Establishment of trigeneration power plant. Alterations to existing building to integrate the proposed additions into the existing structure. Installation of lift; installation of 2 x 45,000 litre underground diesel tanks within the carparking area; stormwater management works; erection of 2.5m high security fence; & construction of electricity substation, generator room & high voltage control room. Reconfiguration of carparking to accommodate 146 carparking spaces. Click for more details...

BUSINESS CONTINUITY CENTRE (BCC)
Offices (3) - 2 Storey project at 97 (Lot 22) Northlakes Dr (1076809), Cameron Park, NSW 2285 in the Commercial Premises (Computer centres). Construction of 1 single & 2 x 2 storey office buildings including space for stationery store and ancillary printing press. The Greater Building Society Business Continuity Centre will include a printing press/stationery store, backup computer facility, open office space for departmental training, open office space for disaster recovery operations and lettable commercial space. The BCC is a 2130sq m building, designed as a 2 storey stand alone facility. The ground floor will house the stationery store, printing press, computer facility, back up generator & staff training office area. The first floor will house temporary staff, which will primarily be used in disaster recovery mode. The core space at the western end includes a lift and internal stair & toilets. The site area has allowed for 2 additional buildings, which may be built in stages, or together. The potential for the added buildings is dependent on future development of the area. The second 2 storey building GFA 1120sq m containing flexible office space is located to the west of the BCC and is designed to utilise the same core facilities as the main building, attached at first floor by elevated link or bridge. The single storey office building GFA 305sq m is located on the front of the site and is detached from the 2 storey buildings. Carparking for 71 vehicles & associated landscaping. Click for more details...

GLOBAL SWITCH SYDNEY 2 DATA CENTRE
Private ownership Commercial Premises (Computer centres) project In The Sydney Council Area for New development. Proposal is to extend existing Global Switch Sydney 1 facility located at 400 Harris St onto vacant site to the east for staged construction of a new data centre. Site works including excavation, installation of in-ground infrastructure, shoring of basement areas, installation of foundation & retaining structures. Construction of a 6 storey data storage facility & 1 basement level, including the installation of plant & equipment, containing approximately 18,175sq m of technical area plus 7,615sq m of plant area. Establishment of direct internal linkages to Global Switch Sydney 1 building. The Global Switch 2 building has been designed to target a LEED Platinum Environmental Sustainable Design rating, to achieve this world class ESD rating the building will adopt a tri-generation system which creates the buildings own power supply using natural gas as the primary energy source instead of grid supplied electricity, green roof, photovoltaic (PV) panels to power external LED building lighting, stormwater & black water harvesting & re-use on site, & use of low VOC finishes. Metal wall cladding: zinc cladding system, metal facade cladding (veils): powdercoated aluminium, air intake grilles: perforated, folded powdercoated aluminium, facade louvres: anodised aluminium, window framing: anodised aluminium, stone wall cladding: honed sandstone, stone wall cladding: honed granite, footpath pavers: exfoliated granite. Works will be constructed in 2 main building stages with internal fitout of the building being undertaken progressively; the works are to be occupied progressively in line with staged construction and fitout of the new building. Ground floor carparking for 12 spaces & loading area. Landscaping & public domain works. Click for more details...

LAURIO PLACE DATA PROCESSING CENTRE
9 (Lot 10) Laurio Place (DP 270249), Mayfield West, NSW 2304 Has Laurio Place Data Processing Centre currently at Construction stage. Construction of a data processing centre incorporating associated office and record storage facility. Warehousing area 440 sq m, production area 504 sq m, office & amenities 228 sq m Click for more details...

NEXTDC S1 DATA CENTRE
Data Centre - 5 Storey project at 4 (Lot 14) Eden Park Dr (DP1148612), Macquarie Park, NSW 2113 In The Council Area Of Ryde of Private. Construction of a part 4/5 storey building to be used as a tier 3 data centre. Installation of fuel tanks with a capacity of 140,000 litres. Ground floor will comprise 11 car spaces, loading area, unpacking, storage, garbage rooms, staging rooms, telecommunication & security rooms, fuel tanks, mezzanine offices & staff amenities. First floor will comprise plant room, offices & amenities. Second floor will comprise data halls, plant rooms. Third floor will comprise data hall & plant rooms. Roof level will comprise mechanical plant room & water tank. Total carparking for 25 vehicles. Click for more details...

EDS COMPUTER CENTRE
Computer Centre - Altns & Addns Addition project In The Burwood Council Area. Internal alterations and additions to an existing computer centre. Click for more details...

WESTPAC DATA CENTRE
Commercial Premises (Computer centres) project In The Ryde Council Area of Data Centre - 3 Level - Refurbishment type. Alterations to existing 3 storey data centre & addition of external services. External services incorporate construction of a single storey building of 690sq m to accommodate an electrical substation & water storage tanks, air intake tanks, replacement of 6 cooling towers & 4 new service risers to the corner of the building. New internal metal ladders, walkways & balustrades. New risers to each corner of existing main building with new concrete slab floor, concrete & concrete block walls, angled concrete slab & copper paneled extrusions. Click for more details...

EQUINIX SY3 DATA CENTRE
Currently at the Construction stage In Sydney is a project estimated to be $ 70000000. This project OVERALL PROJECT COMPRISES - Fitout & use of premises known as the Q stores as a data centre facility to house computer servers and associated equipment & plant. The internal works include dividing the building into a number of rooms to accommodate computer servers, racking & support plant. External alterations include removal of roof skylights and repair or replace high level glazing, roller shutters & pre-cast panels. New lobby & internal amenities and loading/unloading area. The existing building will be divided into 6 large rooms of 1,080-1,260sq m in size. Each room will be designed to accommodate the installation of computer servers, racking & support plant. While some rooms may be leased in their entirety by a large user such as a bank, others will be leased by a variety of small and medium users, with the equipment of each client being secured from the next by caged enclosure. The proposed works include the creation of various plant rooms suitable for housing UPS (Uninterruptible Power Supply) units, battery room & cable equipment, water storage tanks, diesel tanks, generators & plant. Removal of the raised roof lights & replacement with new louvred screens. Removal of roof skylights, existing sheeting & ceilings & fix new roof sheeting to the existing structure. Repair or replace the high level glazing around the perimeter of the building. Fitout of a lobby area, meeting room, toilets & mezzanine office space. Fitout of the rear entry/loading area including reception area, meeting space, lounge area, staff kitchen, office & store rooms. Replacement of pre-cast panels with louvres panels at the rear of the building to permit ventilation of generators. Replacement of the roller shutters at the front of the building with glazing or similar. New slab & roof section at the rear of the building to accommodate the cooling towers & other plant. Provision of a goods/service lift in the north west corner of the site, servicing the lower ground floor & ground floor. Click for more details...

METRONODE DATA CENTRE UNANDERRA
Commercial Premises (Computer centres) project In The Wollongong Council Area of Private ownership. Construction of data and computing facilities to store crucial IT data for corporations and government departments. Designed to be impenetrable, bullet and bomb proof, self sufficient with reserves of water for keeping equipment cool and power supply. Total floorspace 11,796sq m. The data centre will comprise 3 components: bladerooms (data halls), plant rooms & technical space, as well as switchrooms to house electricity supply. The bladerooms are climate controlled computer containers accessible to customers, external ambient air will be used to cool the computers whenever outside conditions are satisfactory. 10 blade rooms are proposed, arranged in pairs & installed over 2 levels in the 2 western buildings & on a single level in the eastern building. Each pair of bladerooms measure 46m x 32m. The bladerooms are finished in powdercoated metal cladding with 2m aluminium louvres to screen the roof plants. The rooms are prefabricated off site with integrated services for electrical cables, fibre optic reticulation & airconditioning. On site construction comprises civil, drainage & service works, & provision of concrete slab or footings for the bladerooms. A total of 16 plant rooms are proposed on the southern portion of the site, each group of 5 plant rooms is associated with a block of bladerooms. The western group of plant rooms consists of a single building structure; the eastern group of plantrooms are double storey buildings to service the double storey bladerooms. All plant rooms are precast concrete structures & house generators, electrical switchboards & uninterrupted power supplies. The plant rooms have a total area of 3,282sq m & will be interconnected via access doors & stairs connecting with bladerooms. Loop road. Carparking for 40 vehicles. Landscaping approx 2,600sq m. Click for more details...

GORE HILL TECHNOLOGY PARK - DATA CENTRE BUILDING B1
Commercial Premises (Computer centres) project for New development. Construction of a new data centre known as building B1. Click for more details...

HEWLETT PACKARD DATA STORAGE & DISTRIBUTION FACILITY
Commercial Premises (Computer centres) project In The Blacktown Council Area of Private ownership. Construction & fitout of a single storey data centre with roof top air handling facilities comprising 2 data cells. The HP data centre will comprise a building area of 11,528sq m, total of 14,731sq m including the admin area, & storage facility including associated infrastructure & office space, each cell of IT floor space with dedicated infrastructure to support each as a stand-alone cell. Each cell will have independent mechanical & electrical systems. Development will also comprise an administrative/technical support office building ancillary to the data centre; hard standing access/manoeuvring areas on site; sprinkler tanks, water storage tanks, pump rooms, diesel generators (external within acoustic enclosure); above ground diesel fuel tanks; mechanical cooling equipment associated with the operating of the data centre; electricity supply infrastructure comprising service to the site & construction of an electrical switch station of 75MW; security infrastructure including fencing & restricted access. Site works to create a proper building platform for the data centre & potential future expansions. Precast concrete panel walls, metal clad roof. Carparking for 28 vehicles. Landscaping. Click for more details...

PACNET DATA CENTRE
Commercial Premises (Computer centres) project at 133-141 Liverpool St (level 5), Sydney, NSW 2052 for Addition. Demolition of the existing redundant mechanical plant & shed structure. Installation of new air cooled chiller units to existing commercial building & associated structures to the fifth level roof/balcony area of existing commercial building on the site. The proposed air cooled chiller plant is essential for the operation of a computer server room associated with a new tenant (telecommunications business) within the existing building. Plant room door system comprising solid core door & seals; fully enclosed plant room constructed of 50mm thick solid concrete or similar lined with 50mm rigid fibreglass with HD perforated surface; soundboard acoustic louvres to inlet side of the plant room; circular duct attenuators to outlet side of the plant room; & all plenums & ducts internally lined with 50mm glass wool duct liner insulation Click for more details...

DATA CENTRE BUILDING BI - GORE HILL TECHNOLOGY PARK
Currently at the Construction stage In Willoughby is a project estimated to be $ 17718000. This project Fitout of the existing data centre currently under construction for Australian Securities Exchange. The fitout being half lower level, 1st floor & half of the roof. Click for more details...

HSBC ULURU DATA CENTRE
Data Centre - 2 Level - Altns Renovations, Refurbishments etc. project In The Parramatta Council Area. Conversion of existing office space into a data centre. Demolition of existing plaster board walls, ducted skirting, joinery, ceiling grid and tiles, window leading to ground carpark, carpet tiles & make safe to all services. Build blockwork walls of half height to perimeter windows & complete with plasterboard walls & ceilings. Access floors to be installed throughout & also vinyl floor ramping from entrances of level 1. Basement carpark ? 6 car park space will be converted to generator room. Ground floor carpark ? structural steel platform to be erected to accommodate mechanical plant installations. Mechanical plant on roof. Click for more details...

EQUINIX SY3 DATA CENTRE
Data Centre - 2 Storey - Fitout - Phases 2 & 3 project at 47-49 (Lot 12) Bourke Rd (DP856809), Alexandria, NSW 2015 In The Council Area Of Sydney of Private. OVERALL PROJECT COMPRISES - Fitout & use of premises known as the Q stores as a data centre facility to house computer servers and associated equipment & plant. The internal works include dividing the building into a number of rooms to accommodate computer servers, racking & support plant. External alterations include removal of roof skylights and repair or replace high level glazing, roller shutters & pre-cast panels. New lobby & internal amenities and loading/unloading area. The existing building will be divided into 6 large rooms of 1,080-1,260sq m in size. Each room will be designed to accommodate the installation of computer servers, racking & support plant. While some rooms may be leased in their entirety by a large user such as a bank, others will be leased by a variety of small and medium users, with the equipment of each client being secured from the next by caged enclosure. The proposed works include the creation of various plant rooms suitable for housing UPS (Uninterruptible Power Supply) units, battery room & cable equipment, water storage tanks, diesel tanks, generators & plant. Removal of the raised roof lights & replacement with new louvred screens. Removal of roof skylights, existing sheeting & ceilings & fix new roof sheeting to the existing structure. Repair or replace the high level glazing around the perimeter of the building. Fitout of a lobby area, meeting room, toilets & mezzanine office space. Fitout of the rear entry/loading area including reception area, meeting space, lounge area, staff kitchen, office & store rooms. Replacement of pre-cast panels with louvres panels at the rear of the building to permit ventilation of generators. Replacement of the roller shutters at the front of the building with glazing or similar. New slab & roof section at the rear of the building to accommodate the cooling towers & other plant. Provision of a goods/service lift in the north west corner of the site, servicing the lower ground floor & ground floor. Click for more details...

GLOBAL SWITCH SYDNEY 1 DATA CENTRE
Commercial Premises (Computer centres) project In The Sydney Council Area of Data Centre - Facade Rectification Works type. Proposed facade rectification works to the Harris St and Quarry St elevations. Works include removal of existing facade elements and replacement with new facade cladding, terracotta tiles, associated support framing, and new parapet cappings. Click for more details...

DIGITAL REALTY DATA CENTRE ERSKINE PARK
1-23 (Lot 2 ) Templar Rd (DP1094504), Erskine Park, NSW 2759 Has Digital Realty Data Centre Erskine Park currently at Construction stage. Construction of a data centre with associated office. The proposed building will have four data halls on the ground floor. The first floor will be constructed of a concrete suspended slab. Store rooms on the eastern side of the facility to be used for storing maintenance equipment and staging equipment deliveries. A small waste storage area will also be provided for the building to accommodate all site waste prior to removal.It will have office areas to the east of the building & generators to the west of the building. The air conditioning equipment is spread uniformly across the rest of this floor.Centre will contain 12 1800 kVA containerised generators, 20 chillers and ancillary mechanical services equipment. Precast concrete panels, metal cladding, metal louvers, combination of concrete roof and a metal roof supported with a steel structure. Carparking for 50 vehicles.Landscaping will be provided along the north and east setbacks ensuring the screening of all proposed car parking and a portion of the proposed building at ground level when viewed from Lenore Drive. Welded mesh fencing is proposed along the Lenore Dr & Templar Rd frontage and is setback within the landscaped area Click for more details...

METRONODE DATA STORAGE FACILITY SILVERWATER
Commercial Premises (Computer centres) project In The Auburn Council Area of Private ownership. Demolition of existing buildings. Construction of an electronic data storage facility in 6 stages. Metronome data centres are designed using bladeroom technology to operate up to 90% of the time using ambient air to cool the computers. The design is based around 2 level data halls which are accessed from a technical space. The bladerooms (also known as data halls) are highly technical prefabricated structures which provide climate controlled environment for the computers, the rooms would be prefabricated off site with integrated services for electrical reticulation & airconditioning. 12 bladerooms are proposed, to be arranged in groups of 4, fire egress would be connected by open bridges & stairs. GFA 13,481sq m, comprising data halls 7,690sq m, technical space 2,007sq m, & plant rooms 3,784sq m. Drainage works. Fuel tank storage capacity 82,500 litres. Bladerooms to be constructed of metal cladding & aluminium louvres, plant rooms to be constructed from precast concrete panels. Stage 1: Site preparation; construction of first bladeroom, plant room & technical space; ring road for Stages 1-3; on-site detention tank for stormwater drainage for Stage 1-4; landscape works. Stage 2: Construction of 2nd bladeroom, plant room & technical space. Stage 3: Construction of 3rd bladeroom, plant room & technical space. Stage 4: Construction of fourth bladeroom, plant room & technical space; ring road; additional landscaping; retaining wall & acoustic wall. Stage 5: Demolition of existing site building; additional site preparation/regrading; construction of 5th bladeroom, plant room & technical space; new retaining wall; additional landscaping. Stage 6: Construction of 6th bladeroom, plant room & technical space; finalisation of landscaping. Carparking for 43 vehicles. Landscaping. Click for more details...

SECURUS DATA CENTRE GORE HILL TECHNOLOGY PARK
Commercial Premises (Computer centres) project In The Willoughby Council Area of Private ownership. Fitout of Tenancy 2 in Building 1 for a Securus data centre. Approx 50% of the tenancy will be occupied by the data halls (white space) on the majority of level 2 & extensive plant & equipment required to service the equipment within the tenancy will be located on the upper ground level. Rooftop plant. Click for more details...

HOMEBUSH DATA CENTRE - SYDNEY WATER
Commercial Premises (Computer centres) project In The Auburn Council Area of State ownership. Refurbishment & upgrade of the Homebush Data Centre & building services within site C building complex Click for more details...

INTERACTIVE COMPUTER CENTRE
39 (Lot 21) Herbert St (DP826371) Tower B, Artarmon, NSW 2064 Has Interactive Computer Centre currently at Construction stage. Addition of an internal mezzanine floor level of 930sq m within existing building of Tower B at St Leonards industrial precinct to provide additional storage to accommodate equipment for an information technology company. The work will integrate the additional level to the warehouse via new stairs & via a sliding door into the adjacent plant room. The plant room also provides other access via a new lift & stairs surrounded with a plasterboard balustrade. The 145sq m plant room will be provided with new air-conditioning with new chiller units & a new 97.5sq m platform. New floor to ceiling stud walls, 64mm mild steel stud, 13mm flush set plasterboard with rhondo P50 shadow line to top & criterion 100mm stainless steel flatbar skirting. New floor to ceiling 10.38mm thick clear laminated safety partition with 100 x 45mm natural anodised aluminium glazed frame. Vinyl floor finishes, 1050mm high stud wall, alucobond cladding, galvanized steel handrails to stairs & external 2100mm high powder coated security fence. Click for more details...

INTERACTIVE COMPUTER CENTRE
Interactive Computer Centre is currently at the Construction stage, valued at about $ 2518000 it is Alterations & additions & fitout to the ground floor & level 3 of the Tower A building in the St Leonards industrial precinct to provide a secure lobby, reception area, staff training facilities, staff amenities with showers, customer hospitality lounges & waiting rooms, meeting rooms, staff cafe with kitchen, external staff BBQ & dining area with vergola at the rear of the tower, reconfiguration of the loading dock, waste storage room & various storage & plant room for an information technology company to expand its overall operations & services from its base in Tower B. Ground floor work comprises removal of the porte-cochere & existing driveway & 2 vehicle crossings for replacement with additional floor space along the Herbert St elevation to accommodate the lobby & hospitality areas. Internal reconfiguration & fitout of the remainder of the ground floor will provide the new staff training auditorium, meeting rooms, staff cafe & kitchen, waste room, loading dock & store rooms. Level 3 works comprise internal alterations to create new male & female & disabled toilet facilities. Installation of a new mechanical plant on the north-east corner of the roof. Floor to ceiling fixed panel glazing, some with cladding, ventilated facade system, aluminium louvres to ground floor feature wall, new rendered walls, render of existing walls, re-tiling of the external terrace, replacement of terrace balustrade & reconfiguration of the steps & hand rails, make good existing footpath & crossing, existing retaining wall to be raised & new sections installed. New landscaping works include the creation of a new walkway. Click for more details...

BUNGARRIBEE INDUSTRIAL ESTATE
Commercial Premises (Computer centres) project In The Blacktown Council Area of Data Centre/Office type. Construction of a 9,977sq m warehouse to be used as a data centre with 791sq m of office space. Carparking for 84 cars. Landscaping Click for more details...

GLOBAL SWITCH DATA CENTRE
Commercial Premises (Computer centres) project at 273 Pyrmont Rd, Ultimo, NSW 2007 of Data Centre - Stages 2 & 3 type of New development. Construction of new data centre stages 2 & 3 Click for more details...

NBN DISASTER RECOVERY CENTRE
Commercial Premises (Computer centres) project for Renovations, Refurbishments etc. development. Extension & fitout of buildings to be used as NBN disaster recovery centres Click for more details...