State

Categories

Sub Categories

Click Here to Find Current Projects

List of Docks & piers, wharves, boat ramps Projects in VIC


ST KILDA PIER KIOSK & CAFE
7 Jacka Bvd between Lwr Esplanade and Beaconsfield Pde, St Kilda, VIC 3182 Has St Kilda Pier Kiosk & Cafe currently at Construction stage. Reconstruction of the St Kilda Pier Kiosk, which will be a replica of the 1904 drawings for the Federation-era building apart from the interior being modernised and the rear of the European style pavilion replaced by a cafe seating 80 people indoors and 80 outdoors. There will also be a rooftop viewing platform and toilets. Kiosk 75sqm approx and cafe 140sqm approx. Click for more details...

BULLOCK ISLAND VESSEL REPAIR AREA
Civil Engineering (Docks & piers, wharves, boat ramps) New project at Bullock Island, Gippsland Basin, VIC 3999. This type is Ciivil Works-Docks, Landscape Works - Design with Local Govt ownership. Gippsland Ports invites submissions for the provision of design services for the development of the Bullock Island Vessel Repair Area. The scope of the design works includes: Site and Civil works layouts; Seawall; alongside berthing; Straddle carrier jetties; Pavement, hardstand and service areas; 100 Tonne capacity straddle carrier; Services; Waste treatment; Amenities upgrade; Carpark; Fencing and security. Click for more details...

MARLAY POINT JETTY/PONTOON
Civil Engineering (Docks & piers, wharves, boat ramps) project for New development. Design & Construction of a Jetty/Pontoon at Marlay Point, Lake Wellington, Victoria. Click for more details...

RIVERSIDE DECK JETTY & BOAT RAMP
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at 4 Riverside Ln, Barwon Heads, VIC 3227. Construction of deck jetty and boat ramp. Click for more details...

EAGLE POINT JETTY
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Foreshore, Eagle Point, VIC 3878. Construction of a jetty on the foreshore between the two existing jetties. The jetty will contain 12 private berths as well as two public access berths. The jetty will not extend past the current line formed by the existing jetties. Click for more details...

YARRA RIVER FLOATING LANDING
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Melbourne Council Area of Private ownership. Design, construct and install a floating landing, approximately 4 metres wide along the Yarra River, Melbourne. Associated works include minor earthworks and path construction, construction of access landing, fabrication and installation of gangway and installation of new lighting. Click for more details...

CROWN FLOATING LANDING
A project in the VIC Within Melbourne. Design, construct and install a floating landing, approximately 4 metres wide along the Yarra River, Melbourne. Associated works include minor earthworks and path construction, construction of access landing, fabrication and installation of gangway and installation of new lighting. Click for more details...

METUNG ROAD JETTY
Civil Engineering (Docks & piers, wharves, boat ramps) project at Metung Rd, Metung, VIC 3904 of Jetty type of New development. Construction of a 12 berth jetty & wet pens. Click for more details...

HOPKINS RIVER FLOATING JETTY
Floating Jetty Construction project at Jubilee Park recreation reserve, Allansford, VIC 3277 In The Council Area Of Warrnambool of Local Govt. Construct a floating jetty on the Hopkins River. Click for more details...

STATION PIER PASSENGER GANGWAY-BOARDING BRIDGES
Station Pier, Port Melbourne, VIC 3207 Has Station Pier Passenger Gangway-Boarding Bridges currently at Construction stage. The design, supply and installation of two new passenger gangway-boarding bridges. Click for more details...

LAKES ENTRANCE FLOATING JETTY & ACCESS RAMPS
A project in the VIC Within East Gippsland. Supply, Delivery and Installation of a Floating Jetty and Access Ramp at the Western Boat Harbour, Lakes Entrance, East Gippsland. Click for more details...

DOCKLANDS YARRA'S EDGE LOWRISE TOWNHOUSES
Townhouses (30) - Stage 1 New project In The Melbourne Council Area. Stage 1 expected to consist of approximately 30 riverfront low-rise townhouses. Also some demolition and wharf and infrastructure works. Click for more details...

ST PATRICKS POINT JETTY
Jetty Construction New project In The Ballarat Council Area. Construction of a Jetty at the Lake Wendouree Foreshore, Lake Wendouree. Click for more details...

PORT OF MELBOURNE PORT STRUCTURE UPGRADES
Port Structure Upgrades project at 32 South Wharf, East Swanson Dock, West Swanson Dock, Port Melbourne, VIC 3207 In The Council Area Of Melbourne of State. Tenders are invited to undertake upgrade works to strengthen and stabilise existing port structures including wharves, retaining walls, sheds and embankments at the following locations. Click for more details...

DAREBIN CREEK-YARRA TRAIL LINK STAGE 2
Bike Path/Walking Trail project at 27 Willow Gr, Willsmere Park, Napier Waller Reserve, Kew East, VIC 3102 In The Council Area Of Boroondara of State. The Principal invites tenders for the construction of four pedestrian bridges, concrete shared path & associated works from Sparks Reserve to Main Yarra Trail, Alphington. Click for more details...

YARRAVILLE WHARF TO NEWPORT PARK
Yarraville Wharf To Newport Park is currently at the Construction stage, valued at about $ 4000000 it is Upgrade works to strengthen and stabilise existing port structures including wharves, retaining walls and embankments at Yarraville Wharf to Newport Park. This work is associated with the Channel Deepening Project which is proposed for Port Phillip Bay commencing in 2008 and is part of the necessary preparatory work for the delivery of the project and is subject to receipt of all necessary project approvals. Click for more details...

PORT OF MELBOURNE MAINTENANCE DEPOT PIER & SITE UPGRADE WORKS
., Port Melbourne, VIC 3207 Has Port Of Melbourne Maintenance Depot Pier & Site Upgrade Works currently at Construction stage. Tenders are invited from suitably experienced companies for the upgrading of the Port's maintenance depot. The scope of works includes the supply, installation and construction of pier, wharf and jetty repairs, building refurbishment, pavement and road repairs, rockbeaching and services upgrading. Click for more details...

STATION PIER BUILDING ALTERATIONS
Station Pier Building Alterations is currently at the Construction stage, valued at about $ 1500000 it is Structural modifications to the deck at Station Pier including housing for two new lifts, relocation of two escalators and a new glazed wall and office. Click for more details...

CONVESSO 8 WATERSIDE PLACE VICTORIA HARBOUR
Civil Engineering (Docks & piers, wharves, boat ramps) New project at No 8 Waterside Pl Victoria Harbour, Docklands, VIC 3008. This type is Residential & Retail Development with Private ownership. Construction of a 32 level residential building with ground floor retail of 1603 square metres and associated works to public spaces and infrastructure including waterfront promenade, streetscape works and wharf. The Bates Smart designed tower is split between a podium level with 5-6 levels of carpark with band beam & slab & precast walls. With 69 apartments above facing south onto Bourke Street and 17 luxury waterfront apartments on the northern side. Retail shops on the Bourke Street frontage. The development will also feature 125 tower apartments and 9 penthouses. Structure of conventionally reinforced floor slab, insitu concrete columns and internal jump form system.The name of the apartments derives from its outer curving precast facade. Sustainability is a large feature of the development with operable windows for cross ventilation and natural light. Exhaust systems will be ducted to outside. Double glazing and acoustically insulated walls to reduce noise. A 200,000 lt rainwater tank for reduction of water consumption and water efficient fittings. Also installation of energy efficient systems including ''smart metering'' and master switch for each apartment to cut down on energy usage when not occupied. Click for more details...

BURNLEY HARBOUR BOAT RAMP RECONSTRUCTION
Civil Engineering (Docks & piers, wharves, boat ramps) project at Yarra River, Burnley, VIC 3121 for New. Upgrade of the boat ramp to the Yarra River at Burnley. Works include removing the existing concrete block flexmat, new piling, installation of edge beams, precast deck panels and ground slab and reformation of existing armour rock. Click for more details...

ESSENDON CANOE CLUB FLOATING JETTY PLATFORM
22 Woods St, Ascot Vale, VIC 3032 Has Essendon Canoe Club Floating Jetty Platform currently at Construction stage. Replacement of existing floating jetty platform on Maribyrnong River and reconstruction realignment of conrete access to pathway. Click for more details...

YARRA BOULEVARD BOARDWALK RECONSTRUCTION
Civil Engineering (Docks & piers, wharves, boat ramps) project at Yarra Boulevard, Richmond, VIC 3121 for New. Reconstruction of Yarra Boulevard Boardwalk. Click for more details...

FRANKSTON YACHT CLUB REDEVELOPMENT
Civil Engineering (Docks & piers, wharves, boat ramps) project at Foreshore St, Kananook Creek, Frankston, VIC 3199 of Yacht Club/Restaurant/Function Centre/Cafe type of New development. Construction of a new Frankston Yacht Club to include the demolition of the existing Yacht Club building and construction of a new 3 storey facility and public realm works. The redevelopment will include new Yacht Club facilities including a boat storage yard and boat shed, club rooms, a ground floor café and public toilets, a first floor restaurant, a second floor safety lookout/navigation room, a timber-decked beach promenade, timber and concrete boat ramp, steel sheet-pile sea wall, external landscaping, road works and car parking. Click for more details...

FOOTSCRAY WHARF REDEVELOPMENT
Civil Engineering (Docks & piers, wharves, boat ramps) project at Footscray Wharf, Footscray, VIC 3011 of Wharf - Redevelopment type of New development. Redevelopment of Footscray Wharf. Works involve demolition and rehabilitation of an existing timber wharf, commercial marina construction, riverbank protection, minor pavement and landscaping. Click for more details...

CURLEW POINT DRIVE JETTY REPLACEMENT
Civil Engineering (Docks & piers, wharves, boat ramps) project for New development. Construction of replacement jettys. Click for more details...

LONG ISLAND BOARDWALKS
Long Island, Lakes Entrance, VIC 3909 Has Long Island Boardwalks currently at Construction stage. Construction of boardwalks at Long Island, Lakes Entrance. Click for more details...

ST KILDA HARBOUR REDEVELOPMENT MASTER PLAN
Civil Engineering (Docks & piers, wharves, boat ramps) New project at St Kilda Pier, St Kilda, VIC 3182. This type is Harbour Redevelopment Master Plan with State ownership. The proposed design features are wave and storm protection to provide an area for safe berthing, mooring and recreational activities within the harbour, reconstruction of the St Kilda Pier on the historic alignment meeting Jacka Boulevard, a new sea pool for swimming and viewing integrated into the pier, creation of an access-for-all swimming ramp from the promenade adjacent to the pier, enhance protection for the Little Penguin colony, including the creation of a viewing boardwalk, provide a new offshore swimming island and wave protection for the harbour, create a new junior sailing academy, boat repair and storage yard combined with a ferry terminal and ticket office, convert pier road in front of Royal Melbourne Yacht Squadron to a new public promenade and open space, protect the historic bluestone sea wall and Catani Gardens, additional marina berths to cater for the growing recreational boating sector. Click for more details...

VICTORIA HARBOUR PRECINCT NEW QUAY MARINA
Marina (2) project at Marina 31, New Quay Promenade, Victoria Harbour Precint, Docklands, VIC 3008 in the Civil Engineering (Docks & piers, wharves, boat ramps). Construction of a new private marina within New Quay West and a new public marina in New Quay East, Victoria Harbour Precinct. Click for more details...

NORTH WHARF SHIP DRY DOCK SUPPORT STRUCTURE
A project in the VIC Within Melbourne. Proposed construction of ship dry dock support structure and associated works. Click for more details...

PELICAN SHORES RETIREMENT VILLAGE
Currently at the Construction stage In Greater Geelong is a project estimated to be $ 165000. This project Construction of a boardwalk. Click for more details...

DAREBIN CREEK SHARED TRAIL - PART A & B
Shared Trail project at Gronn St to Hold Pde, Reservoir, VIC 3073 in the Civil Engineering (Docks & piers, wharves, boat ramps). PART A - Approximately 547 lineal metres of 2.5 metre wide concrete shared path including linemarking and signage. PART B - 33 lineal metres of 3.0m wide boardwalk construction. Click for more details...

MILDURA RIVERFRONT PRECINCT REDEVELOPMENT STAGE 1
Currently at the Construction stage In Mildura is a project estimated to be $ 1000000. This project The site occupies land that is currently part of significant area of public park. It is situated between the Murray River and the existing railway which runs parallel to Seventh Street. The project is focussed on a section of park land that extends from the George Chaffey Bridge to Jaycee Park 1.2km. The project will entail redevelopment of the parkland around three existing precincts; the Nowingi Place Performance Venue, the Ornamental Lakes and the Mildura Wharf which includes the Rowing Club and Powerhouse. The objective is to link the riverfront with the existing Marina development, the Arts and Theatre precinct and the proposed development of the rail corridor. The project focuses on the river park area including construction of a 2km riverfront boardwalk, expanding and extending the existing wharf and boat moorings by 350Lm and upgrading jetties, river edges and amenities, landscaping, irrigation and beautification works and ornamental lakes. Click for more details...

ST KILDA HARBOUR ROYAL MELBOURNE YACHT CLUB SQUADRON MARINA
Private ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Port Phillip Council Area for New development. Replacement of the existing RMYS marina with a 250 berth floating marina in the area between the existing pier arm & the breakwater (currently 198 berths), relocation of 75 swing berths & installation of a floating wave attenuator & spur groyne at the northern end of the harbour & extension of the existing rock breakwater to the east along the pier. Click for more details...

PORTLAND HARBOUR BOAT RAMP AND ASSOCIATED WORKS - PROJECT A
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Glenelg Council Area of Boat Ramp type. Construction of a 4 laned boat ramp and adjacent on-shore works including roadway and ramping area on the southern side of the Lee Breakwater in Portland Harbour at Portland. Construction is scheduled to commence mid december 2013 for completion prior to April 2014. Click for more details...

WEBB DOCK EAST REDEVELOPMENT CONTAINER TERMINAL/OPERATOR
Webb Dock East, Port Melbourne, VIC 3207 Has Webb Dock East Redevelopment Container Terminal/Operator currently at Construction stage. Construction and operation of an International Container Terminal at Webb Dock East. Phase 2 includes additional two post-Panamax ship-to-shore cranes on a second 330 meter berth. Click for more details...

WEBB DOCK WEST REDEVELOPMENT AUTOMOTIVE TERMINAL
Civil Engineering (Docks & piers, wharves, boat ramps) project at Webb Dock West, Port Melbourne, VIC 3207 for New. Construction and operation of an automotive terminal at Webb Dock West. Hardstand and loading and storage facilities. Construction of the automotive terminal will take place in two phases with Phase one involving the construction of a new 185,000m² facility north of the current Webb Dock West car terminal, due to be completed early 2016, and Phase two to cover the incorporation of the current automotive terminal at the south end of Webb Dock West from early 2018. On completion, the terminal will have a total berth length of 920 metres. The facility will also include an 8000m² fully enclosed and weatherproof cargo storage area, a maintenance area and truck parking facilities. Click for more details...

MARINA RESORT MILDURA
Dwellings/Retail Hub/Marina Berths/Residential Subdivision project at Marina Resort, Dockside Dr, Mildura, VIC 3500 In The Council Area Of Mildura of Private. The site is comprised of 4 smaller sites; Site 1, a 38 lot residential site of 12,664 sqm, Site 2, a retail hub site of 5,361 sqm, Site 3, a harbour-side residential site of 2,215 sqm and Site 4 is for 16 large marina berths. Click for more details...

FRANKSTON CITY COUNCIL COASTAL AND MARINE INFRASTRUCTURE PROFESSIONAL SERVICES PANEL
Within the municipality of, Frankston, VIC 3199 Has Frankston City Council Coastal And Marine Infrastructure Professional Services Panel currently at Planning stage. Frankston City Council is seeking tenders from suitably qualified consultants in the field of Coastal and Marine Infrastructure Management Services. Council intends to establish a panel of approved consultants for the provision of these services. Click for more details...

LORIMER STREET PONTOON LANDING AND MARINA REPAIRS
Private ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Melbourne Council Area for New development. Demolition of existing Shed 15 and removal of landing, replacement of new pontoon, relocation of gang way, construction of pedestrian security gate and repair to existing marina. Click for more details...

COWES JETTY
Civil Engineering (Docks & piers, wharves, boat ramps) project at Anderson Rd, Cowes, VIC 3922 for New. Construction of the Anderson Road, Cowes Jetty to the west of the existing boat ramp. Click for more details...

GNOTUK AVENUE BOARDWALK CONSTRUCTION
Currently at the Construction stage In Kingston is a project estimated to be $ 250000. This project Construction of various carpentry works including construction of a boardwalk, amenity nodes, stairs, & ramps, at Gnotuk Avenue Car Park, Aspendale (Melway 92 J7). Click for more details...

CLIFTON SPRINGS JETTY
Jetty New project In The Greater Geelong Council Area. Construction contractors are required to undertake building works associated the construction of a new Clifton Springs Jetty to provide public access to the northern side of the Clifton Springs Harbour breakwater. The Jetty is to be constructed immediately east of the Clifton Springs rock groin. Click for more details...

OLIVERS HILL FORESHORE BOAT RAMP CONSTRUCTION
Olivers Hill Foreshore Boat Ramp Construction is currently at the Planning stage, valued at about $ 925000 it is Replacement of the existing boat ramp & building & works to the existing carpark at Olivers Hill Foreshore (includes Gully Way access steps). Click for more details...

OLIVERS HILL BOAT RAMP & PIER WORKS
Currently at the Construction stage In Frankston is a project estimated to be $ 350000. This project Construction of new boat launching facilities at Olivers Hill, Frankston. Works to include demolition of existing infrastructure as required & installation of two new ramps either side of a central finger pier. Click for more details...

MCMILLAN STRAIT NEW FLOATING PONTOON JETTY
Pontoon Jetty project at McMillian Strait, Paynesville, VIC 3880 in the Civil Engineering (Docks & piers, wharves, boat ramps). Construction of a new floating Pontoon Jetty at McMillan Strait in Paynesville. Works will include removal of the existing pontoon fingers & piles. Click for more details...

LAKE KING JETTY RECONSTRUCTION
Jetty- Reconstruction New project In The East Gippsland Council Area. Reconstruction of Lake King jetty at Metung on the Gippsland Lakes in East Gippsland. Click for more details...

MORDIALLOC CREEK WAVE BAFFLES RECONSTRUCTION
Mordialloc Creek mouth, Mordialloc, VIC 3195 Has Mordialloc Creek Wave Baffles Reconstruction currently at Construction stage. Construction of 200 m long wave baffles & associated FRP boardwalk along Mordialloc Creek, Mordialloc. Works include the demolition of existing timber structure, supply & installation of 172 steel piles with HDPE sleeves, installation of steel beams, structural aluminum frame & FRP decking. Click for more details...

PORT OF MELBOURNE BERTHING FACILITY FOR TUGBOATS
Civil Engineering (Docks & piers, wharves, boat ramps) project at ., Port Melbourne, VIC 3207 of Berthing Facility type of New development. Design & construction of a berthing facility for tugboats. Click for more details...

PORT OF MELBOURNE SHED DEMOLITION & WHARF PILE REPAIRS
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Melbourne Council Area of State ownership. Demolition of a cargo shed & repair of under-wharf timber piles. Click for more details...

TALLANGATTA FORESHORE
A project in the VIC Within Towong. Upgrade of Tallangatta Foreshore boat ramp & trailer parking. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect