List of Dams Projects in Western Australia


KATANNING - STORAGE DAM
Storage Dam For Treated Wastewater New project In The Katanning Council Area. To improve disposal of treated wastewater from Katanning Wastewater Treatment Plant, it is proposed to construct new storage dam. Works to include construction of earthfill embankment, rock-lined & gravel-lined drains & associated works for excavated reservoir; construction of spillway, chute & dissipation structure for reservoir; construction of inlet pipework (DN200 MSCL); construction of rising main to inlet (DN200 PVC); construction of outlet pipework & valve pit (DN600 MSCL); construction of section of delivery main to golf course (DN200 PVC); supply & installation of floating offtake DN200 & associated appurtenances; construction of access road; fencing; site restoration; installation of water level indicators, v-notch seepage measurement weirs, survey control pillars & surface movement pins according to standard drawings. Click for more details...

WATER CORPORATION - EPC SERVICES
State ownership Civil Engineering (Dams) project In The Various Council Area for New development. Panel of prime contractors for provision of engineering design, procurement & construction (EPC) services to Water Corporation. Click for more details...

CHURCHMAN BROOK DAM
State ownership Civil Engineering (Dams) project In The Armadale Council Area for Renovations, Refurbishments etc. development. Proposed remedial works to include improvements to embankments, modifications to spillway & improvements to outlet works. Material for embankment improvements to be excavated from previous borrow pits located in catchment area. Click for more details...

DROUGHT RELIEF STRATEGY - SAMSON BROOK PIPEHEAD DAM
Civil Engineering (Dams) project at Approximately 7 km downstream of existing Samson Dam, Waroona, WA 6215 of Pipehead Dam - Main Contract type of New development. Construction of pipehead dam approximately 7 km below existing Samson Dam, which will store about 300 megalitres of water & replace an existing structure at same site that currently supplies Waroona townsite. Dam would have 15 - 25 m high wall & dosing plant is also to be constructed. Water would be connected to Stirling Trunk Main via 11.5 km of 900 mm pipe. Click for more details...

DROUGHT RELIEF STRATEGY - WOKALUP CREEK PIPEHEAD DAM & DN 1200 TRANSFER MAIN
Currently at the Tenders & Building stage In Harvey is a project estimated to be $ 19000000. This project Construction of 124 megalitre concrete pipehead dam which will supply 10 gigalitres of water p.a. to Harvey Dam. 10 km pipeline of 1,200 mm nominal diameter will connect Wokalup Dam to Harvey Dam. Associated work to include valves, meters & pits. Pipeline will be generally below ground & constructed using open trench excavation that will be backfilled & restored. Click for more details...

VASSE AND WONNERUP WATERWAYS - MARINE FLOODGATES
New project of Civil Engineering (Dams) project at Vasse & Wonnerup Estuaries via Layman Rd & Floodgate Rd, Wonnerup, WA 6280. It is proposed to construct two new floodgates of concrete & steel in waterways of Vasse & Wonnerup Estuaries. New floodgates will be built in close proximity to existing timber floodgates, which have reached end of their design life. Existing timber floodgates to be kept operational while new work is being built. Generally scope of works shall comprise construction & commissioning of replacement floodgates, along with completion of all interfaces between new & existing elements. It includes civil, electrical, instrumentation, mechanical, telemetry & structural works. Scope includes, but is not necessarily limited to design & construction of temporary works such as coffer dams & dewatering facilities so that works can be undertaken in dry conditions; design & construction of measures to limit environmental impacts such as turbidity, odour & noise (it is envisaged that turbidity control measures will include detention basin, clearwater discharge facilities & silt curtains); demolition of remnants of Old Ballarat Railway Bridge & extraction of any associated timber piles that conflict with proposed position of cut-off sheet piles on new floodgates (this work includes backfilling of each extraction site); excavation, disposal & earth filling for floodgates & abutments; supply & installation of permanent sheet piling, cast in-situ reinforced concrete, pre-cast culverts, revetment mattresses, fibreglass stopboards & associated works; supply & installation of mechanical, electrical instrumentation & telemetry works for monitoring & actuation of floodgates; removal & modification of existing stainless steel flap gates from old timber structures & mounting on new structures; road & drainage works; testing & commissioning of new floodgates; demolition of old floodgates, including preservation of south abutment & infill wall of Wonnerup Floodgates. Click for more details...

PORT DENISON LOBSTER FACILITY
Civil Engineering (Dams) New project at Reserve 41089 McIntyre Cove (lot 547), Port Denison, WA 6525. This type is Live Lobster Holding Facility with Private ownership. Live lobster holding facility, maritime classroom annex, boat pens, fuel berth & car parking. FLOOR AREA: 1,000 - 15,000 sq m. Click for more details...

WAROONA DAM
Drakes Brook (access via Inverall Rd off South Western Hwy) 5.5 km approx east of townsite of, Waroona, WA 6215 Has Waroona Dam currently at Construction stage. Raising & stabilisation of Waroona Dam from RL 212.6 m to 215 m, construction of downstream seepage control works in conjunction with upstream clay blanket, submerged remotely-operated valve for control of outlet pipeworks to replace existing intake tower which is to be demolished, demolition of existing spillway & downstream access bridge. Demolition will include removal of side channel & ogee crest, warped transition, bridge abutment walls, pre-cast bridge sections, chute side walls & floor slab, downstream access bridge, energy dissipater & stilling basin & fencing. Following demolition, existing spillway to be backfilled & rehabilitated. Construction of new spillway along with approach channel & 16 m wide straight ogee crest with 235 m long concrete-lined chute which tapers from crest to chute width of 10 m. New spillway to include 6 m high curved approach walls, 9 m high bridge abutment walls, new 6.2 m wide x 18 m long skewed spillway bridge for vehicular access to dam crest road. Bridge to comprise pre-cast beams, top slab substructure, footpath, guardrailing, handrailing & road pavement. Upgrading works to existing instrumentation (this may be undertaken as separate contract), realignment of Inverall Rd & access road & site restoration. Dam instrumentation will involve relocation of existing rain gauge, installation of automated water level indicator, automation of existing hydraulic piezometers & replacement of some standpipe piezometers with electric piezometers, provision of new seepage weirs, automation of piezometer, water level & rain gauge readings & seepage weir & connection to SCADA. Click for more details...

TANJANNERUP DAM
Civil Engineering (Dams) project In The Nannup Council Area of Upstream Outlet Works - Upgrade For Dam type. Works comprise upgrade to upstream outlet works at Tanjannerup Dam. Click for more details...

TANJANNERUP DAM
Civil Engineering (Dams) project at Tanjannerup Rd, approx 5 km east of townsite of, Nannup, WA 6275 of Downstream Outlet Works For Dam type of Renovations, Refurbishments etc. development. Works comprise upgrade to downstream outlet works at Tanjannerup Dam. Click for more details...

WILLIAMS WASTEWATER TREATMENT DAM
A project in the WA Within Williams. It is proposed to develop wastewater treatment dam that will provide additional watering source for recreational facilities. Click for more details...

KALGOORLIE GOLF COURSE - STORMWATER HARVESTING DAM
Civil Engineering (Dams) New project at Reserve 13146 Lower Piccadilly St, Kalgoorlie, WA 6430. This type is 200 Ml Stormwater Harvesting Dam/Associated Works with Local Govt ownership. Construction of 200 ML stormwater harvesting dam & associated works at Lower Piccadilly St for provision of water for reticulation at proposed grass golf course in north west sector of city. Works include clearing, removal & disposal of contaminated material, bulk excavation & haulage offsite, supply & lay Bentofix liner, inlet structures, pre-cast pump well, fencing & other miscellaneous works. Click for more details...

FITZGERALD EMERGENCY WATER SUPPLY DAM
Fitzgerald Emergency Water Supply Dam is currently at the Tenders & Building stage, valued at about $ 100000 it is Works comprise construction of Fitzgerald emergency water supply dam. Click for more details...

SANDALFORD ESTATE WINERY
Civil Engineering (Dams) project at 71 (lot 212) Maxwell Rd, Caversham, WA 6055 for New. Construction of 12 x single storey chalets comprising of open plan bedroom/kitchen/lounge & entry area with separate bathroom & toilet. Construction of health spa, gymnasium, tennis courts, lake, 12 bay car park & additions to existing dwelling to convert into lodge facility. Click for more details...

NORSEMAN TIN DAM - ROOF & FENCING WORKS
Civil Engineering (Dams) project for Renovations, Refurbishments etc. development. Works to comprise of removal of dam roofing & repairs to surrounding fencing at Norseman Tin Dam. Click for more details...

CANNING DAM CHEMICAL DOSING FACILITY
Canning Dam, Canning Reservoir, Armadale, WA 6112 Has Canning Dam Chemical Dosing Facility currently at Construction stage. Works to comprise of design, construction, testing & commissioning of Canning Dam Chemical Dosing Facility upgrade. Click for more details...

LAKE JUALBUP - IMPROVEMENTS
Civil Engineering (Dams) project at Bnd by Herbert Rd Excelsior & Evans Sts & Lake Av, Shenton Park, WA 6008 for Renovations, Refurbishments etc.. Tenders were invited from consultants to prepare feasibility study for lake design at Lake Jualbup, maintaining lake & its surrounds in its current setting with permanent water & if that is not feasible, other options to maintain permanent water on a lesser scale & to investigate whether aquatic ecosystem can be developed within such design. Total area of Lake Jualbup Reserve (parkland vested in City of Subiaco) is 8.92 ha incorporating seasonal water body of 2.34 ha. Water compensating basin (lake) is Water Corporation registered asset & declared main drain & Water Corporation is resposible for management & protection of compensating basin. Lake receives & discharges drainage waters as well as ground water flow. Click for more details...

PICCADILLY DAM - KALGOORLIE
Currently at the Tenders & Building stage In Kalgoorlie-Boulder is a project estimated to be $ 500000. This project Concrete works for construction of Piccadilly Dam. Click for more details...

PICCADILLY DAM - KALGOORLIE
Civil Engineering (Dams) project for Supply & Install development. Supply & installation of HDPE liner & installation of Bentofix liner to new dam. Click for more details...

DONNYBROOK WASTEWATER TREATMENT PLANT & STORAGE DAM
Donnybrook Wastewater Treatment Plant & Storage Dam is currently at the Construction stage, valued at about $ 12000000 it is Works comprise: construction of new earthfill primary treatment pond & associated works; construction of 2 new sludge drying beds & associated works; construction of new earthfill treated effluent storage dam; construction of overland drain & berm to divert flow away from treated effluent storage dam; construction of reinforced concrete floodway; construction of inlet pipework, concrete inlet channel & associated works for treated effluent storage dam; construction of outlet pipework, valve pit & associated works for treated effluent storage dam; supply & installation of floating offtake & associated appurtenances for treated effluent storage dam; construction of outlet & inlet pipework for wastewater treatment plant; construction of concrete spillway for treated effluent storage dam & associated spillway outlet works; construction of access roads; construction of hardstand for future irrigation pump station; excavation & backfilling of trenches to contain underground electrical & instrumentation cables; construction of associated miscellaneous drainage systems for all structures; & site restoration. Click for more details...

PINNAROO VALLEY MEMORIAL PARK - SIR THOMAS MEAGHER LAKE REDEVELOPMENT
Pinnaroo Valley Memorial Park - Sir Thomas Meagher Lake Redevelopment is currently at the Construction stage, valued at about $ 200000 it is Works to comprise of construction of landscaping & irrigation for redevelopment project. Click for more details...

LARK HILL ENVIRONMENTAL WALK TRAILS - BOARDWALKS & VIEWING PLATFORMS
Civil Engineering (Dams) project for New development. Works to comprise of construction & installation of boardwalks & viewing platforms to form part of Lark Hill Environmental Walk Trails. Click for more details...

SHIRE OF RAVENSTHORPE - EARTH WALL DAM
Earth Wall Dam New project In The Ravensthorpe Council Area. Construction of 30,000 cu m earth wall dam within Shire of Ravensthorpe. Click for more details...

WUNDOWIE RECREATIONAL GROUNDS WATER STORAGE UPGRADE
Currently at the Construction stage In Northam is a project estimated to be $ 100000. This project Works include refurbishment of current dam for Wundowie Recreational Grounds water storage upgrade. Click for more details...

OCEAN OUTLET/OUTFALL - ALKIMOS WASTEWATER TREATMENT SCHEME
New project of Civil Engineering (Dams) project at Connected to Alkimos WWTP, extends 1 km onshore & 3.7 km offshore into Indian Ocean, Alkimos, WA 6033. Works comprise: Construction of 3.7 km ocean outfall with diameter of 1,200 mm & diffuser; construction of temporary pipe fabrication area & launch site; construction of temporary site access track; construction of connection pip to Alkimos Wastewater Treatment Plant (WWTP) approx 1,027 m in length with internal diameter of 2,000 mm to be constructed by tunnelling. Click for more details...

ALBANY TREATED WASTEWATER STORAGE DAM 2
New project of Civil Engineering (Dams) project at Timewell Rd, Albany, WA 6330. Works for construction of Albany Treated Wastewater Storage Dam 2 comprises: construction of earthfill embankment dam of approx 10 m in height with 4 m wide vehicular access road at crest of dam with embankments slopes of 1V:3H upstream & 1V:2:5H downstream. Dam also includes central clay core, vertical sand filter on downstream side, blanket sand filter & rock toe; compacted upstream clay blanket & clay liner with gravel cover layer to be constructed covering entire reservoir basin; small spillway drop structure on upper ridge of left abutment that allows flow into existing dam reservoir; construction of outlet works comprising floating offtake arrangement & reinforced concrete encased DN600 MSCL pipe installed through foundations underneath embankment; extension of new inlet works consisting of v-shaped 1.5 m wide HDPE lined open channel, approx 370 m in length with rockfill lining at end of channel upstream of floating offtake outlet works; construction of access road on dam crest; dam instrumentation - v-notch weir, water level measurement & installation of piezometers; minor realignment of existing dam embankment at top end of right abutment; concrete lined spillway down right abutment of existing dam TWSD 1; site restoration & rehabilitation of disturbed areas. Click for more details...

MUCHEA MULTI SPECIES LIVESTOCK CENTRE
Civil Engineering (Dams) New project at Muchea Rd East, Muchea, WA 6501. This type is Forward Works Package with State ownership. Construction of 1 km access road, drainage basin and dam. Click for more details...

WELLINGTON DAM REMEDIAL WORKS - COLLIE RIVER
Dam - Remedial Works project at Located on Collie River, approx 170km s/se of Perth, Burekup, WA 6227 in the Civil Engineering (Dams). Wellington Dam is 34m high gravity structure. Works comprise of demolition works, construction of new bridge structure, installation of post-tensioned ground anchors & other ancillary works. A series of high-tensile steel cables would be installed vertically through the wall into the bedrock below to enhance the dam's stability. An operations bridge will be built along the crest of the dam to provide access to install the steel cables & enable future maintenance & monitoring. Click for more details...

ROELANDS DAM SPILLWAY RECONSTRUCTION
Earthworks, Concrete & Pipe Works Renovations, Refurbishments etc. project In The Dardanup Council Area. Works to comprise completion of reconstruction & repair of Roelands Dam spillway involving earthworks, concrete works, pipe works & associated works at Roelands Dam on the site of the Roelands Village owned by the Australian Government's Indigenous Land Corporation. Click for more details...

WAGIN WATER STORAGE DAM
Currently at the Construction stage In Wagin is a project estimated to be $ 65000. This project To include a second water storage dam above the existing facility known as White dam, to involve 4 to 6 drill tests on-site to establish the clay type & sustainability, to construct a 25 million litre dam with a surface area of close to 1ha, to construct a suitable silt dam in front of the main dam, construction of a suitably spillway to the east of the dam, may be in conjunction with the silt dam, all dam walls must be suitably compacted with a dozer or equivalent. Click for more details...

DRAKESBROOK DAM REMEDIAL WORKS - STAGE 1
A project in the WA Within Waroona. Works to comprise of remedial works - stage 1 outlet works. Click for more details...

MILLAR ROAD LANDFILL FACILITY
Civil Engineering (Dams) project at Millar Rd, Baldivis, WA 6171 of Cell Capping/Leachate Dam type of New development. Works to include the construction of a Leachate Dam at the Millar Rd Landfill Facility & also cell capping of Cells 4, 5, 6 & 7. Click for more details...

LAKE LESCHENAULTIA DAM WALL/STONE PITCHING
Civil Engineering (Dams) project for Renovations, Refurbishments etc. development. Works to include rock toe protection works to the earth dam & full replacement of stone pitching at Lake Leschenaultia, Chidlow. Click for more details...

CLINCH STREET DRAIN - 30 ML STORMWATER STORAGE DAM
New project of Civil Engineering (Dams) project at Clinch St, Moora, WA 6510. Works to comprise construction of a 30 ML stormwater storage dam & associated equipment for the Clinch St drain in the west end property. Click for more details...

MUNDARING WEIR UNDERWATER CONCRETE CORING
New project of Civil Engineering (Dams) project at Mundaring Weir Rd, Mundaring, WA 6073. Works to include the design, fabrication, testing & operation of underwater coring apparatus on Mundaring Weir, horizontally cutting 2m deep at a depth of 30m. Click for more details...

DEPARTMENT OF REGIONAL DEVELOPMENT & LANDS LIVING LAKES STAGE 1
Department Of Regional Development & Lands Living Lakes Stage 1 is currently at the Construction stage, valued at about $ 400000 it is Feasibility study of revitalising inland lake systems to develop into recreational, social & economic opportunities. Click for more details...

SHIRE OF MERREDIN - DAM NO 4
A project in the WA Within Merredin. To include the construction of a lined dam, a pump house & associated mechanical & electrical equipment. Click for more details...

SHIRE OF MERREDIN - DAM NO 2
Civil Engineering (Dams) project at West of the townsite of, Merredin, WA 6415 of Evaporation Control Device - Supply, Installation & Testing type of New development. To include the supply, installation & testing of evaporation control device at dam no 2. Click for more details...

HARDING DAM
A project in the WA Within City Of Karratha. Works to include the design & construction of the Harding Dam WTP 50 MI/D upgrade works. Click for more details...

WATER CORPORATION - PREVENTION OF FALLS (POF) ON EXISTING ASSETS
Water Corporation - Prevention Of Falls (Pof) On Existing Assets is currently at the Tenders & Building stage, valued at about $ 5000000 it is Organisations with suitable experience, capability & capacity to delivery complete package of works comprising of: design; demolition; construction; structural steel fabrication; installation & restoration for dry well wastewater pump stations; elevated tanks & dam intake towers which have been identified for upgrade works at 92 various locations within WA within a 12 month period. Click for more details...

COLLIE KEMERTON WATER MANAGEMENT PROJECT
Collie Kemerton Water Management Project is currently at the Early Planning stage, valued at about $ 115000 it is Consultants to develop a Business Case for the Collie Kemerton Water Management Project based on the development of the integrated water management strategy. Click for more details...

AQUACULTURE & TOURIST ACTIVITES - MONKEY MIA
A project in the WA Within Shark Bay. Tenders invited from developers for the lease of Reserve 50101, Edel Location 106, Monkey Mia. Developers will need to incorporate the cultural, environmental, geographical & historical values of the area. The successful respondent will manage the facility in accordance with the Shire of Shark Bay's tourist regulations. The new development will need water & power supplies. Click for more details...

BURSWOOD PARK BOARD - CAR PARK/LAKE
Civil Engineering (Dams) project In The Victoria Park Council Area of Car Park/Lake - Addns & Altns type. To include the construction of a temporary car park & partial infilling of an existing lake which has a clay liner. Works to comprise demolition, earthworks, roads, drainage, lighting, line marking on roads, car parks & associated works. Click for more details...

PARDELUP PRISON FARM - DAM 21A - EXPANSION
Dam - Expansion project at Muir Hwy, Mount Barker, WA 6324 in the Civil Engineering (Dams). Works to include the expansion of Dam 21A to comprise of extending the eastern & northern walls to accommodate an extra 20,000 cubic meters of water & associated works. Click for more details...

HAWKES AVENUE WUNDOWIE STORAGE DAM
Storage Dam Cover - Design/Construct New project In The Northam Council Area. Works to include the design & construction of a storage dam cover. Click for more details...

SHIRE OF KELLERBERRIN - TOWN DAM
Town Dam project at Located 1 km south o the Kellerberrin town site on the Kellerberrin-Yoting Rd, Kellerberrin, WA 6410 in the Civil Engineering (Dams). Works to include the construction of the Town Dam. Click for more details...

SUCCESS HILL BORE
Civil Engineering (Dams) project In The Bassendean Council Area of Bore - Replacement Or Repair type. Success Hill Bore, Separable Portions Repair or Replacement, throughout the Town of Bassendean. Click for more details...