State

Categories

Sub Categories

Click Here to Find Current Projects

List of Dams Projects


PORT MACQUARIE DAM
Wall Rising project at Rosendahl Reservoir, Port Macquarie, NSW 2444 in the Civil Engineering (Dams). Construction of a wall rising for Port Macquarie Dam. Click for more details...

CHURCHMAN BROOK DAM
State ownership Civil Engineering (Dams) project In The Armadale Council Area for Renovations, Refurbishments etc. development. Proposed remedial works to include improvements to embankments, modifications to spillway & improvements to outlet works. Material for embankment improvements to be excavated from previous borrow pits located in catchment area. Click for more details...

ERARING POWER STATION
Rocky Point Rd, Eraring, NSW 2264 Has Eraring Power Station currently at Tenders & Building stage. Capping & rehabilitation of approx 30 hectares of the Eraring Power Station Ash Dam. Using nominated materials & further construction of associated drainage works as & when required for period of 18 months from the date of issue of the Principal's Purchase Order. Click for more details...

NQ WATER - ROSS RIVER DAM
New project of Civil Engineering (Dams) project at Ross River Dam via, Townsville, QLD 4810. NQ Water is about to embark on the design & construction of a major upgrade to Ross River Dam. The works involves provision of downstream sand filters & supporting fill to full embankment crest height, installation of spillway gates (the fixed spillway crest has recently been lowered under Stage 1 of the project), augmentation of the existing foundation pressure relief system, upgrade of the rip rap & a range of other initiatives. Click for more details...

COWARRA DAM
Erosion Control/Carpark - Altns Addition project In The Port Macquarie-Hastings Council Area. Provide riprap on filter cloth in specified areas to prevent erosion. Construct contour banks & grass lined swales. Extend existing carpark to accommodate buses & extra parking. Click for more details...

VASSE AND WONNERUP WATERWAYS - MARINE FLOODGATES
New project of Civil Engineering (Dams) project at Vasse & Wonnerup Estuaries via Layman Rd & Floodgate Rd, Wonnerup, WA 6280. It is proposed to construct two new floodgates of concrete & steel in waterways of Vasse & Wonnerup Estuaries. New floodgates will be built in close proximity to existing timber floodgates, which have reached end of their design life. Existing timber floodgates to be kept operational while new work is being built. Generally scope of works shall comprise construction & commissioning of replacement floodgates, along with completion of all interfaces between new & existing elements. It includes civil, electrical, instrumentation, mechanical, telemetry & structural works. Scope includes, but is not necessarily limited to design & construction of temporary works such as coffer dams & dewatering facilities so that works can be undertaken in dry conditions; design & construction of measures to limit environmental impacts such as turbidity, odour & noise (it is envisaged that turbidity control measures will include detention basin, clearwater discharge facilities & silt curtains); demolition of remnants of Old Ballarat Railway Bridge & extraction of any associated timber piles that conflict with proposed position of cut-off sheet piles on new floodgates (this work includes backfilling of each extraction site); excavation, disposal & earth filling for floodgates & abutments; supply & installation of permanent sheet piling, cast in-situ reinforced concrete, pre-cast culverts, revetment mattresses, fibreglass stopboards & associated works; supply & installation of mechanical, electrical instrumentation & telemetry works for monitoring & actuation of floodgates; removal & modification of existing stainless steel flap gates from old timber structures & mounting on new structures; road & drainage works; testing & commissioning of new floodgates; demolition of old floodgates, including preservation of south abutment & infill wall of Wonnerup Floodgates. Click for more details...

PARAFIELD STORMWATER MANAGEMENT & SUPPLY
Parafield Stormwater Management & Supply is currently at the Construction stage, valued at about $ 3000000 it is Proposed stormwater harvesting, treatment & supply scheme with associated infrastructure. Scheme will supply industrial consumers with approx 1,500 ML/year. Project includes earth basin construction, electrical & mechanical installations, birdproof netting, aquatic planting, other appurtenant works involving 80,000 sq m of excavation, 30,000 sq m of fill & 75,000 sq m of bird netting. Click for more details...

SPRING CREEK DAM
Civil Engineering (Dams) project In The Orange Council Area of Dam - Upgrade type. Remedial works to be carried out on dam wall to strengthen against floodwaters. Wall to be strengthened & raised. Click for more details...

WILLIAMS WASTEWATER TREATMENT DAM
A project in the WA Within Williams. It is proposed to develop wastewater treatment dam that will provide additional watering source for recreational facilities. Click for more details...

FITZGERALD EMERGENCY WATER SUPPLY DAM
Fitzgerald Emergency Water Supply Dam is currently at the Tenders & Building stage, valued at about $ 100000 it is Works comprise construction of Fitzgerald emergency water supply dam. Click for more details...

TARONG POWER STATION TRIAL ASH EMPLACEMENT
Embankment/Spillway New project In The South Burnett Regional Council Area. Construction of a dam embankment, spillway, subsurface, drainage system and topsoil and grassing of site. Click for more details...

TENNANT CREEK POWER STATION BUNDING/POND
Civil Engineering (Dams) project In The Barkly Shire Council Area of Bulk Fuel Bunding/Oil/Water Seperator Pond - Design/Construct type. Design & construct bulk fuel bunding & oil/water separator pond. Click for more details...

EVERSON'S ABATTOIR WASTEWATER TREATMENT SYSTEM
Civil Engineering (Dams) project In The Kempsey Council Area of Treatment System type. Construction of 3 pond treatment system, incorporating 2 biological enhanced aerobic pons & a wet weather storage pond & the reuse of the treated effluent as spray irrigation on surrounding pastoral lands. Click for more details...

LAKE LLEWELLYN DAM
Civil Engineering (Dams) project at North West Tasmania, Sisters Beach, TAS 7321 of Spillway Upgrade type of New development. Construction of a reinforced concrete spillway and associated earthworks. The upgrade requirement includes a 37 metre long x 15 metre (maximum) wide reinforced concrete side entry spillway and associated earthworks. Click for more details...

GOLD COAST CITY COUNCIL - HINZE DAM STAGE 3
Civil Engineering (Dams) project at 15 km southwest from, Nerang, QLD 4211 of Dam - Stage 3 type of New development. Raising of dam for water storage purposes. The project will be structured as an Alliance with the skills of the partners covering the following tasks: optimisation study; dam wall augmentation (my include fishway); saddle dam upgrades; intake upgrades; spillway upgrades; local trunk water pipework relocation where required; statutory approvals; funding & subsidy management; community & stakeholder engagement; recreation area planning & implementation; local road & bridge works; land & tree clearing; compensatory habitat strategy & implementation; asset handover process. Click for more details...

LAKE JUALBUP - IMPROVEMENTS
Civil Engineering (Dams) project at Bnd by Herbert Rd Excelsior & Evans Sts & Lake Av, Shenton Park, WA 6008 for Renovations, Refurbishments etc.. Tenders were invited from consultants to prepare feasibility study for lake design at Lake Jualbup, maintaining lake & its surrounds in its current setting with permanent water & if that is not feasible, other options to maintain permanent water on a lesser scale & to investigate whether aquatic ecosystem can be developed within such design. Total area of Lake Jualbup Reserve (parkland vested in City of Subiaco) is 8.92 ha incorporating seasonal water body of 2.34 ha. Water compensating basin (lake) is Water Corporation registered asset & declared main drain & Water Corporation is resposible for management & protection of compensating basin. Lake receives & discharges drainage waters as well as ground water flow. Click for more details...

LIVERPOOL WEIR
Weir - Remediation Works project at Lighthorse Park, Atkinson St, Liverpool, NSW 2170 in the Civil Engineering (Dams). Construction of a new steel sheet pile cutoff wall, associated earthworks, rock revetment & sandstone blockwork to secure the stability of the weir structure during flooding of the Georges River. Scope of work includes design & construction of all temporary diversion, protective & dewatering works to allow construction of the works in the 'dry', supply & installation of steel sheet piling, including cutting to the required lengths & applying protective coating, earthwork fill between the cutoff wall & the weir, construction of a concrete cap along the crest of the weir including integration with the existing heritage structure & faced with sandstone blocks cut from principal supplied rock, supply & placement of large rock protection upstream & downstream of the weir including disposal of existing gabion mattresses & minor repairs to the existing weir flagging. Click for more details...

DTEI - MARINE FACILITIES MAINTENANCE
Civil Engineering (Dams) project In The Various Council Area of Marine Facilities Maintenance Panel Agreement type. Panel agreement for DTEI marine facilities maintenance. Click for more details...

SHIRE OF RAVENSTHORPE - EARTH WALL DAM
Earth Wall Dam New project In The Ravensthorpe Council Area. Construction of 30,000 cu m earth wall dam within Shire of Ravensthorpe. Click for more details...

MARSDEN ST WEIR FISH LOCK
Civil Engineering (Dams) project at Parramatta River, Parramatta, NSW 2123 of Weir - Addns type of New development. Construction of a vertical fish lock on the Parramatta River to be located at the site of the existing Marsden St Weir. The fish lock will be constructed in conjunction with the existing weir structure crossing the river. Click for more details...

TILLEGRA DAM
New project of Civil Engineering (Dams) project at Upper Williams River, Dungog, NSW 2420. Construction of a 450 billion litre dam. A small hydro-power generation plant capable of generating 3000 megawatts of energy annually & also a 2000 hectare buffer comprising 1.5 million trees Click for more details...

TILLEGRA DAM
Civil Engineering (Dams) project for New development. Design of a 450 billion litre dam. A small hydro-power generation plant capable of generating 3000 megawatts of energy annually & also a 2000 hectare buffer comprising 1.5 million trees Click for more details...

GOOGONG DAM -BLUE WATER ALLIANCE PROJECT - BWA
Currently at the Construction stage In Queanbeyan is a project estimated to be $ 30000000. This project Construction of Googong Dam spillway rock protection. The purpose of the project is to extend the spillway chute lining, construct a plunge pool & protect eroded rock surfaces. The scope of work include: excavate 23,000m³ of granite/dacite in the spillway & stilling basin; construct 8,000m³ of reinforced concrete slabs & walls at the spillway chute; backfill the eroded gully with 14,000m³ of mass concrete & shotcreting of the rock surfaces Click for more details...

COTTER DAM - BULK WATER ALLIANCE PROJECT - BWA
New project of Civil Engineering (Dams) project at Paddy's River Rd, Cotter River, ACT 2611. Construction of the Enlarged Cotter Dam (ECD) project & related works. The expansion of the dam will increase its capacity from 4 gigalitres to 78 gigalitres. The main dam & associated engineering infrastructure required for operating the future enlarged reservoir (including the intake tower & pipework). Construction of 2 saddle dams located on the right abutment. A quarry to be located on the ridge to the west of the dam wall. Bulk earthworks relating to the stripping of the abutments in preparation of the main wall construction, creation of permanent construction & stockpile pads (constructed from spoil material gained on site) to accommodate materials, aggregate stockpiles & construction equipment & the establishment of main haul roads to the abutment excavations & between the main works areas & the construction site. Upgrades to the intersections of Settlement & Look-out roads with Paddy's River & Brindabella rds to allow construction traffic to safety access these roads from the public road infrastructure. Construction of sediment control measures. Temporary construction signage proposed to be used in conjunction with the ECD construction project. Installation of permanent & temporary construction fencing proposed to be used in conjunction with the ECD construction project. Installation of temporary lighting for the construction area & RCC placement. Rehabilitation works on areas impacted by the construction of the ECD. upgrading to existing forestry tracks as well. Click for more details...

PAULMAR HYDROPONICS
Civil Engineering (Dams) project for New development. Construction of a glasshouse, sheds, office, dam and supply & install water tanks. Creation of access & new carpark. Click for more details...

MILLAR ROAD LANDFILL FACILITY
Civil Engineering (Dams) project at Millar Rd, Baldivis, WA 6171 of Cell Capping/Leachate Dam type of New development. Works to include the construction of a Leachate Dam at the Millar Rd Landfill Facility & also cell capping of Cells 4, 5, 6 & 7. Click for more details...

BURRENDONG DAM
State ownership Civil Engineering (Dams) project In The Wellington Council Area for New development. Stage 1 - Upgrade of the Burrendong Dam. Scope of work includes: Crest raising of main dam embankment & commensurate of saddle dams B & C. Click for more details...

TORRENS LAKE WEIR CONTROL SYSTEM & SCADA UPGRADE
Civil Engineering (Dams) project In The Adelaide Council Area of Weir Control System/Scada - Upgrade type. Design & construction of control system & SCADA upgrade to replace the whole or components of the Torrens lake Weir Control System. Works include: undertake a risk assessment of all the possible causes of a control system disabling fault resulting in the malfunction of Torrens Lake Weir during normal operating conditions & major & minor flood events; proposed appropriate methods & equipment (including possible duplication) for the Weir control system to reliably open & close the Weir gates in response to the water level in Torrens Lake & minimise the risk of malfunction resulting in water loss or overtoppping; installation of appropriate equipment to reliably control the operation of the Torrens lake Weir gates during normal operating conditions & major & minor flood events. Click for more details...

DENILIQUIN FISHWAYS & WEIR
Civil Engineering (Dams) New project at near, Deniliquin, NSW 2710. This type is Fishways/Weir with State ownership. Scope of work includes: Vertical slot fishway at Edward River offtake regulator & Denil fishway at Gulpa Creek Regulator; vertical slot fishway & weir refurbishment at Yallakool Creek Weir Click for more details...

BARWON WATER CAPITAL WORKS PROGRAM STAGE 1
Civil Engineering (Dams) project In The Greater Geelong Council Area of Pump Stations (2)/Pump Station Upgrade/Water Storage Upgrade type. Five projects are expected to commence October 2009. These include two new pump stations, upgrade to an existing pump station, sewer collection system including all pipework at Birregurra (see PN677072) and upgrade of water storage reservoir wall at Aireys Inlet. Click for more details...

DENILIQUIN FISHWAYS & WEIR
Civil Engineering (Dams) project In The Deniliquin Council Area of State ownership. Scope of work includes: Vertical slot fishway at Stevens Weir. Click for more details...

TOOROURRONG RESERVOIR UPGRADE WORKS
Reservoir - Upgrade Works project at 120 Jacks Creek Rd, Whittlesea, VIC 3757 in the Civil Engineering (Dams). Upgrading of the Toorourrong Reservoir to bring it in line with new Australian dam safety requirements. Works include replacing and enlarging the spillway and raise the dam wall by 2.5 metres (dam embankment raised 1.1 metres, with a wave wall of 1.4 metres). The works will be staged and will consist of embankment strengthening, increasing the embankment height, upgrading the Clearwater Channel diversion structure and replacement the existing scour gate. Click for more details...

CRAIG ROAD DAM
A project in the VIC Within Casey. Development of a dam. Click for more details...

SPLIT ROCK DAM
Civil Engineering (Dams) New project at on the Manilla River near, Tamworth, NSW 2340. This type is Consultancy For Contract Site Management Services - Upgrade with State ownership. The Consultant will be engaged to undertake Contract Site Management Services for the Split Rock Dam Stage 1 Safety upgrade works PID904213 to fulfill the role of Principals Authorised Person's Delegate (PAPD) Click for more details...

CHAFFEY DAM
Civil Engineering (Dams) project at 37km south of, Tamworth, NSW 2340 for New. Augmentation & safety upgrade of Chaffey Dam. The proposed works include augmentation of Chaffey Dam to 100 GL by raising the full supply level of the storage by 6.5 meters & upgrading the dam. This will involve raising the dam crest level, raising the Morning Glory Spillway & configuration of the fuseplug spillway. Associated works will include the realignment of access roads, including 2 bridges, surrounding the storage impacted by augmentation. Works to be constructed shall include, but not be limited to: detailed design of morning glory spillway. Dam Crest raising - removal of current parapet wall; excavation of crest to clay core; excavation of material at the downstream toe of dam; haul & place rock from stockpile area for dam wall raising; reinstall parapet wall on the completed dam crest. Morning glory raising - decommission & remove all mechanical and electrical installation from the Morning glory pier deck & access bridge; removal of access bridge & gantry crane & reinstallation after spillway & dam crest raising; raising of morning glory spillway, piers & associated structures by 6.5 metres. Fuseplug construction - construction of concrete dividing wall between bays & construction of fuseplug embankment. Roads & bridges - construction of 6 span bridge across Peel River at Bowling Alley Point & construction of 2 span bridge across Hyde's Creek. Click for more details...

SHIRE OF MERREDIN - DAM NO 4
A project in the WA Within Merredin. To include the construction of a lined dam, a pump house & associated mechanical & electrical equipment. Click for more details...

SHIRE OF MERREDIN - DAM NO 2
Civil Engineering (Dams) project at West of the townsite of, Merredin, WA 6415 of Evaporation Control Device - Supply, Installation & Testing type of New development. To include the supply, installation & testing of evaporation control device at dam no 2. Click for more details...

BARWON WATER COLAC WATER SUPPLY UPGRADE
Gerangamete Treatment Plant, Murroon, VIC 3243 Has Barwon Water Colac Water Supply Upgrade currently at Construction stage. The project will involve constructing a new off-take from the Wurdee Boluc Channel, near Muroon & the existing Barwon Downs Bore field Pipeline; pump station at the Gerangamete Treatment Plant, Barwon Downs; & an 11 km pipeline from there to the existing Colac supply pipeline. While the supplementary supply would normally be sourced from the Wurdee Boluc channel, water also could be accessed from the bore field under extreme dry conditions as a further security measure. Click for more details...

DUMARESQ DAM
Civil Engineering (Dams) project at Dumaresq Dam Rd, Dumaresq, NSW 2350 of Consultancy For Investigation/Preliminary Design/Detailed Design/Documentation type of New development. Upgrade of Dumasresq Dam Click for more details...

CRANBROOK CARE AGED CARE FACILITY
Civil Engineering (Dams) project for New development. Construction of a seniors Living Development consisting of a 160 bed residential care facility, 39 self care housing units, 14 x 2 bedroom, 17 x 2 bedroom + study & 8 x 3 bedroom. Re-construction of a dam in conjunction with Castle Hill Country Club. The RCF will be located on the eastern part of the site, mainly high care, with a total floorspace of 9,318sq m, the RCF consists of 3 levels comprising basement, ground & first floor. Basement comprises carparking, laundry, staff room, plant rooms & kitchen. Ground floor comprises 4 wings joined by a lobby with dining facilities, servery, reception & lobby. A wellness centre of 165sq m is separated from the main RCF & connected to the ground floor by a corridor, & includes hydro pool with glass surroundings, bathroom, activities room, salon & craft/exhibition room. The first floor wings are joined by a lobby which includes a library. The self care units will be located in the western part in 4 blocks, total GFA 5,693sq m, the units will comprise basement carparking, ground, first & second floor. The first block will contain 16 units; second block 9 units & cinema, library, gym & multi-purpose room at ground floor; third block 6 units with cafe; fourth block 8 units. The proposed development also includes work on the adjoining Castle Hill Country Club golf course, comprising reconstruction of existing dam, re-construction of modified golf tee, pedestrian bridge to access golf tee & retaining walls, deck & pontoon associated with dam & drainage works. Powdercoated framed glass balustrade, composite panels, vertical timber & metal cladding to balconies, metal & timber vertical blades, metal roof. Total carparking for 136 vehicles within 3 basement areas & small ground level area. Landscaping 11,008sq m. Click for more details...

MELBOURNE AIRPORT/AIRPORT DRIVE EXTENSION/STEEL CREEK NORTH RETARDING BASINS
Civil Engineering (Dams) New project at Airport Dr, Tullamarine Airport, VIC 3045. This type is Road Works/Retarding Basins with Federal ownership. A new approach to the airport from the Western Ring Road through a 3.7 km extension of Airport Drive from Sharps Road to Mercer Drive. The Airport Drive extension will provide a second entry point into the airport precinct. Airport Drive Stage 1 includes: four lane divided carriageway (with the provision to expand to six lanes at a later time), shared pedestrian and bike path adjacent between Sharps Road and Mercer Drive, signalised intersections at Sharps Road to access Airport Drive and Link Road/Watson Drive, works to realign and connect Link Road to Airport Drive, construction of Watson Drive to connect Melrose Drive, at the intersection of Springbank Street, to the intersection of Airport Drive and Link Road, modification of round-a-bout at Mercer Drive. Construction of 2 retarding basins in Steele Creek North. The Airport Drive retarding basin is to be located to the east of Airport drive at the existing Steele Creek outlet. The basin will be constructed as an open cut system with the volume being approximately 87,100m. The Link Road retarding basin is to be located at the corner of Link Road and Airport Drive. The basin will be constructed as an open cut system with the volume being approximately 43,600m. A temporary retarding basin north of Link Road is required in the life of the MDP which will be formed from the natural topography. A bund wall of 2m high will be required north of Link Road to form the temporary retarding basin embankment wall. The basin will be constructed as an open system with the volume being approximately 14,500m. Vegetated swales along Airport Drive, Sky Road, Link Road and between Melrose Drive and the Link Road retarding basin. 6,250m of major drainage pipe infrastructure to be installed as part of the Steele Creek Drainage Strategy. Click for more details...

PARDELUP PRISON FARM - DAM 21A - EXPANSION
Dam - Expansion project at Muir Hwy, Mount Barker, WA 6324 in the Civil Engineering (Dams). Works to include the expansion of Dam 21A to comprise of extending the eastern & northern walls to accommodate an extra 20,000 cubic meters of water & associated works. Click for more details...

CONDAMINE WEIR FISHWAY
Condamine Weir via, Chinchilla, QLD 4413 Has Condamine Weir Fishway currently at Construction stage. Construction of a fishway for native fish at the Condamine Weir. Click for more details...

CORIN DAM SPILLWAY REMEDIATION
Currently at the Construction stage In Act is a project estimated to be $ 1300000. This project Remediation of the dam core & spillway of coring dam. Removal of one lane from the spillway bridge. Excavate & remediate the dam core. Install replacement road surface, kerb. Click for more details...

COMMISSIONERS CREEK REMEDIAL WORKS
Civil Engineering (Dams) project In The Indigo Council Area of State ownership. Construction of remedial works in Commissioners Creek dam. A preliminary risk assessment has been undertaken by an independent experience dam engineering consultant in 2012. The results of this risk assessment show that the risk in Commissioners Creek is above ANCOLD1?s Limit of Tolerability. A detailed design specification was developed to reduce the consequence of dam failure to a lower level & lower the risk in Commissioners Creek Dam. This will be done by lowering the spillway level & consequently lower the water level & reduce the wet area. Click for more details...

HAMILTON WATER TREATMENT PLANT BASIN NO 1 EMBANKMENT UPGRADE
Currently at the Construction stage In Southern Grampians is a project estimated to be $ 540000. This project Embankment upgrade works include the construction of an earth filled stabilising berm with filters & drainage, dismantling of an access bridge & existing overflow structure, construction of a new overflow structure, relining of the existing outlet pipe, & associated civil, drainage & pipe works at Hamilton Water Treatment Plant (WTP) Basin No 1. Click for more details...

FAIRBAIRN DAM SPILLWAY MAINTENANCE PROJECT
., Emerald, QLD 4720 Has Fairbairn Dam Spillway Maintenance Project currently at Construction stage. Maintenance works on the Fairbairn Dam Spillway. Works to include supply & installation of ground anchors both stressed & passive & mass reinforced concrete. Repairs to the drainage system under the existing concrete slabs & drainage works. Click for more details...

PARADISE DAM IMPROVEMENT PROJECT STAGE 2
Dam - Stage 2 project at Paradise Dam, Caringa via, Biggenden, QLD 4621 In The Council Area Of North Burnett Regional of Private. Construction improvements to the Paradise Dam. Works to include strengthening of the Toe at Monoliths D & K. Repairs to the concrete on the Left Bank Spillway Training Wall. Supply & Installation of Baulk between Dam Crest & Intake Tower Stairs. Construction of a suitable access crossing downstream of the dam. Protection of the left bank. Click for more details...

LUSHER ROAD DRAINAGE - DETENTION POND & PUMPING SYSTEM
Currently at the Construction stage In Maroondah is a project estimated to be $ 2000000. This project Drainage works include detention pond & pumping system at Lusher Road, Croydon. Click for more details...

BURDEKIN FALLS DAM
Civil Engineering (Dams) project In The Charters Towers Regional Council Area of Dam - Civil Works type. Civil works for construction associated with the Burdekin Falls Dam Foundation Drainage Project.The aim of this project is to construct improvements to the dam which will include drilling extra drains and reaming out existing drains from within the confines of the gallery, drilling new drains at the downstream toe of the spillway Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect