List of Docks & piers, wharves, boat ramps Projects in VIC


BULLOCK ISLAND VESSEL REPAIR AREA
Civil Engineering (Docks & piers, wharves, boat ramps) New project at Bullock Island, Gippsland Basin, VIC 3999. This type is Ciivil Works-Docks, Landscape Works - Design with Local Govt ownership. Gippsland Ports invites submissions for the provision of design services for the development of the Bullock Island Vessel Repair Area. The scope of the design works includes: Site and Civil works layouts; Seawall; alongside berthing; Straddle carrier jetties; Pavement, hardstand and service areas; 100 Tonne capacity straddle carrier; Services; Waste treatment; Amenities upgrade; Carpark; Fencing and security. Click for more details...

FOOTSCRAY WHARF RECONSTRUCTION
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Maribyrnong Council Area of Local Govt ownership. Reconstruction of replica wharf in a heritage and floodway overlay. Click for more details...

MARLAY POINT JETTY/PONTOON
Civil Engineering (Docks & piers, wharves, boat ramps) project for New development. Design & Construction of a Jetty/Pontoon at Marlay Point, Lake Wellington, Victoria. Click for more details...

RIVERSIDE DECK JETTY & BOAT RAMP
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at 4 Riverside Ln, Barwon Heads, VIC 3227. Construction of deck jetty and boat ramp. Click for more details...

EAGLE POINT JETTY
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Foreshore, Eagle Point, VIC 3878. Construction of a jetty on the foreshore between the two existing jetties. The jetty will contain 12 private berths as well as two public access berths. The jetty will not extend past the current line formed by the existing jetties. Click for more details...

YARRA RIVER FLOATING LANDING
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Melbourne Council Area of Private ownership. Design, construct and install a floating landing, approximately 4 metres wide along the Yarra River, Melbourne. Associated works include minor earthworks and path construction, construction of access landing, fabrication and installation of gangway and installation of new lighting. Click for more details...

SOUTHBANK PROMENADE FLOATING LANDING
Southbank Promenade, Southbank, VIC 3006 Has Southbank Promenade Floating Landing currently at Construction stage. Design, construct and install floating landing, approximately 4 metres wide along the Yarra River, Melbourne. Associated works include minor earthworks and path construction, construction of access landing, fabrication and installation of gangway and installation of new lighting. Click for more details...

CROWN FLOATING LANDING
A project in the VIC Within Melbourne. Design, construct and install a floating landing, approximately 4 metres wide along the Yarra River, Melbourne. Associated works include minor earthworks and path construction, construction of access landing, fabrication and installation of gangway and installation of new lighting. Click for more details...

METUNG ROAD JETTY
Civil Engineering (Docks & piers, wharves, boat ramps) project at Metung Rd, Metung, VIC 3904 of Jetty type of New development. Construction of a 12 berth jetty & wet pens. Click for more details...

CORNER SLIP ROAD BOAT RAMP
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Corner Slip Rd, Paynesville, VIC 3880. Replace the existing King Street public boat ramp. Click for more details...

SOUTH WHARF TIMBER PILE REPAIRS & CONCRETE MOORING DOLPHINS
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Melbourne Council Area of Local Govt ownership. Works include the repair of existing timber piles and construction of two new mooring dolphins. Click for more details...

HOPKINS RIVER FLOATING JETTY
Floating Jetty Construction project at Jubilee Park recreation reserve, Allansford, VIC 3277 In The Council Area Of Warrnambool of Local Govt. Construct a floating jetty on the Hopkins River. Click for more details...

LAKES ENTRANCE FLOATING JETTY & ACCESS RAMPS
A project in the VIC Within East Gippsland. Supply, Delivery and Installation of a Floating Jetty and Access Ramp at the Western Boat Harbour, Lakes Entrance, East Gippsland. Click for more details...

HOPKINS RIVER FLOATING JETTIES
Floating Jetties project at ., Warrnambool, VIC 3280 in the Civil Engineering (Docks & piers, wharves, boat ramps). Supply and installation of three floating jetties, including fittings and accessories, totalling 166 square metres to be constructed at three different locations along the Hopkins River. Click for more details...

HARBOUR ESPLANADE DEVELOPMENT
Civil Works/Upgrade project at Harbour Esp, Docklands, VIC 3008 in the Civil Engineering (Docks & piers, wharves, boat ramps). Urban design, landscape, architecture, civil (water sensitive urban design), structural and traffic engineering, lighting design, graphic design, electrical services, project management, cost planning/quantity surveying, and community consultation. Click for more details...

YARRAVILLE WHARF TO NEWPORT PARK
Yarraville Wharf To Newport Park is currently at the Construction stage, valued at about $ 4000000 it is Upgrade works to strengthen and stabilise existing port structures including wharves, retaining walls and embankments at Yarraville Wharf to Newport Park. This work is associated with the Channel Deepening Project which is proposed for Port Phillip Bay commencing in 2008 and is part of the necessary preparatory work for the delivery of the project and is subject to receipt of all necessary project approvals. Click for more details...

PORT OF MELBOURNE MAINTENANCE DEPOT PIER & SITE UPGRADE WORKS
., Port Melbourne, VIC 3207 Has Port Of Melbourne Maintenance Depot Pier & Site Upgrade Works currently at Construction stage. Tenders are invited from suitably experienced companies for the upgrading of the Port's maintenance depot. The scope of works includes the supply, installation and construction of pier, wharf and jetty repairs, building refurbishment, pavement and road repairs, rockbeaching and services upgrading. Click for more details...

GELLIBRAND PIER
Port - Upgrade New project In The Hobsons Bay Council Area. Upgrade works to strengthen and stabilise existing port structures including wharves, retaining walls and embankments at Gellibrand Pier. This work is associated with the Channel Deepening Project which is proposed for Port Phillip Bay commencing in 2008 and is part of the necessary preparatory work for the delivery of the project and is subject to receipt of all necessary project approvals. Click for more details...

POWER HOUSE ROWING CLUB
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Stonnington Council Area of Private ownership. Design, manufacture and installation of replacement rowing staging in the Yarra river at Como Park. Click for more details...

STATION PIER BUILDING ALTERATIONS
Station Pier Building Alterations is currently at the Construction stage, valued at about $ 1500000 it is Structural modifications to the deck at Station Pier including housing for two new lifts, relocation of two escalators and a new glazed wall and office. Click for more details...

CONVESSO 8 WATERSIDE PLACE VICTORIA HARBOUR
Civil Engineering (Docks & piers, wharves, boat ramps) New project at No 8 Waterside Pl Victoria Harbour, Docklands, VIC 3008. This type is Residential & Retail Development with Private ownership. Construction of a 32 level residential building with ground floor retail of 1603 square metres and associated works to public spaces and infrastructure including waterfront promenade, streetscape works and wharf. The Bates Smart designed tower is split between a podium level with 5-6 levels of carpark with band beam & slab & precast walls. With 69 apartments above facing south onto Bourke Street and 17 luxury waterfront apartments on the northern side. Retail shops on the Bourke Street frontage. The development will also feature 125 tower apartments and 9 penthouses. Structure of conventionally reinforced floor slab, insitu concrete columns and internal jump form system.The name of the apartments derives from its outer curving precast facade. Sustainability is a large feature of the development with operable windows for cross ventilation and natural light. Exhaust systems will be ducted to outside. Double glazing and acoustically insulated walls to reduce noise. A 200,000 lt rainwater tank for reduction of water consumption and water efficient fittings. Also installation of energy efficient systems including ''smart metering'' and master switch for each apartment to cut down on energy usage when not occupied. Click for more details...

WILLIAMSTOWN FORESHORE
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Hobsons Bay Council Area of Strategic Plan Review type. Strategic plan review for the Williamstown Foreshore (Stony Creek Backwash to Point Gellibrand). The Williamstown Foreshore Strategic Plan Review aims to support local boating activities, tourism and recreation activities, port operations as well as providing important community infrastructure in the precinct, conserving heritage assets and recognising the unique village environment and character of Williamstown. Click for more details...

ESSENDON CANOE CLUB FLOATING JETTY PLATFORM
22 Woods St, Ascot Vale, VIC 3032 Has Essendon Canoe Club Floating Jetty Platform currently at Construction stage. Replacement of existing floating jetty platform on Maribyrnong River and reconstruction realignment of conrete access to pathway. Click for more details...

FRANKSTON YACHT CLUB REDEVELOPMENT
Civil Engineering (Docks & piers, wharves, boat ramps) project at Foreshore St, Kananook Creek, Frankston, VIC 3199 of Yacht Club/Restaurant/Function Centre/Cafe type of New development. Construction of a new Frankston Yacht Club to include the demolition of the existing Yacht Club building and construction of a new 3 storey facility and public realm works. The redevelopment will include new Yacht Club facilities including a boat storage yard and boat shed, club rooms, a ground floor café and public toilets, a first floor restaurant, a second floor safety lookout/navigation room, a timber-decked beach promenade, timber and concrete boat ramp, steel sheet-pile sea wall, external landscaping, road works and car parking. Click for more details...

FOOTSCRAY WHARF REDEVELOPMENT
Civil Engineering (Docks & piers, wharves, boat ramps) project at Footscray Wharf, Footscray, VIC 3011 of Wharf - Redevelopment type of New development. Redevelopment of Footscray Wharf. Works involve demolition and rehabilitation of an existing timber wharf, commercial marina construction, riverbank protection, minor pavement and landscaping. Click for more details...

WEBB DOCK EAST WHARF REHABILITATION WORKS
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Webb Dock East, Port Melbourne, VIC 3207. Concrete wharf repairs at 4 & 5 Webb Dock East. Click for more details...

VICTORIA HARBOUR PRECINCT NEW QUAY MARINA
Marina (2) project at Marina 31, New Quay Promenade, Victoria Harbour Precint, Docklands, VIC 3008 in the Civil Engineering (Docks & piers, wharves, boat ramps). Construction of a new private marina within New Quay West and a new public marina in New Quay East, Victoria Harbour Precinct. Click for more details...

NORTH WHARF SHIP DRY DOCK SUPPORT STRUCTURE
A project in the VIC Within Melbourne. Proposed construction of ship dry dock support structure and associated works. Click for more details...

PELICAN SHORES RETIREMENT VILLAGE
Currently at the Construction stage In Greater Geelong is a project estimated to be $ 165000. This project Construction of a boardwalk. Click for more details...

POINT NEPEAN NATIONAL PARK VIEWING PLATFORM
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Mornington Peninsula Council Area of Private ownership. Construction of a viewing platform at Monash Light Tower, Point Nepean National Park. Click for more details...

MILDURA RIVERFRONT PRECINCT REDEVELOPMENT STAGE 1
Currently at the Construction stage In Mildura is a project estimated to be $ 1000000. This project The site occupies land that is currently part of significant area of public park. It is situated between the Murray River and the existing railway which runs parallel to Seventh Street. The project is focussed on a section of park land that extends from the George Chaffey Bridge to Jaycee Park 1.2km. The project will entail redevelopment of the parkland around three existing precincts; the Nowingi Place Performance Venue, the Ornamental Lakes and the Mildura Wharf which includes the Rowing Club and Powerhouse. The objective is to link the riverfront with the existing Marina development, the Arts and Theatre precinct and the proposed development of the rail corridor. The project focuses on the river park area including construction of a 2km riverfront boardwalk, expanding and extending the existing wharf and boat moorings by 350Lm and upgrading jetties, river edges and amenities, landscaping, irrigation and beautification works and ornamental lakes. Click for more details...

WEBB DOCK INFRASTRUCTURE REDEVELOPMENT
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Melbourne Council Area of State ownership. Webb Dock precinct is to include construction of new roads connecting the terminal directly to the M1 West Gate Freeway via new on and off ramps. Also installation of services and utility access for the 175 ha landside area. Infrastructure upgrades are planned for Swanson Dock including reconfiguring internal road linkages. The works also include substantial upgrades to the existing roundabouts on Todd Road and significantly the development of high quality buffers around Webb Dock which will protect adjoining areas from noise and enhance visual amenity. Webb Dock precinct works include; additional screening & landscaping, public recreation area upgrades, improved bicycle & shared pathways, provision for on-site empty container stacking, construction of noise walls and creation of new parkland. Other works include; Perce White Reserve upgrades. Click for more details...

WARNEET BOAT LAUNCHING FACILITY IMPROVEMENT PROJECT PHASE 1
Civil Engineering (Docks & piers, wharves, boat ramps) project at Rutherford Pd, Warneet, VIC 3980 of Boat Ramp - Altns & Addns type of Addition development. Alterations and additions to existing boat lauching facilities. This will be implemented in two phases. Phase 1 Boat ramps, pontoon and lighting upgrades, Phase 2 raise and seal car park. Click for more details...

PORTLAND HARBOUR BOAT RAMP AND ASSOCIATED WORKS - PROJECT A
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Glenelg Council Area of Boat Ramp type. Construction of a 4 laned boat ramp and adjacent on-shore works including roadway and ramping area on the southern side of the Lee Breakwater in Portland Harbour at Portland. Construction is scheduled to commence mid december 2013 for completion prior to April 2014. Click for more details...

WEBB DOCK EAST REDEVELOPMENT CONTAINER TERMINAL/OPERATOR
Webb Dock East, Port Melbourne, VIC 3207 Has Webb Dock East Redevelopment Container Terminal/Operator currently at Construction stage. Construction and operation of an International Container Terminal at Webb Dock East. Phase 2 includes additional two post-Panamax ship-to-shore cranes on a second 330 meter berth. Click for more details...

MARINA RESORT MILDURA
Dwellings/Retail Hub/Marina Berths/Residential Subdivision project at Marina Resort, Dockside Dr, Mildura, VIC 3500 In The Council Area Of Mildura of Private. The site is comprised of 4 smaller sites; Site 1, a 38 lot residential site of 12,664 sqm, Site 2, a retail hub site of 5,361 sqm, Site 3, a harbour-side residential site of 2,215 sqm and Site 4 is for 16 large marina berths. Click for more details...

PORTARLINGTON PIER APPROACH RECONSTRUCTION
A project in the VIC Within Greater Geelong. Construct 175m and 4.5m wide concrete pier on steel piles and associated works. The new pier approach will be constructed on the right hand side of the existing pier approach. Works will include the installation of 60 numbers of 508mm and 610mm diameter steel piles, concrete crossheads and precast concrete deck, handrail, lightings and minor modification to the existing entrance to the pier. Click for more details...

COWES JETTY
Civil Engineering (Docks & piers, wharves, boat ramps) project at Anderson Rd, Cowes, VIC 3922 for New. Construction of the Anderson Road, Cowes Jetty to the west of the existing boat ramp. Click for more details...

PORTLAND JETTY DEMOLITION AND REMOVAL
A project in the VIC Within Glenelg. Demolition & Removal of Portland Jetty. Click for more details...

PORTARLINGTON SAFE HARBOUR CONSTRUCTION
Portarlington Safe Harbour Construction is currently at the Construction stage, valued at about $ 6000000 it is Construction of Portarlington Safe Harbour (major work components). The proposed works include: Portion 1: Finger Jetty: Commercial berthing areas with steel piles & precast concrete crossheads & decks; including the installation of 54m precast concrete wave screens for the pier approach (4 pontoon rider piles are part of this portion). Portion 2: Pier Head: Loading/vehicle turning areas with steel piles, precast crossheads & decks, including the installation of 65m precast concrete wave screens on the western side of the pier. Lower landing with steel piles, steel frames & FRP gratings, including the installation of walers & fenders; Portion 3: Rock Breakwaters: 270m long eastern rock breakwater & 370m long northern rock breakwater. Portions are separable. Click for more details...

DEPARTMENT OF DEFENCE HMAS CERBERUS WHARF WORKS
Civil Engineering (Docks & piers, wharves, boat ramps) New project at HMAS Cerberus, Crib Point, VIC 3919. This type is Wharf Works with Federal ownership. Wharf repair works including pile remediation & replacement & repairs of Hanns Inlet channel markers at HMAS Cerberus. The project involves the following works. Extension of cathodic protection for the wharf. Repair/replacement of Hanns Inlet channel markers. Repair/replacement of steel members of the wharf. Repair of wharf support columns. Click for more details...

BRIDGEWATER PUBLIC BOAT RAMP REPLACEMENT & BOARDWALK
Civil Engineering (Docks & piers, wharves, boat ramps) New project at ., Bridgewater On Loddon, VIC 3516. This type is Boat Ramp Replacement & Boardwalk with Local Govt ownership. Bridgewater public boat ramp replacement, boardwalk installation & other associated works. Click for more details...

OLIVERS HILL BOAT RAMP & PIER WORKS
Currently at the Construction stage In Frankston is a project estimated to be $ 350000. This project Construction of new boat launching facilities at Olivers Hill, Frankston. Works to include demolition of existing infrastructure as required & installation of two new ramps either side of a central finger pier. Click for more details...

MCMILLAN STRAIT NEW FLOATING PONTOON JETTY
Pontoon Jetty project at McMillian Strait, Paynesville, VIC 3880 in the Civil Engineering (Docks & piers, wharves, boat ramps). Construction of a new floating Pontoon Jetty at McMillan Strait in Paynesville. Works will include removal of the existing pontoon fingers & piles. Click for more details...

BENDIGO GROUNDWATER PROJECT - BRINE STORAGE LAGOON
Storage Lagoon - Construction project at Howard St, Epsom, VIC 3551 in the Civil Engineering (Docks & piers, wharves, boat ramps). Design & construction of a 270 megalitre brine storage lagoon to be constructed at the Bendigo Water Reclamation Plan. The storage will be plastic lined & constructed from compacted fill. Works include an underdrainage system & minor inlet & outlet pipework. Click for more details...

MORDIALLOC CREEK WAVE BAFFLES RECONSTRUCTION
Mordialloc Creek mouth, Mordialloc, VIC 3195 Has Mordialloc Creek Wave Baffles Reconstruction currently at Construction stage. Construction of 200 m long wave baffles & associated FRP boardwalk along Mordialloc Creek, Mordialloc. Works include the demolition of existing timber structure, supply & installation of 172 steel piles with HDPE sleeves, installation of steel beams, structural aluminum frame & FRP decking. Click for more details...

PORT OF MELBOURNE BERTHING FACILITY FOR TUGBOATS
Civil Engineering (Docks & piers, wharves, boat ramps) project at ., Port Melbourne, VIC 3207 of Berthing Facility type of New development. Design & construction of a berthing facility for tugboats. Click for more details...

PORT OF MELBOURNE GANGWAYS
Civil Engineering (Docks & piers, wharves, boat ramps) project for Renovations, Refurbishments etc. development. Refurbish two hydraulically operated, elevated ship gangways. Click for more details...

PORT OF MELBOURNE SHED DEMOLITION & WHARF PILE REPAIRS
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Melbourne Council Area of State ownership. Demolition of a cargo shed & repair of under-wharf timber piles. Click for more details...

LUDERICK POINT BOATING FACILITY
Boating Facility - Upgrade project at Luderick Point Boating Facility, Bemm River, VIC 3889 In The Council Area Of East Gippsland of Local Govt. Construction of an upgrade to the existing Luderick Point boating facility. Works to include demolition & reconstruction of existing hardstand & walk way to allow for realignment of boat ramp. Construction of concrete boat ramp. Construction of new ramp pontoon jetty. Relocation of marinedock system floating pontoon. Construction of a hansa accessibility hoist. Click for more details...