State

Categories

Sub Categories

Click Here to Find Current Projects

List of Conveyors, Stackers, Reclaimers, Materials handling Projects in NSW


BAYSWATER POWER STATION
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at At, Bayswater, NSW 2283. Supply and installation fo handrails to the wall side on incline conveyors at Bayswater Power Station to enable safe access. Click for more details...

HUNTER VALLEY COAL OPERATIONS
Product Coal Feed Bin project at Lemington Rd, Lemington, NSW 2330 In The Council Area Of Singleton of Private. Coal and Allied Operations Pty Ltd operates open cut coal mines and coal preparation plants in the Hunter Valley at Mount Thorley, Hunter Valley Operations (Howick, Hunter Valley and Lemington), Warkworth, Ravensworth and Bengalla Mines. Coal and Allied is interested in receiving Expressions of Interest from companies that can provide professional services for the staged design and construction of a product coal feed bin at the Hunter Valley Operations Load Point. Stage 1 will include site investigation, conceptual design and budget preparation. Stage 2 will encompass design and construction for the completion of the works. all works will comply to stringent Coal & Allied safety standards. It is envisaged that the design process will be highly consultative iwth existing operations, with a key element of the work being the minimisation of disruptions to current train loading facilities during construction. It is envisaged that conceptual works and budget preparation be completed by 1 December 2001 with final works completed (pending internal finanical approval) by the third quarter of 2002. Click for more details...

TAHMOOR COLLIERY - TAHMOOR NORTH EXPANSION STAGE THREE/COAL PREPARATION PLANT
Tahmoor Colliery - Tahmoor North Expansion Stage Three/Coal Preparation Plant is currently at the Tenders & Building stage, valued at about $ 5000000 it is Part of proposed Tahmoor North expansion from 1.9 million tonnes ROM in 2002 rising to 3.2 million tonnes ROM by end 2004 of high quality coking coal. The project is currently scheduled for completion by early 2004 and will proceed in three stages. Expressions of interest are invited for supply of equipment for each stage of the project. Click for more details...

WEST CLIFF COLLIERY - OVERLAND CONVEYOR
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Wedderburn Rd, Appin, NSW 2560 for New. The Overland Conveyor was to be over the 3 kilometres of rough terrain between the Appin and West Cliff Mines. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF
Mine Infrastructure New project In The Newcastle Council Area. Includes mine portal, conveyor, coal stockpile and truckloading area. Click for more details...

ULAN COAL OPERATIONS - CONVEYORS
A project in the NSW Within Upper Hunter. The overland conveyor will be 2 km long and have 1400 t/h capacity. An underground truck conveyor will be upgraded and extended to a total length of 3.2 km. Also a new 4250 t/h stackout conveyor that is 1.6 km long will be installed and it will extend across an open cut haul road via culvert underpass to a 400,000 tonne overall hub stockpile. Click for more details...

MOUNT THORLEY WARKWORTH NO 1 COAL OPERATIONS
Mount Thorley Warkworth No 1 Coal Operations is currently at the Planning stage, valued at about $ 500000 it is Possible infrastructure requirements for extensions at Warkworth and possible integration with the adjacent Mount Thorley operations include the construction of a new conveyor for Warkworth Mine to Mount Thorley Operations and the Mount Thorley Coal Loader. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF - SURFACE INFRASTRUCTURE - CONVEYORS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Includes conveyor and gantries and truckloader bins and bunded fuel tank area. Click for more details...

BAYSWATER POWER STATION
Bayswater Power Station is currently at the Construction stage, valued at about $ 500000 it is Includes testing and calibration of belt weighers at Bayswater and Liddel Power Stations as and when directed by the Principal for a two year period with an option for a further two years. Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO - RESOURCE
South of, Menindee, NSW 2879 Has Pooncarie Mineral Sands Project - Ginkgo - Resource currently at Construction stage. Resource at gingko as at mid 2004 Measured 162Mt ore 5,767 kt heavy minerals, Indicated 43Mt, 856kt heavy minerals. Road construction and a construction camp will be part of the development. Click for more details...

NORTHPARKES COPPER & GOLD OPERATIONS - E48 - RESOURCE
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Parkes Council Area for New development. Development comprises a new underground mine which is 2 km north of the existing E26 underground mine. Mining operations will be conducted by rock caving and ore will be hoisted via an existing shaft. A new above ground conveyor to the existing processing plant will be constructed. Two new tailings storage facilities will be constructed for the residue. A major engineering and construction component of the project will be to set up the underground crusher chamber. Resource estimate is 22,600,000 tonnes @ 1.15% copper and 0.46 g/t gold containing 260,000 tonnes of copper and 334,000 ounces of gold. Mine is expected to produce 5.5 Mtpa and extended to 2017. Click for more details...

BAAL BONE COLLIERY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Series of underground main-gate conveyors for longwall mining. Total length, approx 10 kms. Includes 3 systems. Click for more details...

GLENNIES CREEK COAL MINE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Singleton Council Area of Private ownership. Glennies Creek produces high-fluidity coking coal. Production in 2003 was 1.1 million tonnes of coal. Click for more details...

KOORAGANG COAL TERMINAL EXPANSION - STAGE 3
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at At, Kooragang, NSW 2304 for Addition. Includes rail receival, stacking conveyor system, additional stockyard, additional reclaimer & reclaimer conveying system, additional ship loading conveying stream & ship loader. Click for more details...

COORANBONG COLLIERY - MANDALONG MINE PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at South west of, Morisset, NSW 2264 for New. Underground conveyor Mandalong to Vales Point; Mandalong to Cooranbong; conveyor supporting longwall (trunk road belts etc). total package with three separable elements. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH EAST - RESOURCE
Approx 25 kms west of, Singleton, NSW 2330 Has Ravensworth/Narama Coal Operations - Ravensworth East - Resource currently at Construction stage. Current production of 2.0 million tonnes per annum will be increased to 2.5 million tonnes per annum. This will involve the dragline changing to a 7 day operation. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH WEST - RESOURCE
Currently at the Construction stage In Singleton is a project estimated to be $ 30000000. This project The mine will produce coal at the rate of 1.0 to 1.5 million tonnes per year for six years. Development cost of $30 million are expected. The operation will share existing infrastructure and equipment with Ravenswood East. The Ravensworth/Narama complex, located in the Hunter Valley in New South Wales, includes the Ravensworth East operation, Ravensworth West mining tenements and Coal and Allied's share of the Narama operation. Click for more details...

CADIA HILL COPPER/GOLD OPERATIONS - RIDGEWAY
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at South of Orange and north of, Blayney, NSW 2799. Includes the engineering design for conveyor, crusher and underground services. Click for more details...

COORANBONG COLLIERY - MANDALONG MINE PROJECT
South wast of, Morisset, NSW 2264 Has Cooranbong Colliery - Mandalong Mine Project currently at Construction stage. High capacity longwall belts. Main gate and main trunk conveyors. Click for more details...

TAHMOOR COLLIERY - TAHMOOR NORTH
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at At, Tahmoor, NSW 2573 of Underground Conveyor - Upgrade type of New development. Refurbishing the underground route and installation of the new conveyor. Click for more details...

CML 7 BROKEN HILL BASE METALS PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at via, Broken Hill, NSW 2880 of Resource - Base Metals type of New development. Drilling to date has successfully intersected the shallow zinc lode mineralisation over a strike length of 120 metres with an average width of 80 metres. Drill intersections range from 4 to 13 metres at grades averaging greater than 10% lead and zinc. Click for more details...

WEST CLIFF COLLIERY
Upgrade Conveyor Belts & Drive Units project at Wedderburn Rd, Appin, NSW 2560 In The Council Area Of Wollondilly of Private. The drive units involved are numbers 1.11, 1.5 & 1.9. Click for more details...

BAYSWATER POWER STATION
At, Bayswater, NSW 2283 Has Bayswater Power Station currently at Construction stage. Installation of temperature monitoring sensors on pulley bearings and into the fluid coupling return lines of coal conveyors R1, R2, 3A and 3B. Click for more details...

LIDDELL POWER STATION - FIRE PROTECTION
A project in the NSW Within Muswellbrook. The contract consists of four separable portions. Firstly under condenser fire protection for units 1 to 4. Secondly, Belt protection for 5AR and 5BR conveyors and associated work. Thirdly, Room protection for the decommissioned 1-2 plant control room. Fourthly, Performance testing of the station and Hunter Valley gas turbine pumpsets. Click for more details...

ENDEAVOR BASE METAL OPERATIONS - COPPER RECOVERY CIRCUIT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 40 Km North west of, Cobar, NSW 2835 for New. Copper recovery circuit is in design. Construction is expected to commence shortly. Testwork and detailed design has been completed. The circuit will treat the lead concentrate to extract a copper concentrate estimate to be 1000 tonnes of copper per annum. Click for more details...

LIDDELL POWER STATION - ANTIENE RAIL COAL UPLOADER
A project in the NSW Within Muswellbrook. Proposed development will include the construction of a new rail loop off the main northern rail line at Antiene, an uploading hopper and associated facilities. These facilities will include minor maintenance, fuel storage, and refuelling facilities. Also an overland conveyor to transport coal to the Bayswater power station will be constructed. The proposed development is designed to deliver 15 million tonnes of coal per year and is required to be operational by January 2007. Click for more details...

KOORAGANG COAL TERMINAL STAGE 3 EXPANSION WORKS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at ., Kooragang, NSW 2304. This type is Coal Terminal Expansion with Private ownership. Expansion of terminal capacity from 89 mtpa to 102 mtpa. Development will involve a fourth stacking stream, a new stockpile pad, associated stacking conveyors and a new coal stacker. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 REMAINING STAGES
Coal Terminal - Stage 3/2f project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). The main activities associated with the development of the Newcastle Infrastructure Group Coal Export Terminal would include: dredging of three berths in the south arm of the Hunter River to construct a serviceable port for the export of coal; reuse of dredged sands as preload and engineering fill for construction; disposal of unsuitable dredged sediments at sea in accordance with relevant sea dumping permits; construction of wharf facilities and ship loaders; construction of a Coal Storage Area including coal stockpiles, transfer stations, conveyors, stackers and reclaimers; remediation works including capping of selected areas of the existing Kooragang Island Waste Facility for the development of the rail spur and rail loops; construction of a rail spur and two rail loops, road/rail overpasses, unloading stations and connecting conveyors; installation of power supply, reticulation and control systems; development of access roads and internal roads; development of water management infrastructure including site drainage works, collection ponds and stockpile spray system; and construction of administration and workshop buildings.The plant capacity is designed for up to 66Mtpa, and will be built in 3 stages with the initial stage for 33Mtpa. The plant is to provide three services: (1) receival of coal by rail and stacking the coal out (2) storage and blending of coal in the stockyard, and (3) reclaiming coal and loading it onto ships. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 400000. This project Development comprises the replacement of conveyor belts at Liddell Power Station, as and when directed by the Principal for a two (2) year period from the date of the awarding of Macquarie Generation's Contract. The work includes the removal, overhaul and installation of each conveyor's head and tail end belt cleaning systems. Tenderers are to demonstrate in their tender a working knowledge of the requirements of the Specification gained through experience with and knowledge of the plant described or similar plant. Click for more details...

MANGOOLA COAL PROJECT - STRUCTURAL STEEL & MECHANICAL FOR RAIL LOADING INFRASTRUCTURE
Rail Loading Infrastructure - Structural Steel/Mechanical New project In The Muswellbrook Council Area. For the provision of structural steel & mechanical works. Click for more details...

LIDDELL POWER STATION - EFFLUENT DISPOSAL SYSTEM/PIPELINE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at At, Liddell, NSW 2333. This type is Effluent Disposal System/Mine Conveyor Washdown Pipeline with Private ownership. The Contract shall be for all works associated with the construction of a new effluent disposal system from the Liddell Sewage Plant to the Liddell Ash Dam. The Contract also includes for the construction of a new mines conveyor washdown pipeline to M2/M1 transfer house. Click for more details...

BENGALLA COAL OPERATIONS - ROM HOPPER RELOCATION CONSULTANCY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 4 km west of, Muswellbrook, NSW 2333 of Consultancy - Rom Hopper Relocation type of New development. Tenders to include installation of the new ROM hopper and decommissioning the old one. Click for more details...

BENGALLA COAL OPERATIONS - OVERLAND CONVEYOR DECOMMISSIONING
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 4 km west of, Muswellbrook, NSW 2333 for New. For the decommissioning of an overland conveyor. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND - SURFACE CONVEYOR
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at North of, Ulan, NSW 2850 for New. For the provision of a surface conveyor to take mined coal to the new run-of-mine (ROM) hub stockpile complex. Trade packages as part of the Surface Coal Clearance System to include electrical works (supply, installation & commissioning of electrical components such as earthing, lightning protection, control equipment, lighting, cables, etc), mechanical works (fabrication, site installation & commissioning) & civil works (earthworks, foundations/footings, dressing, substation/switchroom pads). Click for more details...

LIDDELL COAL OPERATIONS - COAL HANDLING PREPARATION PLANT
Coal Handling Preparation Plant project at 20 Km North West of, Singleton, NSW 2330 In The Council Area Of Singleton of Private. Construction of a new Coal Handling Preparation Plant. This will involve the construction of a new preparation section, upgrades to the ROM receival and product coal facilities. The new preparation area will be located next to the old CHPP and its capacity will be 1200 tonnes per hour. This will include new screening, cyclone and spiral components for the plant. Upgrades to the ROM receival equipment include shortening of the apron feeder, a new rotating star wheel, new sizers and an increase in the drive power and length of the ROM conveyor. Modifications to the product handling equipment will include a short product conveyor to collect coal from the new CHPP to be deposited at a new transfer station onto the existing product stockpile rising conveyor. The existing road truck type coarse rejects bin will be replaced by a larger bin capable of loading mining sized trucks. The exisiting CHPP will be dismantled and recycled or disposed of over a one year period. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - CIVIL INSTALLATION FOR UNDERGROUND HAULAGE CONVEYORS
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Orange Council Area for New development. Civil installation is one of 3 packages for the haulage conveyors for underground development. Click for more details...

BICKHAM COAL COMPANY - BULK SAMPLE EXCAVATION PROJECT - RAIL LOADING FACILITY UPGRADE
Currently at the Early Planning stage In Upper Hunter is a project estimated to be $ 10000000. This project For the provision of upgrade services for the rail loading facility. Scope of work not yet determined. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 - OUTBOUND SYSTEM CIVIL STRUCTURAL MECHANICAL WORKS
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Part of lots 6, 7, 20 Cormorant Rd DP 4015754 & 252325, Newcastle, NSW 2300. Design, Supply & Installation of Piled Foundations, Supply & Installation of Concrete Foundations, Shop Detailing, Supply, Fabrication, Painting, Off Site Pre-Assembly & Site Erection of Structural Steel and part supply & complete Mechanical Installation for the Outbound System comprising a 2000t Buffer Bin, two Belt Feeders, Sample Plant, two Transfer Houses, three Conveyors and two substation slabs for a 30Mtpa Coal Export Terminal. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL RECLAIMER EXPANSION
Coal Reclaimers - Fabrication & Installation project at Curlew St, Kooragang, NSW 2304 In The Council Area Of Newcastle of Private. Fabrication & installation of new reclaimers. Part of the 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 Mtpa to a nominal 120 Mtpa. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STACKING EXPANSION
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Curlew St, Kooragang, NSW 2304. Fabrication & installation of new stackers. Part of the 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 Mtpa to a nominal 120 Mtpa. Click for more details...

WEST CLIFF COLLIERY WASHERY UPGRADE
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 4km southeast of, Appin, NSW 2560. Upgrade of the West Cliff Washery over the life of the Bulli Seam Operations Project to handle up to 105Mtpa throughput. To include installation of new components such as rotary breaker & screen house, coarse & fine coal storage bins, triple roll crusher, small coal circuit modules (eg desliming screens, primary & secondary cyclones, centrifuges), flotation cells & a teetered bed separator, coal & tailings thickeners, belt filters & tailings presses. Replacement of the existing Baum jig with a dense medium drum. Upgrades of existing conveyor systems, piping, pumps, sumps, safety & auxiliary systems. Upgrades of power supply systems to provide additional capacity & back up supply. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION
A project in the NSW Within Mid Western Regional. A project at the existing open-cut mine to expand Run-of-Mine (RoM) coal production from 13million tonnes per annum (Mtpa) to 15Mtpa for 12Mtpa per annum of washed & unwashed product coal to be railed to domestic power customers & a port for export. To involve a 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Associated upgrading of the coal handling & stockpiling system to include an additional ROM hopper with associated sizing station & raw coal conveyor & stacker plus an additional product coal stockpile with associated stacking conveyor & reclaim conveyor. Other work to include minor earthworks, conveyors, transfer stations & relocation of site roads. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL - PROJECT 145 RAIL DUMP STATION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 210 Cormorant Rd, Kooragang Island via, Kooragang, NSW 2304 for New. A coal loading expansion project to include installation of a fourth rail dump station, additional track infrastructure & upgrades to existing bucket-wheel reclaimer machines & ship loading facilities. Click for more details...

CENTENNIAL COAL UNDERGROUND MOBILE FLEET 2011-15
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at various mines, ., NSW 2999 of Coal Mining & Handling Equipment type of New development. A project to purchase for various Western Coalfield & Hunter Region operations a mobile development suite for gateroad development, bord & pillar production operations as well as longwall equipment. To include continuous miners, coal clearance systems, breaker line supports, up to 5 feeder breakers, load haul dumps, roof bolters for road development & bord & pillar operations, rubber tyred vehicles, up to 50 shuttle cars, man transporters & specialised mining vehicles. Click for more details...

CENTENNIAL WESTERN COAL SERVICES - SPRINGVALE SERVICES SITE UPGRADE
A project in the NSW Within Lithgow. A project to support western operations (Springvale, Angus Collieries) by upgrading the coal handling & distribution capacity at the central Springvale Coal Services site to 9.5 million tonnes per annum (Mtpa) of run-of-mine (ROM) coal. To include expansion of the coal washery involving installation of new plant adjacent the existing plant for an overall capacity of 7 Mtpa along with additional conveyors & transfer points. Increase of reject disposal capacity. Construction of a private haul road linking the site to the existing Angus Place-Mount Piper power station haul road. Continued integrated rehabilitation of the former Lambert Gully Mine also located on the coal services site. Click for more details...

PINE DALE COAL OPERATIONS STAGE 2 EXTENSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Lithgow Council Area of Operating Mine - Extension type. A project to extend operations 10-15 years by incorporating 201ha in the Blackmans Flat area adjoining the now exhausted original Pine Dale mine & the recently approved 27ha Stage 1 Yarraboldy extension. Continued open cut operations accessing 14.2 million tonnes (Mt) at a rate of 2Mt product coal annually. Construction of a new mine industrial area to include a 600tph crushing & screening plant, 100,000t run-of-mine (ROM) stockpile, 200,000t product stockpiles & maintenance facilities. Construction or relocation of offices, amenities, workshop, water management infrastructure, electric power supply, explosives magazine & fuel storage area. Dewatering of existing pit prior to use for overburden & interburden emplacement. Reinstatement of the now derelict Wallerawang spur rail line & rail siding & construction of a rail load out facility. Internal access roads & private haul road crossing. An additional 60 employees expected at maximum production. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect