List of Conveyors, Stackers, Reclaimers, Materials handling Projects in QLD


WEIPA BAUXITE OPERATIONS - LORIM POINT/NEWEIPA
Stacker - Erection & Miscellaneous Work project at At, Weipa, QLD 4874 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). At Lorim Point. Click for more details...

LADY ANNIE/MOUNT KELLY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Adjacent to Lady Loreta Mine 140 Km North West of, Mount Isa, QLD 4825. To construct a 1900 tpa copper SXEW plant and heap leach. Total copper recovery is expected to be 89% of the ore processed. Click for more details...

BLACKWATER COMET PROJECT
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Via, Blackwater, QLD 4717. Part of Comet CPP project. Coal Handling. Click for more details...

GOONYELLA/RIVERSIDE COAL OPERATIONS - BROADMEADOW
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Isaac Regional Council Area for New development. Ramp 4 (now renamed Broadmeadow) is new underground off the highwall. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Coal Handling & Preparation Plant project at Via, Blackwater, QLD 4717 In The Council Area Of Central Highlands Regional of Private. Comet CPP project. Raw coal and product coal areas included. The new facility will be located adjacent to the current Blackwater North preparation plant and will replace the high cost North, South and Thermal Coal Plants. Click for more details...

BLACKWATER COMET CHPP PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Central Highlands Regional Council Area of Prep Plant/Raw Coal Area/Loadout/High Voltage - Design/Const Package (Combined) type. Now includes the Comet CPP Project (Preparation Plant), and all coal handling facilities, as well a high voltage electrical package. Click for more details...

DALRYMPLE BAY COAL TERMINAL - EXPANSION
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area for New development. Expansions to 60 million tonnes per annum. Click for more details...

GOONYELLA/RIVERSIDE COAL OPERATIONS - BROADMEADOW
Underground Conveyors New project In The Isaac Regional Council Area. Coal Clearance Conveyors. The Drivers may be part of package. Ramp 4 (now renamed Broadmeadow) potential new underground off the highwall. Click for more details...

LAKE LINDSAY COAL PROJECT
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Approx 25 km from, Middlemount, QLD 4746. Overburden removal to commence July 2006; coal will be washed in existing washplant & construction on site will commence shortly. Production of export coking coal, & pulverised coal injection coal, expected to reach its peak in 2008. Coal to be hauled by truck or overland conveyor to German Creek. Blasting necessary prior to conventional truck and shovel strip mining. Dragline operations to 80 metres later in the mine life. Flood levee banks to be constructed parallel to Oaky Creek. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

OAKY NORTH MINE
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Central Highlands Regional Council Area for Subcontract development. For series of conveyors to transport coal from reclaimer to breaker to transfer station to stockpile. Conveyors include 2.3 km & 650 m approx lengths. Click for more details...

LAKE LINDSAY COAL PROJECT - OVERLAND CONVEYOR
Conveyor - Overland New project In The Isaac Regional Council Area. Coal will be transported 25 km to German Creek preparation plant via overland conveyor or truck. Click for more details...

BLAIR ATHOL COAL OPERATIONS
22 km north west of, Clermont, QLD 4721 Has Blair Athol Coal Operations currently at Construction stage. Includes idlers and associated equipment. Click for more details...

OAKY CREEK COAL OPERATIONS - OAKY NO 1
Oaky creek via, Tieri, QLD 4709 Has Oaky Creek Coal Operations - Oaky No 1 currently at Construction stage. A change to thin-seam mining with the south-east extension will necessitate new longwall equipment and an upgrade of the trunk conveyor system. Trunk belt capacity is likely to be expanded from 3,500 tonnes per hour to 4,5000 tonnes per hour. Oaky Creek Coal collectively produces 7 million tonnes a year export coking coal from underground longwall operations. Expressions of Interest were sought for the services of a suitably experienced Contractor to provide the following services and works for the installation of an Underground Conveyor System: civil works; structural steel and fabrication works; installation of structure and belt; project management and supervision; electrical works. Click for more details...

DALRYMPLE BAY COAL TERMINAL - FURTHER EXPANSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740 of Coal Terminal - Expansion type of New development. First phase will take capacity to 68 million tonnes by July 2007. More specifically work onshore will involve a new out loading conveyor system from the stockyard feeding to a new surge bin and sample plant complex (surge bin 3). This will feed to a new shuttling head conveyor that can feed either of the two existing jetty conveyors and a third future conveyor. Offshore work involves a new conveyor L15 gallery structure, a 10 metre widening of the existing jetty by addition of a third pile and an extension of the existing steel headstock at each bent. A new access roadway in between conveyors L5 and L15 to provide maintenance access to L15. An extension of existing conveyor L17 tail. A new drive tower and transfer tower at the head of L15, supported upon a piled platform that will also provide for roadway access to this area and relocated transformers. Two new stackers and two reclaimers will also be installed. Click for more details...

ABBOT POINT COAL TERMINAL EXPANSION STAGE 3
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Abbot Point 25 km north west of, Bowen, QLD 4805 of Coal Terminal Expansion - Stage 3 type of New development. Expansion of terminal capacity from 15 mtpa to 50 mtpa. Key components of the stage 3 expansion will involve the construction of a second berth, a second rail loop and train dump facilities and associated second in loading conveyor. Installation of a new stockyard bund and two new stockpile rows. Up to three new stacker reclaimers and a new yard conveyor and transfer towers will be installed. A second outloading conveyor to the offshore berth, using the existing jetty structure will be installed. Installation of a second offshore berth and a second shiploader on the new berth. Lastly there will dredging work associated with the second berth and the dredge material will be disposed of on either land or sea. Click for more details...

CURRAGH NORTH COAL PROJECT - 50 METRE HIGH LEVEL GANTRY
High Level Gantry (50m) project at North of, Blackwater, QLD 4717 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). 50 metres high for over the creek. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - INLOADING CONVEYOR SYSTEM
Inloading Conveyor System project at Hay Point Road, Hay Point, QLD 4740 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). Scope of work includes the supply and fabrication of new conveyors and rail unloading facilities, civil footings and supports for these conveyors and supply and installation of electrical work associated with these conveyors. Click for more details...

DAWSON SOUTH STAGE TWO PROJECT - COAL HANDLING PREPARATION PLANT
Dawson South Stage Two Project - Coal Handling Preparation Plant is currently at the Construction stage, valued at about $ 400000000 it is Development comprises the development of a Coal handling Preparation Plant (CHPP) to process 5 Mtpa. Coal will be delivered by an overland conveyor with the CHPP processing at 2000 tonnes per hour in two stage mode and 3400 tonnes per hour in single stage mode. The plant will comprise six fully automated stacker and reclaimer machines, dense medium cyclones, spirals and flotation circuits. Coal will then be loaded by a high capacity automated reclaimers to a new rail load out facility. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - FELDSPAR WASH PLANT
Feldspar Wash Plant New project In The North Burnett Regional Council Area. Development comprises the construction of a treatment facility that will comprise a hot acid leach plant and associated equipment. The ore will be shipped from the mine to the feldspar plant at Dakiel Railroad Station where it will be loaded and sent to Gladstone and then be shipped to Brisbane. Click for more details...

COMALCO WEIPA OPERATIONS - SHIPLOADER
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Ship Loader project involves the strengthening and extending the existing Lorim Point wharf, the installation of new conveying system and ship loader machine and dredging work. Click for more details...

DAWSON COMPLEX COAL PROJECT - CONVEYING SYSTEM
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at North west of, Theodore, QLD 4719. This type is Coal Conveying System with Private ownership. To supply two cable belt conveyors at 10 km and 16 km in length, both with horizontal curves and multiple drives. The conveying system will transport ROM coal at a rate of 2400 tons per hour to the newly constructed coal handling preperation plant. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - UPGRADE TO CONVEYOR
Dalrymple Bay Coal Terminal Expansion - Upgrade To Conveyor is currently at the Construction stage, valued at about $ 6000000 it is Upgrade of an existing conveyor. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - UPGRADE TO CONVEYOR
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740 for New. Upgrade of existing yard conveyor. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - UPGRADE TO SHIPLOADER
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740 for New. Upgrade to Shiploader. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - PHASE 2/3
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740. Terminal expansion to increase capacity to 85 Mtpa. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - OUTLOADING SYSTEM OL3 OFFSHORE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740 for New. Outloading Systems OL3 offshore. Work comprises an extension of the existing jetty by 3.8 km to the new shiploader wharf, to be known as berth 4. The dredging work has been completed. Fabrication work for the jetty and wharf will include piles and headstocks. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - STACKER RECLAIMER SR5 UPGRADE
Stacker Reclaimer Sr5 - Upgrade project at Hay Point Rd, Hay Point, QLD 4740 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). Upgrade to existing Stacker reclaimer SR5. Work will mainly mechanical and electrical installation and maintenance. Click for more details...

DALRYMPLE BAY COAL TERMINAL - CONVEYOR UPGRADE
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area for New development. Upgrades to conveyors L 1, L2, L3 and L 4. The tender comprises upgrades to the belt feeder drivers BF5, BF6 and BF7. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - RECLAIMER RL2 BOOM
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740. To design, supply and deliver a new boom for Reclaimer RL2. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - ONSHORE OUTLOADING CONVEYOR SYSTEM
Dalrymple Bay Coal Terminal Expansion - Onshore Outloading Conveyor System is currently at the Construction stage, valued at about $ 60000000 it is To fabricate and erect an Onshore Outloading Conveyor System. The conveyor will be one kilometre in length and will be constructed of fabricated steel. There will be a minor civil work component to the project involving concreting. All the mechanics have been supplied. Click for more details...

ENSHAM CENTRAL UNDERGROUND COAL PROJECT
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 40 km north east of, Emerald, QLD 4720. A project to extend Ensham's Life-Of-Mine by 20-30 years by expanding into underground mining. Operations at around 7.6 million tonnes per annum (Mt/y) expected initially to be bord & pillar. New surface facilities likely to include access roads, workshop & vehicle servicing facilities, administration building, accommodation camp, washplant, tailings dams, conveyors, coal stockpile areas, coal handling & preparation facilities, ventilation shafts & access boreholes. A new conveyor to connect the underground product coal stockpile to the existing conveyor serving the train loading bin. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - RELOCATING/UPGRADING STACKER/RECLAIMER SR3
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at Hay Point Rd, Hay Point, QLD 4740. This type is Stacker/Reclaimer Sr3 - Relocate/Upgrade/Modify with Private ownership. Relocate, upgrade and modify stacker/reclaimer SR3 to SR6 location. The upgrade includes the supply of a new elevator conveyor as well as an upgrade of the electrical system. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - RELOCATING/UPGRADING STACKER/RECLAIMER SR4
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area of Stacker/Reclaimer Sr4 - Relocate/Upgrade/Modify type. Relocate, upgrade and modify stacker/reclaimer SR4 to RL2 location. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - CONVEYORS R8 & S8
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area of Private ownership. To construct and supply conveyors for R8 and S8. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - HOSE & CABLE REELERS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area of Hose & Cable Reelers - Design/Construct/Supply type. To design, construct and supply hose and cable reelers for SR6 & RL2. Click for more details...

CLERMONT COAL PROJECT - COAL HANDLING PREPARATION PLANT
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Isaac Regional Council Area for New development. Off site fabrication & installation of 2 major (2500tph) & 3 minor (300tph) conveyors, a dump hopper, a wash plant (300tph). Associated process piping. Click for more details...

KUNIOON COAL PROJECT - CONSULTANCY FOR COAL MINE INFRASTRUCTURE & OVERLAND CONVEYOR SYSTEM
A project in the QLD Within South Burnett Regional. Engineering consultancy for Kunioom mine infrastructure & overland conveyor. Click for more details...

ABBOT POINT COAL TERMINAL X25 & X50 EXPANSION SPARE DRIVE UNITS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Whitsunday Regional Council Area of State ownership. The scope involves supply of seven conveyor drive units complete with gearbox, fluid coupling, motor and associated couplings mounted on a drive base. A number of drive types are involved, including: 2 x 400kW 3.3 kV, 2 x 560kW 3.3kV, 1 x 1100kW 3.3kV, 1 x 150kW 415V & 1 x 400kW 415V. Click for more details...

PORT OF TOWNSVILLE BERTH 8 & 10 UPGRADE & INNER HARBOUR EXPANSION PROJECT STAGE A
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at ., Townsville, QLD 4810. This type is Berth Upgrade/Military & General Cargo Facility - Stage A with State ownership. Townsville Port Inner Harbour Expansion involves reconfiguration of the inner harbour to maximise the capacity of existing infrastructure & provide safe & secure harbour for the next generation of commercial, cruise & military ships. Cruise, Military & General Cargo Facility on existing Berth 10 at the Port. Includes development of Passenger Terminal with public spaces, new wharves & associated marine works & provision of services to the facility. Other TPIX projects may be included within the contract subject to availability of funding. New Ship loader to be constructed on Berth 8 & any augmentation works necessary to Berth 8 to facilitate construction of the new ship loader. The works include the design & documentation of - new elevated conveyors, gantries & transfer towers. Upgrading of existing vessel fendering on part of Berth 8. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 - BERTH 3 & ONSHORE FACILITIES
A project in the QLD Within Mackay Regional. Construction of a new berth wharf (Berth 3) and shiploader (Shiploader 3/SL3). Construction of 2 new outloading trestle conveyors on a new offshore trestle complete with access roadway. Construction of offshore link conveyors to existing Berths 1 & 2 & the proposed Berth 3 from the new outloading trestle conveyors. Reclamation of land (9.4ha) to the northeast of the existing stockyard area to facilitate the construction of new onshore outloading systems. Construction of two new onshore outloading systems, associated transfer towers & surge bins to feed the new trestle conveyors, generally constructed on the newly reclaimed land area. Demolition & removal of the existing outloading conveyors, including demolition of the existing trestle & roadway structure. Demolition & removal of the 2 existing onshore outloading systems including conveyors, transfer towers & surge bins. Modification of existing stockyard conveyors to feed the new onshore outloading systems by extension of their head ends & construction of new transfer towers. Site infrastructure works to include roads, drainage systems, electrical & water services. Temporary load out facilities & laydown areas to be developed in the Hay Point Tug Harbour. Click for more details...

ABBOT POINT COAL TERMINAL X50 EXPANSION DS1 ABD IL1 STRUCTURAL MECHANICAL & ELECTRICAL WORKS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Rail Unloader (Dumpstation) 1 - including installation of principal supplied wagon vibrating system and vibrating feeders, extension of superstructure, modification to rail support beams, replacement of new steel hoppers and belt weighers, control room fit out. Inloading Conveyors C101/C102/C103 Upgrade - Modification to concrete pedestals and installation of concrete slabs. Strengthening works to existing elevated galleries, modification to existing transfer towers, installation of drive access platforms, modifications and upgrade to conveyor system. Click for more details...

OAKY CREEK COAL OPERATIONS - LONGWALL PROJECT STAGE 4
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. A project to increase production over 5 years by expanding into additional sections of the mine tenement. To include a new longwall mining system & associated development suite. Expansion of the existing coal handling & preparation plant (CHPP). Upgrade of the electrical system. Click for more details...

CAVAL RIDGE COAL PROJECT - COAL PREPARATION PLANT & RAIL FACILITIES
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 16km south of, Moranbah, QLD 4744 of Coal Preparation Plant/Rail Loadout/Conveyor/Roads type of New development. The proposed Caval Ridge CHPP will have a nominal feed capacity of 2 000 t/h and is capable of processing 14-16 Mt/a to produce a nominal 8 Mt/a of hard coking coal, 5.5 Mt/a of which will be sourced from the Caval Ridge Mine & the balance to come by conveyor from the expanded Peak Downs mine. The facility shall operate seven days per week on a continuous basis. The CHPP will consist of: ROM dump hopper for primary sizing; secondary and tertiary sizers with intermediate screening; raw coal stockpiles with mechanised stacking and reclaim facilities; 2 module coal preparation plant, nominally 1000 tph, per module; product coal stockpiles with mechanised stacking and reclaim facilities; train loadout to the north of the Peak Downs Highway, a conveyor will transport material crossing the highway; reject bin and handling system and ultrafine tailings dewatering system. Water supply to be a combination of site water reuse & a raw water supply via a new off take pipeline from existing bulk pipelines. Process plant water will be recycled to minimise raw water make-up requirements for the site. The product coal will be railed approximately 185km to the Hay Point and/or Dalrymple Bay coal terminals for shipment. Click for more details...

WIGGINS ISLAND COAL EXPORT TERMINAL (WICET) PROJECT STAGE 1 - OFFSHORE PLANT & INFRASTRUCTURE
Jetty/Wharf/Berth/Conveyors/Towers/Dolphins project at Golding Point, Wiggins Island, Gladstone, QLD 4680 In The Council Area Of Gladstone Regional of Private. Construction of a 1.8km long approach jetty & transfer tower platform, wharf, wharf conveyor including the drive & take up tower, berthing & mooring dolphins, ship access platforms, jetty conveyor & transfer tower. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - QUARRY MANAGEMENT & GRAVEL SUPPLY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at West of WANDAON, east of TARA & west of, Chinchilla, QLD 4413 for New. A 3 year contract for management of a quarry stockpile & associated works to ensure continuous gravel supply. To include establishment of a quarry pit with access roads. Operate & maintain a surface crushing plant. Manage crushed & uncrushed ore stockpiles in various locations including blending & tramming of material. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PROCESS FACILITY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. For the provision of a process plant. The package will be issued for bid as one package with the following separable parts. Part A: Off-site Assembly of modules including, but not limited to: Modularised bauxite beneficiation plant (including concrete foundations), Modules are nominally 15m(W) x 25m(L) x 20m(H) & up to 1,200 metric tonnes, Primary & secondary sizer structures, Tertiary crushing structure, Transfer stations, Conveyor galleries, Conveyor ground modules. The expectation is that the Tenderer will utilise to the maximum extent possible, modularised structures to reduce manning levels required on-site. Part B: Installation of the modules on Site, Supply of all labour, tools, supervision, quality assurance, temporary storage & workshop facilities, construction plant & equipment, materials, services, ancillary equipment, utilities, consumables & perform all installation & testing necessary. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - DREDGING
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Weipa Shire Council Area of Private ownership. For the provision of dredging works for the following locations: Hey River Terminal, Humbug Terminal, Amrun Export Terminal, Berth pocket, & Wharf area. The scope is fully inclusive of all requirements to complete the works in accordance with the contract including mobilisation, any temporary works & navigation aids, any requirements to comply with quarantine or other statutory conditions, & demobilisation. Click for more details...

QCLNG OPERATIONS - LIFTING EQUIPMENT SPECIALIST
Lifting Equipment Specialist New project In The Various Council Area. A 3 year contract for the supply of lifting equipment. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - CONVEYOR GEARBOXES & DRIVES
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Weipa Shire Council Area of Private ownership. For the provision of Conveyor Gearboxes & Drives for the South of Embley Project. Conveyor drives will range from 90kW to 900kW of installed power. The total number of conveyor drives required for this project is 18. Conveyor drives will be supplied with electric motor, gear reducer, high speed flexible coupling, low speed rigid coupling, disc brake on the high speed shaft, holdback, common mounting base complete with torque arm & safety guards. Click for more details...