State

Categories

Sub Categories

Click Here to Find Current Projects

List of Docks & piers, wharves, boat ramps Projects in QLD


DALRYMPLE BAY COAL TERMINAL - EXPANSION
Private ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Mackay Regional Council Area for New development. Expansions to 60 million tonnes per annum. Click for more details...

MARY RIVER PARKLANDS
Boardwalk/Landscaping New project In The Fraser Coast Regional Council Area. Proposed construction of a boardwalk & landscaping from public jetty in Wharf St to Brolga Theatre in Walker St. Click for more details...

UNIVERSITY OF QUEENSLAND - ST LUCIA CAMPUS
Civil Engineering (Docks & piers, wharves, boat ramps) project at College Rd, St Lucia, QLD 4067 of Boardwalk/Bridge type of New development. Boardwalk & bridge around lake. Click for more details...

BRISBANE CRUISE TERMINAL - PORTSIDE WHARF
Crusie Terminal/Serviced Apartments/ Units/Commerical - 4 & 9 Storey - Stage 1 project at 35 & 37 Harbour Rd 3 & 35 Hercules St, Hamilton Central, QLD 4007 in the Civil Engineering (Docks & piers, wharves, boat ramps). Construction of an international cruise terminal to handle vessels up to 76,000 tones. To include commercial & retail precinct. Stage 1 (stages A B & C) to include the Cruise Terminal Building (Building 7 & 8), Wharf & a 4 storey mixed commercial & residential building (Building 3). The cruise terminal building will include 1105sq m general retail precinct, 1970sq m restaurant precinct, 323sq m function centre. 654sq m cinema precinct, 905sq m office space, 96 room apartment hotel, 457sq m gymnasium & 1347 sqm permanet market space. Building 3 - 4 storey bulding with restaurants & cafes & on ground floor & 5 units above. Stage 1 will include basement & buildings works assoicated with the Cruise Terminal Building, & Building 3. The podium slab , basement slabs & ramps to basement car parks directly beneath the plaza area, the Cruise Terminal Buildign & Bulding 3. Permanent & tempoarary basement walls, the servic road to the wharf, new stormwater systems, wharf remediation & repair work. Click for more details...

NOTIONAL SEAWAY PROJECT CONSULTANCY FOR CRUISE SHIP TERMINAL
Consultancy For Cruise Ship Terminal/Marina Environmental Impact Statement New project In The Gold Coast City Council Area. The Notional Seaway Project comprises the following elements of the Gold Coast Marine Development Project, a cruise ship terminal on the northern end of The Spit and a marina for super yachts and other vessels in the Marine Stadium or to the west of Sea World. Click for more details...

RG TANNA COAL TERMINAL
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Gladstone Regional Council Area of State ownership. Construction of approx 382 m of steel framed wharf structure supported on 1200 mm dia steel piles with prestressed concrete decking & associated dolphin structures. Click for more details...

BUNDABERG PORT AUTHORITY
Civil Engineering (Docks & piers, wharves, boat ramps) project for New development. Concrete hard stand & associated works. Click for more details...

RIVERGATE MARINE & INDUSTRY PARK
Currently at the Construction stage In Brisbane City is a project estimated to be $ 50000000. This project Construction of 1.7ha of hardstand area for maintenance & repairs to boats, shiplift, associated ramps & finger wharves & amenities building. Click for more details...

ROCKHAMPTON RIVERBANK REDEVELOPMENT PROJECT
Civil Engineering (Docks & piers, wharves, boat ramps) New project at Riverbank, Rockhampton, QLD 4700. This type is Boardwalk/Shelters/Restrooms with State ownership. Construction of boardwalk, shelters, restrooms & other ancillary facilities. Click for more details...

DEPARTMENT OF MAIN ROADS JETTIES & PONTOONS
Civil Engineering (Docks & piers, wharves, boat ramps) New project at Various locations within the North of Queensland via, ., QLD 4999. This type is Jetties/Pontoons with State ownership. For the fabrication and installation of aluminium mesh infills to handrails and other safety upgrades to jetties and pontoons in the North Queensland area. Click for more details...

RUSSELL ISLAND JETTY (CONTRACT QT16-127)
State ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Redland Shire Council Area for New development. Construction of a new galvanised steel landing and stairs arrangement. The works also include the installation of aluminium balustrade, rubber fenders and tactile ground surface indicators. Click for more details...

BRAMPTON ISLAND/LINDEMAN ISLAND JETTIES (CONTRACT QT16-128)
Civil Engineering (Docks & piers, wharves, boat ramps) project at Brampton Island,, Lindeman Island, QLD 4741 for New. The work involve replacement of timber headstocks, girders and decking, provide new stairways and balustrades, replacing of fenders piles, provide new lighting and power supply plus other associated works. Click for more details...

PORT OF BRISBANE CONTAINER BERTHS 12 & 13
Currently at the Construction stage In Brisbane City is a project estimated to be $ 5000000. This project Construction of Berths 12 & 13 & associated terminal at the Port of Brisbane. The new terminal will have a total area of 26 hectares, a total quay length of 660 metres and a depth alongside of 14 metres. Click for more details...

RG TANNA COAL TERMINAL
Water Treatment System For Dozer Workshop Facility project at ., Gladstone, QLD 4680 in the Civil Engineering (Docks & piers, wharves, boat ramps). Water Treatment System for Dozer Workshop Facility Click for more details...

DALPURA STREET MACLEAY ISLAND BOAT RAMP & CARPARK FACILITY
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Dalpura St, Macleay Island, QLD 4184. Materials, plant and labour necessary for the supply, delivery, removal, installation and defects liability for the construction of a 40m part tide boat ramp, carpark facility (13 carpark bays and 9 trailer park bays) and lighting upgrade. Click for more details...

PORT OF TOWNSVILLE BERTH 8 & 10 UPGRADE & INNER HARBOUR EXPANSION PROJECT STAGE A
Civil Engineering (Docks & piers, wharves, boat ramps) New project at ., Townsville, QLD 4810. This type is Berth Upgrade/Military & General Cargo Facility - Stage A with State ownership. Townsville Port Inner Harbour Expansion involves reconfiguration of the inner harbour to maximise the capacity of existing infrastructure & provide safe & secure harbour for the next generation of commercial, cruise & military ships. Cruise, Military & General Cargo Facility on existing Berth 10 at the Port. Includes development of Passenger Terminal with public spaces, new wharves & associated marine works & provision of services to the facility. Other TPIX projects may be included within the contract subject to availability of funding. New Ship loader to be constructed on Berth 8 & any augmentation works necessary to Berth 8 to facilitate construction of the new ship loader. The works include the design & documentation of - new elevated conveyors, gantries & transfer towers. Upgrading of existing vessel fendering on part of Berth 8. Click for more details...

RG TANNA COAL TERMINAL CHUTE FOR SHIPLOADER
Rg Tanna Coal Terminal Chute For Shiploader is currently at the Construction stage, valued at about $ 2000000 it is Refurbishment or Fabrication of Telescopic Chute for Shiploader 1 & 2 RGTCT. Click for more details...

ABBOT POINT COAL TERMINAL X50 EXPANSION DS1 ABD IL1 STRUCTURAL MECHANICAL & ELECTRICAL WORKS
Civil Engineering (Docks & piers, wharves, boat ramps) project for New development. Rail Unloader (Dumpstation) 1 - including installation of principal supplied wagon vibrating system and vibrating feeders, extension of superstructure, modification to rail support beams, replacement of new steel hoppers and belt weighers, control room fit out. Inloading Conveyors C101/C102/C103 Upgrade - Modification to concrete pedestals and installation of concrete slabs. Strengthening works to existing elevated galleries, modification to existing transfer towers, installation of drive access platforms, modifications and upgrade to conveyor system. Click for more details...

QLD BOAT RAMPS
Civil Engineering (Docks & piers, wharves, boat ramps) project at Various locations, ., QLD 4999 for New. Burrum Heads, Burrum Heads Road - boat ramp elevated shoulders installation. Kalkie, McGills Road - new 2 lane boat ramp. Russell Island, Jock Kennedy Park - new single lane boat ramp. Rosslyn Bay Boat Harbour - No 2 (Anchor Drive) boat ramp reconstruction. Click for more details...

DOWSE LAGOON REHABILITATION
Dowse Lagoon, Sandgate, QLD 4017 Has Dowse Lagoon Rehabilitation currently at Construction stage. Project will include boardwalks, barbeques, shelters, signage & fitness equipment. Click for more details...

MOURILYAN HARBOUR BOAT RAMP
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Mourilyan Harbour, Mourilyan, QLD 4858. Project consists of a new boat ramp, breakwater & floating walkway: includes asphalt & bitumen, solar lights, piling, concrete pipes, linemarking & accommodation. Click for more details...

HOWARD BOAT RAMP WIDENING
Boat Ramp - Widening Addition project In The Fraser Coast Regional Council Area. Project will involve widening the existing boat ramp. Click for more details...

TANNUM SANDS BOAT RAMP
Civil Engineering (Docks & piers, wharves, boat ramps) project at Ibis Park, Tannum Sands, QLD 4680 for New. Project will involve a single lane boat ramp. Click for more details...

AUSTRALIAN INSTITUTE OF MARINE SCIENCE JETTY CAPE FERGUSON FACILITY
Civil Engineering (Docks & piers, wharves, boat ramps) project at 1526 Cape Cleveland Rd (50km South of, Townsville, QLD 4810 for New. Repairs include removal & replacement of delaminated concrete to the soffit area & application of nominated coatings to the concrete surfaces. Click for more details...

DAVID FLEAY WILDLIFE PARK BOARDWALK
Civil Engineering (Docks & piers, wharves, boat ramps) New project at West Burleigh Road, Tallebudgera, QLD 4228. This type is Boardwalk with State ownership. Construction of timber & concrete boardwalk. Click for more details...

ST GEORGE BOAT RAMP WIDENING
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Balonne Shire Council Area of Boat Ramp type. Widen existing one lane boat ramp to duel lane ramp using pre-fabricated concrete planks. All supply of pre-fabricated concrete planks will be supplied by principal contractor (RoadTek) and be delivered to site. Concrete planks will be position onto sub grade foundation of 75mm crushed rock & bolted together. Click for more details...

TORQUAY VIEWING DECK & DISABILITY ACCESS RAMP PROJECT
Local Govt ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Fraser Coast Regional Council Area for New development. Construction of viewing deck & disability access ramp. Click for more details...

BRISBANE RIVER CITYCAT FERRY TERMINAL BULIMBA
Renovations, Refurbishments etc. project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Ferry Terminal, Bulimba, QLD 4171. Upgrade to Bulimba Ferry Terminal. Work to include additional seating for 30 people. Construction of new dual-berth pontoon & secure overnight moorings. Click for more details...

INNISFAIL BOAT HARBOURCOMMERCIAL WHARF
A project in the QLD Within Cassowary Coast Regional. Construction of a replacement commercial wharf at Innisfail Boat Harbour. To include the demolition/removal of existing 180sq m reinforced conrete wharf. Click for more details...

SHORNCLIFFE PIER RENEWAL PROJECT
Currently at the Construction stage In Brisbane City is a project estimated to be $ 3000000. This project Removal of existing pier. Construction & removal of temporary causeway. Construction of new 350m pier. To include installation of new shelter. Power & Lighting. Bored concrete piles, pre-cast concrete headstockes, concrete girders, timber deck, timber balustrades. Associated landscaping. Click for more details...

HOLMAN STREET FERRY TERMINAL UPGRADE
A project in the QLD Within Brisbane City. Retention of existing Terminal waiting facility & Heritage listed shed. Construction of new pontoon & gangway. Removal of all other structures. Reconfiguration of existing car park in Captain Burke Park. Construction of dedicated passenger drop off zone. Click for more details...

QUEENSLAND UNIVERSITY OF TECHNOLOGY FERRY TERMINAL
Civil Engineering (Docks & piers, wharves, boat ramps) New project at Gardens Point Rd, Brisbane, QLD 4000. This type is Ferry Terminal with Local Govt ownership. Construction of new Ferry Terminal 50m down river from existing flood damaged terminal. To include new boat shaped dual berthing roofed pontoon with seating area for passengers. Detachable gangway allowing pontoon to be removed from direct impact zone during flooding. New pier. Click for more details...

NORTH QUAY FERRY TERMINAL
Civil Engineering (Docks & piers, wharves, boat ramps) project at 15 Queens Wharf Rd, Brisbane, QLD 4000 of Ferry Terminal type of New development. Retention of existing waiting facility. Construction of new dual berthing pontoon & gangway. Gangway will be designed to detach at shore end during floods allowing gangway to rise with flood water & swing behind the pontoon removing at from the direct impact zone of debris. Installation of new lift & ramps providing access from Queens Wharf Road intersection & North Quay to underside of Riverside Expressway & Ferry Terminal. Construction of Public plaza & viewing platform with seating & lighting. New pedestrian crossing & bicycle slow zone. New landscaping to embankment. Click for more details...

ABEL POINT PONTOON REPLACEMENT
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Whitsunday Regional Council Area of State ownership. Design & construction of a pontoon to replace the existing pontoon at Abel Point. To include design of pontoon, gangway & abutment. Supply & fabrication of pontoon & associated components. Supply & installation of pontoon piling including polyethylene sleeves, pontoon gangway & gangway abutment. Click for more details...

EVANS LANDING WHARF REFURBISHMENT
Civil Engineering (Docks & piers, wharves, boat ramps) project for Renovations, Refurbishments etc. development. Removal/Demolition of existing beacon components, existing pile & Evans Landing wharf. Locate & cut below seabed 500mm pile & dispose ashore. Supply & Fabrication of Beacon: Steele Piling, aluminum work platform, aluminum lamp stand, weld-on pile cap. Supply Steelcoat system, Seashield system & all fasteners. Supply & Fabrication of port daymark, beacon identification sign, galvanised steel ladder clamps & section. Fabrication of all components necessary to installation of the Entire Pontoon Structure & deliver to site. Installation of entire pontoon structure including: Piling, pontoon abutment, pontoon & associated furniture & fittings, Pontoon gangway/fixed walkway & fittings. Signage. Installation of wharf includes Supply & Installation of piles & steelwork, sliding fender assembly, steel access deck, security fence & gate. The relocation of bollard to timber deck & modification of structural steel. Provision of cathodic protection for new steel frame & piling assembly required for pilot boat launch. Reconnection of existing services & cathodic protection system. Click for more details...

NORTHSHORE HAMILTON WHARF DEMOLITION - STAGE 1
Northshore Hamilton Wharf Demolition - Stage 1 is currently at the Construction stage, valued at about $ 2505000 it is Demolition of Hamilton wharf precinct 3 & associated infrastructure. To include site preparation, wharf demolition works, traffic management, removal of redundant infrastructure, disposal of materials, minor earthworks & associated works. Click for more details...

COOROOMAN CREEK BOAT RAMP WIDENING
State ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Rockhampton Regional Council Area for Addition development. Widening of existing boat ramp at Coorooman Creek, Zilzie. Works to include site establishment including fencing & installation of environmental management controls. Demolition of existing stone pitched shoulders & removal of existing solar light, information sign, guideposts & log fencing for reinstatement by others. Fabrication of precast concrete boat ramp planks & installation of pavement markers. Construction of boat ramp widening & complete crack repairs to existing boat ramp. Click for more details...

ST HELENS BEACH CARPET SNAKE POINT BOAT RAMP
Boat Ramp - Upgrade New project In The Mackay Regional Council Area. Proposed upgrade of the existing boat ramps & car park. Scope of work includes: reconstruction of the existing boat ramp. Construction of an adjoining rock breakwater structure. Construction of an approach road/causeway Click for more details...

EVANS LANDING BOAT RAMP CAR PARK STAGE 2
Boat Ramp/Car Park - Stage 2 project at ., Weipa, QLD 4874 in the Civil Engineering (Docks & piers, wharves, boat ramps). Construction of concrete pad & de-rigging bays & amenities building. Additional lighting. Full kerbing. Security fencing. Bin bay on concrete slab. Shaded picnic facility. Associated car parking & landscaping. Click for more details...

REDCLIFFE JETTY FENDER PILE UPGRADE
Civil Engineering (Docks & piers, wharves, boat ramps) Renovations, Refurbishments etc. project at Redcliffe Jetty, Redcliffe, QLD 4020. This type is Jetty - Upgrade with Local Govt ownership. Supply & installation of the steel berthing piles for the Redcliffe Jetty Southern Finger. To include removal of existing timber piles & installation of 5 steel piles, HDPE casing, fender unit & mooring cleat. Click for more details...

NOJOOR ROAD CAR PARK & BOAT RAMP
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Nojoor Rd, Twin Waters, QLD 4564. Construction of car park & boat ramp. To include 40 boat parking & 10 car spaces, road extension, drainage work & design & construction of floating walkway. Associated landscaping. Click for more details...

COLMSLIE BOAT RAMP RECONSTRUCTION & FLOATING WALKWAY REPLACEMENT
Boat Ramp Renovations, Refurbishments etc. project In The Brisbane City Council Area. Reconstruction of Colmslie Boat Ramp & the replacement of the floating walkway. Works to include removal & offsite disposal of existing floating walkway modules, piles & abutment. Earthworks. Design, fabrication & construction of the floating walkway. Supply & placement of Type RG4000 precast ramp planks for two boat ramp lanes. Placement of 3 Principal supplied Type T4000 precast ramp (terminator) planks. Supply & placement of grouted scour protection at the toe of the ramp. Construction of cast insitu concrete connecting slab & plank connection. Construction of fully grouted rock shoulders & ungrouted rock shoulders. Click for more details...

BELLENDEN KER BOAT RAMP
Russell River Rd, Bellenden Ker, QLD 4871 Has Bellenden Ker Boat Ramp currently at Construction stage. Reconstruction of the 2 lane boat ramp at Bellenden Ker to meet current all tide standards. Click for more details...

STARBOARD DRIVE & HORSESHOE BAY ROAD
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Starboard Dr & Horeshoe Bay Rd, Bowen, QLD 4805. Reconstruction of existing boat ramps, including the installation of new grouted concrete shoulders and precast concrete planks. Works at Starboard Drive also include the installation of a floating walkway and associated widening works. Click for more details...

PORT OF TOWNSVILLE BERTHS
Berth - Upgrades New project In The Townsville City Council Area. Undertake remedial works across berths 1, 2, 8 & 9. Scope of work involves: repair of concrete defects on the soffit of wharf decks and DENSO wrapping of steel wharf piles. Click for more details...

WESTERN DOWNS PONTOONS
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Various locations within the Darling Downs region including Chinchilla and, Condamine, QLD 4416. Design and construction of pontoons (five in total) at the following locations: Chinchilla Tara Rd, Chinchilla. Condamine Meandarra Rd, Condamine. Charles St, Dirranbandi. Bowen St, St George. Weir Rd, Cunnamulla. Removal and disposal of two existing pontoons at Bowen St, St George and Weir Rd, Cunnamulla. Click for more details...

BURKETOWN WHARF & BOAT RAMP
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Burke Shire Council Area of Local Govt ownership. Replacement of the existing single lane ramp. Construction of a 3 lane boat ramp & concrete hardstand. Click for more details...

MACKAY RIVER STREET BOAT RAMP
Civil Engineering (Docks & piers, wharves, boat ramps) New project at River St, Mackay, QLD 4740. This type is Boat Ramp/Walkway with State ownership. Reconstruction of the existing boat ramp. Design & construct a floating walkway including abutment, restraint piles & floatation modules. Scope of work includes: widening the space for the car-trailer turning area at the head of the ramp. Addition a 2.5m wide floating walkway support lane without destabilising the slope stability of the downstream side batter. Installation of a new heavy duty floating walkway without compromising the number of lanes; due to the likelihood of high flood velocities it is anticipated at least five piles including an end pile may be required in this location. Necessary modifications to the kerbs and traffic islands. The upstream side rock revetment should be further strengthened but no widening will be possible due to the high flood velocities closer to the southern bank Click for more details...

TOWNSVILLE ROSS CREEK BOAT RAMP
Ross Creek, Townsville, QLD 4810 Has Townsville Ross Creek Boat Ramp currently at Construction stage. Remove & rebuild part of the existing boat ramp Click for more details...

THURSDAY ISLAND AND HORN ISLAND MARINE INFRASTRUCTURE
Steel Marine Infrastructure - Refurbishment New project In The Torres Strait Island Regional Council Area. Refurbishments and maintenance of protective coatings to marine steel infrastructure at Thursday Island and Horn Island Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect