List of Dams Projects in Victoria


DARGALONG RD EARTHWORKS/DAM
Civil Engineering (Dams) project In The Strathbogie Council Area of Private ownership. Earthworks and the creation of a dam. Revegetation following completion of dam construction. The fill is then to be used by the contractor in the Goulburn Valley Highway Murchison East Deviation Click for more details...

FAIRWAY WATER RETIREMENT VILLAGE
Currently at the Construction stage In Cardinia is a project estimated to be $ 33000000. This project Construction of a retirement village, brick veneer and large feature lake with associated wetlands on 17 Ha. of vacant land. 380 2 bedroom units comprising attached and detached and combination of 1 and 2 storey but mostly single storey. 350 Independent living units and 30 serviced apartments. Concrete slab steel frame and metal roof. Click for more details...

FOREST RESORT/CRESWICK GOLF CLUB
Midland Hwy, Creswick, VIC 3363 Has Forest Resort/Creswick Golf Club currently at Construction stage. Staged development. Tennis court, interconnecting lakes, lagoons and natural trails. Click for more details...

CRANBOURNE TURF CLUB
Private ownership Civil Engineering (Dams) project In The Casey Council Area for New development. Proposed construction of a storage & irrigation dam. Click for more details...

FLAVORITE HYDROPONIC TOMATOES PTY LTD - GLASSHOUSES
Glasshouses (5) New project In The Baw Baw Council Area. Proposed construction of five new glasshouses plus a 240 megalitre dam at the rear of the property to collect all rainwater run-off and recycled water. Click for more details...

MCMILLANS OF METUNG HOLIDAY VILLAGE - STAGE 2
Dwellings (40)/Health Club/Marina/Restaurant New project In The East Gippsland Council Area. Construction of 30 1-3 bedroom cabins, health club which includes treatment rooms and gymnasium, restaurant, 90 berth marina and wetland lagoon Click for more details...

WASTE TREATMENT PLANT WINTER STORAGE DAM
New project of Civil Engineering (Dams) project at Carrolls Ln, Shepherds Flat, VIC 3461. Buildings and works for a utility installation (waste treatment plant winter storage dam)on public use zone land covered by an environmental significance overlay. Click for more details...

AVALON ROAD HOT HOUSES & DAMS
Civil Engineering (Dams) project at 390 Avalon Rd, Lara, VIC 3212 for New. Construction of hot houses and construction of dams. Click for more details...

DARTMOUTH DAM UPPER SPILLWAY BENCH
New project of Civil Engineering (Dams) project at Dartmouth Dam, Dartmouth, VIC 3701. The works involve the stabilisation of a tension crack in narrow rock benches and steep rock scarps above the upper spillway at Dartmouth Dam. The works includes removal of exposed weathered rock, inspection of exposed rock from elevated platform drilling and grouting of steel dowels up to 8m long, 35m3 shotcreting, drainage and the like. Click for more details...

PAULMAR HYDROPONICS
Civil Engineering (Dams) project for New development. Construction of a glasshouse, sheds, office, dam and supply & install water tanks. Creation of access & new carpark. Click for more details...

KANANOOK CREEK DREDGING
Civil Engineering (Dams) project at Kananook Creek Boulevard, Frankston, VIC 3199 of Dredging And Restoration type of New development. The proposed contract is for a three year term for the maintenance, clearance and disposal of marine sediments, sand and debris within and adjacent to the mouth of Kananook Creek, Frankston. Click for more details...

CHESTERVILLE ROAD AQUACULTURE FACILITY
A project in the VIC Within Kingston. Proposed buildings and works for the development and use of an aquaculture facility. Click for more details...

NORTH EAST WATERWATCH PROGRAM EVALUATION & STRATEGIC PLAN
Civil Engineering (Dams) project In The Various Council Area of State ownership. North East Waterwatch Program evaluation and development of a three year strategic plan (2009-2011). Click for more details...

MAROONDAH HIGHWAY EARTHWORKS
Earthworks project at 878-880 Maroondah Highway (Lot 7 LP127612), Coldstream, VIC 3770 In The Council Area Of Yarra Ranges of Private. Earthworks in association with dam construction. Click for more details...

BARWON WATER CAPITAL WORKS PROGRAM STAGE 1
Civil Engineering (Dams) project In The Greater Geelong Council Area of Pump Stations (2)/Pump Station Upgrade/Water Storage Upgrade type. Five projects are expected to commence October 2009. These include two new pump stations, upgrade to an existing pump station, sewer collection system including all pipework at Birregurra (see PN677072) and upgrade of water storage reservoir wall at Aireys Inlet. Click for more details...

MOUNT GISBORNE ROAD RECREATION RESERVE
Civil Engineering (Dams) New project at 206 Mount Gisborne Road, Gisborne, VIC 3437. This type is Tennis Court/Dam/Pavilion with Private ownership. Construction of a tennis court, lake/dam and pavilion. Click for more details...

DIGHTS FALLS WEIR PROJECT
New project of Civil Engineering (Dams) project at Dights Falls Weir in the Yarra River, Abbotsford, VIC 3067. Replacement of the aging Dights Falls weir and improvement of fish passages on the Yarra River in Abbottsford. The weir replacement and proposed construction of a vertical slot fishway will remove a major barrier to native fish migration in the Yarra. The weir will be similar in shape, location and height to the existing structure and retain a waterfall effect. The fishway will be covered by grates and landscaped into the northern bank of the river to minimise its visual impact. It will be accessible by the public as a platform to view Dights Falls. Click for more details...

BOX HILL GOLF CLUB WATER STORAGE DAM
A project in the VIC Within Whitehorse. Proposed construction of a 20 megalitre water storage dam to Box Hill Golf Club. Click for more details...

HARRISONS ROAD DAM WORKS
Harrisons Road Dam Works is currently at the Planning stage, valued at about $ 200000 it is Construction of dam and associated earthworks Click for more details...

TOOROURRONG RESERVOIR UPGRADE WORKS
Reservoir - Upgrade Works project at 120 Jacks Creek Rd, Whittlesea, VIC 3757 in the Civil Engineering (Dams). Upgrading of the Toorourrong Reservoir to bring it in line with new Australian dam safety requirements. Works include replacing and enlarging the spillway and raise the dam wall by 2.5 metres (dam embankment raised 1.1 metres, with a wave wall of 1.4 metres). The works will be staged and will consist of embankment strengthening, increasing the embankment height, upgrading the Clearwater Channel diversion structure and replacement the existing scour gate. Click for more details...

COWWARR WEIR FISHWAY UPGRADE
Civil Engineering (Dams) New project at Cowwarr Weir, Cowwarr, VIC 3857. This type is Fishway - Upgrade with Local Govt ownership. Upgrade of the Cowwarr Weir Fishway. This project will require the construction of a vertical slot fishway at an existing rock ramp fishway site on the Thomson River at Cowwarr Weir. Click for more details...

CRAIG ROAD DAM
A project in the VIC Within Casey. Development of a dam. Click for more details...

DARTMOUTH DAM
Electrical Services New project In The Towong Council Area. Works include extensive electrical control and monitoring systems critical to the operationand management of Dartmouth Dam are installed at the Dam site. The systems include telemetry, motor control, dam instrumentation, hydraulic control, PLC'S, radios, transducers, pumps, compressors, valves, generator sets and power and lighting distribution. Click for more details...

BARWON WATER COLAC WATER SUPPLY UPGRADE
Gerangamete Treatment Plant, Murroon, VIC 3243 Has Barwon Water Colac Water Supply Upgrade currently at Construction stage. The project will involve constructing a new off-take from the Wurdee Boluc Channel, near Muroon & the existing Barwon Downs Bore field Pipeline; pump station at the Gerangamete Treatment Plant, Barwon Downs; & an 11 km pipeline from there to the existing Colac supply pipeline. While the supplementary supply would normally be sourced from the Wurdee Boluc channel, water also could be accessed from the bore field under extreme dry conditions as a further security measure. Click for more details...

BURNS LANE & BLACKHILL ROAD DAM & TROTTING TRACK
New project of Civil Engineering (Dams) project at 1-95 Burns Ln & 188-264 Blackhill Rd, Toolern Vale, VIC 3337. Construction of a dam and horse trotting track. Click for more details...

ELCHO BASIN CONSTRUCTION STAGE 1
Civil Engineering (Dams) project at Btwn McManus Rd & Broderick Rd, Lara, VIC 3212 of Basin Construction type of New development. Major earthworks which include the construction of a Drainage Detention Basin between McManus Road and Broderick Road, Lara. The works include the 1st stage construction of a major stormwater runoff treatment facility that comprises construction of sedimentation basins. The 1st stage work comprises the sedimentation basin which is the entry to the future Elcho basin/wetland system and any extension of these works or associated structures as directed by the Superintendent. Excavated material from the basin will be transported to industrial allotments adjacent to this site. Exported clay will be placed and compacted under Level 1 Inspection & Testing (refer to Clause 4.7 in Specification T1300043) on the industrial allotments to finished surface levels as detailed in the drawings. The works under this contract, as described in the drawings and specified herein, include but are not limited to: broad-scale clay extraction operations within the site; excavating, shaping and trimming the basin and part of the inlet & outlet channels; loading approved excavated clay material and transporting to the external allotment; soil treatment (clay and topsoil) and import of non-dispersive topsoil all as required and/or directed; construct compacted clay liner in the basin as required; finished surface protection works including topsoiling and grass cover of all exposed clay areas; engineered fill to 98% standard compaction on industrial allotments - Lots 1 & 2; Broderick Road channel and piped drain outlet assembly/works; and ancillary basin and external allotment works. Click for more details...

MELBOURNE AIRPORT/AIRPORT DRIVE EXTENSION/STEEL CREEK NORTH RETARDING BASINS
Civil Engineering (Dams) New project at Airport Dr, Tullamarine Airport, VIC 3045. This type is Road Works/Retarding Basins with Federal ownership. A new approach to the airport from the Western Ring Road through a 3.7 km extension of Airport Drive from Sharps Road to Mercer Drive. The Airport Drive extension will provide a second entry point into the airport precinct. Airport Drive Stage 1 includes: four lane divided carriageway (with the provision to expand to six lanes at a later time), shared pedestrian and bike path adjacent between Sharps Road and Mercer Drive, signalised intersections at Sharps Road to access Airport Drive and Link Road/Watson Drive, works to realign and connect Link Road to Airport Drive, construction of Watson Drive to connect Melrose Drive, at the intersection of Springbank Street, to the intersection of Airport Drive and Link Road, modification of round-a-bout at Mercer Drive. Construction of 2 retarding basins in Steele Creek North. The Airport Drive retarding basin is to be located to the east of Airport drive at the existing Steele Creek outlet. The basin will be constructed as an open cut system with the volume being approximately 87,100m. The Link Road retarding basin is to be located at the corner of Link Road and Airport Drive. The basin will be constructed as an open cut system with the volume being approximately 43,600m. A temporary retarding basin north of Link Road is required in the life of the MDP which will be formed from the natural topography. A bund wall of 2m high will be required north of Link Road to form the temporary retarding basin embankment wall. The basin will be constructed as an open system with the volume being approximately 14,500m. Vegetated swales along Airport Drive, Sky Road, Link Road and between Melrose Drive and the Link Road retarding basin. 6,250m of major drainage pipe infrastructure to be installed as part of the Steele Creek Drainage Strategy. Click for more details...

LAKE SAMBELL DAM WALL UPGRADE
New project of Civil Engineering (Dams) project at ., Beechworth, VIC 3747. The upgrade of the Lake Sambell dam wall. The project comprises a new overflow embankment structure to upgrade the current dam wall, improvements to the existing spillway, and a new intake structure. The works also include filter zones, transitional rock fill, wall armouring and crest treatment. Click for more details...

CATHEDRAL LODGE PRIVATE GOLF COURSE DEVELOPMENT
Civil Engineering (Dams) project In The Murrindindi Council Area of 18 Hole Golf Course Development type. The development of an 18 hole golf course, a golf clubhouse, five cabins (group accommodation), a maintenance facility & an irrigation lake with associated infrastructure works. Click for more details...

BAKERS GULLY DAM REMEDIATION
Civil Engineering (Dams) project In The Alpine Council Area of State ownership. Remediation of Bakers Gully Dam. Undertake remedial works on the embankments & spillways to ensure the safety of the Bakers Gully dams. Click for more details...

COMMISSIONERS CREEK REMEDIAL WORKS
Civil Engineering (Dams) project In The Indigo Council Area of State ownership. Construction of remedial works in Commissioners Creek dam. A preliminary risk assessment has been undertaken by an independent experience dam engineering consultant in 2012. The results of this risk assessment show that the risk in Commissioners Creek is above ANCOLD1?s Limit of Tolerability. A detailed design specification was developed to reduce the consequence of dam failure to a lower level & lower the risk in Commissioners Creek Dam. This will be done by lowering the spillway level & consequently lower the water level & reduce the wet area. Click for more details...

SHEPPARTON COMMUNITY FOOTBALL COMPLEX EARTHWORKS & DRAINAGE
Earthworks & Drainage project at Brauman St, Shepparton, VIC 3630 in the Civil Engineering (Dams). Earthworks & drainage works for the Community Football Complex (CFC) area of the Greater Shepparton Regional Sports Precinct. The works consist of earthworks over the entire CFC site, construction of stormwater drainage & retardation basin. Click for more details...

AMSTEL/RANFURLIE GOLF COURSE DAM & EARTHWORKS CONSTRUCTION
Civil Engineering (Dams) project at 825 Cranbourne-Frankston Rd, Cranbourne West, VIC 3977 of Dam & Earthworks type of New development. Construction of a dam & earthworks. Click for more details...

HAMILTON WATER TREATMENT PLANT BASIN NO 1 EMBANKMENT UPGRADE
Currently at the Construction stage In Southern Grampians is a project estimated to be $ 540000. This project Embankment upgrade works include the construction of an earth filled stabilising berm with filters & drainage, dismantling of an access bridge & existing overflow structure, construction of a new overflow structure, relining of the existing outlet pipe, & associated civil, drainage & pipe works at Hamilton Water Treatment Plant (WTP) Basin No 1. Click for more details...

QUARRY ROAD DETENTION BASIN CONSTRUCTION
Civil Engineering (Dams) project at Quarry Rd, Woodend, VIC 3442 for New. Construction of a detention basin in Quarry Road, Woodend. Click for more details...

LAKE BUFFALO SPILLWAY GATES & HOISTS UPGRADE
Civil Engineering (Dams) project at Lake Buffalo, Myrtleford, VIC 3736 for New. Lake Buffalo spillway gates & hoists upgrade. Works include the supply of equipment, fabrication, factory assembly & testing. Site installation & commissioning for the upgrade of the spillway gates lifting hoists include electrical control equipment & the refurbishment of the spillway gates at Lake Buffalo. Click for more details...

GOULBURN VALLEY WATER FISH PASSAGE/LADDER
Civil Engineering (Dams) New project at Fish Point Weir, Lake Boga, VIC 3584. This type is Fish Passage/Ladder with State ownership. Construction of a concrete fish passage with fish tag reader & hand railing at Fish Point Weir. The package will also include construction of two coffer dams to isolate the working area & the refurbishment of the existing structure including installing new automatic gates supplied by GMW. Click for more details...

LUSHER ROAD DRAINAGE - DETENTION POND & PUMPING SYSTEM
Currently at the Construction stage In Maroondah is a project estimated to be $ 2000000. This project Drainage works include detention pond & pumping system at Lusher Road, Croydon. Click for more details...

NARRACAN DAM SPILLWAY GATES REFURBISHMENT
Spillway Gates - Refurbishment project at Latrobe River, Narracan, VIC 3824 in the Civil Engineering (Dams). Refurbishment of the spillway gates at Narracan Dam including maintenance painting & overhauling the gate rollers. Click for more details...

DAYLESFORD LOW LEVEL BASIN
Currently at the Construction stage In Hepburn is a project estimated to be $ 150000. This project Remediation of the 4 ML Daylesford Low Level Basin. Click for more details...

TORRUMBARRY WEIR ELECTRICAL CUBICLES & SITE INSTALLATION WORKS
Civil Engineering (Dams) project In The Campaspe Council Area of Electrical Cubicles (6) - Supply, Test & Install type. Supply, test & install eight (8) electrical control cubicles, including PLCs & other equipment, used to control the river flow through six river flow control gates at the weir. Torrumbarry Weir is located at the Murray River 40 km north-east of Echuca. Click for more details...

TARWIN STREET DAM WALL
Civil Engineering (Dams) project In The Baw Baw Council Area of Dam Wall type. The works involve the supply of all necessary labour, plant, equipment, materials & expertise for the construction of a dam wall at the retardation basin in Tarwin Street, Warragul. Click for more details...

ETIWANDA SPURLINE BASIN
New project of Civil Engineering (Dams) project at Etiwanda Spurline Basin, Mildura, VIC 3500. Construction of Etiwanda Spurline to provide storage & further developments. Click for more details...

LAKE EILDON SPILLWAY LIFT REPLACEMENT
New project of Civil Engineering (Dams) project at Lake Eildon, Pinniger Rd, Eildon, VIC 3713. Design, manufacture & installation of lift replacement within the Lake Eildon spillway structure. This includes the removal of existing equipment. Click for more details...