List of Conveyors, Stackers, Reclaimers, Materials handling Projects


TAHMOOR COLLIERY - TAHMOOR NORTH EXPANSION STAGE THREE/COAL PREPARATION PLANT
Tahmoor Colliery - Tahmoor North Expansion Stage Three/Coal Preparation Plant is currently at the Tenders & Building stage, valued at about $ 5000000 it is Part of proposed Tahmoor North expansion from 1.9 million tonnes ROM in 2002 rising to 3.2 million tonnes ROM by end 2004 of high quality coking coal. The project is currently scheduled for completion by early 2004 and will proceed in three stages. Expressions of interest are invited for supply of equipment for each stage of the project. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Coal Handling & Preparation Plant project at Via, Blackwater, QLD 4717 In The Council Area Of Central Highlands Regional of Private. Comet CPP project. Raw coal and product coal areas included. The new facility will be located adjacent to the current Blackwater North preparation plant and will replace the high cost North, South and Thermal Coal Plants. Click for more details...

NELSON POINT - IRON ORE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Port area via, Port Hedland, WA 6721 for Renovations, Refurbishments etc.. Extensive modifications will be required to the P12 conveyor prior to the installation of a new stacker (under construction in Perth). Work mainly involves civils & structural/mechanical services. Click for more details...

LAKE LINDSAY COAL PROJECT
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Approx 25 km from, Middlemount, QLD 4746. Overburden removal to commence July 2006; coal will be washed in existing washplant & construction on site will commence shortly. Production of export coking coal, & pulverised coal injection coal, expected to reach its peak in 2008. Coal to be hauled by truck or overland conveyor to German Creek. Blasting necessary prior to conventional truck and shovel strip mining. Dragline operations to 80 metres later in the mine life. Flood levee banks to be constructed parallel to Oaky Creek. Click for more details...

DIRECT REDUCED IRON (DRI)/HOT BRIQUETTED IRON (HBI) PLANT
Currently at the Construction stage In Port Hedland is a project estimated to be $ 8000000. This project Overland/tunnel conveyor will transport ore from Finucane Island to the DRI Plant, approximately 7.5 km southwest of Port Hedland and then return the hot briquetted iron product back to Finucane Island for export. This rates contract is based on tonnages, for example, PIC are to fabricate approximately 720t of structural steel. The balance of this three-part contract may be tendered separately or incorporated into one or both of these awards. Click for more details...

EWINGTON 2 COAL OPERATIONS
8 km east of, Collie, WA 6225 Has Ewington 2 Coal Operations currently at Construction stage. Conveyor belts (Apex), drives (Flenders), pulleys & idlers (Pit Top) required for several electrical/mechanical packages associated with new coal handling facilities. Belt scrapers to be provided by Dyna Engineering (Osborne Park, WA). Click for more details...

NELSON POINT - IRON
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Site facilities via, Port Hedland, WA 6721 for New. The project envisaged to expand the capacity of Nelson Point facilities from approximately 54mt of iron ore per year to approximately 64mt, needed to meet the increasing demand for handling and shipping of iron ore from Newman's Yandi mine and from the DRI/HBI plant. The expansion of facilities will include installation of a third ore dumper to take ore from iron ore trains and speed up the unloading process. Also, the Number 2 crushing and screening plant is to be upgraded at the railhead with new conveyors and related infrastructure. A new marshalling yard incorporating a continuous loop train assembly (to avoid bottlenecking) will be built on the southern side of the existing facility, while new passing loops are to be built on the Jimblebar spur line and the main Newman rail line. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 80 km south of, Darwin, NT 0800 for Addition. Contract for supply & installation of grisleys, 2 x plate feeders & one conveyor system. This tender is to include all associated electricals such as general power distribution & lighting. Click for more details...

MIDDLEBACK RANGES IRON ORE/WHYALLA OPERATIONS
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Whyalla Council Area for New development. The crushing & screening plants will be relocated from Whyalla in a move to reduce dust emissions by eliminating the large number of conveyor transfer points incorporated in the pellet plant (which includes the crushing & screening plants). Some infrastructure at the mine site will need to be modified/constructed. Click for more details...

BAYSWATER POWER STATION
Bayswater Power Station is currently at the Construction stage, valued at about $ 500000 it is Includes testing and calibration of belt weighers at Bayswater and Liddel Power Stations as and when directed by the Principal for a two year period with an option for a further two years. Click for more details...

MOUNT GIBSON PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The City Of Greater Geraldon - Mullewa Council Area of Transfer Station type. A transfer station facility where iron ore will be transferred to rail for transport to the Port of Geraldton. Click for more details...

BAAL BONE COLLIERY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Series of underground main-gate conveyors for longwall mining. Total length, approx 10 kms. Includes 3 systems. Click for more details...

CADIA HILL COPPER/GOLD OPERATIONS - RIDGEWAY
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at South of Orange and north of, Blayney, NSW 2799. Includes the engineering design for conveyor, crusher and underground services. Click for more details...

TAHMOOR COLLIERY - TAHMOOR NORTH
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at At, Tahmoor, NSW 2573 of Underground Conveyor - Upgrade type of New development. Refurbishing the underground route and installation of the new conveyor. Click for more details...

BAYSWATER POWER STATION
At, Bayswater, NSW 2283 Has Bayswater Power Station currently at Construction stage. Installation of temperature monitoring sensors on pulley bearings and into the fluid coupling return lines of coal conveyors R1, R2, 3A and 3B. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CREEK MANGANESE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Includes co-ordinating a number of design and construction contracts for various components of the bulk loading infrastructure and for the co-ordination and resolution of any associated issues. Includes a rail bottom dump, road bottom dump, bulk materials storage area, shiploader and associated conveyor and internal road systems. Includes review of reports by Bootu Creek Resources and KBR. The facility will initially be used for Bootu Creek Manganese Project. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 REMAINING STAGES
Coal Terminal - Stage 3/2f project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). The main activities associated with the development of the Newcastle Infrastructure Group Coal Export Terminal would include: dredging of three berths in the south arm of the Hunter River to construct a serviceable port for the export of coal; reuse of dredged sands as preload and engineering fill for construction; disposal of unsuitable dredged sediments at sea in accordance with relevant sea dumping permits; construction of wharf facilities and ship loaders; construction of a Coal Storage Area including coal stockpiles, transfer stations, conveyors, stackers and reclaimers; remediation works including capping of selected areas of the existing Kooragang Island Waste Facility for the development of the rail spur and rail loops; construction of a rail spur and two rail loops, road/rail overpasses, unloading stations and connecting conveyors; installation of power supply, reticulation and control systems; development of access roads and internal roads; development of water management infrastructure including site drainage works, collection ponds and stockpile spray system; and construction of administration and workshop buildings.The plant capacity is designed for up to 66Mtpa, and will be built in 3 stages with the initial stage for 33Mtpa. The plant is to provide three services: (1) receival of coal by rail and stacking the coal out (2) storage and blending of coal in the stockyard, and (3) reclaiming coal and loading it onto ships. Click for more details...

WAROONA MINERAL SANDS PROJECT - RESOURCE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Current mineable reserve is approx 8.4 million tonnes with an average grade of 10.2% heavy mineral. The mine will process 2,600,000 tonnes of ore per annum. Major work will comprise stripping of the overburden, upgrading and relocation of a wet concentrator plant and nfrastructure. Development will comprise topsoil stripping, overburden removal, installation of drainage and noise bunds, hauls roads, offices, workshops, construction of a clean water dam and associated infrastructure. Associated infrastructure will include in pit hoppers, conveyors, wet screening plant comprising a double deck screen and scrubber, pumps and pipes. A concentrator will be transferred from Capel and it will have the capacity to produce 250 tonnes per hour of HMC ore. The ore when processed will be transported to the North Capel seperation plant. Click for more details...

MOUNT GIBSON IRON ORE MINE & INFRASTRUCTURE PROJECT - STORAGE SHED & FACILITIES
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The City Of Greater Geraldton Council Area of Storage Shed/Associated Facilities type. Construction of dedicated berth, storage shed and shiploading facilities to handle 130,000 tonnes of iron ore. Facilities will include hoppers, conveyors, storage tanks, clarifier, return water tank and pumps, HV cables, power transformer, MCC and switch rooms. A filter plant will be constructed to dry the slurry. Concrete floor, structural steel and cladding. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - BULK EARTHWORKS
Bulk Earthworks project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Civil and Concrete Work comprises moving about 1 million cubic metres of dirt. More specifically the construction of the E deposit primary crushing area and mechanically stabilised earth wall (MSE). To construct a 7.5 km long overland conveyor from the E deposit primary crusher to a new Ore Handling Plant 2 (OHP 2), Stockyard 2 located within the rail loop, associated earthworks and heavy vehicle park-up and upgrade of the infrastructure for the operation. This will include office, amenities and waste water services. Click for more details...

KOOLAN ISLAND PROJECT - SHIPLOADER CONTRACT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Derby-W Kimberley Council Area of Private ownership. The jetty, shiploader and reclaim conveyor is being designed to receive up to and include capsize vessels (200000 tonnes) with a ship loading rate of 4500 tonne per hour. Click for more details...

COBURN MINERAL SANDS PROJECT - OVERBURDEN CONVEYOR
South of, Hamelin Pool, WA 6532 Has Coburn Mineral Sands Project - Overburden Conveyor currently at Construction stage. Overburden Conveyor System. Click for more details...

MANGOOLA COAL PROJECT - STRUCTURAL STEEL & MECHANICAL FOR RAIL LOADING INFRASTRUCTURE
Rail Loading Infrastructure - Structural Steel/Mechanical New project In The Muswellbrook Council Area. For the provision of structural steel & mechanical works. Click for more details...

LIDDELL POWER STATION - EFFLUENT DISPOSAL SYSTEM/PIPELINE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at At, Liddell, NSW 2333. This type is Effluent Disposal System/Mine Conveyor Washdown Pipeline with Private ownership. The Contract shall be for all works associated with the construction of a new effluent disposal system from the Liddell Sewage Plant to the Liddell Ash Dam. The Contract also includes for the construction of a new mines conveyor washdown pipeline to M2/M1 transfer house. Click for more details...

BENGALLA COAL OPERATIONS - ROM HOPPER RELOCATION CONSULTANCY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 4 km west of, Muswellbrook, NSW 2333 of Consultancy - Rom Hopper Relocation type of New development. Tenders to include installation of the new ROM hopper and decommissioning the old one. Click for more details...

BENGALLA COAL OPERATIONS - OVERLAND CONVEYOR DECOMMISSIONING
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 4 km west of, Muswellbrook, NSW 2333 for New. For the decommissioning of an overland conveyor. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - LFM ANALYSERS
On, Finucane Island, WA 6721 Has Iron Ore Rapid Growth 3 Project - Port - Lfm Analysers currently at Construction stage. Low Frequency Microwave (LFM) Moisture Analyser Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - UPGRADE TO SHIPLOADER
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740 for New. Upgrade to Shiploader. Click for more details...

DALRYMPLE BAY COAL TERMINAL - CONVEYOR UPGRADE
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area for New development. Upgrades to conveyors L 1, L2, L3 and L 4. The tender comprises upgrades to the belt feeder drivers BF5, BF6 and BF7. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONVEYOR DRIVES
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The City Of Greater Geraldton Council Area for New development. Supply of 6 No.Conveyor Drives, with capacity ranging from 100kW to 250kW. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONVEYOR PULLEYS & IDLERS
Currently at the Construction stage In City Of Greater Geraldton is a project estimated to be $ 500000. This project Supply of Conveyor Pulleys & Idlers. Approx.650 carriers idlers, 306 vee return idlers plus miscellaneous items. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 4
A project in the WA Within City Of Greater Geraldton. Material Handling System to Berth 4. Package 1. Fabrication, supply, installation & commissioning of material handling system. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE PREPERATION PLANT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Cloud Break Mine Site, Pilbara area via, Newman, WA 6753 for New. Ore Preparation Plant (OPP) is to comprise a crushing and screening operations. The facilities include a screen house, crushers, stockpiles and trainloader. The operation will process ore transported by a conveyor firstly to a portable crusher and sizer located at the operating face of the Cloud Break mine. When the ROM ore has been crushed and sized it will be transported via a conveyor to the screener and crusher. Ore will be sorted into super value fines, high grade fines, high grade lump and lower grade ore. The first three types of ore will be conveyed to the train loading station and shipped to Port Hedland. The low grade will be stockpiled for the future when the Christmas Creek Beneficiation Plant is constructed. Operating facilities at the plant will comprise a Sample Tester, Plant/Workshop store, Communication Tower, High Voltage Switchyard, Sewage Treatment Plant, Potable Water Plant including a Water Tank, Temporary Diesel Power Station, Control Room, Workshops, Laboratories, Amenities area, OPP Administration area including a Store, Laboratory, Emergency Response Centre and Administration building, Mining administration area, Car Parks, two Fuel Farms and a Vehicle Washdown Facility including a washdown slab and an oil separator and automated facilities. A desliming plant will also be constructed. Future expansion of the OPP will include a Desand Plant and associated infrastructure. The developer is currently designing the Desanding plant. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - ONSHORE OUTLOADING CONVEYOR SYSTEM
Dalrymple Bay Coal Terminal Expansion - Onshore Outloading Conveyor System is currently at the Construction stage, valued at about $ 60000000 it is To fabricate and erect an Onshore Outloading Conveyor System. The conveyor will be one kilometre in length and will be constructed of fabricated steel. There will be a minor civil work component to the project involving concreting. All the mechanics have been supplied. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - HOSE & CABLE REELERS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area of Hose & Cable Reelers - Design/Construct/Supply type. To design, construct and supply hose and cable reelers for SR6 & RL2. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRAIN LOAD OUT
Iron Ore Rapid Growth 4 Project - Train Load Out is currently at the Planning stage, valued at about $ 100000000 it is The new TLO facility will match the existing train load-out plant for through train capacity at 58Mtpa. The new TLO will comprise a new section of rail passing through a single tunnel that has two loading vaults. Each vault is located under a discrete stockpile, each with a minimum 25,000 live capacity. These stockpiles will be product specific, one for lump and one for fines, to eliminate product cross-contamination. Each stockpile will be built and maintained by a fixed stacker conveyor, fed from the diverter transfer station at the head of the stockyard reclaim conveyor (the transfer station and stacker conveyors are part of work pack 4N0). The conveyors will discharge from fixed cantilever booms. Dust suppression sprays will be mounted at the head of each conveyor discharge. The spray system will be complete with break tank and pumps for the high pressure for the spray canon. The TLO will have dedicated dust extraction/collection and ventilation systems for each of the vaults. Each of the dust systems will comprise dust hoods, ducting, wet scrubbers, extraction fans, seal tank, circulation pumps, sump tanks, pumps and associated pipe work. The complete tunnel with the vaults will have a vault ventilation system complete with fans, ducting, discharge registers and intake silencers. The stockpiles and stacker conveyors will have dust suppression sprays. Process water will be supplied for dust suppression and dust extraction scrubbers. The dust suppression spray system comprises piping, water cannon and controls. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - YANDI ORE PROCESSING PLANT UPGRADE
Iron Ore Rapid Growth 4 Project - Yandi Ore Processing Plant Upgrade is currently at the Planning stage, valued at about $ 50000000 it is Work comprises upgrading the 42 Mtpa ore processing plant. Click for more details...

INTERNATIONAL POWER HAZELWOOD PULLEYS
A project in the VIC Within La Trobe. For the manufacture, supply and delivery of 3 x EA pulleys for conveyors within an open cut mine. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT PANAMAX BERTH PROJECT
Port Hedland Port Authority - Utah Point Panamax Berth Project is currently at the Construction stage, valued at about $ 20000000 it is Construction of new multi-user Panamax Berth Facility (within area of existing Port Hedland Port referred to as Utah Point) to export iron ore, manganese & chromite. Works consists of construction of 5000 tph travelling shiploader. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

ABBOT POINT COAL TERMINAL X25 & X50 EXPANSION SPARE DRIVE UNITS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Whitsunday Regional Council Area of State ownership. The scope involves supply of seven conveyor drive units complete with gearbox, fluid coupling, motor and associated couplings mounted on a drive base. A number of drive types are involved, including: 2 x 400kW 3.3 kV, 2 x 560kW 3.3kV, 1 x 1100kW 3.3kV, 1 x 150kW 415V & 1 x 400kW 415V. Click for more details...

USELESS LOOP PORT MAINTENANCE & INFRASTRUCTURE UPGRADE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Shark Bay, Useless Loop, WA 6532 for Addition. The project involves the construction of a new pipeline along an existing T-shaped jetty pylon structure approximately 400 m in length, within Useless Loop Port, located approx 5 km north of the town of Useless Loop. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - CRUSHING FACILITIES & OVERLAND CONVEYORS
A project in the WA Within East Pilbara. For the provision of primary and secondry crushing facilites including overland conveyors. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1/PHASE A
Civils/Piping Works/Offices/Roads/Accommodation - Stage 1/Phase A New project In The City Of Karratha Council Area. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages (phases A 7 B) of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Construction of a 920m long jetty & a 2-berth wharf along with new shiploading facilities. Associated piping works expected to include relocation of the natural gas pipeline feeding the Cape Lambert power station, the Cape Lambert landfill site & a transmission line. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Click for more details...

OAKY CREEK COAL OPERATIONS - LONGWALL PROJECT STAGE 4
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. A project to increase production over 5 years by expanding into additional sections of the mine tenement. To include a new longwall mining system & associated development suite. Expansion of the existing coal handling & preparation plant (CHPP). Upgrade of the electrical system. Click for more details...

ANDERSON POINT PORT FACILITIES - BERTH 3
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at Anderson Point, Port Hedland, WA 6721. This type is Port Facilities with Private ownership. The expansion will provide an additional 400m of wharf superstructure, 7 berthing dolphins, navigational aids and associated mechanical components. Click for more details...

NICKEL WEST OPERATIONS - KAMBALDA NICKEL CONCENTRATOR MATERIALS HANDLING CONTRACT
via, Kambalda, WA 6442 Has Nickel West Operations - Kambalda Nickel Concentrator Materials Handling Contract currently at Construction stage. A 5 year contract at the concentrator plant which handles ore from the Leinster, Mouth Keith & Cliffs mines. To include ore handling, crushing & sampling. Click for more details...

GIFFEN WELL IRON ORE PROJECT - EXPORT FACILITIES
A project in the SA Within Port Pirie. Construction at Port Pirie of rail receival, storage & outloading facilities. To include construction in the Port Pirie marshalling yards of 2 equal length dead end sidings behind the tip pocket to allow for unloading in 3 sections. Construction adjacent the port of a 185,000t capacity, negatively pressured ore management shed including a rail unloader (tippler), conveyor to wharf & wash down facilities. Click for more details...

ICHTHYS GAS PROJECT- ONSHORE - TANK INSTALLATION CRANE HIRE
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Darwin City Council Area for New development. A crane hire subcontract for the installation of 2 condensate storage tanks & a condensate buffer tank. To include dry hire of a 200t or 275t crawler crane with luffing boom as well as an 80t rough terrain crane. Click for more details...