KINROSS WOLAROI SCHOOL
Civil Engineering (Docks & piers, wharves, boat ramps) New project at Spring Creek Reservoir, Orange, NSW 2800. This type is Boat Shed/Amenities with Private ownership. Construction of boat shed & amenities block for Rowing Training Course. Associated boat ramps & dock. Click for more details...

ST KILDA PIER KIOSK & CAFE
7 Jacka Bvd between Lwr Esplanade and Beaconsfield Pde, St Kilda, VIC 3182 Has St Kilda Pier Kiosk & Cafe currently at Construction stage. Reconstruction of the St Kilda Pier Kiosk, which will be a replica of the 1904 drawings for the Federation-era building apart from the interior being modernised and the rear of the European style pavilion replaced by a cafe seating 80 people indoors and 80 outdoors. There will also be a rooftop viewing platform and toilets. Kiosk 75sqm approx and cafe 140sqm approx. Click for more details...

MURRAY BRIDGE TOWNSHIP DEVELOPMENT
Wharf - Upgrade - Stage 2b project at Secn 556 & 1002 Hund Mobilong (adj Town Wharf) near, Murray Bridge, SA 5253 In The Council Area Of Murray Bridge of Local Govt. Brick paving, roadworks, kerbing, landscaping, electrical & drainage. Click for more details...

PORT OF GERALDTON - BERTH 4
Western Fillet For Berth project at Berth 4, Port of, Geraldton, WA 6530 in the Civil Engineering (Docks & piers, wharves, boat ramps). Works was to comprise construction of Berth 4 western fillet, consisting of approximately 75 sq m of pre-cast concrete plank supported on steel beams. Click for more details...

ESPERANCE FORESHORE PROTECTION & ENHANCEMENT PROJECT
Foreshore - Redevelopment New project In The Esperance Council Area. Four distinct development nodes have been defined & are recreational & tourism node with tidal pool & kiosks; retail node with marina, retail pier & commercial & recreational activities; cultural node; beach node with Heritage trails, shelters & kiosks & construction of protective seawall. Click for more details...

BEACHPORT BOAT RAMP
Beachport Boat Ramp is currently at the Construction stage, valued at about $ 245000 it is Construct 140 m x 18 m armour-rock breakwater, 4000 cub m approx 30-50 m off-shore & parallel to it. Construct tiered gabion wall, total ht 4 m, length 90 m on shore. Click for more details...

GERALDTON PORT ENHANCEMENT PROJECT
Currently at the Tenders & Building stage In City Of Greater Geraldton is a project estimated to be $ 100000. This project Works comprise protective coatings removal & replacement for Berth No. 6. Click for more details...

THROSBY CREEK BOAT RAMP - DOUBLE ENTRY REFER TO ID299678
Civil Engineering (Docks & piers, wharves, boat ramps) project for New development. Replacement of boat ramp & erection of a pontoon, access road & car parking. Click for more details...

OLD FORT HILL WHARF
Civil Engineering (Docks & piers, wharves, boat ramps) project at Old Fort Hill Wharf, Kitchener Bay, Darwin, NT 0800 for Renovations, Refurbishments etc.. Remove entire structure including complete pile extraction of Old Fort Hill Wharf & disposal of materials to nominated location on sea bed, remove large spill of concrete in west of wharf & temporary land based safety fencing to site during period of contract. Click for more details...

METUNG ROAD JETTY
Civil Engineering (Docks & piers, wharves, boat ramps) project at Metung Rd, Metung, VIC 3904 of Jetty type of New development. Construction of a 12 berth jetty & wet pens. Click for more details...

AUSTRALIAN MARINE COMPLEX WHARF DEVELOPMENT - PHASE 1A
East Berth - Extensions New project In The Cockburn Council Area. Works comprise of construction of extensions to East Berth (formerly 3,000 T loadout wharf) within common user facility located in Henderson (Cockburn Sound), extensions include piling, crane pads, electrical & hydraulic services, walkways & mooring & berthing capabilities. Click for more details...

LARGS NORTH INTEGRATED MARINE PRECINCT MARINA PONTOONS
Currently at the Construction stage In Port Adelaide Enfield is a project estimated to be $ 1000000. This project Design, fabrication, supply & installation of 101 approx marina pontoons with associated support structures & services. Pontoons include all walkways (no less than 1.8 m), flotation units, decking, framing & gangways (ramps). Include mild steel piles & gangways with concrete abutments at top of revetments & aluminium framed trussed system. Required services comprise electricity, water & fire fighting needs with all duct work & piping incorporated in walkways. Click for more details...

RIVERTON BRIDGE CAFE/KIOSK/ECO EDUCATION CENTRE**DOUBLE REPORT REFER ID 770574***
Local Govt ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Canning Council Area for New development. Replacement of existing small kiosk on site & construction of new cafe/kiosk, education centre & floating landing facility. Click for more details...

BEROWRA WATERS FIRE STATION
Civil Engineering (Docks & piers, wharves, boat ramps) project for New development. Construction of a new Rural Fire Station to be constructed in 3 stages. Stage 1 includes demolition of existing pontoon & the existing access ramp & construct a new pontoon with an access ramp. The pontoon will accommodate 2 aluminium flat bottom fire boats. The pontoon will be constructed with a fully welded aluminium frame with rota moulded polythene modules complete with mooring cleats & buffer extrusions for berthing vessels. The deck of the pontoon is to be 18mm thick compressed FC sheeting or expanded aluminium mesh. Stage 2 includes alterations & additions to the existing Ferry Masters residence to be used as the Rural Fire Station & Stage 3 will be for future installation of an air operated buoyancy lift dry dock cradles for the 2 vessels Click for more details...

RUSSELL ISLAND JETTY (CONTRACT QT16-127)
State ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Redland Shire Council Area for New development. Construction of a new galvanised steel landing and stairs arrangement. The works also include the installation of aluminium balustrade, rubber fenders and tactile ground surface indicators. Click for more details...

CUDGEN CREEK BOARDWALK
Clough Land to Marine Parade, Kingscliff, NSW 2487 Has Cudgen Creek Boardwalk currently at Tenders & Building stage. Cudgen Creek pedestrian/cycle boardwalk between Clough Way & Marine Parade & pedestrian/cycle path between Cudgen Creek & Moss Street, Kingscliff. Materials of boardwalk to include precast concrete beams. Click for more details...

JOHNS' CREEK BOAT HARBOUR - BOAT LAUNCHING RAMP
Civil Engineering (Docks & piers, wharves, boat ramps) project at Johns' Creek Boat Harbour, Point Samson, WA 6720 of Boat Launching Ramp type of Renovations, Refurbishments etc. development. Works may include duplication of the boat launching ramp & walk way refurbishment works. Click for more details...

DALPURA STREET MACLEAY ISLAND BOAT RAMP & CARPARK FACILITY
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Dalpura St, Macleay Island, QLD 4184. Materials, plant and labour necessary for the supply, delivery, removal, installation and defects liability for the construction of a 40m part tide boat ramp, carpark facility (13 carpark bays and 9 trailer park bays) and lighting upgrade. Click for more details...

YANCHEP FORESHORE PATHWAY & BOARDWALK
Civil Engineering (Docks & piers, wharves, boat ramps) project for New development. Works to include the design & construction of a foreshore 2.5 m wide pathway & boardwalk connecting Foreshore Vista & Compass Cir. Click for more details...

ROTTNEST ISLAND HOTEL JETTY
Currently at the Construction stage In Cockburn is a project estimated to be $ 402000. This project Works to include the demolition of the existing hotel jetty & to include the design & construction of a new jetty on the same footprint in Thomson Bay. Click for more details...

TANNUM SANDS BOAT RAMP
Civil Engineering (Docks & piers, wharves, boat ramps) project at Ibis Park, Tannum Sands, QLD 4680 for New. Project will involve a single lane boat ramp. Click for more details...

DENILIQUIN FISHWAYS & WEIR
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Deniliquin Council Area of State ownership. Scope of work includes: Vertical slot fishway at Stevens Weir. Click for more details...

PORT BOTANY BLB2 TERMINAL
Civil Engineering (Docks & piers, wharves, boat ramps) project at Fishburn Rd, Port Botany, NSW 2036 of Bulk Liquid Terminal type of New development. The BLB2 project comprises construction of a steel piled pier berth adjacent to the existing BLB1. Associated infrastructure such as marine loading arms, fire fighting equipment, onshore support facilities & pipelines from existing user sites to the new berth. BLB2 has been designed to accommodate 120,000 dead weight tonne vessels to a maximum of 270m length overall Click for more details...

SPIRIT INSIGHT MARTIAL ARTS CENTRE & NATURE BOARDWALK
Martial Arts Centre/Boardwalk project at 120 (Lot 1) Berkeley Rd (DP781022), Fountaindale, NSW 2259 in the Civil Engineering (Docks & piers, wharves, boat ramps). Construction of SIMAC - Spirit Insight Martial Arts Centre & associated structures such as an open air dojo incorporating reception/office area, amenities building including separate area for tea/coffee making & nature boardwalk through existing wetland. Facility will be self sufficient with solar power & rainwater tanks installed. Zen garden. Selected timber wall cladding, reinforced concrete floor, colorbond roof. Carparking for 10 vehicles. Click for more details...

POINT PERON BOAT LAUNCHING FACILITY FINGER JETTIES
Currently at the Construction stage In Rockingham is a project estimated to be $ 344000. This project Works to include the design & construction of 3 piled floating finger jetties & the demolition of 3 existing boat ramp finger jetties. Click for more details...

ABROLHOS ISLANDS - PUBLIC VESSEL MOORINGS
Civil Engineering (Docks & piers, wharves, boat ramps) project at Abrolhos Islands, 60 km west of Geraldton, ., WA 6999 of Public Vessel Moorings - Supply & Installation type of New development. To include the supply & installation of public vessel moorings. Click for more details...

BURRUM HEADS BOAT RAMP
Currently at the Construction stage In Fraser Coast Regional is a project estimated to be $ 5000000. This project Construction of a 2 lane boat ramp at northern extension of Burrum Heads Lions Park. Works to include relocation of drain, floating walkway, interlock reventment, low crested rock groyne & rigging zone. 28 car parking spaces & 48 car & trailor unit parking spaces. Associated landscaping. Click for more details...

SYDNEY INTERNATIONAL CONVENTION EXHIBITION & ENTERTAINMENT PRECINCT - INTERIM FACILITY
Civil Engineering (Docks & piers, wharves, boat ramps) project at Lot 10 Sommmerville Rd (DP1065973), Glebe Island, NSW 2039 of Conference Facility type of New development. Glebe Island Expo. Construction of a new purpose built temporary exhibition facility comprising: 25,000sq m of exhibition space; defined space for a ceremonial entrance & foyer area; registration/reception area; administration area; pre-function space; & public facilities including food & beverage outlets & bathroom amenities; back of house and external storage; waste management facilities; mechanical services; use of the site as an exhibition centre, function centre & food & drink premises. The proposed interim exhibition facility will comprise a weatherproof modular structure, comprising steel & aluminimum frame & polyester PVC coated white woven fabric canopy. All construction works are proposed to be undertaken above the existing sealed ground surface with no excavation works. It is anticipated that the pavilion style structure will simply be bolted onto the existing slab. Design & construction of a new link road onto Robert St & roundabout on Sommerville Rd; vehicular access from James Craig Rd to the south-west and exit onto Sommerville Rd & Robert Street to the north-west; delineation of internal access roads. construction of a temporary private wharf within the waterway adjacent to the north-east corner of the site; & dismantling & removal of structures. construction of a temporary private wharf within the waterway adjacent to the north-east corner of the site. Dismantling and removal of structures.Carparking for 1,000 vehicles. Click for more details...

STINGRAY WHARF
Addition project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Within Mandurah Entrance Channel, Mandurah, WA 6210. Design & construction of an extension to the existing Stingray Wharf. Click for more details...

BATAVIA COAST MARINA - JETTY A
Civil Engineering (Docks & piers, wharves, boat ramps) project at Located within the Batavia Coast Marina, 424km North of Perth, Geraldton, WA 6530 of Jetty A - Design & Construct type of New development. Works to include design & construction of Jetty A on the Batavia Coast Marina comprising of: demolition of the existing concrete & wood structure to be replaced by a new modern floating pen system to accommodate 42 vessels wherein the pens will range in length from 10m to 18m having a finger jetty extending the entire length of the pen making loading, unloading & general access easier, there will be 2 pens for catamarans up to 18m in length, jetty walkways to be made wider & the marina will have enhanced fire & security systems. Click for more details...

KARRATHA - BACK BEACH BOAT RAMP WORKS
Local Govt ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The City Of Karratha Council Area for New development. Works to include upgrade & rebuilding of the Back Beach boat ramp location to deep water. Works to include removal & replacement of existing static jetty with a new jetty incorporation vertical fenders sets at closer spacing to enhance safety. Construction of a new asphalt car park. Click for more details...

BRISBANE RIVER CITYCAT FERRY TERMINAL BULIMBA
Renovations, Refurbishments etc. project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Ferry Terminal, Bulimba, QLD 4171. Upgrade to Bulimba Ferry Terminal. Work to include additional seating for 30 people. Construction of new dual-berth pontoon & secure overnight moorings. Click for more details...

PORT HUGHES BOAT RAMP REDEVELOPMENT
Sections 1895 & 1894, Port Hughes, SA 5558 Has Port Hughes Boat Ramp Redevelopment currently at Construction stage. The Principal invites tenders for the provision of Design & Construction. The Principal has been working with a community steering party with regards to the upgrade of the Port Hughes boat ramp since 2008. The steering party settled on a design that would balance the requirement of the community for increased all weather access & the impact of the surrounding environment & the associate sand movement. The Principal with require construction services for the redevelopment of the Port Hughes Boat Ramp with consideration given to the approved plan. Council will be looking for tenderers to input their skills & knowledge by providing non-conforming alternative where appropriate, with particular attention given to the construction methods for the wharf area & the boat fender. Other items of note include, but are not limited to : a) The Port Hughes Boat Ramp is restricted by a number of factors including geological rock formations & sand movement to its current footprint. The aim of this project is to maximise the available manoeuvring area & throughput & therefore increase the utilisation & capacity of the facility. b) The wharf area (which is also the dredging vehicle access) should have a vertical wall, with suitably spaced boat stops (fenders) & recessed ladders. The ultimate final design of this should consider wave reflection & pricing should be presented in a way that allows flexibility with its overall length & therefore allowing the project to be completed within its defined budget. Note: the aim of this is to keep the wharf area approximately 250mm above the average high tide level, acknowledging that in winter storms it may be topped & the last 30m forming a ramp for excavator / truck access to the mouth of the harbour. c) Details on construction methods & the length of time where the facility will be unavailable for public use should be considered & documents as part of tender submissions. Click for more details...

NORTH QUAY FERRY TERMINAL
Civil Engineering (Docks & piers, wharves, boat ramps) project at 15 Queens Wharf Rd, Brisbane, QLD 4000 of Ferry Terminal type of New development. Retention of existing waiting facility. Construction of new dual berthing pontoon & gangway. Gangway will be designed to detach at shore end during floods allowing gangway to rise with flood water & swing behind the pontoon removing at from the direct impact zone of debris. Installation of new lift & ramps providing access from Queens Wharf Road intersection & North Quay to underside of Riverside Expressway & Ferry Terminal. Construction of Public plaza & viewing platform with seating & lighting. New pedestrian crossing & bicycle slow zone. New landscaping to embankment. Click for more details...

DANGAR ISLAND PONTOON
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Hornsby Council Area of Local Govt ownership. Construction of a new pontoon including gangway & connection to the existing Dangar Island public wharf. Click for more details...

SHELLHARBOUR BOAT RAMP
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Shellharbour boatharbour, Shellharbour, NSW 2529. Upgrade works to Shellharbour boat ramp. Work shall be split into two stages. Scope of work for stage 1: Boat ramp upgrade includes: preconstruction dilapidation survey, site mobilization, demolition & disposal of existing western boat ramp lane, installation of foundation piles, excavation & levelling above & below water level to allow installation of new boat ramp lane, installation of in situ reinforced concrete foundation beams, installation of in situ reinforced concrete slab on ground above MHWM, installation of precast concrete planks below MHWM, reinstatement of seabed material at toe of new boat ramp, As-built survey & completion & demobilisation. Scope of work for stage 2: new timer Jetty & Abutment includes: preconstruction dilapidation survey, site mobilisation, earthworks including demolition & excavation for reinforced concrete jetty abutment, installation of abutment foundation piles, installation of new reinforced concrete jetty abutment, installation of new jetty support piles, installation of timber jetty structure, installation of jetty plastic mesh decking, installation of timber & stainless steel handrails, completion of finishes to timber, As-built survey, completion & demobilisation. Click for more details...

MAYFIELD 7 BULK LIQUIDS BERTH
., Mayfield, NSW 2304 Has Mayfield 7 Bulk Liquids Berth currently at Construction stage. Construction of a new wharf structure to load & unload bulk liquid cargo. Click for more details...

EVANS LANDING WHARF REFURBISHMENT
Civil Engineering (Docks & piers, wharves, boat ramps) project for Renovations, Refurbishments etc. development. Removal/Demolition of existing beacon components, existing pile & Evans Landing wharf. Locate & cut below seabed 500mm pile & dispose ashore. Supply & Fabrication of Beacon: Steele Piling, aluminum work platform, aluminum lamp stand, weld-on pile cap. Supply Steelcoat system, Seashield system & all fasteners. Supply & Fabrication of port daymark, beacon identification sign, galvanised steel ladder clamps & section. Fabrication of all components necessary to installation of the Entire Pontoon Structure & deliver to site. Installation of entire pontoon structure including: Piling, pontoon abutment, pontoon & associated furniture & fittings, Pontoon gangway/fixed walkway & fittings. Signage. Installation of wharf includes Supply & Installation of piles & steelwork, sliding fender assembly, steel access deck, security fence & gate. The relocation of bollard to timber deck & modification of structural steel. Provision of cathodic protection for new steel frame & piling assembly required for pilot boat launch. Reconnection of existing services & cathodic protection system. Click for more details...

MANGROVE CREEK WEIR
Weir - Refurbishment project at Pembertons Hill Rd, Mangrove Creek, NSW 2250 In The Council Area Of Gosford of State. Scope of work includes: restoration works to the energy dissipation and erosion protection immediately downstream of the weir. Replacement of the tie bolts on the bracing elements of the steel sheet pile walls. Minor repairs to the reinforced concrete slab and the steel sheet pile wall. Optional works for the removal of accumulated sedimentation immediately upstream of the weir. Click for more details...

COOROOMAN CREEK BOAT RAMP WIDENING
State ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Rockhampton Regional Council Area for Addition development. Widening of existing boat ramp at Coorooman Creek, Zilzie. Works to include site establishment including fencing & installation of environmental management controls. Demolition of existing stone pitched shoulders & removal of existing solar light, information sign, guideposts & log fencing for reinstatement by others. Fabrication of precast concrete boat ramp planks & installation of pavement markers. Construction of boat ramp widening & complete crack repairs to existing boat ramp. Click for more details...

EAST ARM WHARF INTERIM BERTHING FACILITY
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Berrimah Rd (Portion 5986, 7219 Hundred of Bagot), East Arm, NT 0822. Construction of a 2 x 55m long floating berths approximately 2,010sq m. To include Hardstand loading area approximately 2,200sq m. Skip bins, storage shed security fencing & gate. Skip bins, handrails, ladder & guard rail. Relieving slab, fixed ramp, navigation aids & pneumatic fenders. Car parking for 6 cars. Associated landscaping. Click for more details...

FORT HILL WHARF LABROY PONTOON REFURBISHMENT
Civil Engineering (Docks & piers, wharves, boat ramps) project at 2 Kitchener Dr, Darwin, NT 0800 for Renovations, Refurbishments etc.. Refurbishment works to the 39m x 9m x 2m pilot pontoon (Labroy 120) at the Fort Hill Wharf. Works to include blasting with AS1627 class 2.5 whip blaster. Supply & application of primer paint at 75 - 100 microns & second coat with shield paint to 400 microns. Partial replacement of decking surface. Installation of temporary handrails. Click for more details...

DUNDEE BEACH BOAT RAMP RECONSTRUCTION
Boat Ramp - Reconstruction project at Located within, Dundee Beach, NT 0822 In The Council Area Of Unincorporated North of State. Reconstruction of the Dundee Beach boat ramp at Fog Bay. To include supply & installation of concrete foundations, geotextile fabric, precast concrete planks & crushed rock. Extension & augmentation of existing rock groyne to include foundation preparation, quarry run core material & 2 layers of graded armour rock. Dredging of access channel. Reprofiling & nourishment of beaches. Supply & installation of solar navigation aids. Click for more details...

FISHMARKET RESERVE BOAT RAMP
Civil Engineering (Docks & piers, wharves, boat ramps) project at Fishmarket Reserve, Lot 190 Swan St, Guildford, WA 6055 for New. Works to include the installation of a new concrete boat ramp on the existing ramp at Fishmarket Reserve to comprise of removal & disposal of existing rock pitching, supply & installation of a new concrete boat ramp, supply & installation of limestone rock pitching, reinstatement of turf, boulders & sign posts. Click for more details...

PORT OF ALBANY PILE BENT 89 FENDER REPAIRS BERTH 3
Fender - Upgrade project at Princess Royal Dr, Albany, WA 6330 in the Civil Engineering (Docks & piers, wharves, boat ramps). Construction of replacement of section of damaged steel 610UB113 transverse beam on pile bent 89. Works to include removal, disposal & replacement of damaged bollard anchor plate & angle braces on front face of the pile bent. righting of Pile, installation of replacement of double 610UB113 transverse beam, preparation & installation of one Fender unit. All other works as necessary to complete the aforementioned works. Click for more details...

SWAN REACH FERRY RAMP REFURBISHMENT
Ferry Ramp project at Ferry Ramp at, Swan Reach, SA 5354 In The Council Area Of Mid Murray of State. This tender is for the removal & replacement of sections of concrete ferry ramps. As the concrete ferry ramps are in excess of fifty years of age, some are in need of repair to keep them operational. The ramps have deteriorated due to dry back of the river bank during low water flows in the last drought. The concrete deteriorating with some sections showing exposed reinforcement. The reinforcement is also showing signs of corrosion which has accelerated concrete fractures. Areas for replacement (from top of ramp where concrete meets asphalt); Location : Swan Reach (west side) - Areas for repair 6x x 16m. Contact at Morgan Dockyard is David Hutton at david.hutton@sa.gov.au or mobile: 0408 080 240. Supply of Materials: The following materials will be supplied by the Principal: 1) Rubber Belting & 2) Steel Sheets. Click for more details...

PORT OF MELBOURNE BERTHING FACILITY FOR TUGBOATS
Civil Engineering (Docks & piers, wharves, boat ramps) project at ., Port Melbourne, VIC 3207 of Berthing Facility type of New development. Design & construction of a berthing facility for tugboats. Click for more details...

MACQUARIE WHARF NO. 1 HOTEL
Civil Engineering (Docks & piers, wharves, boat ramps) project at 18 Hunter St, Hobart, TAS 7000 of Wharf type of New development. Construction of wharf to include external decks & shade structures. Materials to include timber deck, galvanised steel pipe handrail, frameless glazed screens fixed to stainless steel posts, timber board stairs & aluminium stair nosings. Associated landscaping. Click for more details...

PINKENBA BASE WHARVES REFURBISHMENT 2016
State ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Brisbane City Council Area for New development. Pinkenba Marine Operations Base wharves (referred as Upstream Wharf and Downstream Wharf). Scope of work includes: Downstream Wharf - extract & dispose of 4 decayed timber fender piles; supply & install 4 replacement timber fender piles; remove all the existing 230 mm high x 150 mm wide of decayed hardwood timber kerbing; supply 230 mm high x 125 mm wide recycled plastic lumber (grey) and cut to required lengths to match existing kerb, re-use holes for the M20 bolts, and install plastic kerbs with new grade 316 stainless steel M20 bolts; remove all waler beams and supply and install replacement timber beams (match existing waler beams); remove 2 corroded steel ladders; supply & install steel ladders as replacments; all bent hand rails are to be straightened, sand blasted & repainted; all bollards are to be unbolted, sandblasted, repainted & reinstalled; cracks specified to be injected using an epoxy; decommissioning & removal of existing asbestos service pipe from under the deck; decommission & removal of existing electrical services; design & construct new electrical services to make safe; decommission & remove all existing firefighting services; design & construct new firefighting services; design & construct potable water supply to wharf & repair damaged/broken concrete at front face of wharf (next to decommissioned fire hydrant). Upstream Wharf - remove only decayed 230 mm high x 150 mm wide of decayed hardwood timber kerbing; supply 230 mm high x 125 mm wide recycled plastic lumber (grey) and cut to required lengths to match existing kerb, re-use holes for the M20 bolts, and install plastic kerbs with new grade 316 stainless steel M20 bolts; remove all waler beams and supply & install replacement timber beams (match existing waler beams); remove 3 corroded steel ladders from the Upstream Wharf; supply & install steel ladders as replacements; all bent hand rails to be straightened, sand blasted & repainted; corroded bollards to be unbolted, sandblasted, repainted & reinstalled; decommission & removal of existing electrical services; design & supply electrical connection to the existing light pole; decommission & remove all existing firefighting services; design & construct potable water supply to wharf; supply & install Denso Seashield 100 Series to all piles. Mooring Pen - undertake detailed design of mooring pen; supply & install mooring pen Click for more details...

JETTY PILE REPLACEMENT
Jetty Piles (40) - Supply/Install project at Various Jetties within the Council boundaries of, Yorke Peninsula, SA 5999 In The Council Area Of Yorke Peninsula of Local Govt. The Principal invites tenders for the supply & installation of forty (40) jetty piles at the following jetties within the Yorke Peninsula Council area: 1) Ardrossan x 5; 2) Edithburgh x 8; 3) Marion Bay x 4; 4) Point Turton x 5; 5) Port Julia x 4; 6) Port Victoria x 4; 7) Port Vincent x 4; & 8) Stansbury x 6. Click for more details...