State

Categories

Sub Categories

Click Here to Find Current Projects

List of Dams Projects


HARDY WINE CO
A project in the SA Within Berri Barmera. Development of waste water effluent treatment system, new storm water retention basin & alterations to existing basin. Click for more details...

SA WATER CORPORATION
Currently at the Planning stage In Various is a project estimated to be $ 51000. This project Provision of dams engineering consulting services over three year period. Click for more details...

FAIRWAY WATER RETIREMENT VILLAGE
Currently at the Construction stage In Cardinia is a project estimated to be $ 33000000. This project Construction of a retirement village, brick veneer and large feature lake with associated wetlands on 17 Ha. of vacant land. 380 2 bedroom units comprising attached and detached and combination of 1 and 2 storey but mostly single storey. 350 Independent living units and 30 serviced apartments. Concrete slab steel frame and metal roof. Click for more details...

DROUGHT RELIEF STRATEGY - SAMSON BROOK PIPEHEAD DAM
Civil Engineering (Dams) project at Approximately 7 km downstream of existing Samson Dam, Waroona, WA 6215 of Pipehead Dam - Main Contract type of New development. Construction of pipehead dam approximately 7 km below existing Samson Dam, which will store about 300 megalitres of water & replace an existing structure at same site that currently supplies Waroona townsite. Dam would have 15 - 25 m high wall & dosing plant is also to be constructed. Water would be connected to Stirling Trunk Main via 11.5 km of 900 mm pipe. Click for more details...

COWARRA DAM
Erosion Control/Carpark - Altns Addition project In The Port Macquarie-Hastings Council Area. Provide riprap on filter cloth in specified areas to prevent erosion. Construct contour banks & grass lined swales. Extend existing carpark to accommodate buses & extra parking. Click for more details...

MURRUMBIDGEE RIVER EN-ROUTE STORAGE FEASIBILITY
State ownership Civil Engineering (Dams) project In The Yass Valley Council Area for New development. Investigate & report on options for en-route storages on the Murrumbidgee River downstream of Burrinjuck Dam & also ways to improve water management in the regulated Murrumbidgee Valley. Click for more details...

TAREE & WINGHAM EFFLUENT MANAGEMENT SCHEMES
State ownership Civil Engineering (Dams) project In The Various Council Area for New development. Construction of Taree & Wingham Effluent Management Schemes. The work includes pumping stations, pipelines, storage dams etc. Click for more details...

MAIDENWELL CATTLE FEEDLOT
Civil Engineering (Dams) project for New development. Proposed expansion of existing feedlot of 1000 standard cattle units to 9000 standard cattle units. Further stages may include control building with amenities, silos, waste treatment. Click for more details...

HAPPY VALLEY DAM
Renovations, Refurbishments etc. project of Civil Engineering (Dams) project at Chandlers Hill Rd, Happy Valley, SA 5159. Construction services for rehabilitation work. Services include: earthworks, pipework (various materials), concrete (pre-cast & insitu), cathodic protection works & specialist concrete works such as concrete repair injection & grouting. Click for more details...

KEEPIT DAM UPGRADE - WORK PACKAGE 1
Civil Engineering (Dams) project for New development. Design of 600 metres of fuse plug spillways, 3 saddle dams & ancillary works Click for more details...

KOREE ISLAND
A project in the NSW Within Port Macquarie-Hastings. Construction of a third pumping station & rising main on Koree Island. Click for more details...

TANJANNERUP DAM
Civil Engineering (Dams) project at Tanjannerup Rd, approx 5 km east of townsite of, Nannup, WA 6275 of Downstream Outlet Works For Dam type of Renovations, Refurbishments etc. development. Works comprise upgrade to downstream outlet works at Tanjannerup Dam. Click for more details...

SCA BLUE MOUNTAINS STORAGES
Water Storages - Maintenance project at Cascade Dams Katoomba Greaves Creek Dam Medlow Bath Woodford Dam Woodford & Fish River Pipeline, Leura, NSW 2780 in the Civil Engineering (Dams). Single, long term contract for the provision of grounds, building & abutment & embankment maintenance services. Click for more details...

BAKERS ROAD WETLANDS
Civil Engineering (Dams) project at Lot 2 Bakers Rd (Hund Pt Gawler PL D061400 Ct 5896/55), Lewiston, SA 5501 for New. Filling & excavation of land for development of wetlands. Click for more details...

SINGLETON RESERVOIR
New project of Civil Engineering (Dams) project at Lot 22 Wattle Ponds Rd (DP752455), Wattle Ponds, NSW 2330. Proposed construction of a 5 megalitre steel water reservoir for provision of town water supply. Click for more details...

NEW BRIGHTON GOLF CLUB DAM UPGRADE
A project in the NSW Within Liverpool. Proposed upgrade of existing dam & construction of a new irrigation dam & artificial wetland. Click for more details...

WASTE TREATMENT PLANT WINTER STORAGE DAM
New project of Civil Engineering (Dams) project at Carrolls Ln, Shepherds Flat, VIC 3461. Buildings and works for a utility installation (waste treatment plant winter storage dam)on public use zone land covered by an environmental significance overlay. Click for more details...

GLENNIES CREEK DAM
Glennies Creek Dam is currently at the Early Planning stage, valued at about $ 9400000 it is Proposed major upgrade of existing dam. Click for more details...

BAYSWATER POWER STATION
Cooling Water Dam Outlet - Upgrade New project In The Muswellbrook Council Area. Supply of materials, fabrication & installation of bulkhead frames, gates & hoisting system onto the dam embankment & underwater intake structure at Liddell Cooling Dam adjacent to Liddell Power Station. The work will also include the provision of underwater diving services to install the bulkhead frames & gates onto the top of the underwater intake structure & the installation of an intermediate support structure & stainless steel wire ropes & fittings. On completion of the works, the new installation shall be commissioned & tested to ensure that the gates operate & shut correctly. The work is to be completed within 4 months from the date of issue of the Principal's Contract. Click for more details...

GLOVERS HILL RESERVOIR
Protective Coating project at off Gowrie Ave, Nelson Bay, NSW 2315 In The Council Area Of Port Stephens of State. Scope of work includes: Fence the work site for the duration of the works, prepare and paint the whole interior of the reservoir, including stiffening ring, ladders, handrails, pipework and all previously painted interior surfaces; prepare and paint all the roof support structure; carry out all fabrication work as identified and directed by the superintendent; all holes in roof, walls or roof support structure due to corrosion, blasting/mechanical cleaning, shall be patched by in plating using welded steel plate or if small holes, filling with weld and grinding flush; prevent any materials from entering the principals water supply system; completely remove the existing coating system to base metal; blasting and painting shall be carried out using a 'total containment' method; returf and revegetate all disturbed areas Click for more details...

LIVERPOOL WEIR
Weir - Remediation Works project at Lighthorse Park, Atkinson St, Liverpool, NSW 2170 in the Civil Engineering (Dams). Construction of a new steel sheet pile cutoff wall, associated earthworks, rock revetment & sandstone blockwork to secure the stability of the weir structure during flooding of the Georges River. Scope of work includes design & construction of all temporary diversion, protective & dewatering works to allow construction of the works in the 'dry', supply & installation of steel sheet piling, including cutting to the required lengths & applying protective coating, earthwork fill between the cutoff wall & the weir, construction of a concrete cap along the crest of the weir including integration with the existing heritage structure & faced with sandstone blocks cut from principal supplied rock, supply & placement of large rock protection upstream & downstream of the weir including disposal of existing gabion mattresses & minor repairs to the existing weir flagging. Click for more details...

WUNDOWIE RECREATIONAL GROUNDS WATER STORAGE UPGRADE
Currently at the Construction stage In Northam is a project estimated to be $ 100000. This project Works include refurbishment of current dam for Wundowie Recreational Grounds water storage upgrade. Click for more details...

GOOGONG DAM -BLUE WATER ALLIANCE PROJECT - BWA
Currently at the Construction stage In Queanbeyan is a project estimated to be $ 30000000. This project Construction of Googong Dam spillway rock protection. The purpose of the project is to extend the spillway chute lining, construct a plunge pool & protect eroded rock surfaces. The scope of work include: excavate 23,000m³ of granite/dacite in the spillway & stilling basin; construct 8,000m³ of reinforced concrete slabs & walls at the spillway chute; backfill the eroded gully with 14,000m³ of mass concrete & shotcreting of the rock surfaces Click for more details...

COTTER DAM - BULK WATER ALLIANCE PROJECT - BWA
New project of Civil Engineering (Dams) project at Paddy's River Rd, Cotter River, ACT 2611. Construction of the Enlarged Cotter Dam (ECD) project & related works. The expansion of the dam will increase its capacity from 4 gigalitres to 78 gigalitres. The main dam & associated engineering infrastructure required for operating the future enlarged reservoir (including the intake tower & pipework). Construction of 2 saddle dams located on the right abutment. A quarry to be located on the ridge to the west of the dam wall. Bulk earthworks relating to the stripping of the abutments in preparation of the main wall construction, creation of permanent construction & stockpile pads (constructed from spoil material gained on site) to accommodate materials, aggregate stockpiles & construction equipment & the establishment of main haul roads to the abutment excavations & between the main works areas & the construction site. Upgrades to the intersections of Settlement & Look-out roads with Paddy's River & Brindabella rds to allow construction traffic to safety access these roads from the public road infrastructure. Construction of sediment control measures. Temporary construction signage proposed to be used in conjunction with the ECD construction project. Installation of permanent & temporary construction fencing proposed to be used in conjunction with the ECD construction project. Installation of temporary lighting for the construction area & RCC placement. Rehabilitation works on areas impacted by the construction of the ECD. upgrading to existing forestry tracks as well. Click for more details...

WAGIN WATER STORAGE DAM
Currently at the Construction stage In Wagin is a project estimated to be $ 65000. This project To include a second water storage dam above the existing facility known as White dam, to involve 4 to 6 drill tests on-site to establish the clay type & sustainability, to construct a 25 million litre dam with a surface area of close to 1ha, to construct a suitable silt dam in front of the main dam, construction of a suitably spillway to the east of the dam, may be in conjunction with the silt dam, all dam walls must be suitably compacted with a dozer or equivalent. Click for more details...

LAUNCESTON FLOOD PROTECTION SCHEME
Earthen Flood Levee - Stage 1 - Scottsdale Levee project at Bounded by North Esk River and Tamar River, Invermay, TAS 7248 in the Civil Engineering (Dams). Construction of an earthen flood levee. Click for more details...

MAROONDAH HIGHWAY EARTHWORKS
Earthworks project at 878-880 Maroondah Highway (Lot 7 LP127612), Coldstream, VIC 3770 In The Council Area Of Yarra Ranges of Private. Earthworks in association with dam construction. Click for more details...

LAKE LESCHENAULTIA DAM WALL/STONE PITCHING
Civil Engineering (Dams) project for Renovations, Refurbishments etc. development. Works to include rock toe protection works to the earth dam & full replacement of stone pitching at Lake Leschenaultia, Chidlow. Click for more details...

TORRENS LAKE WEIR CONTROL SYSTEM & SCADA UPGRADE
Civil Engineering (Dams) project In The Adelaide Council Area of Weir Control System/Scada - Upgrade type. Design & construction of control system & SCADA upgrade to replace the whole or components of the Torrens lake Weir Control System. Works include: undertake a risk assessment of all the possible causes of a control system disabling fault resulting in the malfunction of Torrens Lake Weir during normal operating conditions & major & minor flood events; proposed appropriate methods & equipment (including possible duplication) for the Weir control system to reliably open & close the Weir gates in response to the water level in Torrens Lake & minimise the risk of malfunction resulting in water loss or overtoppping; installation of appropriate equipment to reliably control the operation of the Torrens lake Weir gates during normal operating conditions & major & minor flood events. Click for more details...

KEEPIT DAM UPGRADE MINOR WORKS PACKAGE 1
New project of Civil Engineering (Dams) project at 45km west of, Tamworth, NSW 2340. Scope of work includes foundation stripping/preparation, construction of 2 x earthfill saddle dams (including filters, topsoiling and grassing), permanent fencing, haul roads & permanent local access roads. Click for more details...

JORDAN SPRINGS VILLAGE LAKE
1070-1274 (Lot 2) The Northern Rd (DP1132380), Llandilo, NSW 2747 Has Jordan Springs Village Lake currently at Construction stage. Stormwater management basin & related site works to comprise excavation & filling of land for the purposes of creating a lake with an eventual surface area of approximately 3.27 ha & a volume of 55.5ML, construction of lake edges to the future Jordan Springs Village Lake. Landscaping & embellishments to the area surrounding & within the Village Lake, including tree plantings, planting beds, turfed areas, provision of walkways, furniture, play spaces & public safety signs. Construction of infrastructure services where necessary. Click for more details...

COWWARR WEIR FISHWAY UPGRADE
Civil Engineering (Dams) New project at Cowwarr Weir, Cowwarr, VIC 3857. This type is Fishway - Upgrade with Local Govt ownership. Upgrade of the Cowwarr Weir Fishway. This project will require the construction of a vertical slot fishway at an existing rock ramp fishway site on the Thomson River at Cowwarr Weir. Click for more details...

CRAIG ROAD DAM
A project in the VIC Within Casey. Development of a dam. Click for more details...

SHIRE OF MERREDIN - DAM NO 4
A project in the WA Within Merredin. To include the construction of a lined dam, a pump house & associated mechanical & electrical equipment. Click for more details...

DARTMOUTH DAM
Electrical Services New project In The Towong Council Area. Works include extensive electrical control and monitoring systems critical to the operationand management of Dartmouth Dam are installed at the Dam site. The systems include telemetry, motor control, dam instrumentation, hydraulic control, PLC'S, radios, transducers, pumps, compressors, valves, generator sets and power and lighting distribution. Click for more details...

RIDGE PARK RESERVE FLOOD CONTROL DAM
Civil Engineering (Dams) project at 1 Barr-Smith Ave, Myrtle Bank, SA 5064 for New. Proposed construction of flood control dam including composite earth & concrete dam wall & rock spillway. Associated excavation at Ridge Park Reserve. Click for more details...

WATER CORPORATION - PREVENTION OF FALLS (POF) ON EXISTING ASSETS
Water Corporation - Prevention Of Falls (Pof) On Existing Assets is currently at the Tenders & Building stage, valued at about $ 5000000 it is Organisations with suitable experience, capability & capacity to delivery complete package of works comprising of: design; demolition; construction; structural steel fabrication; installation & restoration for dry well wastewater pump stations; elevated tanks & dam intake towers which have been identified for upgrade works at 92 various locations within WA within a 12 month period. Click for more details...

CHAFFEY DAM
Civil Engineering (Dams) project In The Tamworth Council Area of State ownership. Contract & site management services for the augmentation & safety upgrade project at Chaffey Dam Click for more details...

COLLIE KEMERTON WATER MANAGEMENT PROJECT
Collie Kemerton Water Management Project is currently at the Early Planning stage, valued at about $ 115000 it is Consultants to develop a Business Case for the Collie Kemerton Water Management Project based on the development of the integrated water management strategy. Click for more details...

ELCHO BASIN CONSTRUCTION STAGE 1
Civil Engineering (Dams) project at Btwn McManus Rd & Broderick Rd, Lara, VIC 3212 of Basin Construction type of New development. Major earthworks which include the construction of a Drainage Detention Basin between McManus Road and Broderick Road, Lara. The works include the 1st stage construction of a major stormwater runoff treatment facility that comprises construction of sedimentation basins. The 1st stage work comprises the sedimentation basin which is the entry to the future Elcho basin/wetland system and any extension of these works or associated structures as directed by the Superintendent. Excavated material from the basin will be transported to industrial allotments adjacent to this site. Exported clay will be placed and compacted under Level 1 Inspection & Testing (refer to Clause 4.7 in Specification T1300043) on the industrial allotments to finished surface levels as detailed in the drawings. The works under this contract, as described in the drawings and specified herein, include but are not limited to: broad-scale clay extraction operations within the site; excavating, shaping and trimming the basin and part of the inlet & outlet channels; loading approved excavated clay material and transporting to the external allotment; soil treatment (clay and topsoil) and import of non-dispersive topsoil all as required and/or directed; construct compacted clay liner in the basin as required; finished surface protection works including topsoiling and grass cover of all exposed clay areas; engineered fill to 98% standard compaction on industrial allotments - Lots 1 & 2; Broderick Road channel and piped drain outlet assembly/works; and ancillary basin and external allotment works. Click for more details...

TOD RIVER DAM SAFETY UPGRADE
State ownership Civil Engineering (Dams) project In The Tumby Bay Council Area for New development. Increase flood capacity & upgrade of Tod River Dam in line with Australian National Committee on Large Dams (ANCOLD). The Tod River dam was identified for upgrade in SA Water's 1998 Dam Portfolio Risk Assessment. This project will increase the flood capacity of the dam, its resistance to earthquakes & address the risk of a major leak through the abutments or dam wall. It will also address corrosion issues with the outlet & upgrade it in accordance with the Australian National Committee on Large Dams Incorporated (ANCOLD) Guidelines on Dam Safety Management (2003). Click for more details...

BURRENDONG DAM SAFETY UPGRADE - SADDLE DAM A SPILLWAY
A project in the NSW Within Wellington. Installation of temporary fencing around the work area. Design and construction of the access/haul roads to the Works area, and other temporary Works required to undertake the Works and to comply with WHS, environmental and quality requirements. Clearing, grubbing and stripping topsoil from the Works area. Excavation of the auxiliary spillway channel. This will involve excavation of overburden soils, extremely weathered to slightly weathered meta-siltstones and meta-sandstones by mechanical means and blasting (if required). Hauling and depositing excavated material to nearby stockpiles and spoil disposal areas, including formation and final shaping of the spoil disposal areas. Stabilisation of the auxiliary spillway channel cut slopes including rock bolting and shotcrete where required. Placement of geotextile and rockfill on the spillway floor in the location of an extremely weathered shear zone to provide additional erosion protection. Design and construction of permanent unsealed access roads for long-term inspection and maintenance of the auxiliary spillway and other ancillary items. Provision of environmental control measures during construction. Provision of environmental offsets in accordance with the REF. Supply and installation of permanent security fencing and signage. Provision of permanent site drainage, safety bunds, site cleanup, landscaping, revegetation and disestablishment of all temporary facilities, and removal of construction debris/waste on completion. Click for more details...

MINNIPA STORAGE DAMS
Private ownership Civil Engineering (Dams) project In The Wudinna District Council Area for New development. Construction of 1 x 18 ML earth-banked storage with floating cover, liner & associated pipework. This will replace the use of tanks 2 & 3. Provision for a second 18 ML earth-banked storage when requried in the future. Continued use of existing tank 1 until failure of this tank, (remaining life estimate as 10-15 years). Demolition of tanks 2 & 3. Click for more details...

NIMMITABEL WATER SUPPLY
Pigring Creek, Monaro Hwy, Nimmitabel, NSW 2631 Has Nimmitabel Water Supply currently at Construction stage. Provide a secure water supply for the town of Nimmitabel & facilities to monitor environmental flows. Scope of work includes: construction of zoned earth filled dam including inlet/outlet works. Construction of flow monitoring station. Upgrade of causeway Click for more details...

SHEPPARTON COMMUNITY FOOTBALL COMPLEX EARTHWORKS & DRAINAGE
Earthworks & Drainage project at Brauman St, Shepparton, VIC 3630 in the Civil Engineering (Dams). Earthworks & drainage works for the Community Football Complex (CFC) area of the Greater Shepparton Regional Sports Precinct. The works consist of earthworks over the entire CFC site, construction of stormwater drainage & retardation basin. Click for more details...

AMSTEL/RANFURLIE GOLF COURSE DAM & EARTHWORKS CONSTRUCTION
Civil Engineering (Dams) project at 825 Cranbourne-Frankston Rd, Cranbourne West, VIC 3977 of Dam & Earthworks type of New development. Construction of a dam & earthworks. Click for more details...

PORTERS CREEK DAM
Civil Engineering (Dams) project In The Shoalhaven Council Area of Dam - Upgrade type. Upgrade works to the existing Porters creek Dam. Scope of work includes: pre-construction activities, implementation of all environmental control measures, design & installation of a precise monitoring survey network, staged excavation for construction of the Porters Creek Dam foundations, establishment & operation of a concrete batching plant, placing of a mass concrete buttress on the downstream side of the existing concrete dam, rehabilitation of the site. Click for more details...

FAIRBAIRN DAM SPILLWAY MAINTENANCE PROJECT
., Emerald, QLD 4720 Has Fairbairn Dam Spillway Maintenance Project currently at Construction stage. Maintenance works on the Fairbairn Dam Spillway. Works to include supply & installation of ground anchors both stressed & passive & mass reinforced concrete. Repairs to the drainage system under the existing concrete slabs & drainage works. Click for more details...

SWAN VALLEY IRRIGATION SCHEME DAM
State ownership Civil Engineering (Dams) project In The Glamorgan-Spring Bay Council Area for New development. Construction of a 2,000 ML scheme to pump water from the Swan River in periods of higher river flows & store it in a dam adjacent to the river, close to the township of Cranbrook on the Melrose property. Click for more details...

ETIWANDA SPURLINE BASIN
New project of Civil Engineering (Dams) project at Etiwanda Spurline Basin, Mildura, VIC 3500. Construction of Etiwanda Spurline to provide storage & further developments. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect