State

Categories

Sub Categories

Click Here to Find Current Projects

List of Crushing, Screening, Quarrying Projects


CAIRN HILL MAGNETITE COPPER GOLD PROJECT
Resource - Copper/Gold/Magnetite project at Stuart Highway 55 Km South East of, Coober Pedy, SA 5723 in the Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying). Resource of 10.5million tonnes indicated & 4.2million tonnes inferred of ore @ 51.9% Fe, 0.4% Cu, 0.12g/t Au. Phase 1 of the mine operations to consist of 2 open pits located to extract the northern and southern mineralisations. The project will initially involve a trial mining operation to remove and crush 20 000 tonnes of ore in order to refine engineering parameters. The main mining operation will then involve mining of an estimated 7.3 million tonnes of reserves in the western portion of the ML area, using open pit techniques. The project will involve on-site crushing with direct export of ore for processing. The ore will be transported in bulk by road to a proposed new rail siding (the Mast) and then by rail to Darwin for export by ship. Facilities at the site will include a mobile crushing plant, two waste rock dumps, diesel power plant and reverse osmosis plant. Associated infrastructure will include a water supply borefield and a site access/haulage road to the proposed rail siding. Phase 2 will target low copper & sulphur magnetite deposits immediately to the east of Phase 1 activity. Phase 3 involves expansion further east again. Detailed aeromagnetic surveys have identified targets for drilling to identify these easterly deposits. It is hoped these will come into operation when additional port capacity becomes available at Port Bonython or Darwin, leading to operations expanding up to 5Mtpa. Click for more details...

KUNWARARA MAGNESITE OPERATIONS - KG2 EXTN
A project in the QLD Within Rockhampton Regional. Installation of a new crushing and screening circuit. Click for more details...

RINGTAIL QUARRY
A project in the QLD Within Sunshine Coast Regional. For crushing of 32,000 cubic metres of various grades of gravel. Click for more details...

MOUNT GIBSON IRON ORE PROJECT - STAGE 1
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) New project at Approx 100 km north east of, Dalwallinu, WA 6609. This type is Mining Contract - Open-Cut with Private ownership. To mine approx 2 Mtpa of hematite ore. Includes crushing & screening. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINDY MINDY
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) New project at 60 km Northwest of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Resource estimate is 44.8 Mt @ 55.2% Fe. The ore at Mindy Mindy will be directly shipped. Strip mining with progressive backfilling of the open pit will be the preferred mining method. Infrastructure to be constructed will comprise a semi-mobile crusher; sealed haul road or overland conveyor system from crushing/screening plant to rail loading facility ; secondary crushers; iron ore product stockpile and train loading facilities; administrative and maintenance hub; connection to the proposed 132 kv transmission line to Newman with capcity upgrade at Newman or a 6 MW power station (to be provided and maintained by an external supplier); Mine dewatering pumps and pipeline; airstrip upgrade at Mindy Mindy and an Accommodation village. Click for more details...

CROOM QUARRY PROJECT - STAGES 1 - 6
Croom Quarry Project - Stages 1 - 6 is currently at the Planning stage, valued at about $ 1000000 it is The proposed quarry extension will involve: (1) construction of screening bunds; (2) topsoil removal and stockpiling for later use over bunds or rehabiliated areas; (3) removal of overburden for use in creating screen bunds, rehabilitation of disused sections of the extraction area or for delivery to the market as a general fill material; (4) extraction of resource; (5) haulage of extracted material to the processing plant; (6) crushing, screening and stockpiling of extracted material; (7) transportation of the processed quarry products from the site; and (8) backfilling of depleted quarry areas with clean material to achieve a free draining surface and consistent with the approved final rehabilitation plan. The extraction is proposed in 6 stages with each stage taking approximately 5 years. Click for more details...

BROKEN HILL MINE BASE METAL OPERATIONS - NORTH MINE EXTENSION
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Broken Hill Council Area of Resource - Base Metals type. Resource estimate is 4.2 Million tonnes @ 11.2% Zn, 13.7% Pb and 214 g/t Ag. Likely to include two open cut pits, a waste rock emplacement, a haul road, facilities, stockpiling and crushing areas and associated infrastructure. Click for more details...

MIDDLEBACK RANGE IRON ORE OPERATIONS
Currently at the Construction stage In Adelaide is a project estimated to be $ 170000000. This project Includes mining, crushing, trainloading. Click for more details...

HEBBURN NO 2 COLLIERY - MINING & RECOVERY OF WASTE MATERIALS
Mining/Recovery Of Waste Materials project at Via, Cessnock, NSW 2325 In The Council Area Of Cessnock of Private. This tender includes the rehabilitation of the site. Click for more details...

HUNTLY BAUXITE OPERATIONS - MCCOY CRUSHER MINE RELOCATION PROJECT%
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at North Spur Rd, Pinjarra, WA 6208 for New. Crusher to be relocated 9 km north of existing White Road Crusher site once infrastructure and other related preparations are completed. Crusher relocation is undertaken every 10 years. Click for more details...

FLINDERS RANGES PROJECT - BELTANA - ZINC RESOURCE
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Far North Council Area of Resource - Zinc type. Mining operation will be 150-180,000 tonnes per annum. Indicated-Inferred resource is 941,000 tonnes @ 30.6% zinc for 300,000 tonnes of zinc. Beltana deposit resource is 365,200 tonnes @ 31.2% zinc for 57,400 tonnes of zinc. The Beltana deposit will be mined first with the existing pit to be deepened from 65 metres by another 30 metres. Click for more details...

BOOTU CREEK MANGANESE PROJECT - PROCESS PLANT
Process Plant project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying). The process plant will have a dense media plant, which is a necessary to gain a consistent grade of ore. The ore to be processed near the extractive area by crushing, screening, washing and separation into lump manganese and fine manganese. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - CRUSHING/SCREENING
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at Via, Newman, WA 6753 of Crushing & Screening Plants type of New development. Additional expansion from 110Mtpa to 145Mtpa. Part of a proposed additional expansion to meet increased demand, involving engineering works and capital investment of 2-3 billion $AU over the next five years. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

MIDDLEBACK RANGES OPERATIONS - PROJECT MAGNET - CRUSHING/SCREENING EQUIPMENT
Crushing/Screening Equipment project at North west of, Whyalla, SA 5600 in the Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying). Project Magnet involves conversion of Whyalla steelworks to produce steel from magnetite rather than haematite ore. This will extend the life of the steelworks to at least 2027. Click for more details...

MOUNT NORMA COPPER OPERATIONS
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project for New development. 20,000 tonnes of copper ore initially. More to come. Click for more details...

NARRABRI SHIRE COUNCIL - QUARRY BLASTING
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at Quarry sites via, Narrabri, NSW 2390 of Quarry Blasting type of New development. Tenders invited from suitably licensed contractors with previous experience in quarry blasting works under a Full Service, Work-as-Ordered Contract. Click for more details...

PARDOO IRON ORE PROJECT
Pardoo Iron Ore Project is currently at the Construction stage, valued at about $ 8300000 it is The project is based on an identified iron ore (hematite) resource of approximately 7.4Mt. The project proposes an ore production rate of 1.5 Mtpa, resulting in a mining life of 5 - 6 years. The project involves the open cut mining of eight small pits in five deposits to obtain direct-shipping quality iron ore. The ore will be crushed, screened and stockpiled on site prior to being loaded into rail trains for road haulage to the appropriate berth at Port Hedland. Ore will be stockpiled at the port until it is loaded onto ships for export to overseas customers. The major components of the Pardoo DSO Project are: minesite establishment, mining operations, product transport and export and decommissioning and closure. The minesite access road and temporary construction yard and administration area will be the first infrastructure constructed. The mining operations centre (MOC) will be located in the northern portion of the minesite and contains the following infrastructure: administration area including Atlas facilities, mining contractor's facilities, crushing and screening contractor's facilities, haulage contractors facilities, sewerage treatment and waste water storage, potable water storage, common parking area. The MOC will also contain a fuel storage and refuelling area, power station (diesel), crushing and screening plant, ROM ore pad and product stockpiling area, parking areas and portions of the access road and haul road, and combined contractor's laydown area. Haul roads will be constructed between the pits, waste rock dumps, stockpiles and ROM pad stockpile. Minor access roads will provide access to waste rock dumps and inspection points, dewatering equipment, water management structures, environmental discharge locations and other minesite management areas. The proposed mining operation will be a multiple, open pit mining operation, using conventional drill and blast and load and haul methods. Ore from the pits will be hauled directly to the ROM pad or temporarily stockpiled adjacent to the pits. The crushing and screening plant will provide primary and secondary crushing and screening. Click for more details...

MOUNT NORMA LEACH VAT NUMBER FIVE
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Cloncurry Shire Council Area of Private ownership. Construction will comprise earthworks, lining of the vats, filters, electrical installation, crushing and loading of the vats. The vat is to contain 30,000 tonnes of high leach copper oxide. Click for more details...

KOOLAN ISLAND PROJECT - MINING/CRUSHING CONTRACT
Private ownership Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Derby-W Kimberley Council Area for New development. Approximately 61 million bcm of ore and waste will be mined in the five year contract. Click for more details...

WORSLEY ALUMINA EXPANSION EFFICIENCY & GROWTH PROJECT
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Collie Council Area of Mine Expansion/Refinery - Upgrade type. Development comprises two parts. Expansion of the existing bauxite mining activities and an upgrade of the refinery. Mining will expand into the Saddleback, Marradong, Hotham North, East Quindanning, Morgans, Hotham North Extension, Central and Brookton mining envelopes. Throughput will expand to 16.5 Mtpa. The expansion of mining activities will involve the addition of three new primary crushers and a new crushed ore stockpile will be needed next to the existing secondary crusher to provide extra surge material to feed the overland bauxite conveyor. Additional conveyors include a 34 km extension from the Hotham North mining envelope which will cross both the Albany Highway and the Wandering-North Bannister road, a 16 Km spur from the south east of the Central mining envelope to the Luptons mining envelope and lastly a 28 Km extension from the Central mining envelope to the Brookton mining envelope. Additional bauxite conveyors spurs and haul truck transport may be needed in the future. Refinery expansion will involve an increase in the Bauxite stockpile of 0.5 Mt. At the Milling and Digestion plant an additional mill, an additional desilication tank and eight new slurry heaters will be required. At the Seperation plant, an extension of the residue washing tanks and an expansion of capacity of the causticiser circuit. At the Calcination plant an additional gas fired calciner with bag house with a new hydrate filtration building. Addition of a coal-fired co-generation facility with bag house designed to produce 350 tonnes of steam per hour (equivalent to 204 Mw) and 35 Mw of electrical power. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - BULK EARTHWORKS
Bulk Earthworks project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Civil and Concrete Work comprises moving about 1 million cubic metres of dirt. More specifically the construction of the E deposit primary crushing area and mechanically stabilised earth wall (MSE). To construct a 7.5 km long overland conveyor from the E deposit primary crusher to a new Ore Handling Plant 2 (OHP 2), Stockyard 2 located within the rail loop, associated earthworks and heavy vehicle park-up and upgrade of the infrastructure for the operation. This will include office, amenities and waste water services. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - STRUCTURAL/MECHANICAL/PIPING
Structural/Mechanical/Piping New project In The East Pilbara Council Area. Work comprises structural, mechanical and piping work associated with the expansion of Mining Area C iron ore processing facilities. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/PORT - ELECTRICAL/CONTROLS
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C/Port - Electrical/Controls currently at Construction stage. Area C Electrical and Controls. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - INFRASTRUCTURE
Infrastructure project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Area C Infrastructure Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - STOCKYARD MACHINES
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The East Pilbara Council Area of Stockyard Machines - Upgrade type. Area C Upgrade of Stockyard Machines. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - SANDING SYSTEM DESIGN/FABRICATE
Private ownership Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The East Pilbara Council Area for New development. Sanding System Design and Fabricate. Click for more details...

BUNGAROO IRON ORE PROJECT - RESOURCE
Private ownership Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Ashburton Council Area for New development. Development comprises trial mining of the Bungaroo deposit for three years starting in third quarter 2007. Resource estimate is 15 Mt of Fe ore. Infrastructure proposed for the site include a crushing and screening plant, new haul road, dewatering pipeline, diesel generators for power supply, fuel storage area, refuelling areas, waste water treatment facilities, communication infrastructure and laydown area. A construction camp is also under consideration. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - CRUSHING & SCREENING PLANT
Crushing & Screening Plant project at Newman Hub, Newman, WA 6753 in the Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying). The screening facility comprises two buildings located in close proximity (one bay apart). The first building consists of five scalping screen bays that are fed by a continuously traveling shuttle head conveyor. Each bay consists of a surge bin that is emptied by a vibrating diverging pan feeder that distributes and feeds a double deck banana scalping screen. The second building consists of seven product screen bays that are fed by a continuously traveling tripper. Each bay consists of a surge bin that is emptied by a vibrating diverging pan feeder that distributes and feeds a double deck banana product screen. The crushing building consists of three crushing bays that are fed by a continuously traveling shuttle head conveyor. Each bay consists of a surge bin that is emptied by a vibrating feeder. Each vibrating feeder feeds a short belt conveyor that, in turn, feeds a cone crusher. The screening building has two dust collection systems. (one for each end of the building) and the crushing building has one dust collection system. Each system comprises reticulated ductwork, reverse pulse air cleaning type bag house c/w- bags, compressor, air receiver and receiving hoppers that are discharged by rotary valves back onto the adjacent mainline conveyors. The key criteria for the Crushing & Screening Sections is 58Mtpa. Click for more details...

SUNNYSIDE OPEN CUT COAL PROJECT - CRUSHING & SCREENING PLANT
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Gunnedah Council Area of Crushing/Screening Plant type. Crushing and screening plant for 5 year operation of mine at around 1 million/annum. coal will then be trucked to Whitehaven's Gunnedah coal preparation plant. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRANSPORTABLE SUBSTATIONS CONTROL
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at Newman Hub, Newman, WA 6753 of Transportable Substations/Control - Supply Of type of New development. For the supply of transportable substations, control. Click for more details...

KING ISLAND SCHEELITE PROJECT - STRUCTURAL STEEL FOR SECONDARY CRUSHING & SCREENING PLANT
Private ownership Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The King Island Council Area for New development. For the provision of structural steel for the secondary crushing & screening plant. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - SCREENS FOR PROCESSING PLANT
Screens - For Processing Plant project at 28 km east of, Ouyen, VIC 3490 In The Council Area Of Mildura of Private. For the provision of 3 screens for the processing plant. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - CRUSHING FACILITIES & OVERLAND CONVEYORS
A project in the WA Within East Pilbara. For the provision of primary and secondry crushing facilites including overland conveyors. Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT - RAIL DUPLICATION
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) New project at Emu Siding to Cape Lambert via, Karratha, WA 6714. This type is Rail Duplication with Private ownership. A project to duplicate the 70km rail line between Emu Creek Siding & Cape Lambert as part of a project to increase iron ore capacity to 320 million tonnes per annum (Mtpa). To include construction of a marshalling yard adjacent to Cape Lambert Port, a locomotive refuelling facility, a ballast loadout facility & Arches Siding. Crossovers between the existing & duplicate rail line at Arches, Harding, Green Pool & Emu Sidings. Installation of communication cabling, asset protection & signalling equipment including works to support Automated Train Operation facilities. Modification of existing Harding Siding & expansion of the existing 50km quarry. Extension to the existing Emu Siding to service Deepdale Line. Water for the 5 year construction period expected to be supplied via Harding Dam with new bores also under consideration. Click for more details...

NICKEL WEST OPERATIONS - KAMBALDA NICKEL CONCENTRATOR MATERIALS HANDLING CONTRACT
via, Kambalda, WA 6442 Has Nickel West Operations - Kambalda Nickel Concentrator Materials Handling Contract currently at Construction stage. A 5 year contract at the concentrator plant which handles ore from the Leinster, Mouth Keith & Cliffs mines. To include ore handling, crushing & sampling. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - QUARRY MATERIALS
Quarry Materials - Supply project at Various locations, ., QLD 4999 in the Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying). Supply of quarry materials for earthworks & road works associated with the APLNG pipeline. Locations include: Miles, Wandoan, Lighthouse, Fairview, Cockatoo, Mungungal, Biloela/Callide, Mt Larcom & Gladstone. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - QUARRY MANAGEMENT & GRAVEL SUPPLY
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at West of WANDAON, east of TARA & west of, Chinchilla, QLD 4413 for New. A 3 year contract for management of a quarry stockpile & associated works to ensure continuous gravel supply. To include establishment of a quarry pit with access roads. Operate & maintain a surface crushing plant. Manage crushed & uncrushed ore stockpiles in various locations including blending & tramming of material. Click for more details...

DUGALD RIVER BASE METAL PROJECT CRUSHING & SCREENING PLANT
A project in the QLD Within Mt Isa City. Crushing & screening plant for an underground mining operation of 2million tonnes per annum (Mtpa) of zinc/lead/silver plus 1Mtpa of copper for 200,000tpa zinc concentrate. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT CIVIL WORKS
A project in the WA Within City Of Karratha. Contract to include the CLB 353 stockyard. Conveyor link & rail formation earthworks. Relocation of water pipelines. Excavation, crushing & screening to produce 1 million tonnes (Mt) of pavement material for the construction of 5km of sealed roads. Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 3 MINING CONTRACT
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project for New development. A contract for open cut mining of remnant material from stage 3 operations & ship loading of direct shipping ore (DSO) at a rate of up to 1 million tonnes per annum (Mtpa). To cover all operational mining & civil infrastructure services including drill & blast, loading, haulage & processing of ore for direct shipping. To also include commissioning of a new crushing & screening facility. Click for more details...

BRISBANE CITY COUNCIL QUARRY BLASTING & DRILLING SERVICES
Drilling/Blasting/Materials Supply New project In The Brisbane City Council Area. A contract for drilling and/or blasting and/or supply of materials at 2 quarries. Click for more details...

PAYNES FIND GOLD OPERATIONS RECOMMENCEMENT - PROCESSING PLANT
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Perth Council Area of Private ownership. Plant to produce eluvial/alluvial gold, from small scale open cast workings, utilising its existing alluvial gravity circuit plant with mill & knudsen concentrator. The plant is capable of processing at a rate of 50 tonnes/hour, current expectations are targetting the processing of approximately 9,000 tonnes per month with an average head grade based on historical results of between 0.3 to 0.5 grams per tonne. Click for more details...

KOOLAN ISLAND IRON ORE OPERATIONS EXPANSION - ACACIA EAST
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) New project at Offshore island, 130km north of, Derby, WA 6728. This type is Operating Mine - Expn with Private ownership. Expansion of operations to 4 million tonnes per annum (Mtpa) through the Acacia East Pit Cutback project. The Acacia Pit, located between the existing Mullet & Barrumundi West/East pit, was previously mined as a bermless footwall and it will now involve deepening the existing pit & extending the pit to the east. The pit will be mined through mainly sandstone & schist on the hanging wall (south wall) & siltstone on the footwall (north wall) with waste to be used as backfill. Open pit mining of the ore bodies will be undertaken and the ore will be identified by blast hole sampling and in-pit grade control procedures before hauling direct to the processing area for crushing by existing plant. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS CRUSHER CIRCUIT CONTRACT
Private ownership Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Roper Gulf Shire Council Area for New development. One year extension of the contract to operate the crusher circuit including feeding from the run-of-mine (ROM) stockpile. Covers the primary, secondary & tertiary crushing plants & mobile equipment. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PROCESS FACILITY
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project for New development. For the provision of a process plant. The package will be issued for bid as one package with the following separable parts. Part A: Off-site Assembly of modules including, but not limited to: Modularised bauxite beneficiation plant (including concrete foundations), Modules are nominally 15m(W) x 25m(L) x 20m(H) & up to 1,200 metric tonnes, Primary & secondary sizer structures, Tertiary crushing structure, Transfer stations, Conveyor galleries, Conveyor ground modules. The expectation is that the Tenderer will utilise to the maximum extent possible, modularised structures to reduce manning levels required on-site. Part B: Installation of the modules on Site, Supply of all labour, tools, supervision, quality assurance, temporary storage & workshop facilities, construction plant & equipment, materials, services, ancillary equipment, utilities, consumables & perform all installation & testing necessary. Click for more details...

ASHBURTON RIVER SAND & SHINGLE OPERATIONS EXPANSION
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at via Old Onslow Rd 32km S of, Onslow, WA 6710 of Operating Mine - Expansion type of New development. Sand & gravel extraction during the dry season from the Ashburton River bed & banks between Ten Mile Pool & Mungaroo Well. Excavation to 4m deep with material processed by sand separation followed by crushing & screening to produce aggregates placed in product stockpiles for distribution. Click for more details...

NAMMULDI IRON ORE OPERATIONS EXPANSION - PROCESSING PLANT
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project for New development. A contract to engineer, procure & construct (EPC) a 25 million tonnes per annum (Mtpa) processing plant to handle wet material coming from below the water table. To include a remote primary crushing plant, a 3km overland conveyor & a wet ore processing plant. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - AGGREGATES
New project of Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at Around DALBY to DINGO, ., QLD 4999. As support for well engineering operations, supply & haul/deliver rock, armour rock/spalls, aggregate, roadbases, select fill & concrete products in an area from around Dalby in the south to Dingo in the north. Click for more details...

SILVERGRASS IRON ORE EXPANSION PROJECT (SGE) - PRIMARY CRUSHER
A project in the WA Within Ashburton. For the provision of engineering, procurement & construction of a new primary crusher, 9km of overland conveyor & associated 33kV power line. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect