List of Conveyors, Stackers, Reclaimers, Materials handling Projects in WA


GRIFFIN BLUEWATERS POWER PROJECT - COAL-FIRED POWER STATION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Lot 8 Wellington Loc 796 approx 3km north east of, Collie, WA 6225 for New. The commissioning of the coal-fired power station at Collie will commence October 2008. Click for more details...

NELSON POINT - IRON ORE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Port area via, Port Hedland, WA 6721 for Renovations, Refurbishments etc.. Extensive modifications will be required to the P12 conveyor prior to the installation of a new stacker (under construction in Perth). Work mainly involves civils & structural/mechanical services. Click for more details...

DIRECT REDUCED IRON (DRI)/HOT BRIQUETTED IRON (HBI) PLANT
Currently at the Construction stage In Port Hedland is a project estimated to be $ 8000000. This project Overland/tunnel conveyor will transport ore from Finucane Island to the DRI Plant, approximately 7.5 km southwest of Port Hedland and then return the hot briquetted iron product back to Finucane Island for export. This rates contract is based on tonnages, for example, PIC are to fabricate approximately 720t of structural steel. The balance of this three-part contract may be tendered separately or incorporated into one or both of these awards. Click for more details...

EWINGTON 2 COAL OPERATIONS
8 km east of, Collie, WA 6225 Has Ewington 2 Coal Operations currently at Construction stage. Conveyor belts (Apex), drives (Flenders), pulleys & idlers (Pit Top) required for several electrical/mechanical packages associated with new coal handling facilities. Belt scrapers to be provided by Dyna Engineering (Osborne Park, WA). Click for more details...

EWINGTON 2 COAL OPERATIONS
Currently at the Construction stage In Collie is a project estimated to be $ 1000000. This project Installation of 8 conveyors of various sizes required. Associated components have been ordered. Click for more details...

BHP BILLITON IRON ORE RAPID GROWTH PROJECT - NELSON POINT - PACE
Site facilities via, Port Hedland, WA 6721 Has Bhp Billiton Iron Ore Rapid Growth Project - Nelson Point - Pace currently at Planning stage. The first stage of PACE provided for an increase in capacity to 81 mtpa by 2004. Further stages will provide for capacity levels to exceed 90mtpa. Click for more details...

MOUNT GIBSON PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The City Of Greater Geraldon - Mullewa Council Area of Transfer Station type. A transfer station facility where iron ore will be transferred to rail for transport to the Port of Geraldton. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS
A project in the WA Within East Pilbara. Expansion to 36 million tpa .Some conveyor work involved. Flow modifications. A current project to increase output to 24 million tonnes per annum is nearing completion. Click for more details...

WORSLEY ALUMINA SHIP LOADING FACILITY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Includes shiploader, berth, tanks and conveyor belts. A dust minimising chute will be installed. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS
8 km north west of, Newman, WA 6753 Has Yandicoogina Iron Ore Operations currently at Early Planning stage. Additional power and other infrastructure to complement the new port and mine requirements. Click for more details...

EASTERN RANGES PROJECT - PARABURDOO
Eastern Ranges Project - Paraburdoo is currently at the Construction stage, valued at about $ 1000000 it is Includes modifications to plant at existing facilities (brownfields) and new project area (greenfields). Conveyor work involved. Click for more details...

INDEE GOLD PROJECT - HEAP LEACH PLANT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Port Hedland Council Area of Private ownership. The processing facility will initially treat oxide ores via carbon-in-leach technology. A two stage crushing and screening plant has been acquired. It comprises a feed hopper with vibrating screen and roller crusher, conveyors, 60 metre multi stage, heap leach conveying and stacking system, control room and CAT 320 kva generator. Heap leach pads, channel liners and pond liners are also to be supplied. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - STEEL FABRICATION
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Various sites via, Newman, WA 6753. BHP Billiton has increased iron ore production with work culminating in a production capacity of 110 Mtpa to be completed by late 2004. The company is now investigating ways of increasing production over the next five years to meet a projected increased in demand, especially from China. A complete process redesign will be involved with higher throughput levels and environmental and social benefits. Additional expansions of capacity to 145Mtpa are currently the subject of a feasibility study due for completion late 2004 approx. Click for more details...

BHP BILLITON IRON ORE OPERATIONS - ASSET DEVELOPMENT PROJECTS
Bhp Billiton Iron Ore Operations - Asset Development Projects is currently at the Early Planning stage, valued at about $ 20000000 it is Part of a proposed additional expansion to meet increased demand, involving engineering works and capital investment of 2-3 billion $AU over the next five years. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - SHIPLOADERS/STACKERS/RECLAIMERS
Pilbara Iron Ore & Infrastructure Project - Shiploaders/Stackers/Reclaimers is currently at the Construction stage, valued at about $ 62500000 it is The design, manufacture and construction of a shiploader, stacker and reclaimer. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

MID WEST IRON & STEEL PROJECT - KOOLANOOKA - STORAGE SHED/FACILITIES
Currently at the Construction stage In City Of Greater Geraldton is a project estimated to be $ 3000000. This project Construction of storage shed and associated facilities. Concrete floor, structural steel and cladding. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - PORT INFRASTRUCTURE
At, Finucane Island, WA 6721 Has Iron Ore Rapid Growth Project 3 - Port Infrastructure currently at Construction stage. Development comprises construction a new single stockyard row in area S, the Eastern Yard including a new stacker and new reclaimer. Constructing a new dedicated Return Screened Fines stockpile adjacent to Car Dumper 4 including new stacker and new reclaimer. Joining the existing Berths C & D together to allow existing shiploaders SLO3 and SLO4 to access either berth. Modifications to the long travel of shiploaders SLO3 and SLO4 so they can travel and shipload on Berth C and D. Upgrading and rebuilding the existing Berth C to accommodate shiploader SLO4 and 250,000 DWT vessels, modify the exisitng control system to suit the new operating regime, improve dust control measures, upgrade electrical infrastructure to suit the proposed development, upgrade the exisiting general infrastructure including upgrading a warhouse building , upgrading roads and constructing a new water recovery plant. The existing existing environmental berm will be extend to provide a visual buffer to the town of Port Hedland on the other side of the harbour from the new eastern stockyard. Construction of temporary lay down areas and buildings for the contractors and temporary construction offices for BHP and EPCM staff. Borrow pits will be developed for the taking of material for construction purposes. A new 66 Kv power line will also be constructed and installed. Click for more details...

GERALDTON PORT AUTHORITY - IRON ORE EXPANSION PROJECT - MATERIALS HANDLING
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Development comprises modifications for Conveyor (CV) 13 to allow for the upgrading and reversal for conveying iron to Berth 5. New conveying circuit for iron ore from reversed and upgraded CV 13 to Berth 5. Modifications to the concentrate load out arrangements. Modifications and new conveying circuit to route all minerals and concentrates from the existing mineral sands ship loading truck dump facility to Berth 4. Minor upgrade of Berth 6 ship loader (only if required to accommodate modifications to suit a new minerals conveyor feed circuit such as a reversed feed tipper). New electrical substations, power distribution and electrics for the new development. New control system and provisions for future control systems for all recalim, conveying and ship loading circuits including intergration with existing systems. Upgrade of existing reclaim systems as required to accommodate the loading circuit modifications for both iron ore and minerals. Click for more details...

MOUNT GIBSON IRON ORE MINE & INFRASTRUCTURE PROJECT - STORAGE SHED & FACILITIES
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The City Of Greater Geraldton Council Area of Storage Shed/Associated Facilities type. Construction of dedicated berth, storage shed and shiploading facilities to handle 130,000 tonnes of iron ore. Facilities will include hoppers, conveyors, storage tanks, clarifier, return water tank and pumps, HV cables, power transformer, MCC and switch rooms. A filter plant will be constructed to dry the slurry. Concrete floor, structural steel and cladding. Click for more details...

DAMPIER IRON ORE PORT UPGRADE PROJECT
Port Expansion Phase B New project In The City Of Karratha Council Area. Expansion of port capacity from 116 Mtpa to 140 Mtpa of iron ore. Presently construction works for the previous expansion to 95 Mtpa will be completed by December 2005. A proposal to expand to 120 Mtpa is before State Government authorities at present but does not involve any new construction, only utilising existing infrastructure at Parker Point. Expansion to 140 Mtpa will involve significant new construction work. Development options include upgrading the Parker Point and East Intercourse Island operations and the development of a new greenfields site. Infrastructure required for the expansion includes new car dumpers, screen house replacement, stackers and reclaimers, stockpiles, conveyors, ship loaders and berth works. Click for more details...

WORSLEY ALUMINA EXPANSION EFFICIENCY & GROWTH PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Collie Council Area of Mine Expansion/Refinery - Upgrade type. Development comprises two parts. Expansion of the existing bauxite mining activities and an upgrade of the refinery. Mining will expand into the Saddleback, Marradong, Hotham North, East Quindanning, Morgans, Hotham North Extension, Central and Brookton mining envelopes. Throughput will expand to 16.5 Mtpa. The expansion of mining activities will involve the addition of three new primary crushers and a new crushed ore stockpile will be needed next to the existing secondary crusher to provide extra surge material to feed the overland bauxite conveyor. Additional conveyors include a 34 km extension from the Hotham North mining envelope which will cross both the Albany Highway and the Wandering-North Bannister road, a 16 Km spur from the south east of the Central mining envelope to the Luptons mining envelope and lastly a 28 Km extension from the Central mining envelope to the Brookton mining envelope. Additional bauxite conveyors spurs and haul truck transport may be needed in the future. Refinery expansion will involve an increase in the Bauxite stockpile of 0.5 Mt. At the Milling and Digestion plant an additional mill, an additional desilication tank and eight new slurry heaters will be required. At the Seperation plant, an extension of the residue washing tanks and an expansion of capacity of the causticiser circuit. At the Calcination plant an additional gas fired calciner with bag house with a new hydrate filtration building. Addition of a coal-fired co-generation facility with bag house designed to produce 350 tonnes of steam per hour (equivalent to 204 Mw) and 35 Mw of electrical power. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - BULK EARTHWORKS
Bulk Earthworks project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Civil and Concrete Work comprises moving about 1 million cubic metres of dirt. More specifically the construction of the E deposit primary crushing area and mechanically stabilised earth wall (MSE). To construct a 7.5 km long overland conveyor from the E deposit primary crusher to a new Ore Handling Plant 2 (OHP 2), Stockyard 2 located within the rail loop, associated earthworks and heavy vehicle park-up and upgrade of the infrastructure for the operation. This will include office, amenities and waste water services. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - STRUCTURAL/MECHANICAL WORKS
Currently at the Construction stage In Port Hedland is a project estimated to be $ 180000000. This project Work comprises modification of existing conveyors to increase capacity, the installation of additional conveyors and associated transfers and pipework. On the upgraded Finucane Island wharf the dual cell car dumper will be upgraded and new ship loading conveyors will be provided. Click for more details...

KOOLAN ISLAND PROJECT - SHIPLOADER CONTRACT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Derby-W Kimberley Council Area of Private ownership. The jetty, shiploader and reclaim conveyor is being designed to receive up to and include capsize vessels (200000 tonnes) with a ship loading rate of 4500 tonne per hour. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - LFM ANALYSERS
On, Finucane Island, WA 6721 Has Iron Ore Rapid Growth 3 Project - Port - Lfm Analysers currently at Construction stage. Low Frequency Microwave (LFM) Moisture Analyser Click for more details...

HOPE DOWNS IRON ORE PROJECT - PROCESSING PLANT
75 Km Northwest of, Newman, WA 6753 Has Hope Downs Iron Ore Project - Processing Plant currently at Construction stage. A crush and screen process plant. The plant will initially process 22 Mta of dry iron ore with expansion later on to process 30 Mta of dry iron ore. The process plant will comprise a primary crusher in a processing circuit that incorporates screens that will seperate the oversized ore. The primary ore will then be crushed a second time and fed to seperate lump and fine products. These will be stockpiled for train loading by conveyor belts and travelling luffing stackers. Stockpiled products will be reclaimed by a rail mounted bucket wheel reclaimer. It will then be conveyed to a train loading facility for transport by rail to Dampier port. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BELTING
Belting - Supply Of project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 In The Council Area Of City Of Greater Geraldton of Private. Supply of Belting. Approx.1750m of 900/1350mm wide by 4ply PN800 conveyor belting. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONVEYOR DRIVES
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The City Of Greater Geraldton Council Area for New development. Supply of 6 No.Conveyor Drives, with capacity ranging from 100kW to 250kW. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 5
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Construction Package 3. New Material Handling System to Berth 5. Package 2. Fabrication, supply, installation and commissioning of materials handling system. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 4
A project in the WA Within City Of Greater Geraldton. Material Handling System to Berth 4. Package 1. Fabrication, supply, installation & commissioning of material handling system. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE PREPERATION PLANT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Cloud Break Mine Site, Pilbara area via, Newman, WA 6753 for New. Ore Preparation Plant (OPP) is to comprise a crushing and screening operations. The facilities include a screen house, crushers, stockpiles and trainloader. The operation will process ore transported by a conveyor firstly to a portable crusher and sizer located at the operating face of the Cloud Break mine. When the ROM ore has been crushed and sized it will be transported via a conveyor to the screener and crusher. Ore will be sorted into super value fines, high grade fines, high grade lump and lower grade ore. The first three types of ore will be conveyed to the train loading station and shipped to Port Hedland. The low grade will be stockpiled for the future when the Christmas Creek Beneficiation Plant is constructed. Operating facilities at the plant will comprise a Sample Tester, Plant/Workshop store, Communication Tower, High Voltage Switchyard, Sewage Treatment Plant, Potable Water Plant including a Water Tank, Temporary Diesel Power Station, Control Room, Workshops, Laboratories, Amenities area, OPP Administration area including a Store, Laboratory, Emergency Response Centre and Administration building, Mining administration area, Car Parks, two Fuel Farms and a Vehicle Washdown Facility including a washdown slab and an oil separator and automated facilities. A desliming plant will also be constructed. Future expansion of the OPP will include a Desand Plant and associated infrastructure. The developer is currently designing the Desanding plant. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - NEWMAN HUB
Newman Hub project at Newman Hub, Newman, WA 6753 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). The RGP4 modifications include the final tie-ins that convert the existing Newman Operations from a production plant producing secondary crushed ore (with a nominal top size of -100mm) to a plant producing shipping quality lump and fines products. The main features of the new tie-in, starting at TS2 are: A new transfer tower, 41SE010, built immediately to the NE of the existing TS2, in line with conveyor M110. This tower is structurally linked to TS2. The tail end of the existing conveyor M110 is removed and replace by a new conveyor. 41CV010, which runs in the opposite direction and discharges ore to a new transfer conveyor, 41CV020, the tail of which is in the new transfer tower 41SE010. Connecting to the existing Newman High Grade (NHG) discharge in TS2 (ore from #2 Plant and Bene Plant product). Construction of a new single rotary cell train car dumping facility, a new crushing and screening plant to include scalping with middlings recirculation to produce sized lump and fines product. Construction of a new blending stockyard 5 x 210kt lump and fines, live and dead including stacking and reclaim machines, to produce a direct-shippable blended lump and fines product. Construction of sampling facilities for reconciliation of production from the various ore sources (NHB and SOB sites) and as-stacked blend control on the stockpiles. Construction of a new drive through train loading (TLO) facility with separate lump and fines sections. Modifications and additional track at the entrance of Newman Hub rail loop and new loco services facility near the existing Hub workshops. Modifications and additional tracks and realingments in the vicinity of the existing OB29 train loading facility for connections to new car dumper and train loading facility. These works include the additional SOBs train by pass line. Deconstruction of PB29 conveyors M301, M309, M311 transfer station TS3, part deconstruction M308 and the removal of the entire OB29 train Load-out facility. The deconstruction works also include removal of sections of existing rail line made redundant by the Newman Hub works. Decommissioning of the existing train load-out stackers No 1 & 2, stacker conveyors M110 and M6 and the existing train loading tunnels (demolition not included in the RGP4 scope). Modifications and additions to the existing water supply and reticulation system. Design Capacity is 31Mtpa. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - CRUSHING & SCREENING PLANT
Crushing & Screening Plant project at Newman Hub, Newman, WA 6753 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). The screening facility comprises two buildings located in close proximity (one bay apart). The first building consists of five scalping screen bays that are fed by a continuously traveling shuttle head conveyor. Each bay consists of a surge bin that is emptied by a vibrating diverging pan feeder that distributes and feeds a double deck banana scalping screen. The second building consists of seven product screen bays that are fed by a continuously traveling tripper. Each bay consists of a surge bin that is emptied by a vibrating diverging pan feeder that distributes and feeds a double deck banana product screen. The crushing building consists of three crushing bays that are fed by a continuously traveling shuttle head conveyor. Each bay consists of a surge bin that is emptied by a vibrating feeder. Each vibrating feeder feeds a short belt conveyor that, in turn, feeds a cone crusher. The screening building has two dust collection systems. (one for each end of the building) and the crushing building has one dust collection system. Each system comprises reticulated ductwork, reverse pulse air cleaning type bag house c/w- bags, compressor, air receiver and receiving hoppers that are discharged by rotary valves back onto the adjacent mainline conveyors. The key criteria for the Crushing & Screening Sections is 58Mtpa. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - JIMBLEBAR ORE PROCESSING PLANT
A project in the WA Within East Pilbara. The ore processing plant will include earthworks, civil works, electrical, structural, instrumentation and control, demolition, rail work, communication, stockyard and general services packages. Click for more details...

SINO IRON ORE PROJECT - SLURRY PIPELINE
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The City Of Karratha Council Area for New development. Scope of works modified. The Company has decided on the development of a 25km slurry pipeline instead of an overland conveyor.. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRANSPORTABLE SUBSTATIONS CONTROL
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Newman Hub, Newman, WA 6753 of Transportable Substations/Control - Supply Of type of New development. For the supply of transportable substations, control. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT PANAMAX BERTH PROJECT
Port Hedland Port Authority - Utah Point Panamax Berth Project is currently at the Construction stage, valued at about $ 20000000 it is Construction of new multi-user Panamax Berth Facility (within area of existing Port Hedland Port referred to as Utah Point) to export iron ore, manganese & chromite. Works consists of construction of 5000 tph travelling shiploader. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT PANAMAX BERTH PROJECT
Steel Tube Piling Package - For Berth Facility project at Port Hedland Port, Gilbert St, Port Hedland, WA 6721 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). Provision of steel tube package for construction of new multi-user Panamax Berth Facility (within area of existing Port Hedland Port referred to as Utah Point) to export iron ore, manganese & chromite. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - CRUSHING FACILITIES & OVERLAND CONVEYORS
A project in the WA Within East Pilbara. For the provision of primary and secondry crushing facilites including overland conveyors. Click for more details...

BLUEWATERS POWERSTATION COAL HANDLING PLANT CONVEYOR
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Collie Council Area of Plant Conveyor type. Unit 2 Coal Handling Plan Conveyor structure to be developed. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - WET ORE PROCESSOR SMP
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The East Pilbara Council Area of Structural/Mechanical/Piping - For Wet Ore Processor type. Contract for the provision of structural, mechanical & piping engineering services for a 15 million tonnes per annum (Mtpa) wet ore processor to accommodate 220t capacity haul trucks. To include primary & secondary crushing & screening, waste fines thickening & discharge return lines, stockpiling of lump & fines product, reclaiming & train loadout. Click for more details...

DAMPIER IRON ORE PORT OPERATIONS - PARKER POINT UPGRADE
A project in the WA Within City Of Karratha. A project which is part of Rio Tinto's Growth Program to increase its Pilbara ore handling capacity to 330million tonnes per annum (Mtpa). Upgrade of its Parker Point facility at Dampier Port by 5Mtpa to give an overall 230Mtpa capacity. To include 2 new conyeyors including transfer stations with shuttle heads as well as 2 new surge bins with hydraulically driven belt feeders. During a pause to change a ship's hatch, fine ore to be continuously fed by an existing conveyor to a surge bin & then loaded rapidly afterwards. Existing reclaimers also used to maximum extent by loading via the new surge bins & the top up belt. Click for more details...

ANDERSON POINT PORT FACILITIES - BERTH 3
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at Anderson Point, Port Hedland, WA 6721. This type is Port Facilities with Private ownership. The expansion will provide an additional 400m of wharf superstructure, 7 berthing dolphins, navigational aids and associated mechanical components. Click for more details...

CHRISTMAS CREEK IRON ORE PROJECT - PROCESSING FACILITY 2
Processing Facility project at Via, Tom Price, WA 6751 In The Council Area Of Ashburton of Private. For the design, installation and operation of a 25 million tonne per annum crushing and processing circuit. To include establishment of a remote primary crushing hub, a 7km overland feed conveyor to transfer product from the primary hub to a separate coarse ore stockpile, a scrubbing and wet screening circuit, duplication of the existing CSI/Christmas Creek 1 upgraded 25Mtpa crushing and screening plant and incorporation of a jigging circuit to beneficiate product from the two plants. Click for more details...

NICKEL WEST OPERATIONS - KAMBALDA NICKEL CONCENTRATOR MATERIALS HANDLING CONTRACT
via, Kambalda, WA 6442 Has Nickel West Operations - Kambalda Nickel Concentrator Materials Handling Contract currently at Construction stage. A 5 year contract at the concentrator plant which handles ore from the Leinster, Mouth Keith & Cliffs mines. To include ore handling, crushing & sampling. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT PHASE B - SMP CONTRACT
Structural/Mechanical/Piping - For Balance Of Plant New project In The City Of Karratha Council Area. Structural, mechanical & piping services for conveyors & transfer stations associated with a screenhouse & a pair of car dumpers. Click for more details...

NAMMULDI IRON ORE OPERATIONS EXPANSION - PROCESSING PLANT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. A contract to engineer, procure & construct (EPC) a 25 million tonnes per annum (Mtpa) processing plant to handle wet material coming from below the water table. To include a remote primary crushing plant, a 3km overland conveyor & a wet ore processing plant. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT HEDLAND INFRASTRUCTURE CONSTRUCTION
Lot 4 Clark St, Port Hedland, WA 6721 Has Roy Hill Iron Ore Project - Infrastructure - Port Hedland Infrastructure Construction currently at Construction stage. For the provision of infrastructure construction. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR SHIPLOADERS - DEMOLITION WORKS & CONVEYORS UPGRADE
Dismantling Shiploaders/Conveyors Upgrade project at Nelson Point, Port Hedland, WA 6721 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). Upgrade of a 2 conveyors followed by dismantling of a pair of decommissioned shiploaders. Click for more details...